Documente Academic
Documente Profesional
Documente Cultură
The 100 Series FBM upgrade Hardware conversion in a few, simple steps:
approach
1. Disconnect nosecones from FBMs
Fast and easy installation Weve
designed new 200 Series FBM rack- 2. Remove 100 Series FBMs
mounted inserts to plug-in directly to your 3. Disconnect and remove 100 Series FBM mounting structures
existing 100 Series cells. Field wiring is 4. Insert new 200 Series FBM rack mounted inserts into same location
retained and communicates to the 200
5. Plug in standard 200 Series FBMs
Series FBMs via new termination assembly
adapters (TAAs) and your existing 6. Plug-in term assembly adapters (TAAs)
nosecones. Much of your existing infra- 7. Replace nosecones
structure is retained, including field wiring,
with no extra footprint needed.
schneider-electric.com/processautomation | 3
Schneider Electric
70 Mechanic Street
Foxborough, MA 02035 USA
+1 877 342 5173
schneider-electric.com/processautomation
2016 Schneider Electric. All Rights Reserved. Schneider Electric and Evo are trademarks and the property of Schneider Electric, its subsidiaries,
and affiliated companies. All other trademarks are the property of their respective owners. April 2016 998-19865571_GMA-US_A4