Documente Academic
Documente Profesional
Documente Cultură
SPECIFICATION SHEETS
PCLAG-4-0-P-01A/B
PAGE 4 OF 8
Doc. N: AC0041402-PB1I3-MD17006 Project No. AC0041402 PURCH ORDER NO.
52 REVISION LOG
53 REVISION ISSUE STATUS DATE BY CHK'D APP'D
54 A Emisin Original 23/07/15 Y.CH. G.F. E.R.
55 B Incorporacin de Comentarios 10/08/15 Y.CH. G.F. E.R.
56 0 Emisin Final 14/08/15 Y.CH. G.F. E.R.
57
58
CENTRIFUGAL PUMP
SPECIFICATION SHEETS
PCLAG-4-0-P-01A/B
(Continued)
PAGE 5 OF 8
Doc. N: AC0041402-PB1I3-MD17006 Project No. AC0041402 PURCH ORDER NO.
22 Quench (Q) Cooling (C) Lubrication (G) STEAM AND COOLING WATER PIPING
23 Heating (H) Leakage Pumped Fluid (P) Cooling Water Piping Plan (6.5.3.1)
24 Balance Fluid (E) External Fluid Injection (X) Cooling Water Requirements
25 SEAL FLUIDS REQUIREMENT AND AVAILABLE FLUSH LIQUID: Seal Jacket/Brg. Hsg. GPM @ PSIA
26 Note: If Flush Liquid Is Pumpage Liquid (As In Flush Piping Plans 11 to 41), Plan 23 Seal Heat Exchanger GPM @ PSIA
27 Following Flush Liquid Data Is Not Required. Plan 52 Seal Heat Exchanger GPM @ PSIA
28 Supply Temperature Min/Max / F Total Cooling Water GPM
29 Relative Density (Specific Gravity) @ F Steam Piping: Tubing Pipe
30 Name of Fluid Remarks:
31 Specific Heat BTU/LBF
32 Vapor Pressure PSIA @ C