Sunteți pe pagina 1din 1

POWER TRANSMISSION CORPORATION OF UTTARAKHAND LTD.

(400 KV, 220 KV & 132 KV SUB STATIONS & TRANSMISSION LINES) Dhaliganga(HEP)
220 KV BUS (NHPC 280MW)
MANERI BHALI I
((UTTARKASHI))
(3x30) PITHORAGARH
(PGCIL)
84 82 132 KV ALMORA(2X20) (2X160MVA)
83 84 (62.77
CHIBRO (4x60) 71 74 72
Kms.) 220/33KV
8.59 Kms. 26 Kms.
(2X25 MVA )
76.4 Kms.
5.77 Kms. 84 82
xx 73

82 86
x x88 MANERI BHALI lI
(31.04 Kms.) 74 N
81 82 SIMLI RANIKHET
x 81 (DHARASU) 72
220/ 33 KV (2X(3X5) PITHORAGARH
86 83 84 87 ((4x76))
KHODRI (4x30) CHAMBA (2X40)MVA 71 (6X5 1X20)
(6X5+1X20)
132 KV BHOWALI
H 1X100MVA
885 (2X25 MVA )

84 SRINAGAR ~
14.1 Kms.
(6X5MVA)
67 Km
I 32.5 Kms. 785 78.3 Kms. 104.5
71 132/33 (1X40+1X20)
E

35Kms.
132/66 (3X5)
8.83 Kms. Kms.
44.49
M 71 781 782 783
Ghansali
Kms.
SRINAGAR II
132 KV 73 HALDWANI(2X40)MVA
DHAKRANI (3x11.2) ~ 72 2.3 Kms. 71
A 19.38
400 KV

Kms.
73 40.5 48 Km 220 KV HALDWANI 74
Kms. RISHIKESH
(2x100 MVA) 72 81
C MAJRI (2x40) Bhilangana
93 91 SATPULI KALAGARH(3x66) TANAKPUR (HEP)
(NHPC 120 MW)
P
HEP 3X8MW (2X240 MVA) RAMGANGA 81 Kms.
(5.60 Kms.)
H 71 781 782 783
(78.4) ~
(2X40)MVA
27 Kms. 220 KV BUS
74 DHALIPUR (3x17) 50 Km 3.5 Kms.
Km
A 5.65
73 81
83 82 86 87

132 KV KOTDWAR
(in INDIA)

(44.60 220 KV RISHIKESH 77


L 782
Kms.
72
783 781
Kms.)
72 71 73 76
(2X160 MVA) (2X40 MVA)
71 72 73 74 42 Kms. KHATIMA (3x13.8) A
132 KV 72
132 KV 71 72
73 71 74 KULHAL (3x10) RISHIKESH 220 KV
GIRIBATA 132 KV 132 KV DC
(2X40 MVA)
(41.67 CHILLA (4x36) JASPUR RAMNAGAR 15.61 55 Kms.
Kms.)132
KV 45 Km. 73
74((1X40+1X20)
0 0) Kms. ((In NEPAL))
P 1.67
1 67
Kms. PURKUL(40+20MVA) 71
(41.77
73 (41.14
21.2 400/220KV 400 KV KASHIPUR 62.12 Kms. 71 72 TO NEPAL
L
R Kms.)
132 KV
Kms.) Kms. PUHANA
(PGCIL)
100 Km.
93 91(2x315)
71 72 220 KV 81
BINDAL(2x40MVA) 74 83PANTNAGAR -
A 83.53 81.04 (22.77 72 (44.73
74 73 71 74
(2x160)
73 2X160 (1x40+1x20)

140Km. SIDCUL
Kms.)
D Kms. Kms. Kms.) 73

11 Km.
71 2X80
16.82 Km. 25 Kms. 72 71
77 72 132 KV
E 78
71 74 73 73 132 KV PGCIL

16.5 Kms.
74
74 Bhupatwala 115 KASHIPUR(3X40) 130 Kms.
132 KV MAZRA(3X40MVA) 72
S 83 77 72
(2X40)
71
K
Kms.
115.2
(60.90
Kms.) (16.3
132 KV
71 73

220 KV HARIDWAR RUDRAPUR(2X40) 73


Kms.)
H 220 KV Bus 400KV
81 (2X100) SIDCUL

(2X80) 74 72
74 73 132 KV JWALAPUR (2X40)

47Km.
Kms.
(106)
Kms.
132 KV
SITARGANJ
(2x40)
132 KV
SITARGANJ
S/s Puhana(PGCIL) 2.6 Kms. 71 (2x40)
83 (2X160) 132 KV LAKSAR M/s Sravanti 72 74 11.3 168.3
24 Kms.
220 KV ROORKEE (2X40) 53Km. 60 75X3MW Kms. Kms.
81 132/33 KV 73
(3X40)72 71 26.3 Kms. Kms. . (94.264

3 Km.
71 73 72
132 KV ROORKEE 77 73
BAJPUR(2X40) Kms.)
78 74 132 KV
72 74 KICCHA(2X40) (22.23
132 KV Bhagwanpur 72 (2X100)
(2X40) 78 132 KV MANGLORE (2X40) MAHUAKHERAGANJ Kms.)

71x THAKURDWARA 78 73 73 C.B GANJ


81 82 To Saharanpur 72
77x BAREILY
DOHNA BAREILY PILIBHIT
71 108.95 Kms. MORADABAD To 400KV Bakunthapur
TO SAHARANPUR 73 74
400 KV KASHIPUR
72 132KV
159.8 Kms..
Existing Under Construction TO MUZAFFARNAGAR 400kv 71DHAMPUR SINGLE LINE DIAGRAM OF UTTARAKHAND GRID (as on 28-02-2013)
132 KV
400 KV LINE 78
72 71 NAZIBABAD77
220 KV LINE
132 KV LINE
UTTAR PRADESH To 132 KV NEHTAUR (BIJNOR)

S-ar putea să vă placă și