Sunteți pe pagina 1din 5

HEAVY OIL LONG TERM TESTING FACILITY (HOTTF-1)

Contract Ref. XXXXX Page No.

Client: Contractor: GOFSCO 1 OF 03

ELECTRICAL CABLE SCHEDULE


HO1-ELE-007

E 01-11-17 Issued for Review / Approval SR


D 24-10-17 Issued for Review / Approval SR
C 19-10-17 Issued for Review / Approval SR
B 15-10-17 Issued for Review / Approval SR
A 11-10-17 Issued for Review / Approval SR
REV. DATE DESCRIPTION PRPD. CHKD. APPD.
HEAVY OIL LONG TERM TESTING FACILITY
(HOTTF-1)

ELECTRICAL CABLE SCHEDULE


DOC. NO. REV DATE PAGE No:
HO1-ELE-007 E 01-11-2017 2 OF 03

TABLE OF CONTENTS
1. SCOPE ................................................................................................................................................... 3
2. ABBREVIATIONS .................................................................................................................................. 3
3. CABLE NUMBERING ............................................................................................................................ 3
4. CABLE CONSTRUCTION ..................................................................................................................... 3
HEAVY OIL LONG TERM TESTING FACILITY
(HOTTF-1)

ELECTRICAL CABLE SCHEDULE


DOC. NO. REV DATE PAGE No:
HO1-ELE-007 E 01-11-2017 3 OF 03

1. SCOPE
The scope of this document is to define the ELECTRICAL CABLE SCHEDULE for Heavy Oil Long Term
Testing Facility (HOTTF-1) at North Kuwait.

2. ABBREVIATIONS
Table 2.1
ABBREVIATIONS DESCRIPTION
CU Copper

KV Kilo Volt

LV Low Voltage

PVC Poly Vinyl Chloride

SWA Steel Wire Armour

XLPE Cross-Linked Polyethylene

3. CABLE NUMBERING
Cable numbering format shall be, x-y-z-a

Table 3.1
SYMBOL DESCRIPTION
x From Equipment Tag

y To Equipment Tag

z PC(Power cable) or CC (Control cable)

a Cable serial number

4. CABLE CONSTRUCTION
EXAMPLE: CU / XLPE / PVC / SWA / PVC

Table 4.1
SYMBOL DESCRIPTION
CU Copper

XLPE Cross-Linked Polyethylene

PVC Poly Vinyl Chloride

SWA Steel Wire Armour

PVC Poly Vinyl Chloride


PROJECT TITLE:

HEAVY OIL LONG TERM TESTING FACILITY (HOTTF -1)


DOCUMENT TITLE:

DOC NO : HO1-ELE-007
ELECTRICAL CABLE SCHEDULE
REV E
Type of Cable Gland and

Unarmoured
Armoured/
From Description To Description Cable Details
Size
Length
Sr.No. Unit Cable Numbering Routed Via Remarks
Voltage (Meters)
Size At At
Equipment Equipment Runs Core Type Grade
(Sq.mm) "A" "B"
(KV)

FROM NEW SWITCHGEAR


635 KVA DIESEL GENERATOR-1 MCC - LV SWG
1 HOTTF-1 DG01-MCC-PC-01
(HO1-DEG-0101) SYN PANEL (H01-MCC-01)
Trench 1 4 240 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-75 M-75 Armorued 30 2R X 4C X 240SQMM
FROM DG(SYN PANEL) TO NEW LV
636 KVA DIESEL GENERATOR-1 MCC - LV SWG SWITCHGEAR
2 HOTTF-1 DG01-MCC-PC-02
(HO1-DEG-0101) SYN PANEL (H01-MCC-01)
Trench 1 4 240 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-75 M-75 Armorued 30

MCC - LV SWG CRUDE TRANSFER PUMP -1


3 HOTTF-1 MCC-1102A-PC-01
(H01-MCC-01) (H01 - G - 1102A)
Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 160 CURDE TRANSFER PUMP - 1A

MCC - LV SWG CRUDE TRANSFER PUMP -1


4 HOTTF-1 MCC-1102B-PC-01
(H01-MCC-01) (H01 - G - 1102B)
Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 165 CURDE TRANSFER PUMP - 1B

MCC - LV SWG CRUDE TRANSFER PUMP -1


5 HOTTF-1 MCC-1102C-PC-01
(H01-MCC-01) (H01 - G - 1102C) STAND BY
Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 170 CURDE TRANSFER PUMP - 1C

MCC - LV SWG CRUDE TRANSFER PUMP -2


6 HOTTF-1 MCC-1106A-PC-01
(H01-MCC-01) (H01-G-1106A)
Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 140 CURDE TRANSFER PUMP - 2A

MCC - LV SWG CRUDE TRANSFER PUMP -2


7 HOTTF-1 MCC-1106B-PC-01
(H01-MCC-01) (H01-G-1106B)
Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 145 CURDE TRANSFER PUMP - 2B

MCC - LV SWG WASH WATER PUMP


8 HOTTF-1 MCC-1602A-PC-01
(H01-MCC-01) (H01-G-1602A)
Trench 1 3 25 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 25 WASH WATER PUMP - 1A

MCC - LV SWG WASH WATER PUMP


9 HOTTF-1 MCC-1602B-PC-01
(H01-MCC-01) (H01-G-1602B)
Trench 1 3 25 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 25 WASH WATER PUMP - 1B

MCC - LV SWG COMPACT ELECTROSTATIC COALESCER


10 HOTTF-1 MCC-1103-PC-01
(H01-MCC-01) (H01-G-1103)
Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 150 FOR CEC LOAD

MCC - LV SWG OFF SPEC PUMP


11 HOTTF-1 MCC-1204-PC-01
(H01-MCC-01)
Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 160 FOR OFFICE SPEC PUMP.

MCC - LV SWG NITROGEN GENERATOR


12 HOTTF-1 MCC-PC-0101
(H01-MCC-01) (PACKAGE LOAD)
Trench 1 3 240 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-75 M-75 Armorued 60 FOR NITROGEN GENERATOR

MCC - LV SWG
13 HOTTF-1 MCC-PC-0102A BOILER LOAD-1 Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 120 FOR BOILER -1
(H01-MCC-01)
MCC - LV SWG
14 HOTTF-1 MCC-PC-0102B BOILER LOAD-2 Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 130 FOR BOILER -2
(H01-MCC-01)
MCC - LV SWG
15 HOTTF-1 MCC-PC-0102C BOILER LOAD-3 Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 140 FOR BOILER -3
(H01-MCC-01)
MCC - LV SWG
16 HOTTF-1 MCC-PC-0103 AIR COMPRESSOR UNIT-1 Trench 1 3 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 170 FOR AIR COMPRESSOR
(H01-MCC-01)
MCC - LV SWG
17 HOTTF-1 MCC-PC-0104 TO AC UPS UNIT Trench 1 3 6 Cu/PVC/PVC 450/750V M-25 M-25 UnArmorued 15 FOR SINGLE PHASE AC UPS
(H01-MCC-01)
MCC - LV SWG
18 HOTTF-1 MCC-PC-0105-01 TO SEPERATOR - 03 Trench 1 5 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 160
(H01-MCC-01) 2R X 5C X 16SQMM
MCC - LV SWG FOR SEPERATOR - 03
19 HOTTF-1 MCC-PC-0105-02 TO SEPERATOR - 03 Trench 1 5 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 160
(H01-MCC-01)
MCC - LV SWG TO EXISITING LOW VOLTAGE
20 HOTTF-1 MCC-PC-0106 EXISITNG LOW VOLTAGE SWITCHGEAR Trench 1 4 240 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-75 M-75 Armorued 10
(H01-MCC-01) SWITCHGEAR
MCC - LV SWG
21 HOTTF-1 MCC-PC-0107 OPERATOR CABIN Trench 1 3 16 Cu/PVC/PVC 0.6/1 M-32 _ UnArmorued 15 TO OPERATOR CABIN
(H01-MCC-01)
MCC - LV SWG
22 HOTTF-1 MCC-PC-0108 PORTABLE CABIN OFFICE Trench 1 3 16 Cu/PVC/PVC 0.6/1 M-32 _ UnArmorued 15 TO PORTABLE CABIN OFFICE
(H01-MCC-01)

FROM EXISITING SWITCHGEAR


TO EXISITING LIGHT AND SMALL
23 HOTTF-1 MCC-PC-0108 EXISITING SWITCHGEAR TO EXISITING LIGHT AND SMALL POWER DB Trench 1 4 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 160
POWER DB

TO EXISITING LIGHT AND SMALL


24 HOTTF-1 JB-LPDB-PC-01 LIGHTING JUNCTION BOX-1 Trench 1 4 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 160 TO LIGHTING JUNCTION BOX
POWER DB

25 HOTTF-1 LIGHTING JUNCTION BOX-1 TO ALL LIGHT FITTING _ 1 3 2.5 Cu/PVC/PVC 450/750V _ _ UnArmorued TO ALL LIGHT FITTINGS

26 HOTTF-1 MCC-PC-0109 EXISITING SWITCHGEAR ANTISCALANT Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 35 TO ANTISCLANT
PROJECT TITLE:

HEAVY OIL LONG TERM TESTING FACILITY (HOTTF -1)


DOCUMENT TITLE:

DOC NO : HO1-ELE-007
ELECTRICAL CABLE SCHEDULE
REV E
Type of Cable Gland and

Unarmoured
Armoured/
From Description To Description Cable Details
Size
Length
Sr.No. Unit Cable Numbering Routed Via Remarks
Voltage (Meters)
Size At At
Equipment Equipment Runs Core Type Grade
(Sq.mm) "A" "B"
(KV)

27 HOTTF-1 MCC-PC-0110 EXISITING SWITCHGEAR H2S SCAVENGER Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 35 TO H2S SCAVENGER

28 HOTTF-1 MCC-PC-0111 EXISITING SWITCHGEAR DE MULSIFER Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 35 TO DEMULSIFER

29 HOTTF-1 MCC-PC-0112 EXISITING SWITCHGEAR DIESEL INJECTION Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 35 TO DIESEL INJECTION

30 HOTTF-1 MCC-PC-0113 EXISITING SWITCHGEAR ANTI FOAM Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 35 TO ANTIFOAM

31 HOTTF-1 MCC-PC-0114 EXISITING SWITCHGEAR O2 SCAVENGER Trench 1 3 6 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-25 M-25 Armorued 35 TO O2 SCAVENGER

32 HOTTF-1 MCC-PC-0115-01 EXISITING SWITCHGEAR TO SEPERATOR 01 & 02 Trench 1 5 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 120
2R X 5C X 16SQMM
FOR SEPERATOR - 01 & 02
33 HOTTF-1 MCC-PC-0115-02 EXISITING SWITCHGEAR TO SEPERATOR 01 & 02 Trench 1 5 16 Cu/XLPE/PVC/GSWA/PVC 0.6/1 M-32 M-32 Armorued 120

CONTROL CABLE
MCC - LV SWG CRUDE TRANSFER PUMP -1 FOR CRUDE TRANSFER PUMP-1
34 HOTTF-1 MCC-1102A-CC-LCS-01
(H01-MCC-01) (H01 - G - 1102A) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 160
LOCAL CONTROL STATION
MCC - LV SWG CRUDE TRANSFER PUMP -1 FOR CRUDE TRANSFER PUMP-1
35 HOTTF-1 MCC-1102A-CC-ES-01
(H01-MCC-01) (H01 - G - 1102A) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 160
EMERGENCY STOP
MCC - LV SWG CRUDE TRANSFER PUMP -1 FOR CRUDE TRANSFER PUMP-1
36 HOTTF-1 MCC-1102B-CC-LCS-01
(H01-MCC-01) (H01 - G - 1102B) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 165
LOCAL CONTROL STATION
MCC - LV SWG CRUDE TRANSFER PUMP -1 FOR CRUDE TRANSFER PUMP-1
37 HOTTF-1 MCC-1102B-CC-ES-01
(H01-MCC-01) (H01 - G - 1102B) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 165
EMERGENCY STOP
MCC - LV SWG CRUDE TRANSFER PUMP -1 FOR CRUDE TRANSFER PUMP-1
38 HOTTF-1 MCC-1102C-CC-LCS-01
(H01-MCC-01) (H01 - G - 1102C) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 170
LOCAL CONTROL STATION
MCC - LV SWG CRUDE TRANSFER PUMP -1 FOR CRUDE TRANSFER PUMP-1
39 HOTTF-1 MCC-1102C-CC-ES-01
(H01-MCC-01) (H01 - G - 1102C) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 170
EMERGENCY STOP
MCC - LV SWG CRUDE TRANSFER PUMP -2 FOR CRUDE TRANSFER PUMP-2
40 HOTTF-1 MCC- 1106A-CC-LCS-01
(H01-MCC-01) (H01-G-1106A) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 140
LOCAL CONTROL STATION
MCC - LV SWG CRUDE TRANSFER PUMP -2 FOR CRUDE TRANSFER PUMP-2
41 HOTTF-1 MCC-1106A-CC-ES-01
(H01-MCC-01) (H01-G-1106A) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 140
EMERGENCY STOP
MCC - LV SWG CRUDE TRANSFER PUMP -2 FOR CRUDE TRANSFER PUMP-2
42 HOTTF-1 MCC- 1106B-CC-LCS-01
(H01-MCC-01) (H01-G-1106B) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 145
LOCAL CONTROL STATION
MCC - LV SWG CRUDE TRANSFER PUMP -2 FOR CRUDE TRANSFER PUMP-2
43 HOTTF-1 MCC- 1106B-CC-ES-01
(H01-MCC-01) (H01-G-1106B) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 145
EMERGENCY STOP
MCC - LV SWG WASH WATER PUMP FOR WASH WATER PUMP - 1
44 HOTTF-1 MCC-1602A-CC-LCS-01
(H01-MCC-01) (H01-G-1602A) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 25
LOCAL CONTROL STATION
MCC - LV SWG WASH WATER PUMP FOR WASH WATER PUMP - 1
45 HOTTF-1 MCC-1602A-CC-ES-01
(H01-MCC-01) (H01-G-1602A) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 25
EMERGENCY STOP
MCC - LV SWG WASH WATER PUMP FOR WASH WATER PUMP - 2
46 HOTTF-1 MCC-1602B-CC-LCS-01
(H01-MCC-01) (H01-G-1602B) - LCS
Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 25
LOCAL CONTROL STATION
MCC - LV SWG WASH WATER PUMP FOR WASH WATER PUMP - 2
47 HOTTF-1 MCC-1602B-CC-ES-01
(H01-MCC-01) (H01-G-1602B) - EMERGENCY STOP
Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 25
EMERGENCY STOP
MCC - LV SWG FOR OFFICE SPEC PUMP
48 HOTTF-1 MCC-1204-CC-LCS-01 OFF SPEC PUMP-LCS Trench 1 5 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 160
(H01-MCC-01) LOCAL CONTROL STATION
MCC - LV SWG FOR OFFICE SPEC PUMP
49 HOTTF-1 MCC-1204-CC-ES-01 OFF SPEC PUMP-EMERGENCY STOP Trench 1 3 2.5 CU/XLPE/PVC/GSWA/PVC-FR 450/750V M-20 M-20 Armorued 160
(H01-MCC-01) EMERGENCY STOP