Tank reconstruction
For
a
reconstructed
tank,
the
shell
thickness
readings
used
to
determined
the
allowable
liquid
height
must
have
been
within
the
last:
180 days
Pitting is found on the shell. Corrective action must take place when:
A
tank
is
20
years
old
and
has
a
bottom
thickness
of
0.170''.
Original
bottom
thickness
was
0.250''.
Determine
the
interval
for
the
next
Internal
Inspection?
1.5 years
Widely
scattered
pits
in
a
tank
shell
can
be
ignored
if
the
extent
of
the
pitting
does
not
exceed:
24 hours
During a tank repair, if API 653 conflicts with the design standard, which governs?
API 653
Repaired
or
replace
bottom
welds
shall
be
examined
with
either
a
vacuum
box
or
by
using:
Welding procedures for tank repair to the shell should be qualified in accordance with:
A
lap
patch
is
installed
on
a
tank
bottom
and
the
patch
plate
crosses
a
tank
bottom
weld.
What
is
the
minimum
dimension
for
this
patch-plate?
12''
Which of the following tests are required when qualifying a weld procedure?
Calcining of the tank concrete ringwall can occur when the concrete is:
Which of the following does NOT increase the risk of brittle fracture?
Pan
Which
of
the
following
is
NOT
considered
one
of
the
major
types
of
inspection
records?
Operation history
A
new
tank
bottom
was
installed
above
the
existing
bottom.
Now
the
spacing
between
a
nozzle
and
the
new
bottom
is
below
the
minimum
requirements
of
API
650.
Which
of
the
following
is
NOT
an
acceptable
method
of
repair?
Over-groove weld
2-inches of water
What
is
an
acceptable
response
when
the
actual
thickness
on
a
0.750''
shall
plate
is
below
minimum
thickness?
The qualifications for the person performing the external inspection include:
Which type of settlement causes the greatest stress on the shell-to-bottom weld?
Out-of-plane
Shell
lap
patches
only
allowed
on:
Prior
to
hot
tapping,
how
many
thickness
readings
are
required
at
the
proposed
nozzle
location?
Which
of
the
following
new
welds
does
NOT
need
to
be
examined
by
magnetic
particle
or
liquid
penetrant
methods?
When
reconstructing
a
tank,
how
many
junctions
of
existing
to
new
welds
should
be
radiographed?
25%
In
a
corroded
area,
''t2'',
the
least
thickness
exclusive
of
pits
shall
be
greater
than
or
equal
to:
The qualifications for the person performing the routine in-service inspections include:
Engineer
The grain structure of weld metal is most similar to that found in:
Casting
The
maximum
interval
for
the
internal
inspection
is
:
20 years
Existing weld joints in a reconstructed tank shell meet the minimum requirements of:
Corrosion
has
been
found
on
a
tank
bottom.
The
calculated
remaining
life
on
a
tank
bottom
is
30
years.
What
is
maximum
interval
for
this
internal
inspection?
20 years
The minimum thickness for replacement roof plates on a cone roof tank is:
Tank reconstruction
Stray AC currents
The
minimum
degree
of
surface
cleanliness
for
a
tank
bottom
prior
to
installing
a
coating
is:
NACE #2
The
tank
has
a
remaining
shell
life
of
16
years.
What
is
the
maximum
interval
for
the
UT
thickness
measurements
on
the
shell?
8 years
0.100''
A
tank
with
cathodic
protection
has
a
second
bottom
added
above
the
old
floor.
This
tank
may:
A
corroded
shell
plate
is
being
replaced.
The
new
plate
has
a
calculated
required
thickness
of
0.602''
(includes
corrosion
allowance).
The
adjoining
plate
thickness
is
0.750''.
What
is
the
minimum
plate
thickness
that
can
be
installed?
0.750''
An air test
When
should
2
tensions
specimens
be
taken
at
right
angles
from
corner
of
a
shell
plate?
During a tank reconstruction when both material and rolling direction is unknown
In a reconstructed tank, reused fasteners must meet the minimum requirements of:
When
a
liquid
penetrate
exam
is
conducted
during
a
tank
repair,
the
exam
should
be
conducted
in
accordance
with:
Reconstructing a tank
Existing
shell
penetrations
on
a
reconstructed
thank
shall
meet:
When
replacing
part
of
0.500''
shell
plate
with
a
flush
patch,
the
minimum
size
of
the
replacement
plate
is:
12''
3 feet
When replacing a shell plate that intersects a horizontal joint must be:
When installing a tank bottom lining, generally the humidity should not exceed:
80%
To
obtain
a
joint
efficiency
of
1.0
on
a
riveted
tank,
the
area
being
evaluated
must
be
at
least:
A
120'
diameter
tank
is
hydrotested.
How
many
survey
points
should
be
used
to
check
for
settlement?
12
According to API 653, the minimum diagnostic length of weld in a radiograph is:
6''
When
adding
new
shell
penetrations,
when
shall
an
insert
plate
be
used?
For all penetrations that are greater than 2 NPS, and the shell plate exceeds 1/2'', and the shell plate material
does not meet the current design metal temperature
25 ohms.
On
a
tank
being
reconstructed,
existing
welds
should
be
repaired
if
they
do
not
meet
the
acceptance
criteria
of:
Flange-to-nozzle-neck weld
During repair or alteration, new shell plate welds greater than 1 thick shall be:
Welding or riveting
Hammer test
Two months
An
impressed
current
cathodic
protection
system
was
sized
for
a
specific
tank.
At
the
first
inspection
it
was
determined
that
the
bottom
side
corrosion
rate
was
extremely
high.
What
is
the
likely
cause?
4.0.
Shell is 0.450''
A
PQP
test
coupon
for
a
groove
weld
Is
3/4''
thick.
On
WPS,
what
is
the
minimum
thickness
this
coupon
could
qualify?
1- 1/2''
The
tank
shell
has
remaining
life
of
12
years.
What
interval
for
the
external
inspection?
3 years
A
tank
bottom
is
covered
with
a
0.060''
thick
reinforced
liner.
What
is
the
minimum
acceptable
thickness
for
the
tank
bottom?
0.050"
When
Installing
a
new
bottom
plate
(non-annular
plate),
the
minimum
plate
extension
is:
2''
Replaced
A
hot-tap
procedures
should
include
practices
given
in:
API 2201
Patch
plates
are
not
permitted
in
the
critical
zone
for
carbon
steel
tanks
that
operate
above:
200F
When RBI assessments are conducted, the assessments must be repeated every:
10-years
When
installing
a
new
tank
coating,
the
abrasive
blasting
should
leave
an
anchor
profile
that
is
usually
about:
1.5-4 mils
In
an
RT,
the
minimum
allowed
film
density
in
the
area
of
interest
for
a
gamma
ray
shot
is:
2.0.
The
bottom
course
of
a
shell
has
a
nominal
thickness
of
0.500''
and
a
renewal
thickness
of
0.400''.
The
tank
bottom
has
a
nominal
thickness
of
0.250''.
What
is
the
minimum
allowed
thickness
in
the
critical
zone?
0.125''
What
is
the
maximum
size
of
open
defect
acceptable
in
a
bend
test
for
a
welder's
qualification
test?
1/8''
When
performing
a
PT
examination,
the
light
intensity
in
the
area
of
interest
must
be
at
least:
When using a vacuum box, the vacuum for the test should be between:
3-5 psig
What deposit inside a tank may need to be continuously wetted to keep from igniting?
Pyrophoric iron
When
walking
on
a
the
roof
of
a
cone
roof
tank,
the
inspector
should:
A
tank
has
been
operating
at
100F.
The
tank
temperature
is
raised
to
118F.
The
corrosion
rate
on
the
bottom-side
of
the
tank
will
probably:
Double.
During
a
tank
repair,
if
API
653
conflicts
with
legal
requirements,
which
set
of
requirements
would
govern?
When
qualifying
a
welder
with
RT,
which
of
the
following
discontinuities
are
never
allowed?
Lack of fusion
Holiday
How many UT readings are required when performing the UT shell examination?
Hold a flashlight against the shell, so the light shines parallel to the shell
8-years
4-years
For this shell course, determine the maximum depth allowed for a widely scattered pit
0.321''
The
variable-design
point
method
shall
be
used
to
determine
the
tank
shell
minimum
thickness
for
all
tanks
2''
6''
The
primary
seal
on
an
in-service
tank
is
being
repaired.
According
to
API
653,
how
much
of
the
primary
seal
can
be
removed
at
any
one
time
?
During
a
major
tank
repair,
the
top
shell
course
is
replaced
with
new
material.
The
new
shell
course
is
0.250''.
How
many
RT's
are
required
in
the
new
vertical
welds?
When
performing
radiology
of
a
tank
shell
weld,
the
acceptance
criterion
for
the
weld
is
found
in
which
code?
On a tank bottom, what is the minimum distance allowed between 3-lap joints?
12''
A
tank
bottom
is
being
abrasively
blasted
in
preparation
for
a
tank
lining.
While
the
abrasive
blast
is
being
performed,
the
temperature
should
be
at
least:
3 bars
A
tank
bottom
is
replaced
using
0.250''
plate.
What
is
the
minimum
overlap
required
for
these
bottom
plates?
1.000''