Sunteți pe pagina 1din 9

Annexure-1

Work Planning for Consultancy service to examine.Becharaji -Chanasama - Ranuj Rly Gauge conversion
Tendered Amount Rs. = 2,13,000,00.00 Length of line 65.0 km Work Order given on - 08-11-2017
Time limit 3 months meter gauge to Broad gauge
Sr.No. Activity Month November December January February March
Stage Stage-1A Stage-1B Stage-2A Stage-2B Stage-3A Stage-3B

Date 08-13 14-21 22-30 01-07 08-15 16-23 24-31 01-07 08-15 16-23 24-31 01-07 08-15 16-23 24-29 01-07 08-15 16-23
Quantity
Stage -1 Prepare QAP

Collection of data

Review of data

Preparing the list of crossing

Reconnissance Survey

Stage-1A Inception Report (Draft)

Stage-1B Inception Report (Final)

Stage-2 Topgraphy Survey

Conditon survey of tracks and crossing


structures & Identify station yard

Geothechnical Survey & Soil Exploration


Find out Link for Tanks/Ponds
Testing of Samples

Preperation of LS & CS

Location Survey

Preliminary Design & Strip plan

Cost Estimate & Specifications

Summarized bill of Quantities

Stage-2A
Technical fesibility Report
(Draft)

Stage-2B
Technical fesibility Report
(Final)

Stage-3 Design of Bridge & Other structures

Design of Station yard & Signal system

Preperation of Drawings

Estimation work

Specification & RA

Clearance report from other department


Stage-3A
Detailed Project Report
(Draft)

Stage-3B
Detailed Project Report
(Final)
An
Work Planning for Consultancy service to examine.Becharaji -Chanasama - Ranuj Rly Gauge conversion
Tendered Amount Rs. = 2,13,000,00.00 Length of line 65.0 km Work Order given on - 08-11-2017
Time limit 3 months meter gauge to Broad gauge
Sr.No. Activity Month November December January February March
Stage Stage-1A Stage-1B Stage-2A Stage-2B Stage-3A

Date 08-13 14-21 22-30 01-07 08-15 16-23 24-31 01-07 08-15 16-23 24-31 01-07 08-15 16-23 24-29 01-07
Quantity
Stage -1 Prepare QAP

Collection of data

Review of data

Preparing the list of crossing

Reconnissance Survey

Stage-1A Inception Report (Draft)

Stage-1B Inception Report (Final)

Stage-2 Topgraphy Survey

Dron Lidar Survey

Total Station

Fixing Center Line /Pillar/Pag

Fixing TBM/PBM

Fixing of Boundary Pillar

Conditon survey of tracks and crossing


structures & Identify station yard

Tracks , Bridges, Station Yards, River, Canal,


Village & Town

Geothechnical Survey & Soil Exploration

Drilling

Sampling

Testing

Reporting

Testing of Samples

Preperation of LS & CS

Preparing of LS

Preparing of CS
Location Survey

@ 500 m on of Center line & all other field


details like
wc/stream/river/ROB/RUB/Canal/road/HT/L
T

Preliminary Design & Strip plan

ROB

RUB

Embankment with Track

Signaling

Cost Estimate & Specifications

ROB

RUB

Embankment with Track

Signaling

Summarized bill of Quantities

Stage-2A
Technical fesibility Report
(Draft)

Stage-2B
Technical fesibility Report
(Final)

Stage-3 Design of Bridge & Other structures

ROB

RUB

Embankment with Track

Signaling

Design of Station yard & Signal system

Preperation of Drawings

ROB

RUB

Embankment with Track

Signaling

Station Yard

Estimation work
ROB

RUB

Embankment with Track

Signaling

Station Yard

Specification & RA

Clearance report from other department

Stage-3A
Detailed Project Report
(Draft)

Stage-3B
Detailed Project Report
(Final)
Annexure-1

March
Stage-3B

08-15 16-23
1/16/2017 2/5/2017
3/2/2017 S2

6/10/2017 S3

7/15/2017 S4

S-ar putea să vă placă și