Documente Academic
Documente Profesional
Documente Cultură
ENGINEERING
DPARTEMENT OF MECHANICAL ENGINEERING
INTRNENTSHIP PROGRAM
IN METEC REPORT
NAME: ID NO
1.BELETE GETACHEW ------------------------1357/06
2.DEREJE GETU --------------------------------360/06
INTRODUCTION
Under the operation there are six factories. For each factories one team leader and many labors
(workers).Those are
In our hosting company generally due to the job divided into two:
1. Assembly
2. Maintenance
1. Assembly
In general vehicles in the company done in workshop
1(wheel assembly), workshop
2 (chain assembly), and Engineering tools (e.g. crane, surface rig, stone crasher etc.)
A. Workshop1 (wheel assembly shop): Assemblies excavator (with wheel), grader and loader.
B. Workshope2 (chain assembly shop): assemblys excavator and dozer.
2. Maintenance
In maintenance the main one is re-manufacturing workshop ,and maintain every engine present in
the industry by using different machines such as lath machines, vertical drill machines, plasma arc
and Arc welding machines ,CNC machines (for feature)
Engineering tool: In these factory mainly assemble and maintain excavator, crane, surface
rig, loader, mini loader, water drill etc. In the manufacturing tool there is manufacturing of
stone which is called stone crasher it produces 0, 1and 2 number sands.
Our hosting company working on; Dozer ,Grader ,Excavator ,Crane, Loader ,Roller ,Fork Lift
,Surface rig, Stone crasher, Water drill , Asphalt fever, Asphalt distributer, Dumper
BRIEF HISTORY OF THE COMPANY
By a letter issued from Ministry of Defense of the federal democratic republic of Ethiopia on
March 15, 2007G.C it was decided that the industry shall be structured independently by the name
DEFENCE INDUSTRY SECTOR It had been leading sixteen military Engineering complexes
and development enterprises. And after the decision of the federal democratic republic of
Ethiopian government, the Metals and Engineering Corporation (METEC) has been stablished by
the council of Ministers Regulation No.183/2010, since June 09, 2010, and Metal and Engineering
Corporation took over all responsibilities from defense industry sector to its side.
The final aim of the METEC in the future all body parts will be manufacture
in our county and assemble the parts, due to this it will be fully reduce foreign
currency of our country and METEC also fully supporting the construction
sectors.
RESEARCH AND
DEVELOPEMENT MIS CORPORT
EQUIPMENT PROPERTI
ADMINSTRATION ADMINSTRATION
HUMAN RESOURCE
FINANCE MARKETING ADMINISTRATION
OPERATION
Factories
Loader Factory
We got in to the company as we are assigned by the request of the university industry linkage
officer Mr. Abebe to the company & accepted. When we entered to the company by the month of
March the head office and administration of the company gives as an orientation about the
company and also gives to follow the rules and regulations of the company.
1. Grader
2. Excavator
3. Loader
4. Dozer
5. Engineering tools
6. Remanufacturing
From the above six departments, we work grader loader and excavator department especially in
Grader and Loder. Here some information about these;
GRADER
GRADER ENGINE
-All the power driven devise (engine-gear box) are fixed on the rear frame via 6
pieces of rubber buffers.
When watch the crank shaft at the direction of the engine for the crank axle works
clockwise.
The air will go in to air filter and the engine bearing lubrication and the cooling of
some revolving parts depend on the oil supply pressure the oil of the lubrication
system came from the oil pan via oil pump , the engine oil cooling depends on the
water cooler which is mounted in the engine . PLEASE READ THE DIESEL
ENGINE MANUAL
ABOUT GRADER
A motor grader in load construction machine depend with in long blade to creat a
flar road surface .Sinomach road grader manufacture with heavy duty blade which
conze with 50% larger device like that ordinary one additionaly we can also offer
optional acceciries such as dozer blade front and rear ripper splash gard to the
application range of the construction equipment.
WE OBSERVE FROM DEBRE BIRHAN METEC IN
THE FIRST TWO WEEKS IN GRADER FACTORY :-
COMPONENTS OF GRADER
Power device (cortelo)
Two battery
Two tandem, with 90 OIL for lubrication
Diferential located between in the two tandem
Transmission 15/40 OIL for operating
Propeller shaft
Control valve (hydraulic pump )
Hydraulic tanker
Circle drive:-used to for the machine rotating 360 in all direction
Front frame
Main frame
Axle:- consists universal joints, pistons , tyre road etc.
Indicators
Tslode
Tilting cylinder :- used to up and down the direction
Side lifting cylinder:-used to lift circle drive with out lifting other
device
Scarbata by pin at 90
Ripper piston :-used to lift ripper at the back of the machine
Acmmulator:- used to control the sudden moment of machine as a
safety
Torque converter :-used to multiply torque
Cooling system :- used to 1.for transmission 2.for hydraulic 3.for
engine
AC generator :- used to air conditioning in the cabin
Solonoid :- located on the engine used to transmit fuel
Starter motor:-used to convert electrical energy to mechanical energy
and used to start power
Solenoid on starter:-control power and there are 3 terminals
1.terminal 30- used to receive power from the ready battery
2.terminal C-used to transmit power from terminal 30 to the motor
3.terminal 50-used to control by ignition key by operator Then the
solenoid opened the spool mesh to fly wheel the engine will start.
ELECTRICAL SYSTEM
Battery
Switch
Cortelo:-two battery can be connected in series because to
increase voltage
MAIN COMPONENTS OF BATTERY
o Sulpheric acid (H2SO4)
o Electrolyte
o Road
In battery there is a process regarding with chemical energy convertes to
electrical energy
- +
Battery 1 battery 2
GROUND
SYSTEM
Starter
Power device Accessories: -
Battery like -
OR cortelo sensor ,lights, Motor
al arms etc
Propeller Tandem
differential Wheel
shaft - 1 . Gear drive
- 2 .Chain drive
Loader
A loader is heavy equipment machine used in construction to move a
side or load materials such as asphalt demolition debris, dirt, snow, feed,
gravel, logs, row materials, recycled material, rock, sand, wood chips, etc.
into or onto another types of machinery. Loader is a kind of earthwork self-
loading & unloading machine which is widely used in construction projects
of highway, railway, building, water and electricity systems, port, mine, etc.;
it is mainly used for loading materials such as soil, sand, lime, coal, and so
on.
Re-Manufacturing
In the manufacturing the company used the following machines Electric Arc welding machine,
Oxy-acetylene welding machine, Gas cutting Machine, Circular Gas cutting Machine, vertical
drill Machine, Mini vertical drill Machine , Lathe Machine and CNC Machine(Temporarily not
work).
Arc welding (AW). Arc welding refers to a group of welding processes in which heating of the
metals is accomplished by an electric arc or Arc welding (AW) is a fusion-welding process in
which coalescence of the metals is achieved by the heat of an electric arc between an electrode and
the work. The same basic process is also used in arc cutting
we spent the two month in the company by assisting or helping them by providing
the material beside we learning and upgrading experiences skills. But the rest of the
two months the third and the last month, we were good by performing the activities
solving the problems of the car as repair are maintenance beyond assisting them.
our aim and expectation were exceeded in all possible ways. Not only did we learn
about the work and the problems. But also about the solutions and changing the way
in which the mechanics and the company works. Which leads the existence of bad
work flow in the company?
Towards the end of our internship, we did expect to solve at least one problem say
we have responsible that way given for engineer and for this purpose we always have
definitely improved our practical skills and also theoretical skills. This all tells how
good were during having the short-term position.
problem identification
Since we began working in this company, we have seen a lot of challenges as problems of
the company as well as regarding to the machine parts which are mostly repaired. Those
common problems are listed below.
For example, un proper setting of tools, including bolts, nuts, hammer, washers,
gaskets and also different tool sets. Makes the technician cannot find out easily
when they are needed. In addition to un proper placement of tools, there is also a
problem of active work flow between the technicians and the manager of stocking
shop materials during replacement. This means during disassemble or
assembling, the mechanic needs some new materials or parts for replacement
purpose, they cant get that component easily from the storing shop because of
absence of active work flow. This leads to make the problem takes extra time until
it will get fixed or it kills time as wastage.
Due to very law payment which made them unlade to fun fill their needs, almost all the
labors are not satisfied to work in their position within the company.
All the labors needs to refresh themselves and to be entertained by any situations, but
nothings can fun fill and satisfy their needs due to absence of such kinds of places in the this
company.