Sunteți pe pagina 1din 6

MADHURIMA SAHA

Structural Engineer

Career Summary
An accomplished professional in Civil structural engineering field with
sound Project Management experience. The salient fields of expertise

ry
are -

Bachelor of Engineering with 12+ years experience with market


leaders in supervising, planning, and managing end to end process
of design projects to achieve project objectives within deadlines
complying to quality standards.

Natural passion for quality improvement and commitment to


excellence to impact bottom line.

+61 401685277 Complete control over managing stakeholder expectations and


dedication to optimising productivity
53, Mooramie Avenue
Kensington, NSW 2033 Results-driven and innovative team player with significant
achievements in managing large construction projects.
madhurimash25@gmail.com

Working Rights
Permanent Resident,
Top Key Projects
Australia
Indira Gandhi Container Terminal; Mumbai; Structural Engineer;
completed structural design of project within 18 months |Project Cost:
Expertise:
$25M
Civil Structural engineer
Delhi Metro Rail Corporation; Worked as Structural lead for Depot;
Project Management completed project on time in-spite of additional LEED certificate which
Staff and stakeholder was not included at the Tender Stage |Project Cost: $40 M
Management Lucknow Metro Rail Corporation; Worked as Project Manager and
Structural Analysis & Design Structural Lead; completed project on time in-spite of additional
of RCC & Steel Elements building (Training Institute) which was not included at Tender stage
|Project Cost: $3M
Design of Infrastructure
facilities Ethanol Plant; worked as Design Engineer| Project Cost: $250K
Design of Commercial
Buildings
Design of Residential
Buildings
Career Detail
Design of Hospital
Sep 17- CDIE Pty Ltd, Sydney
Design of Metro Depot Present
Structures An Engineering Consulting firm offering services like
Structural, Civil, and Storm Water; Voluntary work.
Design interface between
different design disciplines
Oct16- DMA Projects Pty. Ltd. - Lead Civil Structural
Design co-ordination among
site team & Stakeholders Aug17 Engineer
Attend client meetings and Key responsibilities and Projects handled
liaison for approvals
Organisational & Planning Develop goals and objectives towards growth of the company
Skills Design & detailing of Industrial Steel Sheds Ethanol Plant
Productivity and economy &Recaustisizing Plant for Quantum paper factory

Maintenance of procedures & Structural analysis of 25m, 35m, 50m trusses & N-girders using
control documentation. finite element analysis software STAAD V8i

Design of steel Cantilever canopies & Flag Post

Attended client meetings and liaised for approval.

Co-ordination with services like Mechanical-Electrical-Plumbing to


Education:
facilitate successful submission of design deliverables
Bachelor of
Engineering(CIVIL), Delhi
College of Engineering, Delhi, Key Achievements
India
Accomplished project objective within deadline by efficiently
managing end to end design process; client unhappy with
calculated steel quantity of superstructure in structural design of
Ethanol Plant; challenged with completing project on time after
making structural changes and keep client happy; prepared
Affiliations: proposal to replace composite deck slab at various floor levels with
Member Institute of MS chequer plates where possible instead of composite slabs at all
Engineer, India levels suggested by client, held several meetings with client and
mutually agreed to have composite slab only at locations where
Holder of Construction
manual inspection was inevitable; engineering judgement reduced
Induction Card (White Card) self-weight of structure by 15%, reduced steel quantity by 20%,
completed project 2 weeks before time, reduced project cost by
$60K

Efficiently resolved architectural issues through client


coordination; Identified clients architectural drawings of
Career History: Recaustisizing Unit of paper company missing major machinery
DMA Projects Pty. Ltd. loads being incorporated in layout; challenged with pursuing client
New Delhi, India- Lead Civil to take immediate action and complete structural design before
Structural Engineer Oct. already-announced opening date of new plant in order to maintain
2016 Aug.2017 company image; proactively organised weekly meetings to discuss
Systra MVA Pty. Ltd pending matter, efficiently engaged stakeholders and played vital
role in incorporating missing technical information; avoided 30 days
New Delhi, India- Lead
project delay and loss of $200K by taking proactive approach
Engineer/Project Manager-
Nov 2013 Sept. 2016 Successfully managed stakeholders through leadership and
Howe (India) Pty ltd, communication skills; faced tough challenge to design column-free
New Delhi, India - structural design of ground floor level swimming pool with canteen,
Principal Civil Engineer, Aug. gym, and dormitories on upper floor; called meeting with Architect
2006 Oct. 2013 Consultant and Client Representative, justified use of post-
tensioned beams with stub columns supporting superstructure,
C.P. Kukreja Associates
Pty. Ltd, New Delhi, India: conveyed design alternative and sought approval on modification of
Structural Engineer Nov. design process subjective to reasonable cost and time; convinced
2004 April 2006 client for post-tension design of beams at all floor levels, saved 120
manhours, generated new business through design of post-
tensioned beams
Saved company significant money through problem solving
ability; company assigned task to design 6 WBL tanks with 14 met.
Trainings and diameter each, self-weight of 110 tonnes, and carrying capacity of
Certifications 2600 tonnes, required safe bearing capacity at site 2.5 Met. below
natural ground level being 10.5 t/sqm, challenged with laying
Training in Etabs, Safe massive concrete quantity; called meeting with engineers and
Training in Finite Element redesigned foundation as ring beam section with circular footing 5
Software, STAAD V8i met. wide; reduced concrete quantity by 40% per foundation,
reduced cost of foundation by $288K
MS Excel, Word, MS Office
Improved companys profitability through innovative thinking;
MS Excel Self-service and
power excel for would be client looking for alternative construction system for DO towers of
managers 5 met. diameter and 30 met. tall; realised construction of HD
tower using traditional shuttering taking too long, project needed
to be completed in strict timelines to avoid penalty, worked
closely with Architects and communicated effectively with site
execution team; using extensive own experience recommended
Software slip form shuttering; completed construction of eight towers
Proficiency within 2 months using this alternative technology, started
operations of DO towers on time, saved $120K and 60 man-days
Etabs, safe each tower
STAAD V8i
MS Office
Nov13- Systra MVA Pty. Ltd -Lead Engineer/Project
Sept16 Manager

References Key responsibilities and Projects Handled -


Provide client support and maintain high level of professionalism
Malay K. Chatterjee
Make frequent client calls to build positive and productive
Project Manager
relationships with clients
Department of
Infrastructure, Planning Analysis and resolution of service issues promptly with
and Logistics of NT competence in client interaction.
Government
Email: Inform and assist management about complex client issues,
malay.chattopaghyay@nt.g resolutions, risk assessment and mitigation.
ov.au
Maintain client focused working environment for the team.
Ph: 0419784530
0889465181 Work in compliance with company policies and procedures.

Design & Detailing of Metro Depot Structures -Detail Design of


Sanjay Garg Transport Nagar Depot, Lucknow Metro Rail Corporation,
Director, DMA Projects Pty. Bahadurgarh Depot, Delhi Metro Rail Corporation Workshop,
Ltd Interior
New Delhi, India Cleaning & Inspection Bay, Stabling Shed, Permanent Way
Ph: +91 9810834868 Building, Pit wheel lathe bldg., Substation, Canteen,
Administration building, Effluent Treatment plant, Sewage
treatment plant and other ancillary structures.
Gregory Chow
Systra MVA Singapore Pte. Structural Design of Rain Water Harvesting pits
Ltd
Proof Checker for Delhi Metro Project Phase III - Elevated
Ph: +65 81820115
&Underground stations for Mundka-Bahadurgarh & Dwarka-
Najafgarh elevated lines Stations.

Attended client meetings and liaised for approval.

Co-ordination with services like Mechanical-Electrical-Plumbing,


signalling & Telecommunication finalize the road layouts and track
alignment within the Metro Depot to finalize the road layouts and
track alignment within the Metro Depots.

Key achievements:
Demonstrated ability to interpret and clarify architectural
drawings for achieving savings; Proactively identified inevitable
amendments to make depot structure LEED certified as per client
request; coordinated with client and concerned authorities and
assured to attain appropriate certification by using providing
necessary structural material in design; faced tough challenge of
identifying areas of items requiring LEED certification and also
bringing project back on track from 60 days behind schedule;
connected with best consultants and resolved to make few
modifications by provisioning solar panels on roof top of RCC
buildings, recycling water by constructing effluent treatment plant
and sewage treatment plant, and replacing masonry bricks by fly
ash bricks; successfully incorporated LEED requirements, met
project deadlines 60 days before schedule and saved $216K

Innovatively managed project for great client experience; Faced


situation with client requesting to add one more building, not part
of contract; challenged with replanning resources, rescheduling
various disciplines, and managing budget; merged four major
buildings, prepared 3D model of integrated buildings thereby
keeping concept unchanged, sought client approval; savings from
modification compensated 30% of total design cost, generated
new business

Efficiently planned and scheduled project for timely completion;


Client insisted overhead Intze tank be designed as style statement
for depot and structure to be supported on circular shaft;
challenged with 18 months time for construction, creating and
maintaining Risk Analysis Mitigation Plan, and organising risk
reviews; To do away with Intze tank, added 3 additional
compartments to underground tank to meet depots water
requirement, pumped water to buildings instead of gravity flow,
sought approval from client; brought project on track with
timeline, saved significant time by eliminating overhead structure

Aug06- Howe (India) Pty ltd - Principal Civil Engineer


Oct13
Key responsibilities and Projects Handled
Co-ordination of drainage works and layout at Indira Container
Terminal at Mumbai Port

Design & Detailing of Building related works of Director General for


Naval Dockyard Project, Mumbai involving layout, planning &
design for (access staircases, fan rooms and ventilation duct
systems & Toilet blocks in the FOB (Fitting Out Berth) for North &
South wharves.
Indira Container Terminal at Mumbai Port -Design and analysis of
Administration Building, Substation buildings, Quayside Office,
Workshop building and other related structures.

Kandla Port, Gujarat - Analysis and design for Administration Bldg.,


Work Shop building

Attended client meetings, coordinated and liaised for approval.

Key Achievements:
Completed challenging project ahead of time by creative thinking;
Encountered pond in demarked area of workshop building at
planning stage; challenged with achieving work progress due to
increased length of column pedestals by 3.5 meters; designed short
columns by introducing tie beams at intermediate level and
reduced column height instead of increasing length; reduced steel
quantity by 5%, completed task well ahead of time

Avoided financial loss through Interpretation of architectural


drawings; Plinth beams above finished road level in workshop
building disturbed cable trench alignment; challenged with
continuing work and added cost due to plinth beam already been
cast at concerned location; justified own structural design in
technical coordination meeting; client consultant re-designed
trench layout by taking responsibility, avoided loss of 70 man-days
equivalent of $112K

Worked with team of Designers and Site Engineers for designing


and building projects; Identified constructability challenges with
design of prestigious Administration building at tender level with
retaining arches dome design; carefully analysed drawings, called
meeting with Architect for suggesting changes with respect to
overhead water tank, reducing self-weight of slabs, modifying facia
designs from RCC to GRC, similarly attended meetings with
Structural Engineer and Mechanical Engineer for recommending
changes; significantly reduced cost of project, received official
instruction from client to finalise contractor and commence work

Nov04- C.P. Kukreja Associates Pty. Ltd: Structural


Apr06 Engineer
Key responsibilities and Projects Handled
Detail design / analysis of R.C.C Building 14, Office Complex for DLF
(Delhi Liasion Fund). 22 storeyed Commercial & Office Complex,
I.T. Sector -raft and superstructure.

Design & Detailing of Batra Hospital Tughlakabad, New Block


Design of foundation(raft) and superstructure. Indira Container
Terminal at Mumbai Port -Design and analysis of Administration
Building, Substation buildings, Quayside Office, Workshop building
and other related structures.
La Gardenia, UNITECH 18 storeyed residential towers with
double basements. These towers were provided with pile
foundations. Attended client meetings, coordinated and
liaised for

Jagannath Institute of Management Studies, Jaipur Academic


Block and Boys Hostel. Performed structural analysis and provided
isolated footings as foundation.

Attended client meetings, coordinated and liaised for approval.

Key Achievements:
Completed challenging project ahead of time by creative thinking;
worked as structural engineer design on residential projects, High rise
Buildings up-to 20 stories, Hospital Building & Commercial Buildings.

S-ar putea să vă placă și