18 May 07
Rev. A Issued for IDC
Circulated : PN TM MJ AC AK - FI

24 May 07 Rev. A 1. Module P2 upper plan shown Circulated thru email


2. Module P1 stool location shifted outboard as per
Kavin engg drawing, ladder shifted forward iwo
stool
3. Personnel transfer crane dimension updated
4. Deck crane boom rest added, location on module
P2 upper level
5. Forecastle deck layout updated fwd offloading
station updated
6. Poop deck layout updated aft offloading station
updated; control stand & bottle rack relocated;
helideck emergency access relocated; mooring
platform modified
7. E-building, Laboratory & Workshop access
platform modified
8. Escape route plan updated
9. Profile updated

04 June 07 Rev. A 1. Module dimensions updated as per Kavin engg. Circulated thru email
drawing 0214-MI20-90SD-5001 Rev. C (Ship
Topside General Plot Plan)
2. Escape Route (on deck and iwo modules)
updated
3. Personnel transfer crane boom rest relocated at
Fr.78 port side (approximately 45m from
centerline of rotation)
4. Bending shoe arrangement updated as per
SOFEC drawing 3201-DG-01-01-00387-43 Rev. A
(Bending Shoe Arrangement)

14 June 07 Rev. A 1. E-house profile view updated as per Amit Circulated thru email
Chaterjee email dated 06june07 Swgr rm
raised up by 300mm
2. Fcle deck layout updated escape route
updated
3. Personnel transfer crane boom rest modified
4. Pneumatic fender layout updated
5. Escape route iwo fender chocks and bollards
updated

Page 1 of 6
Date Drawing Action / Change / Modification Remarks
Rev.
18 June 07
Rev. A 1. Ga updated as per Kishikawa san, email Circulated thru email
comments (16/06/07)
Fcle deck layout updated
Future riser connection area relocated at stbd
side Fr 87-89
Boiler Skid stair access added
Metering unit walkway platform added
St Gen skid platform updated
Poop deck layout updated
Escape route update stern area & iwo boiler
skid stairway,
Deck crane & Personnel transfer crane
updated
2. Module stool supports updated STG module
stool location modified
3. Extg. Pipe rack shown
4. STG Rm Layout updated
5. Escape route iwo STG Rm modified
6. Padeye location for Personnel transfer crane &
deck crane hooks shown
7. Escape way bet. Module P3 & P4 modified IWO
padeye locations for crane hooks

26 June 07 Rev. A 1. Heli deck profile updated Circulated thru email


2. Boiler module additional stool support on fr.61,
Boiler module arrgt updated
3. Double hull for slop tank updated
4. Sea water lift pump location updated
5. Platform iwo sea water lift pump and
Comp/Mgps house modified
6. Escape route updated

05 July 07 Rev. A 1. Flare tower foundation updated Circulated thru email


2. Stair to workshop/laydown module S1 modified
3. Sea water lift pump platform updated stair to
Comp./Mgps House relocated
4. Module P5U moved fwd to avoid OTH; access
steps & platform added.
5. CO2 bottle room for STG added (on top of deck
store)
6. Personnel transfer crane moved inboard by
500mm (Crane 12.85m from C.L.)
7. E-Buliding 2nd level compartment corner cut
(2m x 1.5m) iwo of Personnel transfer crane
platform
8. Pneumatic fender storing location shown
9. Module Stools updated
10. Standby fire pump room moved aft
11. Escape route updated

12 July 07 Rev A 1. Personnel transfer crane shifted outboard Circulated thru email
pedestal distance from edge of the E-building =
225mm)
2. E-building 2nd level (Transformer rm) corner cut
1.5m x 1.5m
3. Closed chock at Fr. 60 stbd side ripped out

Page 2 of 6
4. Escape way platform (1500mm) added iwo of
STG module
5. Escape route updated
6. Fcle deck updated
7. Poop deck updated
8. Deck opening updated as per extg. Drawing

19 July 2007 Rev. A 1.Standby pump room layout updated Circulated thru email
2.E-building name updated to E-house
3.Laboratory and workshop updated
4.Escape route updated shelter shown
5.Fuel oil tank aft of Fr.53 stbd side, change to Diesel
oil tank
6.New stool on Fr.71 shown
7.Extg deck opening updated as per new info dwg
8.Profile updated

20 July 2007 Rev. A ISSUED IFR

31 July 2007 Rev. B 1. Tank compartment fr.32-fr.43 portside deleted Issued IFD
2.Tank compartment fr.40-fr.43 stbd deleted
3.Outbd entrance door on high expansion foam tank
room deleted
4. Fender stowing location shited aft and outboard
5.Stg rm updated as per latest Rev. D drawing
6.UPS & Battery Rm (ps) shown on Boat deck
7.Radio Locker (ps) shown in Nav. Deck
8.Engine Room Plans (main flr,2 nd deck,3rd deck,4th
deck) shown
9.Sea watelift pump platfom updated (made bigger)
10.Slop tank double hull outfitting shown
11.Rescue boat (ps) platform & ladder shown
12.Escape route updated

20 Aug 2007 Rev. B 1.Lifeboat & liferaft updated Circulated thru email
2.Metering Unit Updated
3.Sea water lift pump updated
4.STG rm layout rev. 0 updated
5.Module s2 outbd platform modified
6.Extg. Piping layout Updated
7.Module P2-P5u, S2 updated
8.Boiler rm updated
9. Offloading Station fwd and aft updated
10.Escape route updated

27 Aug 2007 Rev. B 1.Riser porch layout updated Circulated thru email
2. Comp./MGPS house renamed to Deck Auxiliary
Machinery Room, door shifted 1.6m towards aft
3.Accom. Update as per latest accom layout
4. Stools updated-Metering unit & comp/mgps house
support added
5. Module P5U shifted 375mm aft
6. Lab/Workshop layout updated
7. 4th deck plan engine room other decks removed
and shown in respective decks
8. Escape route updated
Page 3 of 6
10 Sept 2007 Rev. B 1. Portside crane location updated (13600 from C.L.) Circulated thru email
2. Maindeck piping updated as per preliminary
layout from Kikuchi san
3. Module P5u foundation shown
4. Extg Dk opening updated
5. Pump room on upper deck-room size corrected
6. Funnel marking and front wall marking shown
7. CO2 bottle room relocated to STG/Boiler platform
8. CO2 bottle cabinet for standby f/p rm shown
9. Escape route in focsle updated
10. Flare tower profile updated
11. New hatch on Fsle deck shown

17 Sept 2007 Rev. B 1. UPS Room and Battery Rm in Boat Deck not Circulated thru email
shown
2. Metering Skid layout shown
3. Boiler skid updated access stair from upper
deck shifted 2000mm fwd
4. Jumper hose porch (riser conn area) updated
5. Spread mooring winch fdn shown
6. Engine room (2nd dk-tank top) update
7. Deck crane (PS) boom rest relocated near gose
maintenace platform
8. Personnel Transfer Crane (SB) boom rest updated
9. Boiler skid on profile updated
10. Flare tower profile full height shown

01 Oct 2007 Rev. B 1. Accom updated door on staircase shown Circulated thru email
2. Nav. Bridge WC (N6) ripped out and becomes
part of Battery room (N5)
3. Escape way on boiler module updated
4. Cable tray shown (as per 6030-5011 rev. 0)
5. Maindeck piping updated as per 40d1-0590
update 30Sept) some hatch location from piping
layout and GA maindeck opening not matching,
kikuchi informed already, will confirm which one is
correct-to follow up later
6. STG stair access modified iwo of STG piping
7. Metering unit platform,stair and vertical ladder
modified due to piping on maindeck
8. Escape route updated
9. Stair to Deck Aux. Mach. Rm shifted inboard due
to pipe

15 Oct 2007 Rev. B 1. Extg platform in fcsle deck shown Circulated thru email
2. Module crossover platform updated
3. Maindeck piping updated as per 40d1-0590
update 14Oct
4. Foam monitor platform size updated as per M
side input (2800x2800; location as per Extg Drg.
No. 4520402
5. Foam monitor new location @ fr.64 & fr. 71 as per
M. side input
6. Deck store modified deck store (client) updated;
deck store for ship use to be in Bosun store.
7. STG stair access modified iwo of stg piping

Page 4 of 6
8. Escape route updated iwo modified deck store,
iwo modified stg stair access
9. Upper deck handrail updated as per Extg Drg. No.
4250401

22 Oct 2007 Rev. B 1. Closed chock and bollard on portside iwo module Circulated thru email
P5U ripped out
2. Escapeway shelter updated shelter on portside
iwo bending shoe relocated near to module P5U;
shelter in sb crane area shown
3. Fwd and Aft spread mooring arrgt updated
4. Future riser porch not shown
5. Extg electrical workshop on boat deck Room
name shown
6. Door to laundry (upper deck)-updated
7. Access stair to port laydown area shifted
1600mm fwd
8. Personnel Landing Area on stbd laydown
updated
9. Maindeck piping updated as per 40D1-0590 Rev.
B
10. Main Cable way updated as per 6030-5011 Rev.
1
11. Foam monitor location updated as per 40d1-
0590 Rev. B (final location to updated later -
drawing in progress)
12. ER updated as per 40d1-0160 Rev. 1 (2nd deck;
3rd deck; double bottom)
13. FRC (fast rescue craft) updated platform
shifted fwd
14. Metering skid access stair and platform updated
15. Escape route updated fwd trans escape way
deleted; escapeway platform stbd extended up to
fwd of sb crane; escape way around crane
removed; escape way iwo FRC platform
modified; escape way iwo metering skid modified

05 Nov 2007 Rev. B 1. Metering skid platform modified platform Circulated thru email
connected to FRC platform; foam monitor for
boiler module attached
2. QC/DC control stand and LCP panel location
update focle deck and poop deck
3. Extg deck opening WTH @ Fr.64 stbd iwo STG
support stool, on extg drawing is actually flush
type manhole (site verified) drawing updated
4. Extg. deck foam monitor location updated
(relocated) as per 40d1-0660 Rev. A
5. Fwd spread mooring layout updated jib crane
shifted aft
6. Fwd and aft mooring winch shown/updated
7. Relocated bollard iwo Mod P5u not ripped out
location updated
8. Escape route updated escapeway iwo Mod
P5U updated; shelter iwo Mod P5U relocated
9. Access ladder to double hull of slop tank shifted
fwd (p&s)
10. Marking on Accom front wall, funnel, ships name
updated/shown
11. Flare piping platform shown portside between
module P5U and flare tower (Fr.92-94)
12. Helideck shown on B-deck
Page 5 of 6
13. Standby fire pump rm shown on profile

Page 6 of 6