SCHEDULE OF BEAM

BOTTOM
SIZE TOP REINFORCEMENT STIRRUPS
REINFORCEMENT
BEAM b D STRAIGHT ANCHOR 6mm dia if not specified
NO.
Inch Inch NO. DIA NO. DIA LEFT MIDDLE RIGHT

B1 230 375 2-12T 2-12T 8@125c\c 8@150c\c 8@125c\c


GB1 230 375 2-12T 2-12T 8@150c\c 8@150c\c 8@150c\c

Schedule of Column
Col. No. Floor Level COL. SIZE STEEL CONF. Zone REGULAR Zone

C1 Footing to top of gate 9" X 21" 10 - 12T 8@6"c/c 8@6"c/c

C2 Footing to top of gate 9" X 21" 10 - 12T 8@6"c/c 8@6"c/c

C3 Stub col 9" X 9" 4 - 12T 8@6"c/c 8@6"c/c

C4 Stub col 9" X 9" 4 - 12T 8@6"c/c 8@6"c/c Schedule of Slab


SLAB THK 5"
8 MM @ 5" C/C ALONG SHORTER SPAN
Schedule of Footings -PAD Footings: SLAB REINFORCEMENT
8MM @ 7" C/C ALONG LONGER SPAN

COL. FOOTING SIZE Total Depth D BARS || TO B BARS || TO L


NO. BXL (SHORT SIDE) (LONG SIDE)

TOR 10 @ 6''
C1 3' - 0'' X 4' - 0'' 18 TOR 10 @ 6'' C/C
C/C

TOR 10 @ 6''
C2 3' - 0'' X 4' - 0'' 18 TOR 10 @ 6'' C/C
C/C