Sunteți pe pagina 1din 16

RESUMEN DE METRADOS EXPLANACIONES

PROYECTO : "MEJORAMIENTO Y REHABILITACIN DE LA CARRETERA OCOBAMBA - RANRACANCHA - EMPALME


RUTA 3S, PROVINCIA DE CHINCHEROS - APURIMAC "
ACTIVIDAD : 02.01.00 EXPLANACIONES
FECHA : NOVIEMBRE 2017
ITEM PARTIDA UNIDAD
02.01.01 Corte y remocin en explanaciones en tierra suelta m3
02.01.02 Perforacin y disparo en roca suelta m3
02.01.03 Perforacion y disparo en roca fija m3
02.01.04 Desquinche y peinado de talud (sin voladura) m2
02.01.05 Remocion de material en tajo abierto m3
02.01.06 Relleno de terraplenes con material propio m3
02.01.07 Transporte de escombros entre 120 m y 1000 m. m-km
NES

- RANRACANCHA - EMPALME
MAC "

METRADO
22,665.43
4,772.36
13,868.67
500.00
18,741.03
62.05
6,812.48
RESUMEN DE REPORTE DE VOLUMENES
PROY: "MEJORAMIENTO Y REHABILITACIN DE LA CARRETERA OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

RESUMEN DE VOLUMEN POR TIPO DE SUELO TRAMO I

VOLUMEN

DEL AL TIPO DE SUELO Reporte Tierra Suelta Roca Suelta Roca Fija

0+000.00 10+000 41,306.46 41,306.46 22,665.43 4,772.36 13,868.67

PARCIAL (M3) 22,665.43 4,772.36 13,868.67


3S, PROVINCIA DE CHINCHEROS - APURIMAC "

CUNETA

Terraplen Tierra Suelta Roca Suelta

62.05 10.00 250.00

62.05 10.00 250.00


REPORTE DE VOLUMENES
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR EN EL CAMINO VECINAL OCOBAMBA
PROY:
APURIMAC.

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

PROGRESIVA AREA AREA AREA DIST. VOLUMEN CORTE VOLUMEN TIPO SUELO TIERRA SUELTA (M3)
CORTE CORTE B RELLENO RELLENO
A
m m2 m2 m2 m m3 m3 PARCIAL ACUMUL.
41,306.46 62.05 22,665.43
9+760.00 26.51 47.91 0.00 20.00 32.11 0.00 2 0.00 0.00
9+780.00 11.24 44.93 0.00 20.00 82.64 0.00 2 0.00 0.00
9+790.00 14.67 35.34 0.00 10.00 40.77 0.00 1 40.77 40.77
9+800.00 14.99 19.99 0.00 10.00 19.25 0.00 2 0.00 40.77
9+820.00 15.33 19.56 0.00 20.00 13.84 0.00 2 0.00 40.77
9+830.00 14.88 19.99 0.81 10.00 7.01 4.05 3 0.00 40.77
9+840.00 32.52 40.28 0.00 10.00 9.65 4.05 3 0.00 40.77
9+860.00 31.93 39.92 0.00 20.00 23.63 0.00 3 0.00 40.77
9+870.00 14.76 43.36 0.66 10.00 27.44 3.30 3 0.00 40.77
9+880.00 25.94 42.57 1.42 10.00 33.92 10.40 3 0.00 40.77
9+900.00 19.65 19.68 0.16 20.00 24.99 15.80 3 0.00 40.77
9+920.00 26.99 34.59 0.55 20.00 11.45 7.10 3 0.00 40.77
9+940.00 17.72 26.20 0.00 20.00 24.13 5.50 3 0.00 40.77
9+960.00 13.63 35.98 0.00 20.00 46.26 0.00 3 0.00 40.77
9+980.00 37.32 44.43 0.21 20.00 44.19 2.10 3 0.00 40.77
9+990.00 13.63 43.01 0.00 10.00 27.37 1.05 3 0.00 40.77
10+000.00 37.32 49.76 0.87 10.00 31.37 4.35 3 0.00 40.77
10+010.00 36.63 0.00 10.00 64.79 4.35 3 0.00 40.77
10+020.00 59.99 0.00 10.00 72.47 0.00 3 0.00 40.77
10+040.00 48.14 0.00 20.00 162.20 0.00 3 0.00 40.77
10+060.00 22.62 0.00 20.00 106.14 0.00 3 0.00 40.77
10+080.00 34.34 0.00 20.00 85.44 0.00 3 0.00 40.77
REPORTE DE VOLUMENES
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR EN EL CAMINO VECINAL OCOBAMBA
PROY:
APURIMAC.

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

PROGRESIVA AREA AREA AREA DIST. VOLUMEN CORTE VOLUMEN TIPO SUELO TIERRA SUELTA (M3)
CORTE CORTE B RELLENO RELLENO
A
m m2 m2 m2 m m3 m3 PARCIAL ACUMUL.
41,306.46 62.05 22,665.43
10+100.00 31.91 0.00 20.00 99.38 0.00 2 0.00 40.77
10+110.00 36.63 0.00 10.00 51.41 0.00 2 0.00 40.77
10+120.00 59.99 0.00 10.00 72.47 0.00 1 72.47 113.23
10+140.00 48.14 0.00 20.00 162.20 0.00 2 0.00 113.23
10+150.00 220.75 0.00 10.00 201.67 0.00 2 0.00 113.23
10+160.00 132.54 0.00 10.00 264.97 0.00 2 0.00 113.23
10+180.00 110.53 0.00 20.00 364.61 0.00 2 0.00 113.23
10+190.00 178.04 0.00 10.00 216.43 0.00 3 0.00 113.23
10+200.00 175.17 0.00 10.00 264.91 0.00 2 0.00 113.23
10+220.00 155.19 0.00 20.00 495.54 0.00 2 0.00 113.23
10+240.00 96.44 0.00 20.00 377.45 0.00 2 0.00 113.23
10+260.00 124.79 0.00 20.00 331.85 0.00 2 0.00 113.23
10+270.00 144.66 0.00 10.00 202.09 0.00 1 202.09 315.32
10+280.00 160.47 0.00 10.00 228.85 0.00 2 0.00 315.32
10+300.00 115.92 0.00 20.00 414.59 0.00 2 0.00 315.32
10+320.00 60.44 0.00 20.00 264.54 0.00 2 0.00 315.32
10+340.00 59.89 0.00 20.00 180.50 0.00 1 180.50 495.81
10+360.00 83.78 0.00 20.00 215.51 0.00 1 215.51 711.32
10+380.00 71.18 0.00 20.00 232.44 0.00 1 232.44 943.76
10+390.00 81.13 0.00 10.00 114.23 0.00 1 114.23 1057.99
10+400.00 68.52 0.00 10.00 112.24 0.00 1 112.24 1170.23
12+900.00 5.62 0.00 20.00 56.20 0.00 1 56.20 1226.43
REPORTE DE VOLUMENES
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR EN EL CAMINO VECINAL OCOBAMBA
PROY:
APURIMAC.

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

PROGRESIVA AREA AREA AREA DIST. VOLUMEN CORTE VOLUMEN TIPO SUELO TIERRA SUELTA (M3)
CORTE CORTE B RELLENO RELLENO
A
m m2 m2 m2 m m3 m3 PARCIAL ACUMUL.
41,306.46 62.05 22,665.43
12+920.00 11.47 0.00 20.00 170.90 0.00 1 170.90 1397.33
12+940.00 8.29 0.00 20.00 197.60 0.00 1 197.60 1594.93
12+960.00 8.25 0.00 20.00 165.40 0.00 1 165.40 1760.33
12+980.00 7.90 0.00 20.00 161.50 0.00 1 161.50 1921.83
13+000.00 5.36 0.00 20.00 132.60 0.00 1 132.60 2054.43
13+020.00 9.86 0.00 20.00 152.20 0.00 1 152.20 2206.63
13+040.00 8.50 0.00 20.00 183.60 0.00 1 183.60 2390.23
13+060.00 6.76 0.00 20.00 152.60 0.00 1 152.60 2542.83
13+080.00 1.72 0.00 20.00 84.80 0.00 1 84.80 2627.63
13+100.00 2.43 0.00 20.00 41.50 0.00 1 41.50 2669.13
13+120.00 4.43 0.00 20.00 68.60 0.00 1 68.60 2737.73
13+140.00 7.58 0.00 20.00 120.10 0.00 1 120.10 2857.83
13+160.00 7.43 0.00 20.00 150.10 0.00 1 150.10 3007.93
13+180.00 7.92 0.00 20.00 153.50 0.00 1 153.50 3161.43
13+200.00 11.71 0.00 20.00 196.30 0.00 1 196.30 3357.73
13+220.00 11.58 0.00 20.00 232.90 0.00 1 232.90 3590.63
13+240.00 11.08 0.00 20.00 226.60 0.00 1 226.60 3817.23
13+260.00 11.31 0.00 20.00 223.90 0.00 1 223.90 4041.13
13+280.00 12.24 0.00 20.00 235.50 0.00 1 235.50 4276.63
13+300.00 8.45 0.00 20.00 206.90 0.00 1 206.90 4483.53
13+320.00 6.38 0.00 20.00 148.30 0.00 1 148.30 4631.83
13+340.00 6.36 0.00 20.00 127.40 0.00 1 127.40 4759.23
REPORTE DE VOLUMENES
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR EN EL CAMINO VECINAL OCOBAMBA
PROY:
APURIMAC.

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

PROGRESIVA AREA AREA AREA DIST. VOLUMEN CORTE VOLUMEN TIPO SUELO TIERRA SUELTA (M3)
CORTE CORTE B RELLENO RELLENO
A
m m2 m2 m2 m m3 m3 PARCIAL ACUMUL.
41,306.46 62.05 22,665.43
13+360.00 10.03 0.00 20.00 163.90 0.00 1 163.90 4923.13
13+380.00 8.86 0.00 20.00 188.90 0.00 1 188.90 5112.03
13+400.00 11.61 0.00 20.00 204.70 0.00 1 204.70 5316.73
13+420.00 6.58 0.00 20.00 181.90 0.00 1 181.90 5498.63
13+440.00 3.08 0.00 20.00 96.60 0.00 1 96.60 5595.23
13+460.00 11.59 0.00 20.00 146.70 0.00 1 146.70 5741.93
13+480.00 12.81 0.00 20.00 244.00 0.00 1 244.00 5985.93
13+500.00 16.58 0.00 20.00 293.90 0.00 1 293.90 6279.83
13+520.00 14.50 0.00 20.00 310.80 0.00 1 310.80 6590.63
13+540.00 10.48 0.00 20.00 249.80 0.00 1 249.80 6840.43
13+560.00 16.14 0.00 20.00 266.20 0.00 1 266.20 7106.63
13+700.00 3.69 0.00 20.00 36.90 0.00 1 36.90 7304.93
13+720.00 7.10 0.00 20.00 107.90 0.00 1 107.90 7412.83
13+740.00 6.78 0.00 20.00 138.80 0.00 1 138.80 7551.63
13+760.00 6.53 0.00 20.00 133.10 0.00 1 133.10 7684.73
13+780.00 4.45 0.00 20.00 109.80 0.00 1 109.80 7794.53
13+800.00 4.39 0.00 20.00 88.40 0.00 1 88.40 7882.93
13+820.00 9.26 0.00 20.00 136.50 0.00 1 136.50 8019.43
13+840.00 9.75 0.00 20.00 190.10 0.00 1 190.10 8209.53
13+860.00 10.57 0.00 20.00 203.20 0.00 1 203.20 8412.73
13+880.00 10.94 0.00 20.00 215.10 0.00 1 215.10 8627.83
13+900.00 11.22 0.00 20.00 221.60 0.00 1 221.60 8849.43
REPORTE DE VOLUMENES
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR EN EL CAMINO VECINAL OCOBAMBA
PROY:
APURIMAC.

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

PROGRESIVA AREA AREA AREA DIST. VOLUMEN CORTE VOLUMEN TIPO SUELO TIERRA SUELTA (M3)
CORTE CORTE B RELLENO RELLENO
A
m m2 m2 m2 m m3 m3 PARCIAL ACUMUL.
41,306.46 62.05 22,665.43
13+920.00 17.08 0.00 20.00 283.00 0.00 1 283.00 9132.43
13+940.00 14.80 0.00 20.00 318.80 0.00 1 318.80 9451.23
13+960.00 15.48 0.00 20.00 302.80 0.00 1 302.80 9754.03
13+980.00 14.29 0.00 20.00 297.70 0.00 1 297.70 10051.73
14+000.00 13.58 0.00 20.00 278.70 0.00 1 278.70 10330.43
14+020.00 8.14 0.00 20.00 217.20 0.00 3 0.00 10330.43
14+040.00 3.83 0.00 20.00 119.70 0.00 3 0.00 10330.43
14+060.00 3.94 0.00 20.00 77.70 0.00 3 0.00 10330.43
14+080.00 2.16 0.00 20.00 61.00 0.00 3 0.00 10330.43
14+100.00 1.01 0.00 20.00 31.70 0.00 1 31.70 10362.13
14+120.00 2.71 0.00 20.00 37.20 0.00 1 37.20 10399.33
14+140.00 6.79 0.00 20.00 95.00 0.00 3 0.00 10399.33
14+160.00 14.48 0.00 20.00 212.70 0.00 1 212.70 10612.03
14+180.00 13.11 0.00 20.00 275.90 0.00 1 275.90 10887.93
14+200.00 13.55 0.00 20.00 266.60 0.00 1 266.60 11154.53
14+220.00 16.38 0.00 20.00 299.30 0.00 1 299.30 11453.83
14+240.00 975.00 0.00 20.00 9913.80 0.00 3 0.00 11453.83
14+260.00 13.89 0.00 20.00 9888.90 0.00 1 9888.90 21342.73
14+280.00 23.08 0.00 20.00 369.70 0.00 3 0.00 21342.73
14+300.00 18.38 0.00 20.00 414.60 0.00 3 0.00 21342.73
14+320.00 12.27 0.00 20.00 306.50 0.00 1 306.50 21649.23
14+340.00 11.82 0.00 20.00 240.90 0.00 1 240.90 21890.13
REPORTE DE VOLUMENES
MEJORAMIENTO DEL SERVICIO DE TRANSITABILIDAD VEHICULAR EN EL CAMINO VECINAL OCOBAMBA
PROY:
APURIMAC.

SECTOR: OCOBAMBA-RANRACANCHA-CCOLLPAPAMPA
UBICAC: OCBAMBA-RANRACANCHA- CHINCHEROS - APURIMAC

PROGRESIVA AREA AREA AREA DIST. VOLUMEN CORTE VOLUMEN TIPO SUELO TIERRA SUELTA (M3)
CORTE CORTE B RELLENO RELLENO
A
m m2 m2 m2 m m3 m3 PARCIAL ACUMUL.
41,306.46 62.05 22,665.43
14+360.00 10.83 0.00 20.00 226.50 0.00 1 226.50 22116.63
14+380.00 9.69 0.00 20.00 205.20 0.00 1 205.20 22321.83
14+400.00 8.77 0.00 20.00 184.60 0.00 1 184.60 22506.43
14+420.00 10.93 0.00 20.00 197.00 0.00 3 0.00 22506.43
14+440.00 8.52 0.00 20.00 194.50 0.00 3 0.00 22506.43
14+460.00 12.09 0.00 20.00 206.10 0.00 2 0.00 22506.43
14+480.00 15.70 0.00 20.00 277.90 0.00 2 0.00 22506.43
14+500.00 0.00 0.00 20.00 157.00 0.00 2 0.00 22506.43
14+520.00 5.65 0.00 20.00 56.50 0.00 2 0.00 22506.43
14+540.00 7.40 0.00 20.00 130.50 0.00 3 0.00 22506.43
14+560.00 10.04 0.00 20.00 174.40 0.00 2 0.00 22506.43
14+580.00 15.16 0.00 20.00 252.00 0.00 3 0.00 22506.43
14+600.00 7.64 0.00 20.00 228.00 0.00 3 0.00 22506.43
14+620.00 15.43 0.00 20.00 230.70 0.00 2 0.00 22506.43
14+640.00 6.67 0.00 20.00 221.00 0.00 3 0.00 22506.43
14+660.00 9.23 0.00 20.00 159.00 0.00 1 159.00 22665.43
14+680.00 11.20 0.00 20.00 204.30 0.00 3 0.00 22665.43
14+700.00 4.18 0.00 20.00 153.80 0.00 3 0.00 22665.43
PORTE DE VOLUMENES
AR EN EL CAMINO VECINAL OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS -
APURIMAC.

###

ROCA SUELTA (M3) ROCA FIJA (M3) RELLENO (M3)

PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL.


4,772.36 13,868.67 62.05
32.11 32.11 0.00 0.00 0.00 0.00
82.64 114.74 0.00 0.00 0.00 0.00
0.00 114.74 0.00 0.00 0.00 0.00
19.25 133.99 0.00 0.00 0.00 0.00
13.84 147.84 0.00 0.00 0.00 0.00
0.00 147.84 7.01 7.01 4.05 4.05
0.00 147.84 9.65 16.66 4.05 8.10
0.00 147.84 23.63 40.29 0.00 8.10
0.00 147.84 27.44 67.73 3.30 11.40
0.00 147.84 33.92 101.65 10.40 21.80
0.00 147.84 24.99 126.64 15.80 37.60
0.00 147.84 11.45 138.09 7.10 44.70
0.00 147.84 24.13 162.22 5.50 50.20
0.00 147.84 46.26 208.48 0.00 50.20
0.00 147.84 44.19 252.67 2.10 52.30
0.00 147.84 27.37 280.04 1.05 53.35
0.00 147.84 31.37 311.41 4.35 57.70
0.00 147.84 64.79 376.20 4.35 62.05
0.00 147.84 72.47 448.66 0.00 62.05
0.00 147.84 162.20 610.86 0.00 62.05
0.00 147.84 106.14 717.00 0.00 62.05
0.00 147.84 85.44 802.44 0.00 62.05
PORTE DE VOLUMENES
AR EN EL CAMINO VECINAL OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS -
APURIMAC.

###

ROCA SUELTA (M3) ROCA FIJA (M3) RELLENO (M3)

PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL.


4,772.36 13,868.67 62.05
99.38 247.21 0.00 802.44 0.00 62.05
51.41 298.62 0.00 802.44 0.00 62.05
0.00 298.62 0.00 802.44 0.00 62.05
162.20 460.81 0.00 802.44 0.00 62.05
201.67 662.48 0.00 802.44 0.00 62.05
264.97 927.45 0.00 802.44 0.00 62.05
364.61 1292.05 0.00 802.44 0.00 62.05
0.00 1292.05 216.43 1018.87 0.00 62.05
264.91 1556.96 0.00 1018.87 0.00 62.05
495.54 2052.50 0.00 1018.87 0.00 62.05
377.45 2429.94 0.00 1018.87 0.00 62.05
331.85 2761.79 0.00 1018.87 0.00 62.05
0.00 2761.79 0.00 1018.87 0.00 62.05
228.85 2990.64 0.00 1018.87 0.00 62.05
414.59 3405.22 0.00 1018.87 0.00 62.05
264.54 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
PORTE DE VOLUMENES
AR EN EL CAMINO VECINAL OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS -
APURIMAC.

###

ROCA SUELTA (M3) ROCA FIJA (M3) RELLENO (M3)

PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL.


4,772.36 13,868.67 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
PORTE DE VOLUMENES
AR EN EL CAMINO VECINAL OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS -
APURIMAC.

###

ROCA SUELTA (M3) ROCA FIJA (M3) RELLENO (M3)

PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL.


4,772.36 13,868.67 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
PORTE DE VOLUMENES
AR EN EL CAMINO VECINAL OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS -
APURIMAC.

###

ROCA SUELTA (M3) ROCA FIJA (M3) RELLENO (M3)

PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL.


4,772.36 13,868.67 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 0.00 1018.87 0.00 62.05
0.00 3669.76 217.20 1236.07 0.00 62.05
0.00 3669.76 119.70 1355.77 0.00 62.05
0.00 3669.76 77.70 1433.47 0.00 62.05
0.00 3669.76 61.00 1494.47 0.00 62.05
0.00 3669.76 0.00 1494.47 0.00 62.05
0.00 3669.76 0.00 1494.47 0.00 62.05
0.00 3669.76 95.00 1589.47 0.00 62.05
0.00 3669.76 0.00 1589.47 0.00 62.05
0.00 3669.76 0.00 1589.47 0.00 62.05
0.00 3669.76 0.00 1589.47 0.00 62.05
0.00 3669.76 0.00 1589.47 0.00 62.05
0.00 3669.76 9913.80 11503.27 0.00 62.05
0.00 3669.76 0.00 11503.27 0.00 62.05
0.00 3669.76 369.70 11872.97 0.00 62.05
0.00 3669.76 414.60 12287.57 0.00 62.05
0.00 3669.76 0.00 12287.57 0.00 62.05
0.00 3669.76 0.00 12287.57 0.00 62.05
PORTE DE VOLUMENES
AR EN EL CAMINO VECINAL OCOBAMBA - RANRACANCHA - EMPALME RUTA 3S, PROVINCIA DE CHINCHEROS -
APURIMAC.

###

ROCA SUELTA (M3) ROCA FIJA (M3) RELLENO (M3)

PARCIAL ACUMUL. PARCIAL ACUMUL. PARCIAL ACUMUL.


4,772.36 13,868.67 62.05
0.00 3669.76 0.00 12287.57 0.00 62.05
0.00 3669.76 0.00 12287.57 0.00 62.05
0.00 3669.76 0.00 12287.57 0.00 62.05
0.00 3669.76 197.00 12484.57 0.00 62.05
0.00 3669.76 194.50 12679.07 0.00 62.05
206.10 3875.86 0.00 12679.07 0.00 62.05
277.90 4153.76 0.00 12679.07 0.00 62.05
157.00 4310.76 0.00 12679.07 0.00 62.05
56.50 4367.26 0.00 12679.07 0.00 62.05
0.00 4367.26 130.50 12809.57 0.00 62.05
174.40 4541.66 0.00 12809.57 0.00 62.05
0.00 4541.66 252.00 13061.57 0.00 62.05
0.00 4541.66 228.00 13289.57 0.00 62.05
230.70 4772.36 0.00 13289.57 0.00 62.05
0.00 4772.36 221.00 13510.57 0.00 62.05
0.00 4772.36 0.00 13510.57 0.00 62.05
0.00 4772.36 204.30 13714.87 0.00 62.05
0.00 4772.36 153.80 13868.67 0.00 62.05