GMC Investments

IT Infrastructure Analysis

TABLE OF CONTENTS

EXECUTIVE SUMMARY .......................................................................................... 1


SYSTEM SERVICE REQUEST .................................................................................. 2
PROJECT GANNT CHART ........................................................................................ 3
PROJECT NETWORK DIAGRAM ............................................................................ 4
PROJECT COMMUNICATION MATRIX ................................................................. 7
PROJECT TASK RESPONSIBILITY MATRIX......................................................... 8
STATEMENT OF WORK AND PROJECT SCOPE ................................................... 9
SYSTEM DESCRIPTION ........................................................................................... 10
FEASIBILITY ANALYSIS ......................................................................................... 13
SYSTEMS COMMUNICATION MATRIX............................................................... 16
SYSTEMS TASK RESPONSIBILITY MATRIX ...................................................... 17
SYSTEMS GANNT CHART ..................................................................................... 18
SYSTEMS NETWORK DIAGRAM .......................................................................... 19
DIALOGUE DIAGRAM .................................................................................................... 20
INTERFACE DESIGNS ............................................................................................... 21
DATA FLOW DIAGRAMS ......................................................................................... 59
ERD ............................................................................................................................. 68
RELATIONAL SCHEMA ........................................................................................... 69
DATA DICTIONARY ................................................................................................. 70
SOURCE / DESINTATION DATA FLOW ................................................................. 74
ISYS 620-601 Systems Analysis and Design

Group Project Rubric

ISYS 620 Section Number: 601 Group Number: 5

Project Title: IT Infrastructure Analysis for


GMC Investments

Student
Photo

Last Name: Alessi Hawk Johnson Shah Ward


First Name: Kristen Jazz Nia Sid Johnson

Max Points Given Points Comments

Conformance to
30
Requirements

Scope 20

Clarity of
20
Organization

Quality of Written
20
Presentation

Quality of Live
10
Presentation

TOTAL 100

GMC Investments
Executive Summary
Date: February 9, 2015

General Project Information


Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Project Overview:
Our sponsor Colleen Johnson is the owner of GMC Investments which operates several bars in Austin.
The company currently manually inputs inventory, sales and payroll data into excel after bar staff collects
and writes down data for reporting to TABC. Staff collects data from a separate POS system. TABC
regulations require bars to report how much inventory was sold, spilled, and compd, and the IRS requires
tip reporting. Currently the system is very data input intensive and the excel spreadsheet tabulates data
using formulas. Our team will analyze and design a system to automate the reporting process and record
inventory, sales, and scheduling data significantly faster using simple user interfaces for bar staff to
directly enter sales data into a database.

Recommendations:
- Implement a data backup system
- Create separate views/interfaces for bar staff
- Streamline the recording process for more accurate inventory tracking

1 of 76

GMC Investments
System Service Request
Date: February 5, 2015

Requestor: Colleen Johnson, Accounting Controller


Date: February 1, 2015
Department: Accounting
Location: 12207 Tanglewild Drive, Austin TX 78758
Contact Information: (512) 832-2164 ccjohnson123@yahoo.com

Type of Request:
New System

Justification:
The state of Texas has increased regulations in reporting the sale of alcohol broken down by liquor, beer,
and wine. The State Comptroller requires lump sum dollar sales for the month broken down into the three
categories, as well as complimentary and spilled drinks. The state audits based on how much alcohol is
purchased as compared to how much is reported in total sales. The state converts liter or .750 liter bottles
to total gallons then divides by the companys average pricing to determine if enough sales are reported.
Additionally, the state requires a physical inventory count to be performed at least once a month. The
current system does not integrate day prices and night prices to create average pricing costs for reporting.
Continued regulations are causing strain on the system, slowing down reporting. Furthermore, all
inventory counts are performed manually and entered into the system by the accounting department,
increasing the risk of human error.

Service Request:
The accounting department requests a new information system which reports the total unit sales of
alcohol based on daily transactions. This system should include day prices as well as night prices,
wholesale prices paid to distributors, and current inventory based on sales and physical counts.

Approver Signature: _________________________


Approver Name and Title: _________________________
Date: _________________________

Reasons for Rejection:


___________________________________________________________

2 of 76
GMC Investments
Project Gantt Chart
Date: February 9, 2015
ID Task Name Duration Start Finish Predecessors b 1, '15 Feb 8, '15 Feb 15, '15 Feb 22, '15 Mar 1, '15 Mar 8, '15 Mar 15, '15 Mar 22, '15 Mar 29, '15 Apr 5, '15 Apr 12, '15
T T S M W F S T T S M W F S T T S M W F S T T S M W F S T T S M W F S T T
1 SystemAnalysisand 1day Thu2/5/15 Thu2/5/15
DesignProjectInitiation

2 SystemServiceRequest 1day Fri2/6/15 Fri2/6/15 1


3 ExecutiveSummary 2days Mon2/9/15 Tue2/10/15 2
4 Ganttchart 2days Wed2/11/15 Thu2/12/15 3
5 NetworkDiagram 2days Fri2/13/15 Mon2/16/15 4
6 TaskResponsibilityMatrix 2days Tue2/17/15 Wed2/18/15 5
7 ProjectCommunication 2days Thu2/19/15 Fri2/20/15 5
Matrix

8 ProjectPlan 2days Mon2/23/15 Tue2/24/15 7,6


9 Statementofworkand 2days Wed2/25/15 Thu2/26/15 8
projectscope

10 SystemDescription 2days Wed2/25/15 Thu2/26/15 8


11 FeasibilityAnalysis 3days Fri2/27/15 Tue3/3/15 9,10
12 ManagementIssues 3days Wed3/4/15 Fri3/6/15 11
13 System'sTask 3days Fri2/27/15 Tue3/3/15 10
ResponsibilityMatrix

14 System'sProject 3days Thu3/12/15 Mon3/16/15 10


CommunicationMatrix

15 InterfaceDesign 7days Tue3/17/15 Wed3/25/15 14,12,13


16 ProcessDescription 3days Thu3/26/15 Mon3/30/15 15
17 DataDesciption 6days Tue3/31/15 Tue4/7/15 16
18 CompletedSystem 6days Wed4/8/15 Wed4/15/15 17
AnalysisandDesign
3 of 76

Task Project Summary Manual Task Start-only Deadline

Project: Group Project.mpp Split Inactive Task Duration-only Finish-only Progress


Date: Fri 4/17/15 Milestone Inactive Milestone Manual Summary Rollup External Tasks Manual Progress

Summary Inactive Summary Manual Summary External Milestone


GMC Investments
Project Communication Matrix
Date: February 9, 2015

General Project Information
Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Stakeholder Document Format Team Contact Due Date


IRS Regulation Inquiries Email Sid, Jazz First Monday of the month
TABC Regulation Inquiries Email Kristen, Sid Every other Monday
GMC Investments Project Status Report Phone, Email Nia, Kristen Every Monday
Suppliers Inventory Inquiries Email Johnson, Nia Every other Monday
Employees Project Status Report Hard Copy Jazz, Johnson First Monday of the month

7 of 76
GMC Investments
Project Task Responsibility Matrix
Date: February 9, 2015

General Project Information


Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Task-Responsibility Matrix
Project: IT Infrastructure Analysis for GMC Prepared by: Jazz Hawk Legend:
Investments P=
Primary
Manager: Johnson Ward Page: 1 of 1 S=
Support
Responsibility Matrix
Task ID Task Kristen Jazz Johnson Nia Sid
A1 Executive Summary P S S S S
A2 Planning Deliverables and Obtain System S S P
Service Request
B1 Develop the Project Plan P S S
B2 Design and Analyze the System S S P
C1 Develop Interface Design S P S
C2 Create Dialogue Diagram P S S
D1 Develop Process Description P S S
E1 Develop Data Model S S P
E2 Data Dictionary S P
F Final Due Date S S S P S

8 of 76
GMC Investments
Statement of Work and Project Scope
Date: March 20, 2015

Project Name: IT Infrastructure Analysis for GMC Investments


Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Problem / Opportunity:
GMCs current TABC reporting system, scheduling system, and inventory management system are not
automated. The current reporting system is very time consuming because it requires manual tabulation of
inventory reporting and then manual data entry by the accounting department, increasing the risk of human
error. The current system also does not integrate day prices and night prices to create average pricing costs
so averages have to be recalculated with every change. Continued regulations are causing strain on the
system, slowing down reporting. GMCs scheduling system is done by manually cross referencing employee
availability and entering it into an excel schedule. Inventory management is also done by manually keeping
tabs on inventory levels.

Project Objectives:
To streamline existing reporting, scheduling, and inventory management systems to enable GMCs personnel
to work more efficiently by automating each function in one comprehensive system backed by a database.

Project Description:
A new information system will be created to extract POS sales data for each reporting category and use it to
produce TABC pdf reports, monitor current inventory to prevent shortages and excess, and schedule
employees for shifts. All of these systems will be backed by one database and the project will follow the
systems development life cycle.

Business Benefits:
Improved reporting efficiency
Improved utilization of bar employees
Improved inventory management
Reduced time commitment from upper level management

Project Deliverables:
TABC reporting tool analysis and design
Scheduling tool analysis and design
Inventory management analysis and design
Documentation and training procedures

Estimated Project Duration: 3 Months

9 of 76
GMC Investments
System Description
Date: March 20, 2015

Project Name: IT Infrastructure Analysis for GMC Investments


Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Alternatives:

The current system houses duplicate copies of information within the POS system and numerous Excel files
containing wholesale prices, sales prices, physical inventory records from manual reports, and employee
data. The system currently relies on bar employees manually recording information followed by the
accounting department entering the information into the numerous Excel files. Also, scheduling is not
integrated in the current POS system and requires manual creation on an existing Excel template.

Alternative configurations include making a separate scheduling system that would require only bar
employee access with no involvement from the accounting department. Similarly, a separate system for the
accounting department could be implemented taking the sales price list and projected units of alcohol sold
directly from the POS system for reconciling to manual reports on physical inventory. An additional
alternative would be to outsource all IT systems rather than compile the information for TABC reporting.

The alternative designs would continue to rely on some manual inputs though, perpetuating the likelihood of
human error. Additionally, the system would not provide the benefit of demonstrating which employees are
responsible for the highest variance in physical inventory versus projected inventory without additional
manual manipulation of data. Outsourcing would not be feasible for the company due to its small size and
the continued reliance on manual data input.

Detailed project description:

We propose creating an integrated system backed by an all-inclusive database which would manage
inventory, TABC reporting, and scheduling tools to increase efficiency.

TABC Reporting Tool

Inputs:
A user interface will collect the ending volumes of inventory per alcohol bottle or container at the end of
each shift. This user interface will also allow employees to export sales data and the days current price sheet
from the POS system into the new system. The data import will eliminate points of error and any change in
pricing from the POS including specials, etc. will be reflected in the average price for that day. Additionally
employees can record spilled and complementary drinks to account variances in ending inventory.

10 of 76
Outputs:
The system will ultimately produce TABC reports daily and an aggregate monthly which include total sales
data, total sales for each reporting category, average sales price of each category, the total change in
inventory in gallons per category, and reconcile the physical inventory change to the projected change based
on sales.

Additionally the system will provide reports on the variance between physical inventory counts and
projected inventory based on sales to identify employees who are pouring too much or too little, or
potentially violating TABC laws by not recording the distribution of alcohol.

System Design:
Inputs gathered in the user interface will be stored in an access database containing inventory, pricing, sales,
employee, and TABC reporting data.

In order to produce the TABC reports, the system will take the input ending inventory and calculate the
change in inventory in ounces based on beginning inventory data from the previous shift in the inventory
management tool. The system will then categorize the change in inventory into three separate reporting
categories of wine, liquor, and beer and aggregate the total change in each segment. Next the system will
convert the change in ounces per segment into gallons.

Finally the system will allow for reconciling the actual gallons used to expected volumes of sales based on
POS sales data.

Scheduling Tool

Inputs:
A user interface accessible by the bar employees will collect available days and shift times for each
bartender on a monthly basis. The interface will allow managers to input the necessary number of employees
required for each shift.

Outputs:
The system will produce a listing of available employees for each shift that the bar manager has access to in
order to create the schedule for the month.

System Design:
The database will house employee information including employee IDs, name, title, etc. The employee will
input their employee ID followed by the shifts they are available to work for the month. The system will
aggregate all inputs by the employees and display the information to the manager. Additionally, the system
will prompt the manager for the desired number of shifts per day. The manager will use these inputs to create
the schedule for the month. The system will have a control in place preventing the manager from scheduling
an employee to work a double shift.

11 of 76
Inventory Management Tool:

Inputs:
Bar employees will enter daily physical inventory totals for all liquor, beer, wine, and non-alcoholic
beverages. Additionally, bar employees will export a listing of drinks sold daily from the POS system.
Management will input a threshold for each item sold that must be on hand at all times.

Outputs:
The system will notify management when the threshold for any item is reached in order for management to
create a new order from the appropriate distributor. Additionally, the system will provide daily reports on
what alcohols account for the highest 10 percent of sales.

System Design:
The system will categorize each type of drink, liquor, wine, beer, and non-alcoholic beverages into groups
based on inventory item. The system will take the inputs from physical inventory counts and compare them
to the threshold established by management. A notification to management will be created when the re-order
threshold for any certain item is met. Additionally the system will maintain a listing of the highest 10 percent
of sales for management to use for sales strategies.

12 of 76
GMC Investments
Feasibility Analysis
Date: March 20, 2015

Project Name: IT Infrastructure Analysis for GMC Investments


Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Feasibility analysis

The new system is estimated to increase sales and reduce inventory costs. We determined that a reduction in
inventory costs by 9% per year was the best metric to use, although alcohol prices are expected to increase
by 1.2% per year. This cost savings is attributed to greater efficiency from bartenders by simplifying
inventory reporting, better inventory management, better procurement planning to take advantage of vendor
deals, and purchasing based on sales trends.

Net Present Value (NPV) Analysis 2015 - 2020


Years
2015 2016 2017 2018 2019 2020 TOTALS
Net Economic Benefits $0 $10,980 $11,112 $11,245 $11,380 $11,517
Discount rate (5%) 1.0000 0.9524 0.9070 0.8638 0.8227 0.7835

PV of benefits $0 $10,457 $10,079 $9,714 $9,362 $9,024 $48,636

NPV of benefits $0 $10,457 $20,536 $30,250 $39,612 $48,636 $48,636

One Time Costs ($17,000) $0 $0 $0 $0 $0 ($17,000)

Recurring Costs $0 ($2,600) ($2,600) ($2,600) ($2,600) ($2,600)


Discount rate (5%) 1.0000 0.9524 0.9070 0.8638 0.8227 0.7835
PV of recurring costs $0 ($2,476) ($2,358) ($2,246) ($2,139) ($2,037) ($11,257)

NPV of all costs ($17,000) ($19,476) ($21,834) ($24,080) ($26,219) ($28,257) ($28,257)

Overall NPV $20,379

Continued on next page --

13 of 76
Estimated benefits (cost savings) in 2016
Liquor cost $46,000.00
Beer cost $56,000.00
Wine cost $20,000.00
Total cost $122,000.00

Expected cost savings due to new inventory system 9%

Total benefit in 2016 $10,980.00


Yearly change in alcohol prices: 1.20%

One Time Costs


2015
Development Costs $5,000
Consulting Fees $10,000
New Hardware $1,000
New Software $1,000
User Training $0
Total $17,000

Recurring Costs (yearly)


2016 - 2020
Application software
$2,000
maintenance
Incremental data storage $500
Supplies $100
Total $2,600

Breakeven Analysis
2015 2016 2017 2018 2019 2020
Yearly NPV Cash flow ($17,000) $7,981 $7,720 $7,468 $7,223 $6,986
Overall NPV Cash flow ($17,000) ($9,019) ($1,299) $6,169 $13,393 $20,379

To calculate the breakeven time, ($7468-$6169)/$7468 = 2.17 years.


Breakeven occurs after 2.17 years or sometime in 2018.

Intangible Benefits

Increased bartender morale


Better customer service and higher customer satisfaction

14 of 76
Cost/Benefit Recommendation:

The Economic Feasibility Analysis shows that the project will result in a positive NPV of $20,379 over the
next five years. Moreover, the return on investment (ROI) and Internal Rate of Return (IRR) are
considerably high with 0.72 and 28% respectively. Based on this analysis we will suggest GMC Investments
to move forward with this project.

Technical Analysis

The new system for TABC reporting, scheduling and inventory management will require GMC Investment
employees to operate basic computing and database tools such as MS Excel and MS Access. The new system
will gather outputs from currently placed Point-of-Sale (POS) system. The exporting data format from the
current POS system is simple CSV, which will be compatible with the new system. Moreover, GMC
Investments will need to rent data storage equipment for about 10GB every year, which will cost
approximately $5 per GB totaling up to $500 per year.

Considering the fact that such modifications to the current system are easy to adapt to and that proper
training will be provided to the employees to get them familiar with the new system in place, GMC
Investment is quite technically capable of implementing a new reporting, scheduling and inventory
management system.

Impact Analysis
The overall operational objective of the new system is to automate several labor-intensive tasks currently
performed by GMC Investment staff members. At present, a variety of off the shelf software tools and
physical record systems are pieced together to produce the required inventory and sales information. These
elements are integrated by human input. Our system will capitalize on existing practices, such as inventory
counts, by replacing pen and ink record keeping with data inputs into the system, which will automatically
use the input data to calculate and report sales.

Legal & Contractual Analysis


Our system seeks to assist GMC Investments in complying with TABC reporting requirements. Therefore,
legal regulations and requirements are the function of the system. Ease and automation of compliance is the
major goal of the project.

Political Analysis
As the owner of GMC Investments is the explicit sponsor of the project, top-level political resistance from
within the organization is of little threat. Other stakeholders in this project include employees and managers
of various levels within GMC Investments. These individuals may be apprehensive during the development
and at the initial adoption of the new system, but with proper training and support, they will be able to see
how the system integrates work and makes their jobs easier. If properly communicated and executed, the
goal of process simplification can be used to sway stakeholders and clear a smooth path for the system
within the organization.

Resource Analysis
Required resources include: data base system, employee/end-user feedback, data base system development
team, inventory information, legal requirements, access to GMC Investments current software systems and
many more. The project team will use these resources to automate and integrate reporting compliance to
TABC. None of these resources are cost prohibitive to obtain, however they are all unique and of critical
importance to the development of the project.

15 of 76
GMC Investments
System Communication Matrix
Date: March 20, 2015

Project Name: IT Infrastructure Analysis for GMC Investments


Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Stakeholder Document Format Team Contact Due Date


IRS Regulation Inquiries Email Sid, Jazz First Monday of the month
TABC Regulation Inquiries Email Kristen, Sid Every other Monday
GMC Investments Project Status Report Phone, Email Nia, Kristen Every Monday
Suppliers Inventory Inquiries Email Johnson, Nia Every other Monday
Employees Project Status Report Hard Copy Jazz, Johnson First Monday of the month

16 of 76
GMC Investments
System Task Responsibility Matrix
Date: March 20, 2015

Project Name: IT Infrastructure Analysis for GMC Investments


Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Task ID Task Kristen Jazz Johnson Nia Sid


A1 Executive Summary P S S S S
A2 Planning Deliverables and Obtain System S S P
Service Request
B1 Develop the Project Plan P S S
B2 Design and Analyze the System S S P
C1 Develop Interface Design S P S
C2 Create Dialogue Diagram P S S
D1 Develop Process Description P S S
E1 Develop Data Model S S P
E2 Data Dictionary S P
F Final Due Date S S S P S

Legend:
P = Primary
S = Support

17 of 76
ID Task Task Name Duration Start Finish Predeces5, ' Feb 1, '1Feb 8, '1Feb 15, Feb 22, Mar 1, '1Mar 8, '1Mar 15, Mar 22, Mar 29, Apr 5, '1Apr 12, Apr 19, Apr 26, May 3, ' May 10, May
Mode F M T S W S T F M T S W S T F M T S W S T F M T S W S T F M T S W S T F M
1 Analysis of Reprting, 6 days Mon 2/2/15 Mon 2/9/15
scheduling, and inventory
systems

2 Interview sponsor 2 days Mon 2/2/15 Tue 2/3/15

3 Reporting Design 20 days Tue 2/10/15 Mon 3/9/15 1,2

4 Scheduling Design 10 days Tue 2/10/15 Mon 2/23/15 1,2

5 Inventory Design 10 days Tue 2/10/15 Mon 2/23/15 1,2

6 Develop Database Design 7 days Tue 3/10/15 Wed 3/18/15 3,4,5

7 Integrate Database Design 6 days Thu 3/19/15 Thu 3/26/15 6

8 Prototype 15 days Fri 3/27/15 Thu 4/16/15 7

9 Evaluate and Test 6 days Fri 4/17/15 Fri 4/24/15 8

10 Implement Database 10 days Mon 4/27/15 Fri 5/8/15 9

11 Training and Feedback 5 days Mon 5/11/15 Fri 5/15/15 10

Task Inactive Task Manual Summary Rollup External Milestone

Split Inactive Milestone Manual Summary Deadline


Project: ProjectNetworkDiagram
18 of 76

Milestone Inactive Summary Start-only Progress


Date: Sun 4/19/15
Summary Manual Task Finish-only Manual Progress

Project Summary Duration-only External Tasks

Page 1
GMC Investments
IT Infrastructure Analysis
Interface Design
Form: 0 Log In Form

Users: Employees and Managers

Task: Employees and Managers use this to log-in to the main menu

System: Microsoft Excel

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

21 of 76
Screen: 1. Main Menu Screen

Users: Employees and Managers

Task: Employees and Managers can select different tools / functions within the
system

System: Microsoft PowerPoint

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

22 of 76
Screen: 2 Inventory Management Screen

Users: Employees and Managers

Task: Employees and Managers can select different tools / functions within
Inventory Management

System: Microsoft PowerPoint

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

23 of 76
Report: 2.1 Inventory on Hand Report

Users: Employees

Task: Provides user with current inventory information

System: Microsoft Excel

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

Comments:

24 of 76
Report: 2.2 Inventory on Order Report

Users: Employees and Manager

Task: Employees and managers can view this report to know what inventory has
been ordered

System: Microsoft Excel

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

25 of 76
Alert: 2.3 Inventory Min Ordering Alert

Users: Employees

Task: Alerts employees when inventory falls below specified levels

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Edit Minimums Help

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

Comments:

26 of 76
Form: 2.4 Sales Data Import Form

Users: Employees

Task: Employees use this screen to import selected sales data from Aloha, the point
of sales software system

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

27 of 76
Help Information 2.4 Sales Data Import Form (POS System)
The intent of this screen is to retrieve sales data from Aloha system. This form is used by employees to
import sales data from Aloha into the inventory management system.

Field Descriptions

1. Beer Sales Sale of beer between dates


2. Wine Sales Sale of wine between dates
3. Liquor Sales Sale of liquor between dates
4. All Sales Sale of all types of alcohol between dates
5. From: ____ To: ____ Dates to identify the period from which sales are
wanted
6. Import Importing sales into inventory system

Special Function Keys

F1 = Help (To show this screen)

F2 = Print

28 of 76
Form: 2.5 New Inventory Shipments / Receiving Form

Users: Employees

Task: Allows employees to enter new inventory information when shipments are
received

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

Comments:

29 of 76
Help Information 2.5 New Inventory Shipments / Receiving Form
This form helps employees record new inventory when a shipment is received and lets update the
inventory levels.

Field Descriptions

1. Category Category of alcohol product


2. Product Name Name of the product
3. Container (size) Size of the container
4. Quantity Number of containers received

Description of Category

1. Beer
2. Wine
3. Liquor

Description of Product Name

1. Heineken
2. Shiner
3. Blue Moon
4. Chardonnay
5. Merlot
6. Black Label
7. Red Label

Button Guide

1. Add another item Allows the user to add another item


2. Enter Inventory Received Submits changes on this form to the inventory system
3. Create New Item Takes the user to the Create New Item form

Special Function Keys

F1 = Help (To show this screen)

F2 = Print

30 of 76
Form: 2.6 Purchase Ordering Form

Users: Manager

Task: Allows manager to set inventory levels to alert employees of need to reorder
specific inventory items

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

31 of 76
Help Information 2.6 Purchase Order Form
The intent of this screen is to allow manager to set inventory levels. When the inventory of a certain
alcohol product will go below the set level, employees will be alerted to re-order that product.

Field Descriptions
1. Select Category Selection of category of alcohol product
2. Select Type Selection of type of alcohol product
3. Select Product Selection of specific product
4. Select Size/Container Selection of size/container for product
5. Minimum Level

Description of Category
1. Beer
2. Wine
3. Liquor

Description of Type
1. Top Shelf
2. Premium

Description of Product
1. Heineken
2. Shiner
3. Blue Moon
4. Chardonnay
5. Merlot
6. Black Label
7. Red Label

Description of Size
1. 1 liter
2. 2 liter

Special Function Keys


F1 = Help (To show this screen)
F2 = Print

32 of 76
Form: 2.7 Create New Item Form

Users: Employees

Task: Allows users to create new inventory item

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

33 of 76
Help Information 2.7 Create New Item Form
This form helps employees record new inventory when a shipment is received and lets update the
inventory levels.

Field Descriptions

1. Category Category of alcohol product


2. Product Name Name of the product
3. Container (size) Size of the container
4. Classification Classification of product

Description of Category

1. Beer
2. Wine
3. Liquor

Button Guide

1. Create new item and export to alpha Submits information on this form to Aloha

Special Function Keys

F1 = Help (To show this screen)

F2 = Print

34 of 76
Form: 2.8 Import Projected Inventory Form

Users: Employees

Task: Employees use this screen to import projected inventory data based on sales
from Aloha, the point of sales software system

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

35 of 76
Help Information 2.8 Import Projected Inventory Form
This form helps employees import projected inventory data based on sales from the point of sale software
system

Field Descriptions
1. Bottled Beer As of: Input a date in mm/dd/yyyy format
2. Keg Beer As of: Input a data in mm/dd/yyyy format
3. Liquor As of: Input a data in mm/dd/yyyy format
4. Wine As of: Input a data in mm/dd/yyyy format

Button Guide:
1. Import from Aloha Imports data from Aloha

Special Function Keys:


F1 = Help (To show this screen)
F2 = Print

36 of 76
Report: 2.8.1 Projected Inventory Report

Users: Managers

Task: Managers use this report to import projected inventory amounts based on
sales form Aloha

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

37 of 76
Screen: 3 TABC Reporting Tool

Users: Employees and Managers

Task: Employees and Managers can select different tools / functions within TABC
Reporting Tool

System: Microsoft PowerPoint

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

38 of 76
Form: 3.1 Physical Inventory Count Form

Users: Employees

Task: Employees use this form to perform physical inventory counts

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

39 of 76
Help Information 3.1 Physical Inventory Count Form
The intent of this screen is to obtain a physical count of all inventory on site. Employees use this form to
maintain a physical count of inventory for TABC reporting purposes and inventory control.

Field Descriptions

7. Unopened Whole Bottles Number of unopened bottles for a specified inventory


item
8. Opened % Remaining % of liquid in opened bottle of a specified inventory
item
All percentages are in increments of 10

Special Function Keys

F1 = Help (To show this screen)

F2 = Print

40 of 76
Form: 3.2 Sales Price Modification Form

Users: Mangers

Task: Managers use this screen to modify prices for all inventory

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

41 of 76
Help Information 3.2 Sales Price Modification Form
The intent of this screen is to allow manager to set sales price. Current price for each inventory item is
listen with a field to update price. If price is not updated, the current price is used by default.

Field Descriptions

6. New Price Selection of category of alcohol product

Button Guide

4. Save New prices are saved in the database but not transferred to
Aloha
Advised for price changes during client serving times
5. Save & Export New prices are saved in the database and exported to Aloha

Special Function Keys

F1 = Help (To show this screen)

F2 = Print

42 of 76
Form: 3.3 Sales Price Export Form

Users: Managers

Task: Managers use this message box to confirm export of sales prices to Aloha

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

43 of 76
Help Information 3.3 Sales Price Export Form
This form allows managers to export the pricelist saved in the database to Aloha.

Button Guide

1. Yes Prices from database are exported to Aloha


2. No Prices are not exported, return to previous screen

Special Function Keys

F1 = Help (To show this screen)

F2 = Print

44 of 76
Report: 3.4 TABC Report

Users: Managers

Task: Managers generate this report to demonstrate the number of units sold and the
revenue recorded for tax purposes

System: Microsoft Excel

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

45 of 76
Report: 3.5 Variance Report

Users: Managers

Task: Managers use this report to reconcile the variance between projected and
physical inventory

System: Microsoft Excel

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

46 of 76
Screen: 4 Scheduling Tool

Users: Employees and Managers

Task: Employees and Managers can select different tools / functions within the
system

System: Microsoft PowerPoint

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

47 of 76
Form: 4.1 Create Schedule Form

Users: Managers

Task: Managers use this screen to create a custom schedule for specific dates and modify the
shift times and shift requirements. The output of filling out this form is the Employee
Scheduling Tool Form, a customized schedule form in which employees can be
assigned to shifts.
System: Microsoft Access
Environment: Standard Office Environment
Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

48 of 76
Help Information 4.1 Create Schedule Form
This form helps managers to create a custom schedule for specific dates and modify the shift times and
shift requirements. The output is the Employee Scheduling Tool Form.

Field Descriptions
1. For Dates: Insert date schedule begins on in mm/dd/yyyy format
2. To Date: Insert date schedule ends on in mm/dd/yyyy format
3. # of Shifts Insert the number of shifts desired on a particular date
4. # of Shifts Insert the number of shifts desired on a particular date
5. # of Shifts Insert the number of shifts desired on a particular date
6. Shift 1 Insert the number of employees needed per shift on given date
7. Shift 2 Insert the number of employees needed per shift on given date
8. Shift 3 Insert the number of employees needed per shift on given date

Description of Shifts:
Maximum of 3 shifts per day (morning, mid-day, and night)
Button Guide:
1. Modify Shift Times Saves the change in shift times
2. Save Saves the new schedule that was created

Special Function Keys:


F1 = Help (To show this screen)
F2 = Print

49 of 76
Form: 4.1.1 Modify Shift Times Form

Users: Managers

Task: Managers use this report to modify default shift times in order to create
schedules

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

50 of 76
Help Information 4.1.1 Modify Shift Times
This form helps managers to modify default shift times in order to create schedules

Field Descriptions
1. Date to Modify Insert date to modify in mm/dd/yyyy format
2. Shift Number Insert shift number to change
3. Shift Begin Time Insert shift begin time (Morning, Mid-day, night)
4. Shift End Time Insert shift end time (Morning, Mid-day, night)

Button Guide:
3. Save Saves the modifications to shift times

Special Function Keys:


F1 = Help (To show this screen)
F2 = Print

51 of 76
Form: 4.2 Assign Employees to Schedule Form

Users: Manager

Task: Managers use this form to assign employees to specific shifts on a created
schedule

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

* The blank boxes represent where data already input on the Schedule Creation form will be displayed, not entered. That data
cannot be modified without opening the Schedule Creation form and reopening the Scheduling Tool Form.

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

52 of 76
Help Information 4.2 Assign Employees to Schedule Form
This form helps managers assign employees to specific shifts on a created schedule

Field Descriptions
1. For Dates: Insert date schedule begins on in mm/dd/yyyy format
2. To Date: Insert date schedule ends on in mm/dd/yyyy format
3. # of Shifts Insert the number of shifts desired on a particular date
4. # of Shifts Insert the number of shifts desired on a particular date
5. # of Shifts Insert the number of shifts desired on a particular date
6. Shift 1 Insert the number of employees needed per shift on given date
7. Shift 2 Insert the number of employees needed per shift on given date
8. Shift 3 Insert the number of employees needed per shift on given date
9. Employee Assigned Select the Employee in which to schedule for that shift

Button Guide:
1. Save Saves the employee assignments per shift

Special Function Keys:


F1 = Help (To show this screen)
F2 = Print

53 of 76
Report: 4.3 Finalized Schedule Report

Users: Employees and Manager

Task: Managers use this report to review and notify employees of their scheduled
shifts

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

54 of 76
Form: 4.4 Employee Availability Form

Users: Employees

Task: Employees use this form to indicate which shifts they can work.

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

55 of 76
Help Information 4.4 Employee Availability Form
This form helps employees indicate which shifts they are available to work

Field Descriptions
1. Employee ID Input Employee ID number for Employee
2. Employee Name Input Employees Name
3. Make Employee Inactive Check box if want to make employee inactive
4. Shift Times check boxes Check boxes under shift in which employee is available to work

Button Guide:
2. Save Saves the employee assignments per shift

Special Function Keys:


F1 = Help (To show this screen)
F2 = Print

56 of 76
Report: 4.4.1 Employee Availability Summary Report

Users: Managers

Task: Managers use this report to analyze the availability of their employees

System: Microsoft Access

Environment: Standard Office Environment

Sample Design:

*Empty Boxes will be green to show available and red to show unavailable next to each employees
record.

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

57 of 76
Screen: 5 Log Off

Users: Employees and Managers

Task: Employees and Managers can choose to log off or cancel logging off.

System: Microsoft PowerPoint

Environment: Standard Office Environment

Sample Design:

Testing & Usability Assessment


Please Rate 1-5 (5 being highest)
Sample Size (15 users)
-Simplicity: _____
-Functionality: _____
-Overall Satisfaction: _____

58 of 76

ExternalEntities
POS:TheAlohaPointofSaleSystemtracksandcanexportdetailedsalesandsalesprojection
datatothesystem.ThePOSalsoreceivespricingdatafromthesysteminordertocalculate
salesandoutputsalesreports.
AccountingDepartment:TheAccountingDepartmentspecifiesdailypricesforimportintothe
systemforuseinTABCReporting,andultimatelyforthePOSsystemaswell.Accountingalso
receivesaVarianceReporttoreconciledifferencesbetweenprojectedinventorydepletionand
actualinventorydepletion.

59 of 76
TABC:TheTABCreceivesInventoryDepletionDatafortaxationpurposestodeterminethat
thebarispayingtaxesonallofitsalcoholsales.
BarManagement:BarManagersspecifythenumberofshiftsperday,thenumberofstaff
neededforshifts,andthecreateschedulesbyassigningBarEmployeestoshifts.BarManagers
thensendfinalizedschedulestoBarEmployees.
BarEmployee:BarEmployeesspecifytheirworkavailability.BarEmployeesareassignedto
workshiftsandreceivethefinalizedweeklyschedule.Theyalsophysicallydetermineand
documentinventorylevelsatthecompletionoftheirshiftstobeusedinTABCreporting.

DataFlows:
.
Sales&ProjectionData:date,salesbycategory,projectedinventorydepletionbycategory,
PricingData:inventoryitemnumber,inventoryitemname,price,datespriceisvalid,
DepletionData:date,inventorydepletionbycategory,salesbycategory,averagesalesprices
bycategory,totaltaxdue
VarianceReport:reportingperiod,varianceinprojecteddepletionandphysicaldepletionby
category,
StaffingScheduleData:scheduledateperiod,shiftsrequiredperday,employeesrequiredper
shift,
StaffSchedule:scheduledateperiod,assignedshifttimes,numberofshiftsperday,employees
assignedtoshifts
EmployeeSchedule:employeename,scheduledateperiod,numberofshiftsperday,
employeesassignedtoshifts,assignedshifttimes,otheremployeesassignedtothoseshift
times,
AvailabilityData:employeeID,employeename,scheduledates,availabilityforspecific
shifts,

60 of 76

Process1.0Scheduling
AcceptsstaffneedsdatafromBarManagementandemployeeavailabilitydatafromBar
Employee
Afterprocessingthedataabove,acceptsStaffAssignmentDatafromBarManagementto
createfinalemployeeschedulefortheweek
CreatesEmployeeScheduleusingallthedata
ForwardsEmployeeScheduletoBarManagementandBarEmployees

Process2.0TABCReporting
AcceptsdepletiondatafromtheInventoryManagementProcess

61 of 76
CreatesTABCdepletionreport
ForwardsthereporttoTABCforperiodicreporting

Process3.0InventoryManagement
AcceptssalesandprojectedinventorydatafromPOSsystemandphysicalinventorydatafrom
BarEmployee
Createsvariancereport
ForwardsvariancereporttotheAccountingDepartment
ForwardsphysicaldepletiondatatoProcess2(TABCReporting)
Acceptssalespriceexportformfromtheaccountingdepartmentandforwardsthepricingdata
toPOSsystem

DataFlowsUniquetothisDiagram
PhysicalInventoryDepletionData:physicalinventorydepletiondatabyinventorycategory,
associatedsalesprices

62 of 76

Process1.1
AcceptsstaffingneedsdatafromBarManagementandcreatesablankscheduletemplatebased
onstaffingneedsforshiftseachweek
Forwardsstaffrequirementsfromthistemplatetoprocess1.3

Process1.2
AcceptsemployeeavailabilitydatafromBarEmployeeandcreatesweeklyemployee
availabilitychart
Forwardsthisemployeeavailabilitydatafromthischarttoprocess1.3

Process1.3
Acceptsemployeeavailabilitydatafromprocess1.2andstaffrequirementsfromprocess1.1
AcceptsstaffassignmentdatafromBarManagementtogeneratefinalweeklyschedule
ForwardsfinalweeklyscheduledatatoBarManagementandBarEmployee

DataFlowsUniquetothisDiagram
Staffrequirementsfromblankscheduletemplate:Dateandtimeofeachshiftaswellasnumber
ofemployeesrequiredpershift
Employeeavailabilitydatafromthechart:Datesandtimeseachemployeeisavailabletowork

63 of 76

Process2.1
Acceptsphysicalinventorydepletiondatafromprocess3.0
Calculatestotaltaxablesalesamount
Forwardstaxablesalesdatatoprocess2.2

Process2.2
Acceptstotaltaxablesalesamountfromprocess2.1
CompilestaxablesalesdataandactualsalesdataforcomparisonbyTABC
Forwardinformationtoprocess2.3

Process2.3
Acceptsadjustedtaxablesalesamountsforvariance/errorfromprocess2.2
Appliestaxratetocalculatetaxesdue
ForwardsTABCDepletionReporttoTABCReporting

DataFlowsUniquetothisDiagram
TotalTaxableSalesAmount:Totalamountofdollarsalessubjecttotaxation
AdjustedTaxableSalesAmountsforVariance/Error:Salesdatafrominventorysystem
comparedagainstsalesdatafromPOSSystem

64 of 76

Process3.1
AcceptsphysicalinventorydatafromBarEmployee
Aggregatestotaldepletedinventorydataofeachcategory
Forwardsinventorydepletionamountstoprocess3.2

Process3.2
Acceptsinventorydepletionamountsfromprocess3.1
Aggregatesdepletionlessspillallowancesbycategory
Forwardsphysicalinventorydepletiondatatoprocess2.0

Process3.3
AcceptssalesandprojectiondatafromPOSsystem
Createsprojectedinventoryreports
Forwardsdatafromthisreporttoprocess3.4

Process3.4
Acceptsprojectedinventorydatafromprocess3.3
Createsvariancereport
Forwardsdatafromthisreporttoaccountingdepartment

65 of 76

Process3.5
Acceptssalespriceexportformfromaccountingdepartment
ForwardsthisdatatothePOSsystem

DataFlowsUniquetothisDiagram
ProjectedInventoryreport:Formateddataforprojectedinventorybasedonsalesamountsfor
eachinventoryitem
PhysicalInventoryReport:Formateddataforphysicalcountofeachinventoryitem
InventoryDepletionAmounts:Changeinphysicalinventoryforeachinventoryitem

66 of 76

Process1.1.1
BarManagementdeterminesthetimingandnumberofshiftsrequiredforaspecificweek
ForwardsinformationtoProcess1.1.2

Process1.1.2
AcceptsshiftinformationfromProcess1.1.1
BarManagementinputsnumberofemployeesrequiredpershift
ForwardsinformationtoProcess1.3

DataFlowsUniquetothisDiagram
WeeklyShiftRequirementData:Dateandtimeofeachshiftneededtobefilledbyemployees

67 of 76
GMC Investments
ERD
Date: April 6, 2015
General Project Information
Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward
Distributor Supplies/Issuppliedby

PK DistributorID
Inventory
Employee
Name
PK InventoryID
PK EmployeeID
ContactName
Name
Address Name
Supervises/
Issupervisedby
WholesalePrice
Phone Address

SalesPrice
Email Phone

Type Isauthorizedby/Authorizes
PayRate
Iscomprisedof/Comprises
FK DistributorID
JobTitle

PhysicalCount
EmpSupervisor

ProjectedCount

SalesItem
Size

PK FK InventoryID

Schedule
PK FK SalesID
Isavailable
PurchaseOrder PK Date
Qty
Itemonorder PK Shift
PK OrderID

Iscontainedin/Contains
Includes/Isincludedin NumberOfEmp
FK EmployeeID Schedules/Isscheduledby

OrderDate
Sales
InvOrder InvReceived
PK SalesID
PK FK InventoryID

FK EmployeeID EmpShift
PK FK OrderID

FK Date PK FK EmployeeID
Qty
FK Shift PK FK Date

SalesPrice PK FK Shift
68 of 76
GMC Investments
Relational Schema
Date: April 6, 2015
General Project Information
Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Distributor (DistributorID, Name, ContactName, Address, Phone, Email)


PurchaseOrder (OrderID, EmployeeID^, OrderDate, InvReceived)
Inventory (InventoryID, Name, WholesalePrice, SalesPrice, Type, DistributorID^, PhyscialCount,
ProjectedCount, Size)
InvOrder (InventoryID^, OrderID^, Qty)
SalesItem (InventoryID^, SalesID^, Qty)
Employee (EmployeeID, Name, Address, Phone, PayRate, JobTitle, EmpSupervisor)
EmpShift (EmployeeID^, Date^, Shift^)
Schedule (Date, Shift, NumberOfEmp)
Sales (SalesID, EmployeeID^, Date^, Shift^, SalesPrice)

69 of 76
GMC Investments
Data Dictionary
Date: April 6, 2015
General Project Information
Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Entities:

Entity 1: Distributor
Description: Information on external distributor
Attribute 1: Address
Description: Physical address of distributor
Attribute 2: ContactName
Description: Sales person contact at distributor
Attribute 3: DistributorId PK
Description: Arbitrary distributor ID number
Attribute 4: Email
Description: Contact Email
Attribute 5: Name
Description: Distributor name
Attribute 6: Phone
Description: Distributor phone number
Entity 2: Employee
Description: Information on bar and accounting employees
Attribute 1: Address
Description: Physical address of employee
Attribute 2: EmployeeID PK
Description: Arbitrary employee ID number
Attribute 3: JobTitle
Description: Title of Employee
Attribute 4: Name
Description: Employee name
Attribute 5: PayRate
Description: Hourly rate of employee
Attribute 6: Phone
Description: Employee phone number
Entity 3: EmpShift
Description: Associative entity between Employee and Schedule
Attribute 1: Date PK
Description: Date of shift
Attribute 2: EmployeeID PK
Description: Arbitrary employee ID number
Attribute 3: Shift PK

70 of 76
Description: Time of shift (night or day)
Entity 4: Inventory
Description: Information on each inventory item
Attribute 1: DistributorId
Description: Arbitrary distributor ID number
Attribute 2: InventoryID PK
Description: Arbitrary inventory ID number
Attribute 3: Name
Description: Inventory brand and bottle name
Attribute 4: PhysicalCount
Description: Number on hand based on physical count
Attribute 5: ProjectedCount
Description: Projected number based on sales
Attribute 6: SalesPrice
Description: Price per unit sold
Attribute 7: Size
Description: Units of container
Attribute 8: Type
Description: Classification of liquor, beer, wine, or non-alcoholic
Attribute 9: WholesalePrice
Description: Price of container
Entity 5: InvOrder

Description: Associative entity between Inventory and PurchaseOrder

Attribute 1: InventoryID PK
Description: Arbitrary inventory ID number
Attribute 2: OrderID PK
Description: Order ID number
Attribute 3: Qty
Description: Quantity of inventory item on order
Entity 6: PurchaseOrder

Description: Information on inventory items on order with a certain vendor

Attribute 1: EmployeeID
Description: Arbitrary employee ID number
Attribute 2: InvReceived
Description: Restricted yes or no answer signifies which orders have been fully fulfilled
Attribute 3: OrderDate
Description: Date order was placed
Attribute 4: OrderID PK
Description: Order ID number
Entity 7: Sales

Description: Information on daily sales

Attribute 1: SalesID PK
Description: Sales ID number from POS system

71 of 76
Attribute 2: Date FK
Description: Date of shift
Attribute 3: EmployeeID FK
Description: Arbitrary employee ID number
Attribute 4: Shift FK
Description: Time of shift (night or day)
Attribute 5: SalesPrice
Description: Sales price of the inventory item at the time of the sale.
Entity 8: SalesItem

Description: Associative entity between Sales and Inventory

Attribute 1: InventoryID PK
Description: Arbitrary inventory ID number
Attribute 2: SalesID PK
Description: Sales ID number from POS system
Attribute 3: Qty
Description: Quantity of individual inventory item sold
Entity 9: Schedule

Description: Schedule of employee shifts

Attribute 1: Date PK
Description: Date of the year
Attribute 2: NumberOfEmp
Description: Number of employees working a shift
Attribute 3: Shift PK
Description: Time of shift (night or day)

72 of 76
Relationships:

Relationship 1: Supplies
Distributor 1 to many
Inventory 1 to 1
Description: By law alcohol is licensed to a single distributor
Relationship 2: Comprises
Inventory 1 to many
Sales Item 1 to 1
Relationship 3: Contains
SalesItem 1 to 1
Sales 1 to many
Relationship 4: Item on order
Inventory 1 to many
InvOrder 1 to 1
Relationship 5: Includes
InvOrder 1 to 1
PurchaseOrder 1 to many
Relationship 6: Authorizes
PurchaseOrder 1 to 1
Employee 0 to many
Relationship 7: Supervises
Employee 0 to 1
Employee 1 to many
Relationship 8: Is available
Employee 1 to many
EmpShift 1 to 1
Relationship 9: Schedules
EmpShift 1 to 1
Schedule 1 to many
Relationship 10: Conducts
Sales: 1 to 1
EmpShift: 1 to 1

73 of 76
GMC Investments
Source / Destination Data Flow
Date: April 6, 2015
General Project Information
Project Name: IT Infrastructure Analysis for GMC Investments
Sponsor: Colleen Johnson, Accounting Controller
Project Manager: Johnson Ward

Data Flow From/TO


Context Diagram
Availability Data From Bar Employee to Process 0
Final Employee Schedule From Process 0 to Bar Employee
Physical Inventory Data From Bar Employee to Process 0
Sales & Projection Data From POS to Process 0
Pricing Data From Process 0 to POS
Staff Schedule Data From Bar Management to Process 0
Final Staff Schedule From Process 0 to Bar Management
Staff Assignment Data From Bar Management to Process 0
Sales Price Export Form From Accounting Department to Process 0
Variance Report From Process 0 to Accounting Department
TABC Depletion Report From Process 0 to TABC

LEVEL 0
Sales & Projection Data From POS to Process 3.0
Pricing Data From Process 3.0 to POS
Sales Price Export Form From Accounting Department to Process 3.0
Variance Report From Process 3.0 to Accounting Department
Physical Inventory Depletion Data From Process 3.0 to Process 2.0
TABC Depletion Report From Process 2.0 to TABC
Physical Inventory Data From Bar Employee to Process 3.0
Availability Data From Bar Employee to Process 1.0

74 of 76
Final Employee Schedule From Process 1.0 to Bar Employee
Staff Schedule Data From Bar Management to Process 1.0
Final Staff Schedule From Process 1.0 to Bar Management
Staff Assignment Data From Bar Management to Process 1.0

LEVEL 1
Process 1 Level 1
Availability Data From Bar Employee to Process 1.2
Final Employee Schedule From Process 1.3 to Bar Employee
Employee Availability Data from the Chart From Process 1.2 to Process 1.3
Staff Schedule Data From Bar Management to Process 1.1
Final Staff Schedule From Process 1.3 to Bar Management
Staff Assignment Data From Bar Management to Process 1.3
Staff Requirements form blank schedule template From Process 1.1 to Process 1.3

Process 2 Level 1
Physical Inventory Depletion Data From Process 3.0 to Process 2.1
Total Taxable Sales Amounts From Process 2.1 to Process 2.2
Adjusted Taxable Sales Amounts for Variance/Error From Process 2.2 to Process 2.3
TABC Depletion Report From Process 2.3 to TABC Reporting

Process 3 Level 1
Sales & Projection Data From POS to Process 3.3
Pricing Data From Process 3.5 to POS
Sales Price Export Form From Accounting Department to Process 3.5
Projected Inventory Report From Process 3.3 to Process 3.4
Variance Report From Process 3.4 to Accounting Department
Physical Inventory Data From Bar Employee to Process 3.1
Physical Inventory Report From Process 3.1 to Process 3.4
Inventory Depletion Amounts From Process 3.1 to Process 3.2
Physical Inventory Depletion Data From Process 3.3 to Process 2.0

75 of 76
LEVEL 2
Process 1.1 Level 2
Staff Schedule Data From Bar Management to Process 1.1.1
Weekly Shift Requirement Data From Process 1.1.1 to Process 1.1.2
Staff Requirements by Shift Template From Process 1.1.2 to Process 1.3