21 22 23 24 21
7 Land Acquisition
Intake well
Head Works
Sumps
GLBR
OHBR
8 8 17 3 1
Forest
As Per District Notes
22 23 24
192 18 80
523 67 51
62 31 80
0 23 0
0 0 0
7 2 0
Details of R&B Road crossings of Kaddam Segment in Adilabad District
Segment type
Name of the
S No Segment no. Primary Trunk / Name of Mandal Name of R&B road R&B Road No.
segment
Secondary Trunk
1 3 4 5 6 7 8
Majer District
364 Komuram Bheem 22 Primary Asifabad Asifabad to Utnoor
Road
Majer District
365 Komuram Bheem 22 Primary Asifabad Asifabad to Utnoor
Road
Majer District
366 Komuram Bheem 22 Primary Asifabad Asifabad to Utnoor
Road
Majer District
367 Komuram Bheem 22 Primary Asifabad Asifabad to Utnoor
Road
9 10 11 12 13
7.5mts (BT:
Gorrigutta 'X" (12/0 to 12/350)
3.75mts)
7.5mts (BT:
Rallaguda (14/0 to 14/300)
3.75mts)
7.5mts (BT:
Borlakunta 'X' (15/0 to 15/250)
3.75mts)
7.5mts (BT:
Kothimir (16/0 to 16/850)
3.75mts)
7.5mts (BT:
Jendaguda (17/0 to 17/500)
3.75mts)
7.5mts (BT:
Beebra (19/0 to 19/800)
3.75mts)
7.5mts (BT:
Pesrakuntta (22/0 to 22/300)
3.75mts)
7.5mts (BT:
Inam ( 24/0 to 24/700)
3.75mts)
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
7.5mts (BT:
Chinna Inam(26/0 to 26/800)
3.75mts)
7.5mts (BT:
Parvathipet (27/0 to 27/300)
3.75mts)
7.5mts (BT:
Dahegaon (29/0 to 29/300)
3.75mts)
17 KM 3.75mts
15.80 KM 3.75mts
13.4 KM 3.75mts
5.18 KM 3.75mts
4.1 KM 3.75mts
17.3 KM 3.75mts
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
pagadepally 7 350
repallewada 7 350
tandur IB 7 350
tandur 7 350
Gopalnagar 7 350
Gampalapally 7 350
Tangalapally 7 350
venunagar 7 350
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
boyapally 7 350
barlagudam x 7 250
katherla x 7 250
pochampally 7 250
madaram-3 7 250
Kumbari 7 500
kowtala 7 500
yapalaguda 7 500
Gurudupet 7 500
Dhannurhetty 5 500
chinthalapati 5 500
balajiankoda 5 500
chinthalamannepally 5 500
indranagar 5 500
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
babasagar 5 500
thatinagar 5 350
balepally 5 350
hetty 5 200
Manikguda
12 1200 1800
(KM : 62 to 62/2)
Kancheraguda
12 1200 1800
(KM : 65/4 to 65/6)
Jandaguda
12 1200 18
(KM : 65/2 to 65/4)
Jankapur Jail
12 1200 1800
(KM : 317/8 to 318)
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
Adilabad X Road
12 1200 1800
(KM : 319/2 to 319/4)
Saleguda Road
12 1200 1800
(KM : 320/8 to 321)
Dhasnapur Road
12 1200 1800
(KM : 316/6 to 316/8)
Asifabad
12 1200 1800
(KM : 316/2 to 316/4)
Gundi Road
12 1100 1600
(KM : 316 to 316/2)
Rajura Road 12
1100 1600
(KM : 314/8 to 315)
Godavelly Road 12
1100 1600
(KM : 314 to 314/2)
Rahapally Road 12
1100 1600
(KM : 310 /8o 311)
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
BurugudaRoad 12
1100 1600
(KM : 310/4 to 310/6)
Mothuguda Road 12
1100 1600
(KM : 309/8 to 310)
12
KotharahapallyRoad
1100 1600
(KM : 306/6 to 306/8)
12
Parasanambala Road
1100 1600
(KM : 304/8 to 305)
3.50
Salugupalle X rd 250
3.50
Salugupalle X rd 110
3.50
Motlaguda 75
3.50
Bombaiguda 75
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
3.50
Errakunta 75
3.50
Elkapalli-P 75
3.50
Yellur 75
3.50
Loadpalle 75
3.50
Sulugupally 75
3.50
Sadmeka Bapugudem 75
3.50
Lambadiguda 90
3.50
Dubbaguda 63
3.50
Andugulaguda 75
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
3.50
Kuntalamanepalle 75
3.50
Thummalaguda 75
3.50
Jajulpet 75
3.50
Jaihindpur X 63
3.50
Rebbena 75
3.50
Kothaguda 75
3.50
Marthidi 75
3.50
Rangapur 75
3.50
Elkapalli-B 75
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
3.50
Kukuda x 75
3.50
ootsarangapally 75
3.50
Arkaguda 63
3.50
Bareguda 75
3.50
Munjampalle 75
3.50
Rudrapur 75
3.50
Kothaguda 250
3.50
Kethini 140
3.50 250
Guvvalagudem
3.50 250
Nagampet
3.50 250
Raspally
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
3.50 250
Pothepally
- -
- - -
3/600 @ Gollagudem
5.75 300mm 400mm --
Road
23/0 @ (Neelwai ST
5.75 300mm 400mm --
Colony)
7.5mts (BT:
( 15.2 / 16.5 ) to ( 15.2 / 0 )
3.75mts)
Length of Water supply Encasing pipe
Crossed location (Chainage) Status
crossing pipe dia dia proposed
Segment type
Seg PR Road
SL No Name of the segment Primary Trunk / Name of Mandal Name of PR road
no. No.
Secondary Trunk
1 3 4 5 6 7 8
Water Encasing
Length of
Crossed location (Chainage) supply pipe dia Status
crossing
pipe dia proposed
10 11 12 13
Segment type
Name of the Segmrent
S No District Primary Trunk / Name of Mandal Name of the Canal Crossed location (Chainage)
segment no.
Secondary Trunk
1 2 3 4 5 6 7 8
37 ADILABAD KADDAM 24 Primary Jannaram D13 FC Chain 51 S24 road crossing 139/950
38 ADILABAD KADDAM 24 Primary Jannaram D13 FC Chain 92 S24 road crossing 141/2
Segment type
Name of the Segmrent
S No District Primary Trunk / Name of Mandal Name of the Canal Crossed location (Chainage)
segment no.
Secondary Trunk
45 ADILABAD KADDAM 24 Secondary Jannaram D18 B/Ls FC @ Ch 147 S24 road crossing 153/1
65 ADILABAD KADDAM 24 Primary Khanapur MR6 D27 Minor Sathanpally Pembi X road
9 10 11 12 13
MS Pipe with CC
0.92 25.00 500.00
Encasement
1 2 3 4 5 6 7 8
9 10 11 12 13 14 15
Raod crossing Mamda Mondigutta 263/6-8 left side 40 M - 60 M 75mm HDPE 300 mm
Superintending Enigneer
Road Crossing at
1 SRSP-Adilabad 21 NIRMAL - NANDED 222 Bhainsa Mudhole 40 m - 60 M
Shirdi JN
Bhainsa Electrical
5 SRSP-Adilabad 21 NIRMAL - NANDED 222 40 m - 60 M
Sub Station
Road Crossing at
10 SRSP-Adilabad NIRMAL - NANDED 222 40 m - 60 M
Kalwa road 6/0
Road Crossing at
11 SRSP-Adilabad NIRMAL - NANDED 222 Madegaon X road 40 m - 60 M
12/0
Road Crossing at
12 SRSP-Adilabad NIRMAL - NANDED 222 40 m - 60 M
Rampur 16/0
Road Crossing at
13 SRSP-Adilabad NIRMAL - NANDED 222 40 m - 60 M
Lolam JN
Superintending Enigneer
500 700
110 200
110 200
160 250
350 500
90 150 Joint
Inspectio
n
125 200 complete
d
Demand
300 500
Not
received
Not
received
90 150
75 mm 200 mm
500 mm 700 mm
150 mm 300 mm
1400 mm 1800 mm
Enigneer
Adilabad
TDWSP- Pumps Design Information SRSP- Nirmal Sgement, Name of
S. Segment Location of Pumping Delivery Pumping Length of Type of P/M Pump Suction Suction Delivery Point (i.e. Delivery
No Station Design Main Size Pumping (i.e Material, Floor lowest level Maximum OHBR/GLBR/ level i.e.
Discharge (mm) Main pressure rating, level in i.e lowest level i.e Sump/WTP/Aerator/OHSR MWL of
(LPM) i.e by (m) class/thickness '+'m' water level in maximum etc.) in '+m' Delivery
2033 (LPM) etc.) sump/intake water level in Point in
well in '+m sump/intake '+m'
well in '+m'
2 3 4 5 6 7 8 9 10 11 12
1
420.00
1 21 SRSP intake well 98756 1400 21950 MS16, 14, 12mm 329.85 311 332.537 WTP
Jandaguda SUMP 4614 300 3000 DI K9 302.23 Chinchughat OHBR 450.00
2 21 306.33 299.83
Daheguda SUMP 1242 150 4200 DI K9 356.40 Molalgutta OHBR 575.00
3 21 360.50 354.00
Darloddi SUMP 205 100 800 DI K9 359.05 Punaguda OHBR 565.00
4 21 363.15 356.65
Addagutta SUMP 39 63 391 HDPE 10Kg/cm2 279.25 Kolamguda OHSR 323.15
5 21 283.35 276.85
Addagutta SUMP 2990 250 2200 DI K9 279.15 Mangurla (Bela) OHBR 420.00
6 21 283.25 276.75
Laxmipur JN SUMP 478 110 5024 HDPE 8Kg/cm2 235.97 Laxmipur OHSR 283.38
7 21 240.07 233.57
Khadki JN SUMP 63 63 1292 HDPE 8Kg/cm2 272.95 Khadki OHSR 321.71
8 21 277.05 270.55
Ganeshpur SUMP 33 63 207 HDPE 6Kg/cm2 305.19 Ganeshpur OHSR 318.00
9 21 309.29 302.79
Raipur Kolam SUMP 33 63 100 HDPE 6Kg/cm2 314.40 Raipur Kolam OHSR 331.15
10 21 318.50 312.00
Raipur Thanda SUMP 49 63 100 HDPE 6Kg/cm2 438.40 Raipur Thanda OHSR 462.25
11 21 442.50 436.00
Ratnapur SUMP 71 63 2899 HDPE 12.5Kg/cm2 320.38 Ratnapur OHSR 416.85
12 21 324.48 317.98
Dahegaon SUMP 1666 200 2566 DI K9 327.82 Palsi-B OHBR 470.00
13 21 331.92 325.42
G-Hatnr Damanguda SUMP 582 100 3500 DI K9 480.92 B-Hatnur Ratanguda OHBR 580.00
14 21 485.02 478.52
Buthai Thanda SUMP 570 100 5500 DI K9 464.25 Umarda-G GLBR 605.00
15 21 468.35 461.85
Ispur thanda SUMP 41 63 4902 HDPE 10Kg/cm2 512.36 New Ispur OHSR 544.08
16 21 516.46 509.96
Derba sump 62 63 2235 HDPE 10Kg/cm2 447.00 Derba thanda OHSR 480.67
17 21 451.10 444.60
Bondidi sump 166 63 40 HDPE 10Kg/cm2 468.04 Bondhidi OHSR 468.74
18 21 472.14 465.64
Renganwadi SUMP 51 63 50 HDPE 6Kg/cm2 500.27 Renganwadi OHSR 515.87
19 21 504.37 497.87
Peechara SUMP 73 63 250 HDPE 6Kg/cm2 459.40 Peechara OHSR 479.72
20 21 463.50 457.00
Dhannur-B SUMP 151 63 4979 HDPE 12.5Kg/cm2 437.49 Nagapur OHSR 511.10
21 21 441.59 435.09
Raghunathpur SUMP 48 63 100 HDPE 6Kg/cm2 479.40 Raghunathpur OHSR 498.76
22 21 483.50 477.00
Sevalal thanda SUMP 97 63 1370 HDPE 10Kg/cm2 386.42 Hanuman Thanda OHSR 432.59
28 21 390.52 384.02
371.03 Ranapur, Gangapur & TD
Ranapur SUMP 186 75 1944 HDPE 8Kg/cm2 399.05
29 21 375.13 368.63 Thanda OHSRs
WTP CLEAR WATER SUMP 1200 42858 MS 14mm 418.50 414.40 MAIN GLBR @ Arepally Gutta 535.00
33 21 81676 412.00
Babuldole SUMP 500 800 DI K9 480.50 476.40 Babuldole GLBR 515.00
34 21 12779 474.00
collection well 21495 600 1500 DI K9 366.50 359.50 362.40 RSF 393.71
35 21
Sump at Head works 11471 500 500 DI K9 383.50 376.50 379.40 OHBR 1( LKS, Bhainsa) 417.50
36 21
Sump at Head works 11750 500 500 DI K9 383.50 376.50 379.40 OHBR 2 ( Mudhole) 418.21
37 21
Sump at Head works 9112 450 500 DI K9 383.50 376.50 379.40 OHBR 3 (Kubeer side) 420.20
38 21
Sump Lokeshwaram 1922 200 1400 6 363.46 356.46 359.36 Lokeshwaram OHBR 382.00
39 21
Sump/ karegam 1090 200 3600 DI K9 372.00 365.00 367.90 OHBR / karegam 1 396.50
40 21
Sump/ karegam 1341 200 3600 DI K9 369.50 362.50 365.40 OHBR / karegam 2 398.50
41 21
Sump/ Beltaroda 771 150 1400 DI K9 372.00 365.00 367.90 Beltaroda OHBR (tanur Mandal) 423.00
42 21
Sump/Bolsa 2343 250 5500 DI K9 425.10 418.10 421.00 Boregam OHBR 1 439.10
43 21
Sump/Bolsa 952 150 5500 DI K9 395.26 388.26 391.16 Boregam OHBR 2 446.00
44 21
Sump at kubeer 2778 250 1200 DI K9 394.76 387.76 390.66 Kubeer OHBR 422.25
45 21
Sump at kubeer 507 100 5500 DI K9 394.76 387.76 390.66 Doderna T1 OHBR 477.00
46 21
Sump at kubeer 356 100 6500 DI K9 394.76 387.76 390.66 sirpally OHBR 457.00
47 21
Sump at Rajura 2778 250 8000 DI K9 395.50 388.50 391.40 Pardi-B OHBR Kuntala 426.50
48 21
Sump at Rajura 627 250 8000 DI K9 395.50 388.50 391.40 Pardi-B OHBR Pardi Line 426.50
49 21
Sump at Kuntala 1697 200 4700 DI K9 369.50 362.50 365.40 OHBR Kuntala 399.50
50 21
t, Name of the District: Adilabad
Maximum Minimum Friction Max. Min. Duty No of No of No of Apx. HP Type of Type of Size of Pump Is the Total Other Total load
Static Static Head Loses in Duty point Pumping working standby of each Pump Water to be House pumping Pumping load such load of
Head (m) (m) Pumping point Head hours pumps pumps Pump VT/HSC/ pumped (LXBXH in station Load of as Pumping
Main for Head (m) Submersibl (Raw/Clear) case common Pumping Lighting, Station
Prospectiv (m) e rectangular for other Station WTPs (KW)
e and DaiXH in group of (KW) etc.
Discharge case of Pumps (KW)
i.e for circular) (Yes/NO)
2033
demand
(m)
13 = 16 = 17 =
14 = Col(12) 26 27 28
Col(12) - 15 Col(13) + Col(14) + 18 19 20 21 22 23 24 25
- Col(10)
Col(9) Col(15) Col(15)
109.00 87.46 11.86 120.86 99.32 22 4 2 1000 HSC raw 48mX10m No 2982.00 15.00 2997.00
150.17 147.77 10.46 160.63 158.23 8 2 1 130 HSC clear 10mX5m No 194.00 10.00 204.00
221.00 218.60 38.18 259.18 256.78 8 2 1 60 HSC clear 10mX5m No 89.00 5.00 94.00
208.35 205.95 1.96 210.31 207.91 8 1 1 20 HSC clear 10mX5m No 15.00 1.00 16.00
46.30 43.90 0.44 46.74 44.34 8 1 1 3 HSC clear 10mX5m 2.00 12.00
Yes 10.00
143.25 140.85 8.41 151.66 149.26 8 2 1 80 HSC clear 10mX5m 119.00 119.00
49.81 47.41 36.06 85.87 83.47 8 1 1 20 HSC clear 10mX5m No 15.00 1.00 16.00
51.16 48.76 3.46 54.62 52.22 8 1 1 4 HSC clear 10mX5m No 3.00 0.50 3.50
15.21 12.81 0.17 15.38 12.98 8 1 1 3 HSC clear 10mX5m No 2.00 0.50 2.50
19.15 16.75 0.08 19.23 16.83 8 1 1 3 HSC clear 10mX5m No 2.00 0.50 2.50
26.25 23.85 0.17 26.42 24.02 8 1 1 3 HSC clear 10mX5m No 2.00 0.50 2.50
98.87 96.47 9.63 108.50 106.10 8 1 1 5 HSC clear 10mX5m No 4.00 0.50 4.50
144.58 142.18 9.95 154.53 152.13 8 2 1 50 HSC clear 10mX5m No 75.00 5.00 80.00
101.48 99.08 56.74 158.22 155.82 8 1 1 40 HSC clear 6mX4m No 30.00 3.00 33.00
143.15 140.75 85.86 229.01 226.61 8 1 1 50 HSC clear 6mX4m No 37.00 3.00 40.00
34.11 31.71 6.03 40.14 37.74 8 1 1 3 HSC clear 6mX4m No 2.00 0.50 2.50
36.07 33.67 5.81 41.88 39.48 8 1 1 4 HSC clear 6mX4m No 3.00 0.50 3.50
3.10 0.70 0.62 3.72 1.32 8 1 1 3 HSC clear 6mX4m No 2.00 0.50 2.50
18.00 15.60 0.09 18.09 15.69 8 1 1 3 HSC clear 6mX4m No 2.00 0.50 2.50
22.72 20.32 0.87 23.59 21.19 8 1 1 3 HSC clear 6mX4m No 2.00 0.50 2.50
76.02 73.62 64.80 140.82 138.42 8 1 1 15 HSC clear 6mX4m No 11.00 1.00 12.00
21.76 19.36 0.16 21.92 19.52 8 1 1 3 HSC clear 6mX4m No 2.00 0.50 2.50
173.62 171.22 43.02 216.64 214.24 8 2 1 160 HSC clear 12mX9m No 239.00 10.00 249.00
80.14 77.74 0.83 80.97 78.57 22 2 1 50 HSC clear 10mX5m No 75.00 5.00 80.00
23.24 20.84 2.03 25.27 22.87 8 1 1 7 HSC clear 6mX4m 5.00 5.50
Yes 0.50
24.79 22.39 27.47 52.26 49.86 8 1 1 6 HSC clear 6mX4m 4.00 4.00
52.17 49.77 18.82 70.99 68.59 8 1 1 6 HSC clear 6mX4m No 4.00 0.50 4.50
48.57 46.17 8.00 56.57 54.17 8 1 1 5 HSC clear 6mX4m No 4.00 0.50 4.50
30.42 28.02 15.95 46.37 43.97 8 1 1 7 HSC clear 6mX4m No 5.00 0.50 5.50
40.61 38.21 4.23 44.84 42.44 8 1 1 4 HSC clear 6mX4m 3.00 3.50
Yes 0.50
48.54 46.14 8.72 57.26 54.86 8 1 1 4 HSC clear 6mX4m 3.00 3.00
38.00 35.60 1.37 39.37 36.97 22 2 1 80 HSC clear 36mX10m 119.00 199.00
Yes 80.00
123.00 120.60 34.46 157.46 155.06 22 4 2 1200 HSC clear 36mX10m 3579.00 3579.00
41.00 38.60 1.51 42.51 40.11 22 2 1 130 HSC clear 12mX9m No 194.00 10.00 204.00
VT PUMP
34.21 31.31 3.02 37.23 34.33 22 2 1 560 raw 14m No 835.00 10.00 845.00
SET
41.00 38.10 0.78 41.78 38.88 22 2 1 120 HSC clear 17mX7m 179.00 194.00
41.71 38.81 0.81 42.52 39.62 22 2 1 100 HSC clear 17mX7m Yes 149.00 15.00 149.00
43.70 40.80 0.85 44.55 41.65 22 2 1 100 HSC clear 17mX7m 149.00 149.00
25.54 22.64 7.03 32.57 29.67 22 1 1 50 HSC clear 6mX4m No 37.00 3.00 40.00
31.50 28.60 6.48 37.98 35.08 22 1 1 18 HSC clear 6mX4m 13.00 13.50
Yes 0.50
36.00 33.10 9.42 45.42 42.52 22 1 1 25 HSC clear 6mX4m 19.00 19.00
58.00 55.10 5.37 63.37 60.47 22 1 1 19 HSC clear 6mX4m No 14.00 1.00 15.00
21.00 18.10 13.52 34.52 31.62 22 2 1 150 HSC clear 6mX4m 224.00 234.00
Yes 10.00
57.74 54.84 30.87 88.61 85.71 22 1 1 32 HSC clear 6mX4m 24.00 24.00
34.49 31.59 4.01 38.50 35.60 22 1 1 30 HSC clear 9mX6m 22.00 30.00
89.24 86.34 69.48 158.72 155.82 12 1 1 30 HSC clear 9mX6m Yes 22.00 8.00 22.00
69.24 66.34 43.37 112.61 109.71 12 1 1 15 HSC clear 9mX6m 11.00 11.00
38.00 35.10 26.75 64.75 61.85 22 2 1 70 HSC clear 6mX4m 104.00 104.50
Yes 0.50
38.00 35.10 1.81 39.81 36.91 12 1 1 11 HSC clear 6mX4m 8.00 8.00
37.00 34.10 18.85 55.85 52.95 12 1 1 38 HSC clear 6mX4m No 28.00 3.00 31.00
S.No Segment Location of Pumps and intended to Delivery Design Pumping Length of Type of P/M Pump Floor Suction lowest Suction Maximum Delivery Point (i.e.
carry Clear/ Raw Water Discharge Main Size Pumping Main (i.e Material, level level i.e lowest level i.e maximum OHBR/GLBR/
(LPM) (mm) (m) pressure water level in water level in Sump/WTP/Aerator/St
rating, sump/intake sump/intake well in illing Chamber/OHSR
class/thicknes well '+m' etc.)
s etc.)
1 2 3 4 5 6 7 8 9 10 11
Asifabad Intakewell
1 Komaram Bheem 46049 1200 500 MS,10 mm 243 221 238 256.25
340
2 34323 1200 2074 MS,10 mm 248.79 243.79 247.14
Sump at Head Works
310
3 11726 600 1083 DI , K9 248.79 243.79 247.14
330
4 2848 300 1062 DI , K9 277.349 272.349 275.699
Sump at Madaram Gutta
360
5 97 100 1200 DI , K9 277.349 272.349 275.699
Keslaguda Sump
Keslaguda Sump
9 9022 500 5020 DI , K9,9.0 288.91 283.91 287.26 485.99
Sump at Sirpur-U
13 4867 400 1000 DI , K9,8.1 559.413 554.413 557.763 595
Tadihatnoor Sump
14 2593 250 2297 DI , K9,6.8. 480.11 475.11 478.46 534.865
15 Komaram Bheem Sump at Doddigudem Jn 27 63 1720.446 hdpe,63,10 kg/c 225.917 224.417 225.917 285.036
16 Sump at OttiGhat OHSR 4 100 1823 DI,100,K9,6 284.964 283.464 284.964 456.469
18 Sump at Chirrakunta OHSR 825 150 300 DI,150,K9,6 228.738 227.238 228.738 226.972
19 Sump at Kodduguda Jn 1316 150 1037 DI,150,K9,6 252.684 251.184 252.684 315
20 sump at Kammargaon Jn 2 224 100 1834 DI,100,K9,6 122.314 120.814 122.314 225
21 Sump at Pavugua OHSR 34 63 260 hdpe,63,10 kg/c 240.667 239.167 240.667 259.015
23 Sump at Bheemguda OHSR 62 63 443 hdpe,63,10 kg/c 234.445 230.945 232.445 235.525
24 Sump at Goleti JN 2435 250 1061 DI,250,K9,6.8 245.98 244.48 245.98 320
25 Sump at Cheelapalle OHSR 228 150 2879 DI,150,K9,6 208.33 206.83 208.33 320
26 Sump at Enoli Jn 272 100 826 DI,100,K9,6 269.21 267.71 269.21 283.653
27 Sump at Peddapullara Jn 967 100 576 DI,100,K9,6 254.09 252.59 254.09 320
28 Sump at Navedhari OHSR 1551 150 2106 DI,150,K9,6 249.54 248.04 249.54 340
29 Sump at Ganeshpur OHSR Jn 994 150 780 DI,150,K9,6 240.9 239.4 240.9 330
31 Sump at Doddiguda village jn 81 100 2932 DI,100,K9,6 277.13 275.63 277.13 481.363
32 Sump at Gottigondguda OHSR 55 63 235 hdpe,63,10 kg/ 453.388 451.888 453.388 479.943
34 Sump at ANDUTANDA JN 232 100 2170 DI,100,K9,6 455.744 454.244 455.744 493.321
Sump at DUBBAGUDA
35 DHANORA B JN 159 100 1538 DI,100,K9,6 435.662 433.162 434.662 496.6
36 Sump at INKER GUDA JN 667 150 1328.646 DI,150,K9,6 442.249 437.749 439.249 490.708
37 Sump at SAMAKA JN 214 100 2987 DI,100,K9,6 480.375 475.875 477.375 568.264
39 Sump at kundi gg j/n 50 63 528 hdpe,63,10 kg/ 526.845 525.345 526.845 558.924
40 Sump at Kowtala JN OHSR 110 63 971 hdpe,63,10 kg/ 459.514 458.014 459.514 502.69
41 Sump at Somjiguda ohsr 53 63 250 DI,200,K9,6 498.477 496.977 498.477 504.47
Sump at Sungapur lambadithanda
42 j/n 774 150 600 DI,150,K9,6 516.334 514.834 516.334 560
43 Sump at Jhari ohse JN 702 150 2250 DI,150,K9,6 421 419.5 421 555
44 Sump at Jhari ohse JN 5970 350 2250 DI,350,K9,7.7 440.812 439.312 440.812 530
45 Sump at kattaguda x Rd 675 150 2000 DI,150,K9,6 494 492.5 494 545
46 Sump at sedwai lambaditanda j/n 572 150 300 DI,150,K9,6 494 492.5 494 535
47 Sump at madhapur sc j/n X-Mid 1135 150 100 DI,150,K9,6 530.465 528.965 530.465 570
Sump at TEKIDIGUDA OHSR
48 (INDRAVALLY MANDAL) OHSR 60 63 100 hdpe,63,10 kg/ 545.827 544.327 545.827 545.827
49 Sump at Patnapur OHSR 318 100 43 DI,100,K9,6 517.563 516.063 517.563 517.563
50 Sump at Somjiguda Exist ohsr 53 63 287 hdpe,63,10 kg/ 504.47 502.97 504.47 504.47
51 Sump at Alliguda 3 OHSR 31 63 1401 hdpe,63,10 kg/ 579.558 578.058 579.558 589.105
52 Sump at Bijuriguda Gutta 859 150 1100 DI,150,K9,6 569 566 567.5 635
54 Sump at Patha guda JN 21 100 2682 DI,100,k9,6 499.052 497.552 499.052 578.685
55 Sump at Loddiguda JN 520 150 1643 DI,150,k9,6 550 548.5 550 594
Sump at Maguram Modi
56 Kannepally JN 23 100 1860 DI,100,k9,6 272 270.5 272 400
Lingiguda Sump (for OHBR at
57 Lingiguda Gutta) 219 100 2642 DI,100,k9,6 313.543 312.043 313.543 390
Sump at Bhugga Jn (GLBR on
58 Bugga Gutta)
Sump at Nayakapuguda 1323 200 4469 DI,200,k9,6 331.5 330 331.5 450
(rompally ) JN-For OHBR at
59 Nayakapuguda Gutta 206 100 2000 DI,100,k9,6 359.85 358.35 359.85 580
60 Sump at Sarpanchguda JN 410 150 5776 DI,150,k9,6 383.5 382 383.5 560
61 Sump at Wadoni Ohsr jn 34 100 2407 Di,100,K9,6 417.78 415.28 416.78 501.409
Sump at Rajulaguda (Chanduri)
62 JN 12 63 1424 hdpe,63,10 kg/ 423.647 421.147 422.647 475.661
Name of the District:- Adilabad
Delivery level Maximum Minimum Friction/ Max. Duty Min. Duty No of No of No of Apx. HP of Type of Pump Type of Water to Size of Pump
i.e. MWL of Static Head Static Head Station loses point Head point Head Pumping working standby each Pump VT/HSC/ be pumped House (LXBXH in
Delivery Point (m) (m) in the pipes (m) (m) hours pumps pumps Submersible (Raw/Clear) case rectangular
(m) and DaiXH in case
of circular)
12 13 14 15 16 17 18 19 20 21 22 23 24
0.14 2 1 1060
256.25 35.25 18.25 35.39 18.39 22 HSC Raw 24 x 12
0.35 2 1 2500
343 99.21 95.86 99.56 96.21 22 HSC Clear
24 x 12
0.73 2 1 360
313 69.21 65.86 69.94 66.59 22 HSC Clear
1.55 1 1 90
333 60.651 57.301 62.201 58.851 22 HSC Clear
4x6
0.76 2 1 6
363 90.651 87.301 91.411 88.061 22 HSC Clear
0.09 2 1 120
315.052 40.421 37.071 40.511 37.161 22 HSC Clear
24 x 12
10.47 2 1 200
294.91 20.279 16.929 30.749 27.399 22 HSC Clear
0.37 1 1 10
320.38 36.47 33.12 36.84 33.49 22 HSC Clear
4x6
5.05 4 2 680 4x6
491.99 208.08 204.73 213.13 209.78 22 HSC Clear
5.77 3 1 450
491.99 208.08 204.73 213.85 210.5 22 HSC Clear
2.79 3 1 450
581.88 100.89 97.54 103.68 100.33 22 HSC Clear
4x6
10.20 2 1 140
587.13 106.14 102.79 116.34 112.99 22 HSC Clear
0.96 1 1 15
630 75.587 72.237 76.547 73.197 22 HSC Clear 4x6
6.78 2 1 70
551.865 76.755 73.405 83.535 80.185 22 HSC Clear 4x6
0.99 8 1 1 3
300.036 75.619 74.119 76.609 75.109 HSC Clear 4X6
0.00 4 1 1 3
471.469 188.005 186.505 188.005 186.505 HSC Clear 4X6
4.51 4 1 1 3
329.569 43.261 41.761 47.771 46.271 HSC Clear 4X6
1.30 4 1 1 10
241.972 14.734 13.234 16.034 14.534 HSC Clear 4X6
10.47 4 1 1 50
330 78.816 77.316 89.286 87.786 HSC Clear 4X6
5.28 8
230 109.186 107.686 114.466 112.966 1 1 15 HSC Clear 4X6
0.23 4
274.015 34.848 33.348 35.078 33.578 1 1 3 HSC Clear 4X6
1.63 4
469.69 237.745 236.245 239.375 237.875 1 1 5 HSC Clear 4X6
1.15 4
250.525 19.58 18.08 20.73 19.23 1 1 3 HSC Clear 4X6
2.80 8
325 80.52 79.02 83.32 81.82 2 1 100 HSC Clear 4X6
1.22 8
325 118.17 116.67 119.39 117.89 1 1 15 HSC Clear 4X6
3.38 4
298.653 30.943 29.443 34.323 32.823 1 1 5 HSC Clear 4X6
23.41 4
325 72.41 70.91 95.82 94.32 1 1 50 HSC Clear 4X6
28.63 4
345 96.96 95.46 125.59 124.09 2 1 100 HSC Clear 4X6
4.74 4
335 95.6 94.1 100.34 98.84 2 1 50 HSC Clear 4X6
0.01 4
270.551 50.421 48.921 50.431 48.931 1 1 3 HSC Clear 4X6
1.34 4
496.363 220.733 219.233 222.073 220.573 2 1 10 HSC Clear 4X6
0.49 4
464.943 13.055 11.555 13.545 12.045 1 1 3 HSC Clear 4X6
0.68 4
471.348 1.5 0 2.18 0.68 1 1 3 HSC Clear 4X6
6.66 4
478.321 24.077 22.577 30.737 29.237 1 1 5 HSC Clear 4X6
2.38 4
471.6 38.438 36.938 40.818 39.318 1 1 3 HSC Clear 4X6
3.92 4
475.708 37.959 36.459 41.879 40.379 1 1 5 HSC Clear 4X6
7.92 4
543.264 67.389 65.889 75.309 73.809 1 1 3 HSC Clear 4X6
0.45 4
392.58 9.122 7.622 9.572 8.072 1 1 3 HSC Clear 4X6
0.93 4
573.924 48.579 47.079 49.509 48.009 1 1 3 HSC Clear 4X6
7.12 4
517.69 59.676 58.176 66.796 65.296 1 1 3 HSC Clear 4X6
0.49 4
519.47 22.493 20.993 22.983 21.483 1 1 3 HSC Clear 4X6
2.32 4
563 48.166 46.666 50.486 48.986 1 1 5 HSC Clear 4X6
7.28 4
558 138.5 137 145.78 144.28 2 1 10 HSC Clear 4X6
5.96 4
543 103.688 102.188 109.648 108.148 2 1 70 HSC Clear 4X6
6.03 4
548 55.5 54 61.53 60.03 1 1 5 HSC Clear 4X6
0.67 4
538 45.5 44 46.17 44.67 1 1 5 HSC Clear 4X6
0.77 4
573 44.035 42.535 44.805 43.305 1 1 5 HSC Clear 4X6
0.24 4
560.827 16.5 15 16.74 15.24 1 1 3 HSC Clear 4X6
0.23 4
532.563 16.5 15 16.73 15.23 1 1 3 HSC Clear 4X6
0.56 4
519.47 16.5 15 17.06 15.56 1 1 3 HSC Clear 4X6
1.04 8
604.105 26.047 24.547 27.087 25.587 1 1 3 HSC Clear 4X6
5.13 8
638 72 70.5 77.13 75.63 1 1 10 HSC Clear 4X6
0.02 8
523.888 196.62 195.12 196.64 195.14 1 1 3 HSC Clear 4X6
0.11 8
593.685 96.133 94.633 96.243 94.743 1 1 3 HSC Clear 4X6
3.09 8
597 48.5 47 51.59 50.09 1 1 5 HSC Clear 4X6
0.09 8
403 132.5 131 132.59 131.09 1 1 3 HSC Clear 4X6
7.30 8
393 80.957 79.457 88.257 86.757 1 1 3 HSC Clear 4X6
11.42 8
453 123 121.5 134.42 132.92 2 1 80 HSC Clear 4X6
4.95 8
583 224.65 223.15 229.6 228.1 1 1 5 HSC Clear 4X6
7.06 8
563 181 179.5 188.06 186.56 2 1 10 HSC Clear 4X6
0.23 8
504.409 89.129 87.629 89.359 87.859 1 1 3 HSC Clear 4X6
0.19 8
490.661 69.514 68.014 69.704 68.204 1 1 3 HSC Clear 4X6
Is the Total Pumping Other load Total load
pumping Load of Pumping such as load of
station Station (KW) Lighting, Pumping
common for WTPs etc. Station
other group (KW) (KW)
of Pumps
(Yes/NO)
25 26 27 28
790.76 2.00 792.76
Yes
2138.56
Yes 2133.56 5.00
0.00
Yes
73.62
Yes 71.62 2.00
0.00
Yes
241.72
Yes 238.72 3.00
0.00
Yes
851.94
Yes
850.44 1.50
850.44 1.50 0.00
Yes
0.00
Yes
441.64
Yes 440.14 1.50
0.00
Yes
11.19 1.5 12.69
No
52.22 0.345 52.57
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
7.46 0.345 7.81
No
37.30 0.345 37.65
No
11.19 0.345 11.54
No
2.24 0.345 2.58
No
3.73 0.345 4.08
No
2.24 0.345 2.58
No
74.60 0.345 74.95
No
11.19 0.345 11.54
No
3.73 0.345 4.08
No
37.30 0.345 37.65
No
74.60 0.345 74.95
No
37.30 0.345 37.65
No
2.24 0.345 2.58
No
7.46 0.345 7.81
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
3.73 0.345 4.08
No
2.24 0.345 2.58
No
3.73 0.345 4.08
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
3.73 0.345 4.08
No
7.46 0.345 7.81
No
52.22 0.345 52.57
No
3.73 0.345 4.08
No
3.73 0.345 4.08
No
3.73 0.345 4.08
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
7.46 0.345 7.81
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
3.73 0.345 4.08
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
59.68 0.345 60.03
No
3.73 0.345 4.08
No
7.46 0.345 7.81
No
2.24 0.345 2.58
No
2.24 0.345 2.58
No
Progress of Uploaded Forest Clearances un
FCA Prpposal
Segment No. Segment name Sub Segment District received in Hard
Copy
Structures Pipeline
Yellampally -
3 23 - Adilabad 0.195 10.658 Yes
Mancherial
FCA Prpposal
Segment No. Segment name Sub Segment District received in Hard
Copy
8
FCA Prpposal
Segment No. Segment name Sub Segment District received in Hard
Copy
10
11
12
13
14
15
16
17
18
19
20
21
22
Page 138 of 148
est Clearances under TDWSP as on date
Remarks
RoFR
Enumeration NOC from
FCA Proposal Certificate
/pegmarking primary user
uploaded uploaded
uploaded Y/N
Y/N
yes Yes No NA
Yes Yes No NA
RoFR
Enumeration NOC from
FCA Proposal Certificate
/pegmarking primary user
uploaded uploaded
uploaded Y/N
Y/N
RoFR
Enumeration NOC from
FCA Proposal Certificate
/pegmarking primary user
uploaded uploaded
uploaded Y/N
Y/N
Paid by
1 Adilabad SRSP-NIRMAL Talamadugu SCR 138/3-4 Ambari to Kosai 138/3-4 90 150 SCR-NED-2015-19 04-06-15 1085 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16
through DD on
13.01.2016
Paid by
Thalamadugu to
2 Adilabad SRSP-NIRMAL Talamadugu SCR 143/3-4 143/3-4 90 150 SCR-NED-2015-20 04-06-15 1084 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16
Kosai
through DD on
13.01.2016
Paid by
Thalamadugu to
3 Adilabad SRSP-NIRMAL Talamadugu SCR 146/3-4 146/3-4 160 200 SCR-NED-2015-21 04-06-15 1082 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16 Way leave charges for amt
Umram
Rs.15,17,040 as per Demand
through DD on
notes (7Nos @ Rs,2,16,720.00
13.01.2016
Each Crossing) Paid on
13.01.2016 by EE,TDWSP,
Paid by Nirmal By DDs in favour of
Adilabad to
4 Adilabad SRSP-NIRMAL Adilabad SCR 161/2-3 164/2-3 90 150 SCR-NED-2015-22 04-06-15 1080 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16 Sr.Dvisional Finance
Umaram
through DD on Manager,Nanded . Permission
Granted for Laying pipe line
13.01.2016
under the track ,Lr issued by
DRM,Works,Nanded ,SCR vide
Paid by Lr No NW/372/W-
Adilabad to
5 Adilabad SRSP-NIRMAL Jainath SCR 166/8-9 166/8-9 90 150 SCR-NED-2015-57 20-11-15 1081 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16 1/Xing/2015 Dt: 18.01.2016 .
Pipalakuti
through DD on
13.01.2016
Paid by
Adilabad to
6 Adilabad SRSP-NIRMAL Jainath SCR 169/7-8 169/7-8 90 150 SCR-NED-2015-58 20-11-15 1083 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16
Pipalakuti
through DD on
13.01.2016
Paid by
Adilabad to
7 Adilabad SRSP-NIRMAL Jainath SCR 171/1-2 171/1-2 90 150 SCR-NED-2015-59 20-11-15 1086 NED 23-07-2015 SSE/JE/P.WAY 20.11.2015 20.11.2015 8.12.2015 2.17 EE,TDWSP,Nirmal 2.1672 Dec-16
Pipalakuti
through DD on
13.01.2016
10 Adilabad Komaram Bheem Tandur SCR 231/16 Rachini Road 231/16 250 350 SCR-SC-2015-50 05-07-15 IDBI 000039 NED 26-07-2015 SSE/JE/BPA 20-11-2015 20-11-2015 19.11.15 0.6 Dec-16
11 Adilabad Komaram Bheem Tandur SCR 227/20 Repallevada 227/20 250 350 SCR-SC-2015-51 05-07-15 IDBI 000040 NED 26-07-2015 SSE/JE/BPA 20-11-2015 20-11-2015 19.11.15 0.6 Dec-16
4.20 Lakhs (@
12 Adilabad Komaram Bheem Khagaz Nagar SCR 200/30 Vemapally 200/30 250 400 SCR-SC-2015-52 05-07-15 IDBI 000041 NED 11/8/2015 SSE/JE/skzr 20-11-2015 20-11-2015 19.11.15 0.6 0.60 Lakhs Per Dec-16
Paid By Demand Draft
Each Crossing Centage Charges Paid and
13 Adilabad Komaram Bheem Sirpur T SCR 191/18 Sirpur Town 191/18 250 400 SCR-SC-2015-53 05-07-15 IDBI 000042 NED 11/8/2015 SSE/JE/skzr 20-11-2015 20-11-2015 19.11.15 0.6 No : 291002,Dated: Dec-16
,Total 7 Nos GADs & Estimates Submitted .
24.11.2015
14 Adilabad Komaram Bheem Sirpur T SCR 184/32 Makudi 184/32 90 110 SCR-NED-2015-54 05-07-15 IDBI 000043 NED 11/8/2015 SSE/JE/skzr 20-11-2015 20-11-2015 19.11.15 0.6 Crossngs =4.20 Dec-16
Lakhs)
15 Adilabad Komaram Bheem Rebbana SCR 217/00 Asifabad Road 217/00 350 500 SCR-SC-2015-55 05-07-15 IDBI 000044 NED 26-07-2015 SSE/JE/BPA 20-11-2015 20-11-2015 19.11.15 0.6 Dec-16
16 Adilabad Komaram Bheem Rebbana SCR 222/05 Asifabad Road 222/05 200 350 SCR-SC-2015-56 05-07-15 IDBI 000045 NED 26-07-2015 SSE/JE/BPA 20-11-2015 20-11-2015 19.11.15 0.6 Dec-16
Progress of Forest Clearencs u
Forest Area
S NO District Name Segment No segment (Sub Segment)Source required in
Ha
1 3 2 4 5 6
7 8 9 10 11 12
RF Yes 11
RF Yes 13
RF Yes
RF Yes
RF Yes 10
RF Yes 3
WL Yes 19
WL Yes 10
RF Yes 13
RF Yes 6
RF Yes 6
RF Yes 4
RF Yes 8
RF Yes 20
WL 4
RF 11
RF 14
RF 1
RF 11
RF 13
RF 11
RF 16
RF 6
RF 6
WL 12
RF Yes 6
RF Yes 9
WL Yes 11
WL Yes 32
DLC
Form-I Remarks
Resolution
13 14 15