Documente Academic
Documente Profesional
Documente Cultură
Date Regular servicing as per Maintenance Checklist / Major or Minor repairs Maintenance performed by Time Cost Tag-out (If Tag Removed
Company / Business / Individual Taken Required) & Checked by
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Childrens Services SA website:
Machine Guarding - Maintenance Schedules.
EQUIPMENT / MACHINERY CHECKLIST School Name Blank (Highlight this cell & insert school name)
WH&S legislation - Plant Code of Practice 2005 outlines that workers (staff members) and others (students, maintenance contractors)
using plant / equipment should be trained and provided with information and instruction on :
o safe work practices and operating procedures
o maintenance procedures
The below checks are recommended for equipment prior to or during a unit of work where the equipment will undergo moderate to heavy use.
Date
Follow-up
/ / / / Actions
RANDOM EQUIPMENT CHECKS Signature
Tick or comment Tick or comment Tick or comment Tick or comment Eg. Cracked blade replaced 03/10
John Smith
Visual check of mains Electrical Switches, Wiring and/or Conduit (Cracks, broken controls
etc.) Arrange for immediate repair of any faults
Verify all Guards are secure and function correctly (Check latches, locks, fasteners and/or
interlocks)
Ensure workspaces and walk-ways are clear and unobstructed and that no slip-hazards are
present
Conduct close inspection for damage to Switch Gear Test operation of Switch Gear
(Proper function of switch controls)
Check availability of specific tools for this machine. (spanners, Allen keys, drifts, soft head
hammers etc.)
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Childrens Services SA website:
Machine Guarding - Maintenance Schedules.
EQUIPMENT / MACHINERY CHECKLIST School Name Blank (Highlight this cell & insert school name)
Other:
Other:
Other:
Other:
Other:
Other:
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Childrens Services SA website:
Machine Guarding - Maintenance Schedules.
EQUIPMENT / MACHINERY CHECKLIST School Name Blank (Highlight this cell & insert school name)
Date / Follow-up
END OF SEMESTER /
Date
Signature Actions ANNUAL CHECK /
CHECKS Tick or comment Tick or comment Eg. Blade & pulley alignment Signature
adjusted 02/10 Tick or comment
Sem 1 Sem 2 John Smith
Check condition of 50mm line markings defining Operator Zones
Check the availability of spare parts i.e. cutters, drive belts, etc.
and Access Walkways
Lubricate all points in accordance with the manufacturer's Review Safety Operating Procedure and update if necessary
specification
Other:
Clean out T slots in table
Other:
Check position and operation of table feed stops and stops on
other slides
Other:
Check work holding vice for proper operation. Clear away swarf
and waste build-up that may restrict clamping movement
Other:
Replace suds / coolant totally and dispose according to Material
Safety Data Sheet (MSDS) Other:
Protect all bare metal surfaces before Term Shutdown
eg. Yellow line for operator zone repainted
(CRC, WD40, RP7 of similar) Follow-up Actions
14/12 John Smith
Clear away all fines swarf and waste from inside and around
housings, cabinets etc
Examine bolts used for mounting the motor to the machine. Re-
tighten if necessary
Acknowledgement: Much of the information for this document has been sourced from content kindly provided by Department of Education & Childrens Services SA website:
Machine Guarding - Maintenance Schedules.