Sunteți pe pagina 1din 37

NACE ECDA

Seminar

External corrosion
Direct Assessment
Seminar
Houston 2009

A Spectra Energy Company


NACE ECDA
Seminar

ECDA Clean Data


&
D.E. Success Rate
NACE ECDA Seminar Houston 2009

Agenda

Union Gas (A Spectra Energy company)


ECDA Step Overview
Indirect Inspection - Clean Data
Direct Examination Success
Questions?
NACE ECDA Seminar Houston 2009
NACE ECDA Seminar Houston 2009

Union Gas Ltd.


Transmission, Distribution, and Storage
Transmission integrity program per
Canadian Regulations
Utilizes ILI and ECDA
ECDA
Started in 2004
To date 34 pipelines (or partial pipelines)
and 142 DE (111 excavations)
NACE ECDA Seminar Houston 2009

ECDA Steps Overview


Pre-Assessment
Indirect Inspection
Direct Examination
Post Assessment

Note:
Excellence in Data
Accountability Steps 1-4
NACE ECDA Seminar Houston 2009

Indirect Inspection Clean Data

Influence testing
CIPS / DCVG (ACVG)
AC Attenuation
Soil Resistivity
AC Voltage
NACE ECDA Seminar Houston 2009

Indirect Inspection

Influence Testing
Line needs to be clean
All influencing rectifiers are simultaneously
interrupted
No dynamic stray currents (tellurics)
NACE ECDA Seminar Houston 2009

Checking that the Line is Clean


Record a waveform during the OFF cycle
and search for single-phase and three-phase
rectifiers fingerprints.
Install recorders for tellurics
Check for obvious false OFF potentials
Assess the magnitude of lateral gradient in
Off cycle
Complete telluric compensation as required
NACE ECDA Seminar Houston 2009

Waveform
(As Captured by a Field Oscilloscope - OFF Cycle)
NACE ECDA Seminar Houston 2009

Frequency Spectrum
(As Displayed by the Instrument)
NACE ECDA Seminar Houston 2009

Spectrum Analysis
1800
1620
1600
1400
1200
Amplitude (mV)

1200
1000
800
600
400 340
270
200
0
DC 60 Hz 120 Hz 180 Hz
Frequency

DC Component Matches survey value


60 Hz Component Filtered by the survey equipment
NACE ECDA Seminar Houston 2009

Spectrum Analysis
1800
1620
1600
1400
1200
Amplitude (mV)

1200
1000
800
600
400 340
270
200
0
DC 60 Hz 120 Hz 180 Hz
Frequency

120 Hz Component Fingerprint of a single-phase rectifier


left ON or out of sync. With a 270 mV value, the line is not
clean.
NACE ECDA Seminar Houston 2009

Spectrum Analysis
1800
1620
1600
1400
1200
Amplitude (mV)

1200
1000
800
600
400 340
270
200
0
DC 60 Hz 120 Hz 180 Hz
Frequency

180 Hz component - Fingerprint of a three-phase rectifier left


ON or out of sync and/or harmonics of 60 Hz. A 340mV
value versus 1620 mV 60 Hz is probably a harmonic.
NACE ECDA Seminar Houston 2009

Tellurics
CIPS Data. As Measured.
-2500

To TB at Rd. 2
To TB6

-2000
Potential (mV)

-1500

-1000

-500

0
2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500
Chainage (m)

ON Potential OFF Potential -1000 mV Criterion


NACE ECDA Seminar Houston 2009

Tellurics
CIPS Data. Tellurically Compensated.
-2500

To TB at Rd. 2
To TB6

-2000
Potential (mV)

-1500

-1000

-500

0
2000 2050 2100 2150 2200 2250 2300 2350 2400 2450 2500
Chainage (m)

ON Potential OFF Potential -1000 mV Criterion


NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Interrupter Failure (Telluric Record at Remote TP)
-2000
-1800
-1600
-1400
Potential (mV)

-1200
-1000
-800
-600
-400
-200
0
0.65625 0.66125 0.66625 0.67125 0.67625
Time (GMT)
OFF Potential ON Potential
NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


High Contact Resistance
( CIPS in Northern Ontario)
-2500

-2000
Potential (mV)

-1500

-1000 Severe CIPS Indication

-500
Rock

0
1740 1760 1780 1800 1820 1840 1860 1880 1900 1920
Chainage (m)

ON Potential OFF Potential -1000 mV Criterion


NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


High Contact Resistance

V
Vmeas
Rc
1
RV
When the contact resistance (Rc) is within the same range as
the internal resistance of the voltmeter (Rc), the measured
value would be only half of the real potential.
NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Double-reading Survey
-2500

-2000
Potential (mV)

-1500
Real CIPS Indication

-1000

-500

0
1750 1770 1790 1810 1830 1850 1870 1890
Chainage (m)

True OFF Potential Measured OFF Potential -1000 mV Criterion

The area was surveyed twice (once using a 1M spoiler) and


the true potential was calculated using simple math.
NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Low Shifts during DCVG Survey
(CIPS/DCVG in Northern Ontario)
-1400 120

-1200 100

-1000 80
Potential (mV)

Gradient (mV)
-800 60

46.5%IR

59.5%iR
27.2%IR
-600 40

26.8%IR
19.2%IR

-400 20
89.9%IR

-200 0

0 -20
1000 1050 1100 1150 1200 1250 1300 1350 1400 1450 1500

Chainage (m)

ON Potential OFF Potential -1000 mV Criterion Lateral Gradient @ 3m


NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Low Shifts during DCVG Survey
Direct Measurements

GOL RE
% IR
VRE

To validate the calculated %IR, we measured both the


lateral gradient and the pipe-to-soil potential to
remote earth
NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Low Shifts during DCVG Survey
100%
Validation Results
95.0%
89.9%
90%
Measured Calculated
80%

70%
63.0%
59.5%
60%
%IR

50%

40%

30%

20%

10%

0%
1101.6 1485.7
Chainage (m)

The results show a very good match.


NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Low Shifts during DCVG Survey
DE Results (Photo)

Extended Coating Damage at Chainage 1101.6


NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Low Shifts during DCVG Survey
DE Results (Coating Inspection
0m 1m 2m N
12:00

1:00
Map)
FACTORY
0.5 1.5
12:00

1:00
APPLIED
2:00 COAL 2:00
TAR
3:00 3:00

4:00 4:00

5:00 5:00
BARE PIPE &
FACTORY APPLIED
6:00 DISBONDED COATING 6:00
COAL TAR
(SEE NOTE)
7:00 7:00

8:00 8:00

9:00 9:00
Very Poor
10:00 Adhesion 10:00
Very
11:00 Poor 11:00
Adhesion

Ch. 1100.5m Ch. 1102.8m

Note: Part of the disbonded coating came off during excavation. The entire coating was removed.

LEGEND

Disbonded Coating Bare Pipe & Disbonbed Coating Unexcavated


NACE ECDA Seminar Houston 2009

Problems During Indirect Inspections


Coating Quality Under New Asphalt
(No Permission to Drill Holes)
1000

900

800 DCVG Surveyed Area Asphalted Parking Lot

700 Rate of Loss: 10.74 dB/km Rate of Loss: 8.57 dB/km

600
Signal (mA)

500

400

300

200

100

0
5550 5600 5650 5700 5750 5800 5850
Chainage (m)

AC Attenuation. Rate of Loss.


NACE ECDA Seminar Houston 2009

Indirect Inspection
Criteria for identification of indications
Criteria for classification of indications

Direct Examination
Prioritization
Select D.E. sites
Flag:
How well we do on DE?
Need to predict what we expected to find!
NACE ECDA Seminar Houston 2009

Prioritization Table Sample


DC Interference (DCI)
DC Voltage Close Interval
Gradient Potential Survey SV MD MN NI
Indication Indication
5 6 7 8
CIPS-SV 1 I I I I
DCVG-SV CIPS-MD 2 I S S S
CIPS-MN 3 I S S S
CIPS-SV 4 I I I S
DCVG-MD CIPS-MD 5 I S S S
CIPS-MN 6 I S M M
NACE ECDA Seminar Houston 2009

Prioritization Table (Contd)


DC Interference (DCI)
DC Voltage Close Interval
Gradient Potential Survey SV MD MN NI
Indication Indication
5 6 7 8
CIPS-SV 10 I S S S
DCVG-BT CIPS-MD 11 I S M M
CIPS-MN 12 I S M N
CIPS-SV 13 I* N N N
DCVG-NI CIPS-MD 14 I* N N N
CIPS-MN 15 I* N N N

* Consider excavating a short section of line under severe risk of


external corrosion, even if DCVG indications were not found.
NACE ECDA Seminar Houston 2009

Direct Examination Success

Expectation of findings from the predictions


(for each DE)
Actual findings from each DE excavation
Compared the predictions to the actual
findings
NACE ECDA Seminar Houston 2009

Direct Examination - Prediction

Coating Condition and Metal Loss


(Only two areas to predict)
Relatively simple, straight forward
statements in ECDA reports
Variety of terms used in the reports to
describe the severity of each area on 122
recommended sites
NACE ECDA Seminar Houston 2009

Direct Examination - Findings

Coating Condition and Metal Loss


Detailed findings documented by
measurements & photos for each area in the
reports
Again a variety of descriptive terms used
NACE ECDA Seminar Houston 2009

Direct Examination - Comparison

Coating Condition and Metal Loss


Categorized and scaled the descriptive
terms used from both coatings and metal
loss
Done for both predictions and findings
Made relative evaluations within and
between all categorizations
NACE ECDA Seminar Houston 2009
Small holidays / minor holidays

Success
DE Descriptor Expectation Finding
Rate

DE#2. 8" Augusta Lateral


- Minor holidays - Four very small holidays (jeep indications) (two pinholes, 0.5x0.1cm, 0.2cm diameter) 90
Ch. 4504.70 m

- Eight very small holidays (jeep indications) (two 0.3cm, 0.4cm, 0.8cm, 1cm
diameters; 0.4x0.2cm, 1.0x0.5cm, 1.3x0.5cm)
- Some of the jeep indications appeared fresh and may be the result of probing the line
DE#2 during excavation
- Minor holidays 100
Ch. 1009.40 m

- Five of the jeep indications were on the longitudinal weld

DE#5 - One small holiday (5cm diameter) and nine very small holidays (jeep indications) (0.1
- Small holidays 100
Ch. 3896.40 m to 0.5cm diameter dents, 0.5x0.1cm scratch)

DE#4
- Five "minor" coating holidays (3cm, 4cm, and three 5cm diameters) in field applied
Ch. 1454.90 m - Minor holidays 100
Denso tape, 20-30% damaged
(Validation with indication)

- Eight very small holidays (jeep indications) covered by calcareous deposits (3cm,
6cm, 6cm, 10cm, 10cm, 15cm diameters; 10x3cm, 30x20cm)
- Extent of coating damage could not be measured due to adherent calcareous
coverage
DE#1
- Minor holidays 100
Ch. 256.60 m

- Spot of poor adhesion (1-2cm dia.) was found at jeep indication with largest deposit
NACE ECDA Seminar Houston 2009

Direct Examination - Comparison

For each Direct Examination


Compared coating expectation to finding
Compared metal loss expectation to finding
Scored the comparison by %
Averaged the two % comparison
NACE ECDA Seminar Houston 2009

Direct Examination - Results

Prediction vs. Finding


4 years (2004, 2005, 2006, 2007)
27 pipelines
122 DE (some validation)
Approx 4 DE = n/a
Overall success rate of 95%
NACE ECDA Seminar Houston 2009

Questions?

Questions?