GENERAL NOTES ABBREVIATIONS

1. ALL DIMENSIONS ARE IN mm


2.ALL HEIGHTS ARE FROM F.F.L
25 24 23 FIN.CEILING = L+2550MM
246
3.BACK BOX INSTALLATION DETAIL SHALL BE
REFERRED IN TYPICAL INSTALLATION DETAIL
FIN.CEILING = L+2550MM
4.EXACT LOCATIONS OF SHAVER SOCKET TO BE
667 1133 1300 1484 1183 1618 500 FOLLOWED AS PER ARCHITECTS TILE LAYOUT
NETWORK SWITCH
CONSOLIDATION BOX 5. REFERRED DRAWINGS OF WIRING LAYOUT TO BE
150X450 OPENING FOR FOLLOWED.
LOUVER AT 100mm FROM FFL 6.FINAL LOCATION FOR FCU TO BE INLINE WITH
COORDINATION DRAWING. (ATR-SPLL-VT(L6-L62)-0111)

28 (2M) (4M)
DT1 (4M) (X) LIGHTING & POWER ATR-SPLL(MAX)-EL-DWG-VT-(L41-L57)-6677
(2M) ELV ATR-SPLL(MAX)-LV-DWG-VT-(L41-L57)-6679

50
C1 D1 C1
A K
VDP

1300

1300

1500

1300
1300
ELECTRICAL/ELV(BACK BOX ) SIZE EQUAL TAG QTY
X X X LIVING/DINING/BED ROOMS/COMMON CORRIDOR
(X)
(2M1) (6M1) (6M1)

300

300

300

300
EX1 EX2 EX3 (6M1) LIVING(6M1) 2 MODULE BOX 76.5 x 76.5 x 51 2M1 12
DT1 DT4 (2M1) DINING SK1
DINING 04
4 MODULE BOX 76.5 x 136.8 x 51 4M1

A/P X CH+2400 25 24 25
YARD WM CH+2400 6 MODULE BOX 76.5 x 214.2 x 51 6M1 12

KITCHEN DT6 WH KED


ELEVATION -1 SHAVER 135.5 x 76.5 x 51 Z 03 ELB

(1100 SH)
300x450
ELEVATION -2 SINGLE BOX 76.5 x 76.5 x 51 X 03
EQB

25
(1100 HT)

DW
YARD/ MAIDS ROOM / KITCHEN
CONSOLIDATION BOX
LIVING SINGLE BOX 76.5 x 76.5 x 51 X 22

C4 C4' MASTER BATHROOM


1
X
20 DOUBLE BOX

HOME AUTOMATION(BACK BOX )


76.5 x 136.5 x 51 Y 02

MAID W.C.
23 21 40 188 2 MODULE BOX 76.5 x 76.5 x 51 2M 05

4 2 X 22 26 MASTER BATHROOM FIN.CEILING = L+2550MM


400 175
4 MODULE BOX 76.5 x 136.8 x 51 4M 03

19 6 MODULE BOX
SOFFIT (HIGH LEVEL)
76.5 x 214.2 x 51 6M 02

3 POWDER MAID ROOM


26a
SINGLE BOX 76.5 x 76.5 x 51 X 09

REF
VDP
27 REFERENCE DRAWINGS
19a REV. REV.
(2M) DESIGN DRAWING NO SHOP DRAWING NO
NO NO

25
DT5 DT2 532 (4M) F1
DT3
DT2 ATR-DT3-AR-DWG- 3092-02 R1 ATR-SPLL(MAX)-EL-DWG-GN-TYP-5001 R1
CH+2550 ATR-DT3-AR-DWG- 3619-02 ATR/SPLL/AR/DWG/VT/L43 /0182

25
29 R0 R0

1300

1300
X 1300 ATR-DT3-AR-DWG- 3620-02 R0 ATR-SPLL(MAX)-EL-DWG-VT-L43-1333 R0
A/P

DT3
X ATR-DT3-AR-DWG- 3621-02 R0 ATR-SPLL(MAX)-EL-DWG-VT-L43-1334 R0

L.1 DINING CORRIDOR AREA

300
(2M1) (6M1) LIVING (6M1)

300

300
ATR-DT3-AR-DWG- 5430 R0 ATR-SPLL(MAX)-LV-DWG-VT-L43-1335 R0
ATR-DT3-AR-DWG- 5431 R0 ATR/SPLL/GM/DWG/VT/(L6-L62) 0142 R0

SLIDING DOOR X ATR-DT3-AR-DWG- 5436 R0 ATR/SPLL/GM/DWG/VT/(L6-L62) 0111 R0


LOCATION TO BE ELEVATION -3 ELEVATION -5 ATR-DT3-AR-DWG- 5438
DT3 R1

DT2
FINALIZED .
25 ATR-DT3-AR-DWG- 5456 R0

BALCONY BATHROOM 3 12
18
6 17 16
2377 1230

CH+2400 832 1157 955 892


LIVING

15 PROJECT
BEDROOM 2 MASTER BEDROOM

7 5 8 13 14 COLOMBO RESIDENTIAL TOWER


(6M) COLOMBO, SRI LANKA

2650
F1 CLIENT
400
INDOCEAN DEVELOPERS (PVT) LIMITED
CH+240025

1300
9 (X)
DESIGN ARCHITECT

150
300
10 DT2 SAFDIE ARCHITECTS, LLC.
29 (2M1) (6M1) (6M1)
(2M1)
(6M1)

300

300

300
LIVING 100 PROPERZIE WAY
SOMERVILLE, MA 02143-3740 USA
ELEVATION 7 T 617.629.2100 F 617.629.2406
ELEVATION -6
F1A F1A F1A F1A F1A F1A
L ELEVATION -08 ASSOCIATE ARCHITECT
DESIGN TEAM 3
SINGAPORE
T 658.499.7168
STRUCTURAL ENGINEER
MR. PREDRAG EROR
P.O. BOX 102803, DUBAI, UAE
T 9714.3629234 F 9174.3629234
995
296 2274 MECH, ELECT, PLUMBING ENGINEER
1272 2500 1057
FIN.CEILING = L+2400
405 405 2000 600
1103 1105 CKR CONSULTING ENGINEERS PVT. LTD.
1050 636 1385
PO BOX 73889
G3
DUBAI, UAE
T +97143384277
LANDSCAPE ARCHITECT
F1 P LANDSCALE CO., LTD.
2200

(4M)
F1

2200
(2M1) (2M1)
F1 59/3 SOI SUKHUMVIT 39 SUKHUMVIT ROAD, KLONGTON NUA
2100

DT2 DT3
2200

(Z)
W6
F1
DT2 F1
WATTANA, BANGKOK 10110 T. 662.261.3700.9

1300
1300

1300

LOCAL STRUCTURAL ENGINEER & SUPERVISION CONSULTANT


1100

(2M) (2M)
HS
TP DEEPAL WICKREMASINGHE ASSOCIATES

450
450
(2M1) (2M1)
(6M1) (6M1) MASTER BEDROOM NO. 377/2, Thalawathugoda Road, Hokandara South, Sri Lanka.

300

300
MASTER BEDROOM
300

150

150
BEDROOM 2
150

150
(4M1) BEDROOM 2 (2M1) (4M1) (4M1) (6M1)
BEDROOM 2 (4M1)
T- +94 11 4402395

ELEVATION -10 ISSUE


ELEVATION -09 ELEVATION -12 ELEVATION -13 ELEVATION -14 ELEVATION -15 ELEVATION -16 ELEVATION -17
NO. DESCRIPTION DATE
00 FOR APPROVAL 07.09.2017
488 148 667
450 654 1677
232 1165 133 660 498 319 349 807
W9 W9 W9 568
W9
808 1485
200 222 1050 FIN.CEILING = L+2400
FIN.CEILING = L+2400MM FIN.CEILING = L+2400MM FIN.CEILING = L+2400MM 1252
FIN.CEILING = L+2400MM
231 780 392 CO-0RDINATION CERTIFICATE
806 754
W8
S. NO DISCIPLINE DATE SIGNATURE
EQM

G3
(X)
1.
3300

(6M)
DT2 C1 C1 C1 C1 C4 2.
REF. (X)
(2M1) (2M1)
3.
2200

G2 G2 G2 G2
(X) (X) (X)(X) DT6 DT4 D1 DT6
2100

(Z)
(Z)
2000

DT4 (X) (X) (X) (X) DT5 DT5 DT5 (X) (X) (X) (Y)
4.

1733
DT2 DT3 DT2 DT2
1700

1700

1300
1300

1300

1300

1100

1300

1300

1050
1100

W11
1150

1150

1150

1150

1150

1150
EQM

(X) (X)
KEY PLAN

600
(X)
H F D B
500

500
SK1 SK1

450
MASTER BATHROOM
(X)
150

ELEVATION -18 ELEVATION -19 ELEVATION -19a ELEVATION -20 ELEVATION -21 ELEVATION -22 ELEVATION -23 ELEVATION -24 ELEVATION -25 G E C A

133 139 W9
Main Contractor
4nos 25 PVC Conduits
200 413 150 ADB
526 218 844 FIN.CEILING = L+2550MM
FIN.CEILING = L+2400 TRUNKING 100mm x 50mm
(FOR ELECTRICAL)
100mm x 60mm
VERTICAL TRAY
W3
G3
(FOR ELECTRICAL)
Sub Contractor
500

131 MAXAIRE (PVT) LTD


400
110 , Isipathana Mawatha,
(Y) (X) DISTRIBUTION BOARD ALTAIR Colombo 05.
DT9 Indocean Developers (Pvt) Ltd T : +94 11 2501370, 2501305, 4641477
2350

(X) (X) (X) (2M1) No: 121A, Sir James Peiris Mawatha F : +094 11 2589860
2100

DT6
DT1 F1 Colombo 02 E : info@maxaire.net
614 GA1A Approved
1500

DISCIPLINE
1650

Approved as Corrected
1300
1300

1300

HS
Submit Specified Item
Revise and Resubmit ELECTRICAL
TP Rejected
650

(X)
450

LIVING LIVING
The review is only for general conformance DRAWING TITLE
with the design concept of the project and
M12 M12

general compliance with the information given VERTICAL TOWER UNIT -G


in the Contract Documents. Contractor is
responsible for: Dimensions to be confirmed LEVEL -43
ELEVATION -26 ELEVATION -26a ELEVATION -27 ELEVATION -28 SECTION -29-29 ELEVATION -4 and correlated at the job site; information that
WALL CONDUIT INSTALLATION FOR ELECTRICAL
DETAIL-A pertains solely to the fabrication processes or
to the means, methods, techniques,
sequences, and the procedures of
AND ELV SYSTEMS
constructions; coordination of the Work of all
trades; and for performing all work in a safe
and satisfactory manner.
Detailed Drawn Checked Approved Scale Size
Any approval from the Engineer/Consultant of
submittals, materials and workmanship etc. 1:50
shall not relieve the Contractor of his sole Udayashantha Kusum Buddika Jayasuriya A1
responsibility and obligation to comply with
all requirements under the Contract. Date Date Date Date
Consultant/Engineer 07.09.2017 07.09.2017 07.09.2017 07.09.2017
Reviewer Drawing Number Rev.
Signature Date ATR-SPLL(MAX)-GM-DWG-VT-L43-6626 0