ELECTRICAL INSPECTORATE

Questionnaire for HV/MV Installation


High Voltage Installation
I. Particulars of Installation:

1 (a) 1. Name of consumer with official address to which all


communication should be addressed.


(b)Phone No and Email of the Consumer

2 Location of HV Installation (Full particular of the
3 town/village and namewith
Power Requirements, of the streetoftoload
nature be furnished.)
4 Sanction of load with authority (copy of the TANGEDCO
Letter)
5 Name and address of contractors (with license details)
carrying out the installation and the Electrical supervisor with
competency certificate No. of who is directly to supervisor
the work

6 Are all equipments and lines of the consumer proposed to be
erected entirely within the property of consumer?
7 Are all the materials and apparatus conform to the relevant
specifications and ISI?

8 Name, Residential address, telephone number of
chairman /MD/ Authorized signatory

9 Copy of memorandum and articles of association of the
company
10 Brief details of proposal
II Technical:
1 Details of H.V Installation
a. Substation (In door or Out-door)
b. Transformer
c. H.V Switchgear
d. H.V Alternator
e. H.V. Motor
f. H.V Capacitor
g. Other H.V Equipment
h. Switch Gear Details of normal and rupturing Capacity
should be furnished.
2 Details of M.V Installation
a. Alternator
b. Motor and other equipments
c. Switchgear
3 Do all the equipments satisfy condition of the
supplier?
4 Distribution Mains If any (Details of Line Supports
and conductor size to be furnished).
5 Are these to be Erected Entirely with in the property
of the Consumer

Page 1 of 2
III Drawing (in Quadruplicate, Signed by the consumer and
contractor) to be sent

a. Site plan showing point of Supply HT installation
Routes of mains (O.H & U.G)
b. Plant and elevation of substation with Clearance to
nearby buildings or structure to be always furnished in
the drawings
c. Schematic layout of the equipments
d. Sectional layout of switch gear with erection details
e. Earthing Arrangements
f. If the Building height is 15Mtr and above, Details of
Planning permit and drawing approval obtained from
the DTCP/CMDA authority
g. If the Installation is having building of G+3 floor and
above, Elevation drawing indicating the total height of
the building
IV Whether Challan for Adequate drawing scrutiny fee as
per G.O 30 is enclosed
V General
1 Have the equipments been ordered? If Received
details, if not received probable date of receipt.
2 Probable date of completion of installation
VI (i) Date of last R63 inspection and copy of the defect
report
(ii) Date of last R46 inspection and copy of the defect
report
(iii) Compliance of returns on electricity generation and
tax remittance in the case of consumption on self
generation or sale of energy.
(iv) Compliance of energy data filing in the case of
designated consumers alone

Signature of the Consumer Signature of the Contractor


For Siva Energy Infrastructure (I) Pvt. Ltd., For Siva Energy Infrastructure (P) Ltd.

Authorized Signature Director

For Chief Electrical Inspector to Government

Page 2 of 2