Construction of Decentralised Waste Water Treatment Plant Pilot Project for Koye Fetche Condominium

WEEKLY PROGRESS REPORT


LOT-II WWTP2 Date: 25 November 2017

1 Weather: Sunny
Sunny
2 Health and Safety: No accident,No meeting conducted regarding H & S
3 Environment, Access & Community: NA
4 Contractual Issues: LC / E-M issue still pending

Concrete pouring activity is continued for PTU foundation column a


Excavation for Primary clarification tank completed
5 Civil Construction Activities: Rebar fixing for biological treatment unit part 2 continued at slow
6 E-M Installation Activities NA
7 Testing and Commissioning: NA
8 Other Activities: NA
9 Measurement & Payment: NA
10 Variations: NA
11 Overall progress: Very slow ; Material shortage at site such as rebar,congrete aggreg

As you know HDPE & Stainless steel pipe can't be imported this tim
reinforced concrete pipe as sleeve under primary clarifcation tank b
12 Any Other Remarks: the pipe. Let me know your openion in this regard.

Signature __________________________________
oye Fetche Condominium Site
S REPORT
Prepared By: Eyob T.

arding H & S

or PTU foundation column and chemical top tie beam


k completed
nit part 2 continued at slow rate

ch as rebar,congrete aggregates,water stop and pipes

pe can't be imported this time. The contractor proposed to use 90cm


er primary clarifcation tank base slabs later to be grouted after installing
n this regard.