The electrical design data defines the design requirements agreed by owner/clients in addition to
Design philosophy for electrical facilities no: 6-51-0099 Rev 4 (Any additional deviation must be
recorded as part of this document)
1.0 SITE CONDITIONS
1
A. Equipment design temperature (IS 9676) : 45C
B. Soil Resistivity : Later (after the soil Resistivity test)
C. Minimum temperature. for battery sizing : 10C
D. per IS-1893)
E. Altitude above mean sea level : <1000 m
2.0 POWER SOURCE DETAILS
2.1 General
A. Independent system or existing system : Independent system
2.2 Grid Supply * Refer CPP design basis
A. Name of sub station / MW : *
B. Number of feeders : *
C. Length of feeder :*
D. Type of conductor/ cable size : * mm
E. Voltage : * kV %
F. Frequency : * Hz %
G. Minimum/maximum fault level : * kA / KA
H. Design fault level / Basic Insulation Level : * kA / kV
I. System neutral earthing : *
J. Minimum load power factor stipulated by : *
K. Supply authority :*
L. Parallel operation of incomers : * Yes/No
M. PLCC requirement : * Yes/No
2.3 CPP and its configuration * Refer CPP Design basis
A. Number / type of captive generators : * /Steam, Gas turbine
B. Generator rating/Voltage/Power factor : * MW/ kV/ 0.8
C. Parallel operation with grid : * Yes /No
D. Neutral earthing : High resistance earthed
2.4 Emergency generator * Refer CPP design basis (Emergency
power for lighting from existing PREP power plant)
A. Number / type of emergency generator :*
B. Generator rating/Voltage/Power factor :* kW/ V/ 0.8
C. Starting :* Auto / Manual
D. Short time para :* Yes/No
E. Paralleling with grid system :* Yes /No
2.5 Details of Existing System
Refer CPP design basis
1
Based on PREP-IOCL design basis and DFR
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 4 of 17
6
Hard wired annunciation panel is not proposed. Annunciation will be part of substation HMI
7
No grid backup is envisaged as per CPP design basis.
8
Separate data concentrators for HV and MV are not required for same make and type of relays
9
For motors greater than 2.5MW, maximum starting current shall be based on motor startup study
10
As 33KV switchboards are of rating 31.5KA and available in GIS, instead of local isolating panel, it is
suggested to provide push button station with lamp indication for trip of sending end breaker and requires
approval with CEA for implementation.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 6 of 17
11
4.3 Relay protection system
Protection devices for power distribution system shall be as indicated below
Relay Relay description Transformer Motor Outgoing feeder Incomer
number Feeder feeder
(Secondary (Secondary
winding winding HV HV MV HV MV PCC/
voltage voltage PCC/ PMCC
> 3.3 KV) < 0.433 KV) PMCC
51 IDMTL over-current relay Yes Yes - Yes Yes Yes Yes (4)
(4) (13)
51N IDMTL earth-fault relay Yes (7) No - Yes Yes Yes Yes
(4) (13)
51G 51G backup earth-fault relay Yes Yes - No No No No
(secondary neutral)
99 Motor protection relay with locked
rotor feature No No Yes No Yes (8) No No
(50, 50N,46, 49, 50L/R)
64R Instantaneous restricted earth-fault Yes No - No No No No
relay (secondary side)
50 Instantaneous over-current relay Yes Yes - No No No No
50N Instantaneous earth-fault relay Yes (6) Yes - No No No No
87 Differential protection relay Yes (1) No Yes (2) Yes (3) No No No
86 High speed tripping relay Yes Yes Yes Yes Yes Yes Yes
95 Trip circuit supervision relay Yes Yes Yes Yes No Yes No
63 Transformer auxiliary relay Yes Yes - No No No No
27/2 Under-voltage relay with timer - - No - - Yes Yes (5)
(14) (5)
11
Generator protection requirement shall be covered separately in respective EPCC document.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 7 of 17
Note:
1. * Substation with long high voltage switchboards having substantial amount of cabling work
2. Battery room shall be preferably located in corner side at first floor of the substation
building.
5.3 Specific Equipment Locations
A. Batteries
Electrical switchgear batteries : Separate room in sub-station
UPS batteries : Separate room in control room
B. Battery charger for electrical system : In substation air conditioned room
Battery charger for instrumentation : In Control room along with UPS.
C. Variable speed drive panels/Thyristor control panel : Air-conditioned room in substation
D. UPS System : Air conditioned room in control room
E. Lead-Acid and Nickel-Cadmium : In separate rooms
F. Annunciation panel : Not envisaged/ HMI to have
annunciation Operator room in
substation
6.0 EQUIPMENT DESIGN
6.1 EHV Switchyard NOT APPLICABLE
A. Bus bar system : Single/Double
B. Circuit breaker type : Minimum oil/SF6
C. Isolator type : Pantograph/ Semi pantograph/ Centre rotating/ Centre break
6.2 HV Switch-board
A. Execution : Drawout (Fixed for GIS-33KV)
B. Bus bar system : Single/(Double bus for GIS)
C. Circuit breaker typ : SF6/Vacuum
D. Motor Control : Breaker/ Vacuum contactor
6.3 Current Transformer (CT)/potential Transformer (PT)
A. CT Secondary
14
Protection : 1/5A
12
HV cables in cable cellar shall be laid in trenches filled with sand
13
Pressurization not required for remote MCC room located in safe area
14
1A Protection CT for differential, REF protection; Separate CT for differential/ REF protection
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 9 of 17
6.5 MV Switchboard
A. Execution
i. PCC / PMCC
Breaker panels :Draw out/Single front
Contactor feeders :Drawout, single / Double front
ii. MCC :Drawout, single / Double front
iii. ASB :Drawout /Fixed, single/Double Front
iv. LDB :Drawout /Fixed: single/Double Front
v. Motors
PMCC : Above 55KW Upto&Including 160kW
MCC : Upto and including 55 kW
17
vi. Type of switchboard for package : Compartmentalised/Fixed type
B. Motor Starter Type
i. Contactor and switch fuse with overload relay: Up to 22 kW
ii. Contactor, switch fuse and overload relay with: Above 22 up to 55 KW
CBCT for earth fault protection
iii. Contactor and switch fuse with motor protection relay
: Above 55 up to 160KW
15
Rating of Power and intermediate transformers, OLTC requirement including vector grouping of all
transformers shall be decided during basic engineering based on KSLD attached with FEED.
16
To be finalized based on licensors recommendation
17
Package like AC plant MCC, Bagging plant MCC etc
18
6.5C(i to iv): Operating philosophy and location of controls shall be as per process and instrumentation
design basis.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 10 of 17
6.6 Motors
Motors High voltage 415 volts
Enclosure:
Indoor IP55/IP54 IP55/IP54
Outdoor IP55 IP55
Insulation class F (Temp. Rise limited to B) B
19
Plant wide Telephone and LAN system shall be common. Refer design basis for LAN system for details.
20
Siren shall be electronic type with 5 tones (as per IOCL comment clause 2.3.10 (9) on fire and safety
document no. 6556-00-16-47-DB-01), Number and range shall be modified as per the availability.
21
DC motor application is not envisaged
22
Licensors recommendation/ EIL equipment specification shall apply
23
6 or 12 pulse rectifier as per manufacturers standard and as required for meeting EIL equipment
specification requirement.
24
Cable for motor above 110KW shall be sized considering copper cable.
25
1.5 mm Cu conductor PVC Insulated wire shall be used in conduit with proper colour coding for building
lighting.
26
Cable sizes for PA and FA systems are indicative. These shall be finalised later as per the manufacturers
recommendation
27
1Core or 3 Core HV cable shall be decided during basic engineering based on load and distance
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 12 of 17
28
Where fire proof MOVs are provided cables shall be fire survival type as per IEC331 or mica insulated
29
Cables for FA/PA shall be laid in instrument duct where available and shall be in separate trays where ducts
are not available in ISBL.
30
FA and PA cables in offsite area shall be laid in road berm (opposite to berm used for lighting cable). Where
chemical handled are hazardous for PVC insulation, cables shall be laid above ground.In such cases. Cables
shall be laid overhead on pipe rack or above ground on sleeper level depending on availability of pipe rack/
sleeper. Where there is no rack/ sleeper, cable shall be laid in trenches if cables are large and directly buried if
cables are few.
31
Road crossing through PVC pipe or culvert shall be decided based on number of cables.
32
The secondary voltage for lighting transformer shall be 380V.
33
Lighting shall normally be done using 30m flood light mast as per IOCL philosophy. Street light shall be
considered only where considered absolutely necessary.
34
Local control shall be through FLP lighting panel in process area.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 13 of 17
35
ELCB shall be provided at sub distribution feeder at LDB for lighting panels for AC as well as DC lighting.
36
All buildings except remote buildings not having DC supply shall be provided with DC lighting for escape.
For buildings where DC supply is not available, portable DC light for escape to be provided.
37
To be provided on watch towers through search light
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 14 of 17
ii. Cable sizes for motors not confirming to above table e.g. for 2/4 poles motors, extended distance,
reduced voltage starting, low speed motors, shall be worked out on case to case basis.
iii. Cables sizes as indicated above are applicable for a distance up to 350m maximum and for 2/4
poles motors fed from MCCs located near PCCs and PMCCs.
iv. Cables for lighting shall be used to allow the following voltage dips
Street lighting :10%
DC critical lighting :5%
14.0 SPECIFIC REQUIREMENTS
i. Canopy shall be provided for all out door equipment.
ii. Substation shall be sized to ensure 2 nos panel extension on each bus section
for all HV/ MV switchboards except GIS.
iii. Dummy panel shall be provided in switchboards wherever there is expansion
joint in the building.
iv. If signal cables for DCS interface with substations are envisaged, these shall be
laid in separate trays/ trench. However in exceptional cases signal cables may
be laid in electrical trench, properly cleated on trench wall allowing 300mm gap
with other power cables in the trench.
v. For building engineering, each office room, in addition to switch/ socket for
lighting design, shall be provided with minimum 2 nos telephone sockets and 2
number LAN socket at two different location as duly approved during detailed
engineering.
vi. Modular type switches/sockets in main control room and all non plant buildings
shall be modular type.
vii. Lamps shall be standardized for the purpose of inventory in hazardous area
lighting as below.
38
Cable sizes given in the table are indicative and standardized for inventory and are the minimum sizes. The
cable size as required to meet voltage drop criteria shall be provided.
Format No. EIL 1641-1924 Rev. 1 Copyright EIL All rights
reserved
DOCUMENT No.
ENGINEERING DESIGN BASIS 6556-00-16-50-DB-01
ELECTRICAL Rev.0
Page 16 of 17
Well glass normal Lighting : 70W HPMV lamps for well glass fittings
Flood Lighting : 250W HPMV lamps for flood lighting
Critical lighting : 100W GLS lamps
15.0 ATTACHMENTS
Design philosophy for Electrical Facilities 6-51-0099 Rev 4
16.0 DEVIATION TO DESIGN PHILOSOPHY
Document number 6-51-0099 rev 4
The requirement given under engineering design basis document shall be overriding. However
following job specific requirement are highlighted as deviation to Design Philosophy of Electrical
facilities document number 6-51-0099.
16.1 Clause 4.6.1 Voltage drop
i. b(ii) MCC/Aux switchboard situated remote from PCC/PMCC 2%
ii. d - Cable between PCC/PMCC to motor- 5% during normal running
16.2 Clause 4.11 DC Power supply
i. DC power supply system for electrical controls and for critical lighting shall be
separate. For electrical controls and instrumentation, DC system shall be dual
redundant with single set of battery and for critical lighting, DC system shall be
non redundant.
16.3 Clause 4.15.3 Plant communication system-capacity for future expansion
i. Exchange supplied shall be fully wired for hardware, power supply, software etc
for the capacity as required with spare capacity of 20% field call stations with no
future modification in exchange hardware/ software.
ii. Exchange shall have required hardware for communication between two
exchange of the same make
16.4 Clause 4.16 Fire detection and alarm system
i. Cl 4.16.5 : Spare fire alarm loop for future shall be 20% or 1number whichever is
maximum. Each loop shall be engineered to provide the flexibility to add 20%
additional detectors in future, if required.
ii. Cl 4.16.6 : The status for actuation of fire suppression system shall also be wired
to fire alarm panel to annunciate at central fire alarm monitor.
16.5 Clause 5.3 Switchgear
i. Cl 5.3.4 : Each HV Switchboard (above 415V and except 33KV) shall have
minimum 2 numbers spares of each type. (i.e. type like transformer feeder, motor
feeder, plant feeders etc)
ii. Cl 5.3.4 : Each MV Switchboard (Up to 415V) shall have 20% spares of each
type ( Spares in each MCC shall however be 20% subject to 1 number of each
motor feeder module )
16.6 Clause 5.7 Battery charger and Distribution board
i. Cl 5.7.3 : Each DCDB shall have 20% spare feeder for future use.
ii. DCDB outgoing feeders for critical lighting shall be provided with ELCB.
16.7 Clause 5.8 Uninterrupted power supply system
i. Cl 5.8.4: Spare feeders in ACDB shall be 20% for future use with minimum of 1
number of each rating.
ii. Cl 5.8.5 : UPS shall be sized to have 20% spare capacity on calculated load for
future loads.
16.8 Clause 5.13 Cable and Wires
i. Cl 5.13.6 : No unarmored cable shall be used.
ii. Cl 5.13.10 : Control cables shall have 1core spare upto 6core requirement and
20% or 2 core whichever is maximum for cables having requirement above 6
cores.
iii. For 4-20mA signal interface between switchboards and DCS, screened cable
shall be used.
iv. Cl 5.13.7 : Cables laid for hazardous area shall not have any joints.
16.9 Clause 5.14 Control stations
i. Cl 5.14.1 : Each motor shall be provided with local control station. If specified per
process or equipment control requirement, local control station can be part of
local control panel.
16.10 Clause 5.16 Actuators for motor operated valves
i. MOV shall have separately mounted actuator in area of high vibrations. In
particular the MOVs for Cooling water application shall have separate actuator
located near the valve for local actuation.
16.11 Clause 7.2 Cabling System
i. Clause 7.2.5: Cable trays shall be sized to allow 20% additional space for future
cables.
ii. Clause 7.2.14: MCTs shall be provided wherever the entry is above ground. And
where entry is below ground, sleeves (Laid in outward slope to avoid water entry)
shall be provided for electrical cables.
16.12 Clause 7.4 Lighting system
i. Non-plant buildings such as administrative building, gatehouses etc should be
provided with energy efficient CFL lamp fixtures.
ii. In plant buildings, control rooms should be provided with energy efficient CFL
lamp fixtures.