Sunteți pe pagina 1din 162

Project No.

S7948 Vessel Name: "Overseas Raphael" (Tender # S021822)


Arrived On :- 17/03/2015, Docked on:- 17/03/2015, Undock on:- 26/03/2015, Sailing:- 12/04/2015,
BUDGET 3 (REV 1)
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

E00001 3.3 DRYDOCK DUES :


- Drydock for first (1st) day 1 LS 17,550.00 17,550.00
- Subsequent docking days 9 days 8,775.00 78,975.00

E00003 3.1 TUGS AND PILOTS


Provided tugs, pilot, launches and rigger assistance for shifting
of vessel.

1) From Sea to Dock No 3 on 17th March 2015


- Pilotage 1 Time 1,350.00 1,350.00
- Tug assistance 15.5 hrs 450.00 6,975.00
- Rigger assistance 20 Nos 50.00 1,000.00
- Launches 3.5 hrs 45.00 158.00

2) From Dock No 3 to Berth No. 2 on 26th March 2015


- Pilotage 1 Time 1,350.00 1,350.00
- Tug assistance 15.5 hrs 450.00 6,975.00
- Rigger assistance 10 Nos 50.00 500.00
- Launches 5 hrs 45.00 225.00

3) From Berth No.6 to sea on 29 Feb 2013 (Est)


- Pilotage 1 Time 1,350.00 1,350.00
- Tug assistance 14.5 hrs 450.00 6,525.00
- Rigger assistance 20 Nos 50.00 1,000.00
- Launches 3.5 hrs 45.00 158.00

E00007 2.17 GAS-FREE CERTIFICATE -


First gas free certificate 1 EA 360.00 360.00
Following certificates, allow 1 times per day 26 EA 175.00 4,550.00
Motor boat service to transport Chemist hrs 180.00 -

E00008 37.02 VENTILATION


Hire of ventilators, Allow 1days x 19 fans 0 hrs 4.00 -
Connect/disconnect, Allow 19 fans 0 Nos 90.00 -

E00008 37.04 LIGHTING


Hire of heating lamps, Allow 1days x 18 fans 0 days 3.00 -
Connect/disconnect x 18 sets 0 set 90.00 -

E00009 2.6 FIRE LINE


Connected & disconnected - 1 lines x 1 times 1 line 145.00 145.00
Kept line under pressure during the repair-1line 26 days 45.00 1,170.00

E00009 2.7 FIRE WATCHMAN


Provided fire watchman during repair period - one man 26 days 180.00 4,680.00

E00010 3.5 TEMPORARY GANGWAY


One gangway free of charge during repair period FOC
Additional one no. gangway to provide during period of repairs 1 No 600.00 600.00

E00011 2.4 SHORE POWER / GENERATOR HIRE


Mobilization/remobilization, Allow one engine one time 1 time 155.00 155.00
Hire of portable generator (440V/60HZ/ 600AMPS) 10 days 450.00 4,500.00
10days; from 17/03/15 to 26/03/15
Supplied of Diesel 5444 ltrs 1.20 6,532.80

Page 1 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

17 March 2015 - 3223ltrs


23 March 2015 - 2014ltrs
25 March 2015 - 207ltrs

E00012 2.12 TELEPHONE CONNECTION


Provided telephone connection to the vessel 2 times 70.00 140.00

E00013 2.1 COOLING WATER CONNECTION


ACCOMMODATION - A/C x 2 lines (in and out) -
1 2 lines 85.00 170.00
connection/disconnection
Suppllied : Connected from 18 March 15 - 26 March 15 9 days 70.00 630.00

HYDROLIC COOLING for lower down windlass x 1 Nos -


2 1 lines 85.00 85.00
connection/disconnection
Suppllied : on 18 March 15 and 26 March 15 2 days 70.00 140.00

3 L.T. COOLER x 2 lines (in and out) - connection/disconnection 2 lines 85.00 170.00
Suppllied : Connected from 21 March 15 - 26 March 15 6 days 70.00 420.00

AC ENGINE CONTROL ROOM x 2 lines (in and out) -


4 2 lines 85.00 170.00
connection/disconnection
Suppllied : Connected from 18 March 15 - 26 March 15 9 days 70.00 630.00

5 PROVISION x 2 lines (in and out) - connection/disconnection 2 lines 85.00 170.00


Suppllied : Connected from 18 March 15 - 26 March 15 9 days 70.00 630.00

E00014 2.3 FRESH WATER SUPPLY -


Connect/disconnect, 1 140.00 140.00
Supply from yard's main, approx 500m3 500 ton 2.70 1,350.00

E00015 2.2 BALLAST WATER SUPPLY


Connection and disconnection charges - 4 tanks 4 time 1,170.00 4,680.00
Supply from Yard's main , 17000ton 17000 ton 0.14 2,380.00
Remove/refit air vent head

E00016 2.14 COMPRESSED AIR SUPPLY - NA


Connection and disconnection charges - 0 times 95.00 -
Supply from yard's main Hrs 10.00

E00019 2.11 SEWAGE DISCHARGE CONNECTION


Connection and disconnection of sewage discharge line during 3 180.00 540.00
in drydock

E00020 2.9 GARBAGE REMOVAL.


Galley refuses during the repair period. 26 45.00 1,170.00

E00021 2.13 SHORE CRANE SERVICE


Crane services provided for lifting vessel's stores, provisions
and Owner's spare parts
Crane usage 18.00 hrs 45.00 810.00
19 March 2015 - 3hrs
20 March 2015 - 2hrs
21 March 2015 - 2hrs
22 March 2015 - 3hrs
23 March 2015 - 2hrs
25 March 2015 - 2hrs
26 March 2015 - 2hrs
28 March 2015 - 2hrs

Yard's riggers, per normal manhour (3 men per hr) Nett 54 Mhrs 15.00 810.00

Page 2 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

E00024 SEA TRIALS ASSISTANCE.


Sea trial allow - Allow 44mhrs (If required) NETT 44 Mhrs 20.00 880.00

E00035 4 HULL BLASTING AND PAINT


4.2.1 Flat Bottom
Hand scraping 3750 m2 1.03 3,863.00
HP washing up to 300bar pressure 12500 m2 0.54 6,750.00
Spot blasting to SA2.0 1125 m2 8.40 9,450.00
1st T/U coat 1294 m2 0.55 712.00
2nd T/U coat 1294 m2 0.55 712.00
Hosing down with fresh water 12500 m2 0.11 1,375.00
Apply 1 F/C A/F SPC 12500 m2 0.53 6,625.00

Rudder blade - 319m2 -


HP washing up to 300bar pressure 319 m2 0.54 172.00
Spot hydroblasting WJ2, per m 319 m2 14.50 4,626.00
1st T/U coat 319 m2 0.55 175.00
2nd T/U coat 319 m2 0.55 175.00
Hosing down with fresh water 0 m2 0.11 -
1st F/C A/F SPC 319 m2 0.53 169.00
2nd F/C A/F SPC 319 m2 0.53 169.00

4.2.2 Vertical Area


Wash down oil stain with Yards chemical 16340 m2 3.00 49,020.00
HP washing up to 300bar pressure x 2 times 32680 m2 0.66 21,569.00
Spot hydroblasting WJ2, per m 2766 m2 14.50 40,107.00
Hosing down with fresh water 16340 m2 0.20 3,268.00

From 22.6m to 14m:


1st coat international red, 100 4360 m2 0.72 3,139.00
2nd coat intersleek 970, 150 4360 m2 2.20 9,592.00

From 22.6m to bilge keel (spot)


1st T/U coat Intershield 300, 125, 3181 m2 0.74 2,354.00
2nd T/U coat Intershield 300, 125, 3181 m2 0.74 2,354.00
1 T/U coat Intersleek 731, 100, 5881 m2 2.20 12,938.00
1 F/C coat Intersleek 970, 150, 11980 m2 1.97 23,601.00

Painting Preparation (refer to tender S021822/001)


Cleaning of dock bottom - NA LS 15,000.00 -
Removal of grit from dock & hosing down NA m2 0.90 -
Propeller protection during application 1 LS 4,000.00 4,000.00
Paint mixing station for silicon based paint / station 6 EA 1,390.00 8,340.00

Temporary covering of Yokohama Fenders using heavy duty


plastic and providing a manifold with hoses to spray water in 4 EA 2,900.00 11,600.00
order to avoid contact damages of silicon based painting on
hull, during vessel at alongside of berth.

Addl Fender areas :


HP washing up to 300bar pressure 1000 m2 0.66 660.00
Grit blast to SA 2.0 spot 50 m2 10.60 530.00
1st T/U coat intershield 300 ALu, 150, 58 m2 0.88 51.00
2nd T/U coat Intergard 263, 100, 58 m2 0.88 51.00
Hosing down with fresh water 1000 m2 0.22 220.00
1 F/C coat Intersmooth SPC, 145, 1000 m2 0.74 740.00

4.2.3 Top side

Page 3 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

HP washing up to 300bar pressure 5750 m2 0.66 3,795.00


Grit blast to SA2.0 621 m2 11.40 7,079.00
Apply 1st T/U coat 150mic 662 m2 0.94 622.00
Apply 2nd T/U coat 75mic 662 m2 0.94 622.00
Hosing down with fresh water 5750 m2 0.22 1,265.00
Apply 1 F/C 150mic, 5750 m2 0.72 4,140.00

Additional:
Cutting line x 2 Coats x 1606Meter run 1606 mtrs run 5.00 8,030.00

Provided protection covering of following items :- 1 Ls 850.00 850.00


- Speed Log, Echo Sounder
- Anodes, ICCP

Provided protection covering of plywood on handrails (2.4m x 292 LS 15.00 4,380.00


1.2m)

12 pcs 23.00 276.00


Fit/remove wooden plugs with stand off pipes, 12 Nos

E00036 4.2.7 HULL MARKING 1 Ls 6,550.00 6,550.00


Repainted with Owners supply paint

E00037 37.13 HULL ANODES


Renew welded type zinc anodes, 18kgs x 40nos 720 Kgs 3.20 2,304.00
Renew welded type zinc anodes, 13kgs x 15nos 195 Kgs 3.20 624.00

Supply of anodes @18kgs each NETT 40 Pcs 90.00 3,600.00


Supply of anodes @13kgs each NETT 15 Pcs 65.00 975.00

E00038 11.1 ANCHOR CHAINS


Lower and range anchors and chains on dock bottom for
examination, clean with HP fresh water jet mark shots by white 1 Ls 3,050.00 3,050.00
paint and restow on completion.
Grit sweep anchor chains EA 600.00 -
Calibrate anchor chains. 2 EA 480.00 960.00

Reweld loose link studs EA 30.00 -

Disconnect from bitter ends and change first lengths to end, EA 840.00 -
Renewal of anchor chains with Owner supply, i.c. w anchor
Lgths 650.00 -
chain rangeon dock, per each length

E00039 11.1 CHAIN LOCKER


Chain lockers to clean by hosing down and coat with 1 coat of
Owner's paint up to 2 mtrs high, including scrapping of the 1 LS 2,850.00 2,850.00
bottom
Remove/dispose mud, 12 Tons 100.00 1,200.00

Staging:
Chain Locker , Port & Stbd Side Provide Temp.Platform: 2 off
1 Ls 700.00 700.00
hanging each @1.5x0.75x1.5 meters - total 6 planks
Chain Locker , Port & Stbd Side Provide Access Ladder: 2 off
structure each @0.75x0.75x15 meters 1 Ls 1,500.00 1,500.00

Main Deck, Port & Stbd Side Iwo Windlass: 2 off tower each
@2x1x2 meters 1 Ls 270.00 270.00

E00040 9.02 RUDDER CLEARANCES


Open/ close manholes with new yard supplied Gaskets, 1pc 0 EA 100.00 -
Measure and record rudder clearances 1 LS 740.00 740.00
Remove/refit pintle access plates, 2 nos. 0 EA 420.00 -

Page 4 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

Remove cement from nuts and recement 0 LS 790.00 -


Check tightness of pintle nut 0 LS 580.00 -
Renew gland packing with Owner supply materials 0 LS 740.00 -
Carry out pressure test of rudder 0 LS 285.00 -

Staging:
Dock Bottom, Port Side Rudder Area: 1 off tower @3x3x16
1 LS 1,920.00 1,920.00
meters
Dock Bottom, Port Side (Outrigger): 1 off structure @3x3x6
1 LS 720.00 720.00
meters

Dock Bottom, Top Area: 1 off railing @2x1.2x1.5 meters 1 LS 128.00 128.00

Remove/refit bottom plug and hydrotest rudder. 0 LS 325.00 -

E00041 10.01.01 TAIL SHAFT CLEARANCES


Measure and record werdown clearance before and aft repairs 1 LS 700.00 700.00

Cut and reweld rope guard for access 1 EA 525.00 525.00


Magnaflux test of shaft cone 0 LS 580.00 -
4 nos anodes supplied and installed on rope guards with Yard's
4 EA 80.00 320.00
supplied anodes
Fit and weld net cutter using ship supply 0 LS 400.00 -

Staging:

Dock Bottom, Port Side Fwd Area: 1 off tower @3x2x7 meters 1 LS 560.00 560.00

Dock Bottom, Center Rope Guard Area: 1 off hanging


1 LS 500.00 500.00
@4x0.75x1.5 meters - total 10 planks

E00042 8 SEA VALVES


1. Low sea chest SW suction. B'fly, 600 1 EA 730.00 730.00
Elbow pipe 90 deg. 600 x 500 removed. 1.85 Mtrs 766.49 1,418.00
2. Low sea chest cleaning steam Globe , 40 1 EA 65.00 65.00
3. FWG cooling overboard. B'fly, 125 1 EA 180.00 180.00
Spool . 1 mtr. removed for access 1.75 Mtrs 154.80 271.00
4. Waste water discharge ovbd. Storm 100 1 EA 100.00 100.00
Renewed brass flap shaft, dia, 12 mm x 200 1 EA 200.00 200.00
5. Galley water discharge ovbd. Storm 100 1 EA 100.00 100.00
6. Sewage water discharge ovbd. Storm 100 1 EA 100.00 100.00
Renewed brass flap shaft, dia. 10 mm x 150 1 EA 200.00 200.00
7. Aft draft gauge SW inlet. Gate, 80 1 EA 110.00 110.00
8. Boiler blowdown ovbd.. Globe, 50 1 EA 60.00 60.00
9. High sea chest SW suction. B'fly, 600 1 EA 730.00 730.00
Opened strainer cover and removed element 1 EA 200.00 200.00
10. High sea chest cleaning steam Globe , 40 1 EA 65.00 65.00
11. COPT cooling SW disch. ovbd. B'fly, 450 1 EA 470.00 470.00
Elbow pipe 90 deg. 500 x 700, access 1.85 Mtrs 702.62 1,300.00
12. Waste water discharge ovbd. Storm 100 1 EA 100.00 100.00
13. Central cooling sw overboard B'fly, 350 1 EA 370.00 370.00
. Elbow pipe 90 deg. 500 x 2 mtr, access 2.50 Mtrs 702.62 1,757.00
14. Scruber overboard.. B'fly, 300 1 EA 340.00 340.00
. Elbow pipe 90 deg. 500 x 2 mtr, access 2.50 Mtrs 702.62 1,757.00
15. Bilge, fire & GS pump ovbd. B'fly, 250 1 EA 280.00 280.00
16. Hyd. Oil cooler ovbd.. Globe, 65 1 EA 100.00 100.00
17. OWS discharge ovbd.. Globe, 50 1 EA 65.00 65.00
18. Emerg. Fire pump sea suction Globe , 250 1 EA 210.00 210.00

Sea Chest & Overboard valves in Pump Room:

Page 5 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
1. Cargo seachest suction. B'fly 600 1 EA 840.00 840.00
. Removed spool pipe for access. 1.70 Mtrs 766.49 1,303.00
2. Sea chest blowing. . Globe 40 1 EA 75.00 75.00
3. Ballast seachest suction. B'fly 600 1 EA 913.00 913.00
Located inside the double bottom
4. Sea chest blowing. . Globe 40 1 EA 81.00 81.00
. Located insode the double bottom
5.. Ballast discharge ovbd.. B'fly 700 1 EA 1,231.00 1,231.00
Removed spool pipe for access 1.70 Mtrs 894.24 1,520.00
7.. Ballast discharge ovbd.. Check 700 1 EA 1,231.00 1,231.00

Other overboard valves:


1. Fwd. draft level gauge ( F.P tk ) Gate 80 1 EA 316.00 316.00
. Removed to workshop,ovhl and press, tested
2. Mid. draft level gauge ( 4S WBT ) Gate 80 1 EA 316.00 316.00
. Removed to workshop,ovhl and press, tested
3. Mid. draft level gauge ( 4P WBT ) Gate 80 1 EA 316.00 316.00
. Removed to workshop,ovhl and press, tested
4. Hyd.. Cooler ovbd. ( P ). Globe 65 1 EA 121.00 121.00
5. Hyd.. Cooler ovbd. ( S ). Globe 65 1 EA 121.00 121.00
6. Chain locker eductor ovbd. ( S ) Globe 65 1 EA 121.00 121.00
7. Chain locker eductor ovbd. ( p ) Globe 65 1 EA 121.00 121.00
8. Chain locker eductor ovbd. ( S ) Globe 65 1 EA 121.00 121.00

Staging:
Engine Room, Port Side Bottom Area: 2 off hanging each
1 LS 800.00 800.00
@2x1.5x1.5 meters - total 16 planks
Pump Room, Bottom Area: 1 off hanging @2x2x1.5 meters -
1 LS 500.00 500.00
total 10 planks

E00043 8.2 SEA CHEST


Remove/refit grids, cleam and paint as per bottom paint
5 EA 935.00 4,675.00
scheme, 5 sea chests

Supplied cutter pin Split pin AISI 316 SS x 30mm x 2mm x 60 Nos 10.00 600.00
60Nos
Staging:
Dock Bottom, Port & Stbd Side Fwd Area: 2 off tower each
@3x1.6x3.5 meters 1 LS 560.00 560.00

Dock Bottom, Port Side Aft Area: 1 off tower @3x2x5.5 meters
1 LS 440.00 440.00

Dock Bottom, Port Side Aft Area: 1 off tower @3x2x8 meters
1 LS 640.00 640.00

Dock Bottom, Port Side Aft Top Area: 1 off extension


@3x1.2x1.5 meters - total 8 planks 1 LS 400.00 400.00

Dock Bottom, Stbd Side Aft Area: 1 off tower @3x2x3.5 meters
1 LS 280.00 280.00

E00044 2.16 BOTTOM PLUGS

Remove/refit including vacuum test and cementing 12 Nos 55.00 660.00

Manufacture lead washers x 12 Nos 12 Nos 12.00 144.00


-
E00045 10.1.04 PROPELLER POLISHING
Propeller normal polishing Ls 3,500.00 -
DPT of blades roots and tips Ls 550.00 -
Dye check blade tips i.c.w above item a)

Staging:
Dock Bottom, Port & Stbd Side : 2 off tower each @3x2x8
1 LS 1,280.00 1,280.00
meters

Page 6 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

Dock Bottom, Port & Stbd Side: 2 off extension each


1 LS 700.00 700.00
@4x0.5x1.5 meters - total 4 planks

IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM


E00053 4.03 -
(ICCP)
Scrapped, HP wash, spot 2.0 and apply filler and paint as per
3 Loc 800.00 2,400.00
vertical side

Electrical Assistance:
25 March 2015 - 13mhrs Nett 13 Mhrs 15.00 195.00
25 March 2015 (night)- 20mhrs Nett 20 Mhrs 15.00 300.00
27 March 2015 - 9mhrs Nett 9 Mhrs 15.00 135.00

Open/ close manholes with new yard supplied Gaskets, 4pcs EA 100.00 -

Staging:
Dock Bottom, Port & Stbd Side Fwd Area: 2 off tower each
1 LS 1,920.00 1,920.00
@3x3x8 meters
Dock Bottom, Port & Stbd Side Fwd Area: 2 off tower each
1 LS 1,320.00 1,320.00
@3x3x5.5 meters
Dock Bottom, Stbd Side Aft Area: 1 off tower @6x3x6 meters 1 LS 1,440.00 1,440.00

E00054 9.01 STEERING GEAR CLEARANCES


Yard assistance per normal man hour (Nett) Nett 30 Mhrs 20.00 600.00

E00055 9.01 STEERING GEAR PUMPS OVERHAUL 2 NOS - CANCELLED


Overhaul steering gear pump by locally available specialized
Nett 0 LS 7,800.00 -
workshop with Owner supply spares, 1pct (Nett)

E00056 9.01 STEERING GEAR PUMP MOTORS OVERHAUL 2 NOS


Overhaul electric motor 160kw 1 EA 1,785.00 1,785.00

Additional:
1. Resleeved NDE end cover bearing housing. 1 EA 450.00 450.00
2. Renewed 2 nos. V-rings V90 & V75, Yard supply Nett 2 EA 10.00 20.00
3. Supplied of Bearing - 6318 C3 SNR - 1 nos. Nett 1 EA 128.00 128.00
4. Supplied of Bearing - 7315 BG NSK Japan- 1 nos. Nett 1 EA 326.00 326.00

E00057 9.02 RUDDER AND RUDDER PINTLE (REF E00040 ABOVE) 0

TAIL AND INTERMEDIATE SHAFTS ALIGNMENT - USING


E00058 10.01 LS 1,150.00 -
LASER - CANCELLED

E00059 10.01.01 TAILSHAFT WITHDRAWAL LS 17,000.00 -

TAILSHAFT JACK UP TEST TO BE CONDUCTED ON THE


E00060 10.01 SHAFTING PRIOR TO THE VESSEL ENTERING THE
DRYDOCK
Jack up test, 1 test 0 TIME 1,100.00 -

E00061 10.01.02 SEAL RENEWAL


Overhaul seals with Owner supply spares 1 LS 3,680.00 3,680.00
Skim chrome liners 0 LS 420.00 -

Access Works:
Removed ( 1 ) platform access iwo fwd. seals 1 EA 250.00 250.00

Staging:
Engine Room, Bottom Area Iwo Tailshaft: 1 off platform
1 LS 160.00 160.00
@2x2x1.5 meters

E00062 10.01.04 PROPELLER BLADE REPAIRS - CANCELLED

E00063 11.01 PORT AND STBD BILGE EJECTORS CLEANING


Port & stbd bilge ejectors/valves 2 EA 670.00 1,340.00

Page 7 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

E00064 12.01 CARGO CRANE LOAD TEST


Load test with dynamometer, 1 test 1 LS 2,600.00 2,600.00

E00065 12.01 CARGO CRANE OVERHAUL


Overhaul cargo hook with Owner supply spares 0 LS 1,250.00 -
Overhaul hoist block with Owner supply spares EA 600.00 -
Remove/refit bolts of slew ring EA 50.00
Check tightness of bolts EA 30.00
Remove refit wire ropes, EA 1,200.00

E00066 12.02 PROVISION CRANE LOAD TEST


Load test with dynamometer, 1 test 1 LS 1,200.00 1,200.00

E00067 12.02 PROVISION CRANE OVERHAUL


Overhaul hoist block with Owner supply spares EA 400.00 -
Overhaul cargo hook with Owner supply spares, 1No. EA 950.00 -
Remove/refit bolts of slew ring, per bolt EA 50.00
Check tightness of bolts, per bolt EA 30.00
Remove refit wire ropes, each EA 900.00

E00068 12.03 WINDLASS BRAKE LININGS - CANCELLED LS 4,800.00 -

E00069 12.03 PAINT BRAKE BANDS


Power tool brake drums. 2Nos 0 LS 360.00 -
Clean brake bands and apply Owner supply paint, 2sets 0 LS 420.00 -

E00070 12.04 ANCHOR WINDLASS / MOORING WINCH


A. Inboard shaft
Remove to workshop, overhaul assemble with Owner supply
0 EA 8,500.00 -
spares and reinstall, per shaft assembly
Renew mooring winch break lining with Owner supply materials,
0 EA 2,000.00 -
per drum
Power tool brake drums. Each EA 180.00

B. Outboard shaft
Remove to workshop, overhaul assemble with Owner supply
1 7,500.00 7,500.00
spares and reinstall, per shaft assembly

C. Final testing
Renew break lining with owner supply materials, per each drum 2,000.00
Gritblast brake bands and apply O/S paints, each 240.00

Built up worn out areas of 1 nos dog clutch - Allow 20hrs 20 hrs 60.00 1,200.00
Built up pinion shaft - Allow 20Hrs 20 hrs 60.00 1,200.00
Provide 2 steel ring plates, size 240mm OD x 190mm ID x
2 Nos 450.00 900.00
30mm thk

MACHINING PROCESS:
Normalized bore on ( 1 ) wire rope drum, machine / build /
machined ( 1 ) existg. shaft, build up / machined on ( 1 ) existg.
192 hrs 75.00 14,400.00
dog clutch, mfrd. ( 1 + 1 ) stl. Spacer and ( 5 ) brz. Sleeves,
proc. N0. 152298. ( 192 hrs. )

Mfrd. ( 1 ) brz. split pedestal bearing, proc. No. 152399. ( 38 hrs.


38 hrs 75.00 2,850.00
)

E00071 12.04 FWD WINCH BRAKE TEST


Break holding test, per test time 450.00 -

E00072 14.01 PV VALVES OVERHAUL


Overhaul PV valves, 18 EA 750.00 13,500.00

MACHINING PROCESS:

Page 8 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Skimmed - off seat in ( 15 + 14 ) valve bodies and ( 14 + 14 )
98 hrs 75.00 7,350.00
existg. valve discs, proc. N0. 152300. ( 98 hrs. )
Drill - out broken bolt & retapped holes on ( 1 ) existg. vac.
3 hrs 75.00 225.00
Valve body, proc. no. 152331. ( 3 hrs. )

E00073 14.02 CARGO TANK BELL MOUTHS RENEWAL


Remove/refit bell mouths in tanks for inspection:
dia 500 mm, 12pcs 0 LS 10,920.00 -
dia 450 mm, 2pcs 0 LS 1,490.00 -
dia 400 mm, 16pcs 0 LS 10,560.00 -
dia 300 mm, 1pc 0 LS 580.00 -
dia 250 mm, 18pcs 0 LS 8,100.00 -

Repair pits with Owner supply epoxy filler 100mm dia x 4mm
EA 30.00
deep, each
Repair pits by welding 100mm dia x 4mm deep, each EA 50.00

E00074 14.02 CARGO TANK WELL REPAIR 0 LS - -

E00075 19.02 MAIN ENGINE PISTON OVERHAUL (No 6 & 7)


Open up cylinder cover, withdraw piston, cleaning, check ,
A 2 EA 1,425.00 2,850.00
measure and renew Owner supply rings and reinstall
Transport cylinder heads to workshop and overhaul, pressure
2 EA 1,125.00 2,250.00
test,
Transport pistons to workshop and Overhaul & pressure test
2 EA 1,050.00 2,100.00
i.c.w ABOVE ITEM

ADDITIONAL JOBS:
( 2 ) spare piston crowns lifted from ship and transported to yard
2 EA 900.00 1,800.00
workshop, cleaned and ring grooves measured.
( 1 ) spare exhaust valve assembly lifted from ship and
1 EA 110.00 110.00
transported to yard workshop and cleaned.

B Clean and calibrate cyl liners, (No 6 & 7) 2 EA 200.00 400.00


Piston rod stuffing box overhaul, per unit 2 EA 525.00 1,050.00
Withdraw cyl liners and install, per unit EA 1,200.00 -
-
C Overhaul starting air valves, (No 6 & 7) 2 EA 220.00 440.00

E00076 19.03-19.06 M/E BEARINGS


19.03 MAIN ENGINE CROSSHEAD BEARING
Open/close for survey, 4 units 0 EA 600.00 -
Dress up scratches on pins: Price after inspection.

19.04 M/E CRANK PIN AND BEARINGS


Open/close crank pin bearing for survey, 3units 0 EA 475.00 -
Dress up scratches on pins: Price after inspection.

19.05 M/E MAIN BEARINGS


Open/close main bearing for survey 2 EA 587.50 1,175.00

19.06 M/E THRUST BEARING


Open/close and remove/refit, one each fwd and aft pads for
0 EA 1,250.00 -
inspection

E00077 19.01 MAIN ENGINE DEFLECTIONS


Measure and record twice 1 LS 1,330.00 1,330.00

E00078 19.07 M/E HIGH PRESSURE FUEL PUMPS


Allow to overhaul by yard personnel using O/S spares 7 EA 1,850.00 12,950.00
Addt'l. ( 4 ) HP pipes and polishing of shock absorbers pistons
4 EA 200.00 800.00
iwo scratches and access

E00079 19.08 M.E TURBOCHARGER - CANCELLED LS 18,000.00 -

Page 9 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
E00080 19.09 MAIN ENGINE AUX BLOWERS
Overhaul with Owners supply spares, 2Nos 2 EA 3,600.00 7,200.00

Additional for both blowers:


Resleeved both end covers bearing housing. 4 EA 450.00 1,800.00
Renewed flange gasket,V-rings V65- 4 nos. & oil seals 80 x 100
Nett 8 EA 10.00 80.00
x 10- 4 nos., Yard supply
Manufacture and Supplied gas lock bush x 2nos Nett 2 EA 138.00 276.00
Yard Supplied- 6313 ZC3 SNR 4 nos. Nett 4 EA 59.00 236.00

E00081 19.11 MAIN ENGINE SCAVANGE SPACE CLEANING


Open under piston space doors, clean scavenge spaces and
0 LS 1,980.00 -
reclose doors

E00082 19.12 INTERMEDIATE SHAFT BEARING SURVEY 1 LS 820.00 820.00


Open/close intermediate shaft bearing for inspection, 1pc

E00083 19.13 MAIN ENGINE STAY BOLTS AND HOLDING DOWN BOLTS
Check tightness with ships tools, each 80 EA 80.00 6,400.00
Holding down bolts = 64 pcs.
Stay bolts = 16 pcs.

E00084 19.14 M/E CAMSHAFT DRIVE INSPECTION - CANCELLED LS 1,520.00 -

E00085 23.01 M/E AXIAL VIBRATION UNIT ( REPEAT OF SEQ. # E00088 )

DIESEL GENERATOR TURBOCHARGER OVERHAUL -


E00086 21.01 LS - -
CANCELLED

E00087 23.02 AUX BOILER INSPECTION


Open, clean, fresh water wash and close boilers, 1No 1 LS 5,200.00 5,200.00
Pressure testing of boiler, per time EA 1,260.00

E00088 23.01 AUX BOILER SAFETY VALVE OVERHAUL - -


Overhaul and test 4 EA 550.00 2,200.00

E00089 23.02 OVERHAUL BOILER MOUNTINGS IN SITU


Boiler mounting valves overhaul in place and refitted back with
new ship supply gaskets.
Main stop steam valve Angle check 250 dia 2 EA 336.00 672.00
Steam line warning valve Globe 15 dia 2 EA 104.00 208.00
Boiler air vent valve Globe 25 dia 2 EA 104.00 208.00
Steam pressure tranmitter valve Globe 10 dia 8 EA 104.00 832.00
Level transmitter valve Globe 15 dia 8 EA 104.00 832.00
Surface blow down check valve Globe 25 dia 2 EA 104.00 208.00
Surface blow down valve Globe 25 dia 2 EA 104.00 208.00
Blow down check valve Globe 50 dia 2 EA 104.00 208.00
Bottom blow down valve Globe 50 dia 2 EA 104.00 208.00
Boilet Aux. Feed water stop valve Globe 100 dia 2 EA 216.00 432.00
Boilet Aux. Feed water check valve Globe 100 dia 2 EA 168.00 336.00
Boiler main feed water stop valve Globe 100 dia 2 EA 168.00 336.00
Boiler main feed water check valve Globe 100 dia 2 EA 168.00 336.00
Level gauge stop valve Globe 15 dia 8 EA 104.00 832.00
Boiler water circulation valve Globe 100 dia 2 EA 168.00 336.00
Boiler water circulation return valve Globe 100 dia 2 EA 168.00 336.00
Circulating pump suction Globe 80 dia 2 EA 168.00 336.00
Sampling outlet Globe 80 dia 2 EA 168.00 336.00
Dosing stop valve Globe 15 dia 2 EA 104.00 208.00
Dosing check valve Globe 15 dia 2 EA 104.00 208.00

Machining Process:

Page 10 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Mfrd. ( 66 ) pcs. Copper washers, proc. N0. 152324. ( 28 hrs. ) 28 Hrs 75.00 2,100.00
Skimmed - off ( 1 ) valve body and ( 5 ) valve discs, proc. No.
9 Hrs 75.00 675.00
152367.( 9 hrs. )

E00090 23.03 EGE SAFETY VALVES 2 NOS


Overhaul and test, 2pcs 2 LS 550.00 1,100.00

E00091 23.04 EGE SOOT BLOWERS OVERHAUL


Remove to workshop, overhaul with Owner supply spares and
2 EA 700.00 1,400.00
reinstall, each

MACHINING PROCESS:
Manufacture steel valve disc as per process number 152357 -
7 hrs 75.00 525.00
7hrs
Mfrd. ( 1 ) stl. fitting, proc. No. 152403. ( 7hrs) 5 hrs 75.00 375.00
Mfrd. ( 2 ) stl. Yoke plates, proc. No. 152420. ( 15 hrs. ) 15 hrs 75.00 1,125.00

E00092 23.05 EGE INSPECTION


Open, clean, fresh water wash and close, 1No. 1 EA 3,000.00 3,000.00
Pressure test, per test EA 575.00

E00093 23.05 EGE MOUNTINGS OVERHAUL


EGE bolier valves overhaul in place and refitted back with new
ship supply gaskets.
EGE boiler Globe 15 dia 5 EA 104.00 520.00
EGE boiler Globe 80 dia 1 EA 168.00 168.00
EGE boiler Globe 65 dia 2 EA 168.00 336.00
EGE boiler Globe 25 dia 1 EA 104.00 104.00

Machining Process:
Mfrd. ( 10 ) pcs. Copper washers, proc. N0. 152325. ( 9 hrs. ) 9 hrs 75.00 675.00

E00094 25.01 ALTERNATOR INSPECTIONS 3 NOS.


Open up end covers, clean alternators windings in place, dry up
3 LS 3,250.00 9,750.00
by heating lamps and box up. Excluding removal of rotor, 3Nos

E00095 25.02 MAIN AND EMERGENCY S.BOARD SERVICE


MAIN SWITCH BOARD
Main switchboard cleaning ; To clean and retighten connections
1 EA 3,300.00 3,300.00
by yard technicians

EMERGENCY SWITCHBOARD
Emergency switchboard cleaning ; To clean and retighten
1 EA 1,400.00 1,400.00
connections by yard technicians

Trouble shooting and testing of alarm Panel x 1No 1 EA 700.00 700.00

E00096 25.02 METERS CALIBRATION 25 NOS.


MAIN SWITCH BOARD
Calibration of meters, 17pcs 17 EA 90.00 1,530.00

EMERGENCY SWITCHBOARD
Calibration of meters, 8pcs 8 EA 90.00 720.00

E00097 25.03 MAIN CIRCUIT BREAKERS 2000A/1250A - 7 NOS.


Overhaul by yard technicians, 7pcs 7 LS 1,200.00 8,400.00
Additional:
Reverse power relay; as follows: 3 EA 1,200.00 3,600.00
Reverse Power Relay - D/G # 1; Omron K2WR-R-R2 4000/5A,
460/115V
Reverse Power Relay - D/G # 2; Omron K2WR-R-R2 4000/5A,
460/115V
Reverse Power Relay - D/G # 3; Omron K2WR-R-R2 4000/5A,
460/115V

Page 11 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
E00098 26.01 E/R SUPPLY FAN MOTORS - 4NOS
Overhaul with Owners supply spares 2 EA 2,070.00 4,140.00

Additional:
Fan NO1:
Resleeved NDE end cover bearing housing. 1 EA 450.00 450.00
Washed and painted the impeller 1 EA 225.00 225.00
Renewed fan guard Frame-200 & 2 nos. V-rings V50, Yard
2 sets 110.00 220.00
supply
Yard Supplied- 6310 ZZC3 SNR- 2 nos. Nett 2 EA 25.00 50.00

Fan No2:
Resleeved both end covers bearing housing. 2 EA 450.00 900.00
Washed and painted the impeller 1 EA 225.00 225.00
Renewed fan guard Frame-200 & 2 nos. V-rings V50, Yard
2 sets 110.00 220.00
supply
Yard Supplied- 6310 ZZC3 SNR- 2 nos. Nett 2 EA 25.00 50.00

E00099 26.02 PURIFIER ROOM EXHAUST FAN MOTOR - 1 NO


Overhaul with Owners supply spares, 1pc 1 EA 875.00 875.00
Additional:
Washed and painted the impeller. 1 EA 100.00 100.00
Renewed 2 nos. oil seals 25 x 40 x 5, Yard supply 2 EA 10.00 20.00
Yard Supplied - 6205 ZZC3 SNR- 2 Nos. Nett 1 EA 15.00 15.00

E00100 26.03 PUMP ROOM FAN MOTORS


Old pump room exhaust fan motor dismantled, sent to
2 LS 1,656.00 3,312.00
workshop, dismantled and reassembled back, No 1 and No 2
New motor rigged out from jetty and installed x 2 Nos 2 LS 414.00 828.00

Fan casing repair x 2 plaff Nett 1 EA 1,800.00 1,800.00

E00101 27.02 CCR INSTRUMENT CALIBRATION


Calibrate by locally available specialized workshop, (Nett) Nett 46 EA 150.00 6,900.00
Charges for calibration and certification of pumproom
transmitters x 20 Nos
Charges for calibration and certification of CCR repeater gauge
x 20 nos
Charges for calibration and certification of engine room local
gauge x 6 nos

E00102 27.05 E/R TEMPERATURE CONTROL VALVES


Overhaul by yard personnel 2 EA 133.33 267.00

Central cooling temp. control valve W-41v, 5k-300a


Jacket cooling temp. control valve W-14v, 5K-150a

E00103 27.06 AUX BOILER PRESSURE GAUGES


Calibrate gauges, 9pcs 9 EA 150.00 1,350.00

E00104 27.07 M/E FUEL OIL PRESS CONTROL VALVE - OVERHAUL


Overhaul by yard technicians with Owner supply spares, 1pc 1 LS 1,850.00 1,850.00

MACHINING PROCESS;
Skim - off seat on ( 1 ) existg. valve body, proc. N0. 152402. ( 4
4 hrs 75.00 300.00
hrs. )

E00105 27.08 PORTABLE EQUIPMENT & GAUGES - CALIBRATION


Calibrate portable equipment 8 EA 150.00 1,200.00

Temp calibrator x 1 No 1 EA 150.00 150.00


Pressure calibrator x 2Nos 2 EA 150.00 300.00
Temp gauge x 1 No 1 EA 150.00 150.00
Pressure gauge x 10 NO 10 EA 150.00 1,500.00

E00106 28.01 PUMPS - 32 NOS - CANCELLED LS 39,565.00 -

Page 12 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

E00107 29.01 EDUCTORS - 6 NOS - CANCELLED


Open up, overhaul in place and reinstall, 6pcs 0 LS 1,850.00 -

E00108 29.02 INCINERATOR DIESEL OIL TANK - CANCELLED 0 LS 500.00 -

EMERGENCY GENERATOR FUEL TANK CLEANING -


E00109 29.02 0 LS 500.00 -
CANCELLED

STEERING GEAR HYDRUALIC OIL DAILY TANK CLEANING -


E00110 29.03 0 EA 500.00 -
CANCELLED

FWD AND AFT MACHINERY HYDRAULIC OIL TANKS X 2


E00111 29.04 0 EA 500.00 -
TANKS - CANCELLED
Local cleaning of 30m
E00112 29.05 INCINERATOR W.O TANKS - CANCELLED 0 EA 700.00 -

E00113 29.06 H.F.O SETTLING TANK


Local cleaning of 30m - CANCELLED 0 EA 950.00 -

E00114 29.07 HFO SERVICE TANK - CANCELLED


Local cleaning of 30m 0 EA 950.00 -

E00115 29.08 BILGE HOLDING TANK CLEANING - CANCELLED 0 EA 700.00 -

E00116 29.09 OILY BILGE TANK - CANCELLED 0 EA 700.00 -

E00117 29.10 PURIFIER SLUDGE TANK - CANCELLED 0 EA 700.00 -

E00118 29.11 INERT GAS FAN AND MOTOR


overhaul 240KW 1 EA 4,300.00 4,300.00

E00119 29.11 IG CASING COATING - GLASS FLAKE - CANCELLED 0 - -

E00120 29.12 ENGINE ROOM OVERHEAD CRANE


Load test, 1 test 1 EA 750.00 750.00
Remove/refit wire - CANCELLED 0 EA 900.00 -

E00121 29.12 E/R WIRE HOOK OVERHAUL


Overhaul hook with Owner supply spares, 1 No. 0 EA 840.00 -

E00122 29.13 RELIEF VALVE TESTING


Overhaul and test relief valves in E/R 11.00 EA 350.00 3,850.00

1. Heavy Fuel oil Purifier heaters relief valves 3 nos.


1/2" 16 bar
2. M/E Fuel oil Purifier heaters relief valves 2 nos.
1/2" 16 bar
3. AE Fuel oil Purifier heaters relief valves 2 nos.
1/2" 16 bar
4. Lube oil Purifier heaters relief valves 2 nos.
1/2" 16 bar
5. Boiler Heavy Fuel oil heaters relief valves 2 nos.
1/2" 30 bar

E00123 29.14 LIFTING GEAR LOAD TEST


1st Batch:
Chain blocks, 10 pcs 10 EA 105.00 1,050.00
Eye bolts, 34 pcs 34 EA 60.00 2,040.00
Shackles, 20 pcs 20 EA 60.00 1,200.00
Wire slings, 13 pcs 13 EA 60.00 780.00
Nylon straps, 6 pcs 6 EA 60.00 360.00

Page 13 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
2nd batches to be updated

E00124 30.01 MAIN ENGINE AIR COOLERS - 2 NOS - CANCELLED LS 7,020.00 -

E00125 30.02 START AIR RECEIVER & SAFETY DEVICES


Open/close and clean start air receiver, 1No - CANCELLED 0 EA 1,800.00 -
Overhaul relief valve, 4 EA 550.00 2,200.00
Overhaul drain valve, 9 EA 175.00 1,575.00

Safety valve as follows:


M/E Air receiver #1 20 x 25
M/E Air receiver #2 20 x 25
Control Air receiver 15 x 20
A/E Air receiver 15 x 20

Drain valve as follows:


M/E Air receiver #1 20 mm. x 3 pcs. 2
valves found not good, renewed with ship's spares.
M/E Air receiver #2 20 mm. x 2 pcs.
Control Air receiver 15 mm. x 2 pcs.
A/E Air receiver 15 mm. x 2 pcs.

E00126 30.03 VACUUM CONDENSER


Clean and test 0 EA 4,875.00 -
Staging, 1.2m x 2m x 2m x 1No. 0 EA 135.00 -

Drill out tubes EA 10.00 -


Plug tubes EA 15.00 -
Renew tubes with Owner supply materials EA 30.00 -

AIR EJECTOR CONDENSER - INCLUDE ANODE RENEWAL -


E00127 30.04 LS 2,850.00 -
CANCELLED

E00128 30.05 ATMOSPHERIC CONDENSER - INCLUDE ANODE RENEWAL

Clean and test 1 EA 3,600.00 3,600.00

Drill out tubes EA 10.00 -


Plug tubes EA 15.00 -
Renew tubes with Owner supply materials EA 30.00 - -

Rubber Lining Repairing of central cooler FW cooler Inlet cover


Nett 2 EA 450.00 900.00
X 2 NOS

Access Works:
1 pc. 90 deg. elbow pipe 500 x 250 x dia. 250 mm. 1.63 Mtr 295.00 479.00
1 pc. Branched pipe with 4 flanges and valve, 600 x 250 x dia.
2.00 EA 209.00 418.00
200 mm.
1 pc. Globe valve, angle, dia. 100 mm. 1.00 EA 63.00 63.00
1. pc. T- piece with valve, 4 flanges, 1 ntr. X 400, dia. 90 x dia.
2.00 EA 295.00 590.00
65 mm.
1 pc. branched elbow pipe with 3 flanges and valve, 1 mtr. X 1
1.00 EA 295.00 295.00
mtr.

MACHINING PROCESS:
Mfrd. ( 4 ) zinc anodes,proc. No. 152310. ( 4 hrs. ) 4 EA 120.00 480.00

FWD AND AFT CENTRAL F.W. COOLERS - 2 NOS -


E00129 30.06 LS 21,000.00 -
CANCELLED

E00130 30.07 MAIN L.O. COOLER - CANCELLED LS 12,565.00 -

E00131 30.08 STERN TUBE L.O. COOLER - CANCELLED LS 1,800.00 -

E00132 30.09 LOWER AUX. BOILER F.O. HEATER - CANCELLED LS 2,200.00 -

Page 14 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

E00133 30.1 FWD & AFT MAIN ENGINE F.O. HEATERS - CANCELLED LS 4,400.00 -

E00134 30.11 HFO PURIFIER OUTER HEATER - CANCELLED LS 2,200.00 -

E00135 33.01 ENGINE ROOM FAN FIRE DAMPERS


Open up and overhaul, 4pcs 1 EA 600.00 600.00

Fire damper repair:


Cropped out existing wasted materials from flap assy, and mesh
frame assy. cut and fabricated new materials installed. after 1 NOs 3,160.00 3,160.00
repair assembiled the parts and send back to onboard installed.
Bar Flat Stl 6*25mm Gr A 2736 x 6 Nos (1)
Bar Flat Stl 6*25mm Gr A 1483 x 6 Nos (2)
Bar Flat Stl 6*25mm Gr A 623 x 12 Nos (3)
Bar Flat Stl 6*25mm Gr A 572 x 6 Nos (4)
Plate Gr A 605 x 178 x 6 x 1 No (5)
Plate Gr A 586 x 214 x 6 x 1 No (6)
Plate Gr A 269 x 162 x 6 x 1 No (7)
Plate Gr A 300 x 300 x 6 x 1 No (8)
Plate Gr A 500 x 40 x 6 x 1 No (9)
Pipe 1.5" Sch 40 Api 5l Gr -B 500 x 1 No (10)
Bar Flat Stl 6*25mm Gr A 60 x 24 Nos (11)
Gasket N/P (Neoprene) 1550 x 1550 x 6 x 1 No (12)

E/R FAN PULLEY WHEELS OVERHAUL 6 NOS. - INCLUDE


E00136 33.01
RENEWAL AT WIRE
Overhaul pulley wheels, 12 pcs 0 EA 90.00 -

E00137 33.02 LIFEBOAT LOAD TEST


Remove/refit life boats ashore, 1 EA 1,200.00 1,200.00
Yard assistance for load testing of Davits 1 EA 1,800.00 1,800.00
Load test boats with weights 1 EA 2,200.00 2,200.00

E00138 33.02 LIFEBOAT DAVIT LOAD TEST 1 LS - -

E00139 33.03 LIFEBOAT AIR CYLINDER HYDRO TEST - CANCELLED LS 720.00 -

E00140 34.01 PORT AND STBD PILOT ACCESS POINT


Croppedout and replace with new steel iwo port and stbd pilot
1 LS 3,366.00 3,366.00
access point repair
Angle 100*75*8 Gr A 1000 x 2 Nos (A1)
Plate Gr A 1500 x 590 x 8 x 2 Nos (P1)

Cut and installed stiffeners iwo port and stbd pilot access point. 1 LS 2,142.00 2,142.00
Plate Gr A 424 x 186 x 6 x 6 Nos (1)
Plate Gr A 250 x 50 x 6 x 4 Nos (2)
Plate Gr A 500 x 50 x 6 x 4 Nos (3)

E00141 34.02 BALLAST EXCHANGE VALVE DECK STAND


Renew deck stands, with vertical angle bar supports 4pcs per
0 units 525.00 -
unit, Total 10 units
Renew pump room bilge suction valve deck stands, with vertical
0 units 120.00 -
angle bar supports 6pcs, 1 unit

E00142 34.03 BUNKER TANKS OIL COAMING


Renew coaming plates
Low Sulphur Fuel Oil Bunker tank coaming on sunken deck
(Frame 25) 1900 mm x 330 mm x 6mm thick
1 0 LS 840.00 -
Renew vent coaming drain pipe
25A steel pipe 2 meters

Page 15 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

Low Sulphur Fuel Oil Bunker tank air pipe coaming on sunken
deck (Frame 20) 800 mm x 330 mm x 6mm thick
2 0 LS 840.00 -
700 mm x 330 mm x 6mm thick Renew vent coaming drain pipe
25A steel pipe 2 meters

No. 3 HFO Bunker tank coaming on upper deck (Frame 38)


3 0 LS 540.00 -
500 mm x 330 mm x 6mm thick

No. 3 HFO Bunker tank air pipe coaming on upper deck (Frame
4 36) 0 LS 540.00 -
800 mm x 330 mm x 6mm thick
700 mm x 330 mm x 6mm thick

Renew vent coaming drain pipe


0 LS 840.00 -
25A steel pipe 2 meters

No. 1 HFO Bunker tank coaming on upper deck (Frame 21)


5 700 mm x 330 mm x 6mm thick Renew vent coaming drain pipe 0 LS 840.00 -
25A steel pipe 2 meters

E00143 34.04 EXHAUST GAS ECONOMIZER HEATING TUBES


Heating tubes using yard supplied material (Rev) Nett 1 LS 10,500.00 10,500.00

E00144 34.05 BUNKER LINE MODIFICATIONS.


Fabricate and modification of bunker lines:
Identification, preparation construction drawing and fabricate
new lbunker line on Main deck and in engine room using ship
suppied material:
1 New Line on Main Deck
Spool 1:
C.S Pipe 4" sch 40 x 6400 mm L x 1 Nos 6.40 Mtrs 135.00 864.00
C.S Elbow 4" x 2 Nos 2.00 EA 77.00 154.00
C.S Reducer 6" x 4" x 1 Nos 1.00 EA 77.00 77.00

Spool 2:
C.S Pipe 4" sch 40 x 6400 mm L x 1 Nos 6.40 Mtrs 135.00 864.00

Spool 3:
C.S Pipe 4" sch 40 x 4050 mm L x 1 Nos 4.05 Mtrs 135.00 547.00
C.S Elbow 4" x 1 Nos 1.00 EA 77.00 77.00

Spool 4:
C.S Pipe 4" sch 40 x 5150 mm L x 1 Nos 5.15 Mtrs 135.00 695.00
C.S Elbow 4" x 1 Nos 4.00 EA 77.00 308.00

Spool 5:
C.S Pipe 4" sch 40 x 6000 mm L x 1 Nos 6.00 Mtrs 135.00 810.00
C.S Elbow 4" x 1 Nos 1.00 EA 77.00 77.00

Spool 6:
C.S Pipe 4" sch 40 x 500 mm L x 1 Nos 1.75 Mtrs 135.00 236.00

M.S Angle bar support + U bolts x 200 x75x75x5 x 5 Nos 5 EA 180.00 900.00
M.S Angle bar support + U bolts x 500 x75x75x5 x 5 Nos 5 EA 180.00 900.00

Access Works:
Remove/refit existing valve 6" x 1 no on main deck 1 EA 144.00 144.00
Remove/refit existing pipe 6" x 1 no on main deck 1.75 Mtrs 129.00 226.00
Remove/refit existing pipe 4" x 1 no on main deck 1.75 Mtrs 90.00 158.00
Provide and blanking size 280 mm dia x 20mm thk 2 EA 750.00 1,500.00

Carried out Pressure test x 2 times 1 LS 1,200.00 1,200.00

2 New Line in Engine room ( to be revised as per actual)

Page 16 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Spool 1:
C.S Pipe 4" sch 40 x 3400 mm L x 1 Nos 3.40 Mtrs 162.00 551.00
C.S Elbow 4" x 1 Nos 1 EA 92.00 92.00
C.S Reducer 6" x 4" x 1 Nos (Yard supplied) 1.00 EA 102.00 102.00

Spool 2:
C.S Pipe 4" sch 40 x 2800 mm L x 1 Nos 2.9 Mtrs 162.00 470.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 3:
C.S Pipe 4" sch 40 x 3000 mm L x 1 Nos 3.00 Mtrs 162.00 486.00

Spool 4:
C.S Pipe 4" sch 40 x 3000 mm L x 1 Nos 3.00 Mtrs 162.00 486.00

Spool 5:
C.S Pipe 4" sch 40 x 3160 mm L x 1 Nos 3.16 Mtrs 162.00 512.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 6:
C.S Pipe 4" sch 40 x 4580 mm L x 1 Nos 4.58 Mtrs 162.00 742.00
C.S Elbow 4" x 2 Nos 2.00 EA 92.00 184.00

Spool 7:
C.S Pipe 4" sch 40 x 1000 mm L x 1 Nos 2.00 Mtrs 162.00 324.00

Spool 8:
C.S Pipe 4" sch 40 x 3570 mm L x 1 Nos 3.57 Mtrs 162.00 578.00
C.S Elbow 4" x 2 Nos 2.00 EA 92.00 184.00

Spool 9:
C.S Pipe 4" sch 40 x 2500 mm L x 1 Nos 2.75 Mtrs 162.00 446.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 10:
C.S Pipe 4" sch 40 x 2300 mm L x 1 Nos 2.65 Mtrs 162.00 429.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 11:
C.S Pipe 4" sch 40 x 3000mm L x 1 Nos 3.00 Mtrs 162.00 486.00
C.S Elbow 4" x 1 Nos 1 EA 92.00 92.00
C.S Reducer 6" x 4" x 1 Nos (Yard supplied) 1.00 EA 102.00 102.00

M.S Angle bar support +U bolts x 200 x75x75x5 x 9 Nos 9 EA 180.00 1,620.00

Carried out Pressure test x 2 times 1.00 LS 1,200.00 1,200.00

Fabricated and installed coaming x 8" dia x 500mmL 1.75 Mtrs 290.00 508.00

Access Works:
Remove/refit:
C.S Pipe 4" sch 40 x 3000mm L x 1 Nos 3 Mtrs 162.00 486.00
Fabricate and install blank flanges 1 Nos 750.00 750.00

Staging:
Engine Room, Stbd Side (Landing Platform): 1 off platform
1 LS 100.00 100.00
@1.5x1x1.5 meters
Engine Room, Stbd Side 2Nd Level: 1 off tower @2x1x3 meters
1 LS 135.00 135.00
Engine Room, Stbd Side Bottom Area: 1 off hanging
1 LS 350.00 350.00
@2x0.75x1.5 meters - total 5 planks
Engine Room, Stbd Side Bottom Area: 1 off tower @3x1.2x6
1 LS 270.00 270.00
meters
Main Deck, Stbd Side Iwo Accommodation: 1 off tower
1 LS 840.00 840.00
@15.5x1.2x3.5 meters

Page 17 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

E00145 34.06 ANCHOR HAWSE PIPE COVER HINGES - CANCELLED


Renew hinges, total 8 hinges 0 EA 240.00 -

E00146 34.07 MDO AFT MANIFOLD FILLING VALVES - CANCELLED


Modify pipe line and install Owner supply valves, 2 sets 0 EA 360.00 -

E00147 34.08 PUMP ROOM MUSHROOM VENT - CANCELLED


Crop and renew guide boxes 370mm x 150mm x 80mm x 2pcs 0 EA 640.00 -

E00148 34.09 AIR HANDLING UNIT REPAIR. 1 LS 1,020.00 1,020.00


Carried out doubling of AHU plate
Plate Galvanized 910 x 146 x 2 x 2 Nos (DOUBLER) - bending

E00149 34.10 REMOTE GAUGES FOR BUNKER TANKS IN CCR - -

E00150 34.11 FIRE DETECTION SYSTEM IN LAUNDRY AND GALLEY - -

Access Works:
Remove the existing ceiling panel and save for reuse from
various locations in way of electrical works. After completion of 1.00 LS 2,300.00 2,300.00
electrical works, reinstall back the same ceiling panel in place.
Area/size:
Officer's laundry
Ceiling panel - 1820 x 750 x 1 mm thick - 1 no.
1820 x 360 x 1 mm thick - 1 no.
Crew's laundry
Ceiling panel - 1820 x 920 x 1 mm thick - 3 nos.
950 x 920 x 1 mm thick - 2 nos.
A/c diffuser - 180 x 80 mm - 5 nos.
Sunken deck passage
Ceiling panel - 1150 x 300 x 25 mm thick - 6 nos.
Crew mess room
Ceiling panel - 2370 x 300 x 25 mm thick - 2 nos.
Service space room
Ceiling panel - 1750 x 300 x 25 mm thick - 4 nos.
Galley
Ceiling panel - 4050 x 300 x 25 mm thick - 8 nos.
C deck passage
Ceiling panel - 1150 x 300 x 25 mm thick - 2 nos.

SEPARATE STRONG POINTS AND CHOCKS FOR TUG


E00151 34.12 - -
ESCORTS
Cut fabricate and installed additional under deck stiff iwo aft port
towing equipment
Angle 300*90*11/16 Gr A 890 x 1 No (3615) 50 Kgs 6.63 332.00
Plate Eh 36 700 x 1027 x 11 x 1 No (3615 C) 200 Kgs 7.40 1,480.00
Angle 300*90*11/16 Gr A 890 x 1 No (3615A) 50 Kgs 6.63 332.00
Angle 350*100*12/17 Gr A 890 x 1 No (3615D) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (4615) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (4615 A) 50 Kgs 6.63 332.00
Plate Eh 36 700 x 995 x 11 x 1 No (4615 C) 200 Kgs 7.40 1,480.00
Angle 350*100*12/17 Gr A 890 x 1 No (4615 D) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 2 Nos (DL 1/2) 100 Kgs 6.63 663.00
Angle 300*90*11/16 Gr A 890 x 2 Nos (DL 1/2A) 100 Kgs 6.63 663.00
Angle 350*100*12/17 Gr A 890 x 2 Nos (DL 1/2B) 100 Kgs 6.63 663.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 3) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 3A) 50 Kgs 6.63 332.00
Angle 350*100*12/17 Gr A 890 x 1 No (DL 3B) 50 Kgs 6.63 332.00
Plate Eh 36 700 x 799 x 11 x 1 No (DL 3C) 200 Kgs 7.40 1,480.00
Plate Eh 36 385 x 260 x 11 x 2 Nos (DL 4) 70 Kgs 7.40 518.00
Plate Eh 36 3440 x 800 x 11 x 2 Nos (DL 4/5B) 600 Kgs 7.40 4,440.00
Plate Eh 36 850 x 547 x 11 x 2 Nos (DL 4/5C) 100 Kgs 7.40 740.00
Plate Eh 36 898 x 150 x 20 x 2 Nos (DL 4/5CF) 100 Kgs 6.82 682.00
Page 18 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Plate Eh 36 3300 x 150 x 20 x 2 Nos (DL 4/5F) 400 Kgs 6.82 2,728.00
Plate Eh 36 435 x 260 x 11 x 1 No (DL 4A) 35 Kgs 7.40 259.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 5) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 5A) 50 Kgs 6.63 332.00
Angle 350*100*12/17 Gr A 890 x 1 No (DL 5B) 50 Kgs 6.63 332.00
Plate Eh 36 878 x 800 x 11 x 1 No (DL 5D) 200 Kgs 7.40 1,480.00
Plate Eh 36 907 x 150 x 20 x 1 No (DL 5DF) 50 Kgs 6.82 341.00
Angle 250*90*12/16 Gr A 971 x 1 No (DL AB 1) 50 Kgs 6.63 332.00
Angle 250*90*12/16 Gr A 971 x 2 Nos (DL AB 2) 100 Kgs 6.63 663.00
Plate Eh 36 300 x 305 x 11 x 2 Nos (FR 4/5) 70 Kgs 7.40 518.00
Plate Eh 36 Z 900 x 1780 x 20 x 1 No (M DK 1) 300 Kgs 6.82 2,046.00
Plate Eh 36 Z 2050 x 1700 x 20 x 1 No (M DK 2) 558 Kgs 6.82 3,803.00
Plate Eh 36 708 x 737 x 11 x 1 No (SL 5C) 200 Kgs 7.40 1,480.00

Add'L Material Iwo. Aft Port Towing Equipment.


Plate Eh 36 850 x 547 x 11 x 1 No (1) 200 Kgs 7.40 1,480.00
Plate Eh 36 898 x 150 x 20 x 1 No (2) 200 Kgs 6.82 1,364.00
Plate Eh 36 300 x 305 x 11 x 1 No (3) 35 Kgs 7.40 259.00

Install Owner supplied bollard and Chock 1 LS 4,400.00 4,400.00


-
Carry out MPI check on insert plate 4 corner - 2 meters length -
1 LS 520.00 520.00
BUDGETARY
Carried out RT(2 shots) - BUDGETARY 1 LS 3,375.00 3,375.00
-
Carry out blasting SA 2.5 of under deck stiffeners and apply 2
1 LS 4,429.00 4,429.00
coats of Owner paint at workshop - BUDGETARY

Engineering calculation Nett 1 LS 4,920.00 4,920.00

Staging:
Engine Room, Port Side Iwo S.Gear Room: 1 off tower
1 LS 1,215.00 1,215.00
@5.5x3x4.5 meters
Poop Deck, Port Side (Counter Weight): 1 off structure
1 LS 405.00 405.00
@3x3x1.5 meters
Side Shell, Stern Area: 1 off hanging @3x1x2 meters - total 8
1 LS 400.00 400.00
planks
Engine Room, Port Side Iwo S.Gear Room: 1 off extension
1 LS 1,000.00 1,000.00
@4x1.8x1.5 meters - total 20 planks
Engine Room, Port Side Iwo S.Gear Room: 1 off extension
1 LS 400.00 400.00
@2.5x1.5x1.5 meters - total 8 planks
Engine Room, Aft Area Iwo S/Gear Room: 1 off hanging
1 LS 1,100.00 1,100.00
@6.5x1.2x1.5 meters - total 22 planks
Engine Room, Aft Area Iwo S/Gear Room: 1 off tower @4x2x3
1 LS 540.00 540.00
meters
SAMPLING PORTS FOR BALLAST TANKS AND FORE PEAK
E00152 34.13
TANK
Modify ballast tank manholes, 1pc 1 set 528.00 528.00

E00153 34.14 OFFICER SMOKING ROOM GLASS RENEWAL - CANCELLED


Renew broken glass with Owner supply new glass, 1pc 0 LS 420.00 -

E00154 34.15 WHEELHOUSE WEATHER DOORS LOCK RENEWAL


Renew locks of sliding door with Owner supply spare locks x 1
1 LS 360.00 360.00
no

E00155 34.16 DECK PIPE TRAY PROTECTIVE PLATE


Renew Steel angle Plates
EA 90.00 -
70 mm x 120 mm x 6mm thick, per mtr

E00156 STAGING ASSISTANCE - BUDGETARY


23 March 2015 - ASSISTANCES AND PROVIDE 24 PCS. OF
PLANKS IN WBT # 3 PORT AND STBD SIDE DOUBLE Nett 45 Mhrs 15.00 675.00
BOTTOM - A00174 - 45mhrs
23 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN SIDE SHEEL FOR RIGGING OUT THE THE
Nett 18 Mhrs 15.00 270.00
CUTTING PLATE AS PER TRADE REQUEST- A00160 -
18mhrs

Page 19 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

24 March 2015 - ASSISTANCES AND MODIFICATION OF


STAGING 7 LOCATION IN WBT 5 P/ S AND 4 PORT TO FIT Nett 45 Mhrs 15.00 675.00
UP PLATE AS PER TRADE REQUEST.- A00160 - 45mhrs
25 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN WBT 5 PORT & STBD TO RIGGING DOWN AND Nett 20 Mhrs 15.00 300.00
FIT UP THE PLATE - A00160 - 20mhrs
26 March 2015 ASSISTANCES AND MODIFICATION OF
STAGING IN ENGINE ROOM BOTTOM FOR TEMPORARY
Nett 16 Mhrs 15.00 240.00
DISMANTLING AND ERECTION AGAIN AS PER TRADE
REQUEST. - E0144 - 16mhrs
28 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN WBT 5 PORT TO PIT UP NEW PLATE - A00160 - Nett 25 Mhrs 15.00 375.00
25mhrs
29 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR
Nett 36 Mhrs 15.00 540.00
TEMPORARY DISMANTLING OF STAGING AND PUTTING
BACK - A00168 - 36mhrs
29 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN WBT 5 PORT & STBD SIDE FROM FRAME NO. Nett 27 Mhrs 15.00 405.00
62 66 67 72 AND 88.- A00160 - 27mhrs
29 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR CUTTING Nett 20 Mhrs 15.00 300.00
THE PLATES - A00168 - 20mhrs
30 March 2015 - ASSISTANCES AND MODIFICATION PLUS
DISMANTLING OF STAGING IN CHAIN LOCKER PORT & Nett 45 Mhrs 15.00 675.00
STBD SIDE TO INSTALL NEW PLATE - A00168 - 45mhrs
30 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER FOLLOW UP BY 2ND SHIFT Nett 30 Mhrs 15.00 450.00
FOR INSTALLING NEW PLATE - A0168 - 30mhrs
31 march 2015 (st shift)- ASSISTANCES AND MODIFICATION
OF STAGING IN CHAIN LOCKER PORT & STBD FOR FIT- UP Nett 54 Mhrs 15.00 810.00
NEW PLATE -A00168 - 54Mhrs
31 march 2015 (2nd shift)- ASSISTANCES AND MODICATION
OF STAGING IN CHAIN LOCKER PORT & STBD SIDE
Nett 28 Mhrs 15.00 420.00
FOLLOW UP BY 2ND SHIFT FOR CONTINUES FIT-UP NEW
PLATE - A00168 - 28mhrs
1 April 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR FIT-UP Nett 54 Mhrs 15.00 810.00
NEW PLATE AS PER TRADE REQUEST - A00168 - 54mhrs
1 April 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR FIT- UP
Nett 36 Mhrs 15.00 540.00
NEW PLATE CONTINUES AS PER TRADE REQUEST- A00168
- 36mhrs

E00157 SAFETY HANDRAIL


Main Deck, Port & Stbd Side Iwo Void Space: 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Main Deck, Port & Stbd Iwo Wbt 1 To 5 Open Access: 16 off
1 LS 1,536.00 1,536.00
railing each @1.2x1.2x1.5 meters
Main Deck, Stbd Side Iwo Slop Tank(Open Hole): 1 off railing
1 LS 96.00 96.00
@1.2x1.2x1.5 meters
Main Deck, Pump Room (Skyligth): 1 off railing @3x3x1.5
1 LS 240.00 240.00
meters
Main Deck, Engine Room (Skylight): 1 off railing @3x3x1.5
1 LS 240.00 240.00
meters
Main Deck, Port & Stbd Iwo Lifeboat Davit: 2 off railing each
1 LS 640.00 640.00
@8x0x1.5 meters
Engine Room, Iwo Apt Tank (Open Access): 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Main Deck, Port & Stbd Iwo C.Locker Open Access: 2 off railing
1 LS 192.00 192.00
each @1.2x1.2x1.5 meters
Forepeak, Provide Railings (Open Holes): 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Forepeak, Provide Railings (Open Access): 4 off railing each
1 LS 192.00 192.00
@1.2x0x1.5 meters
Main Deck, Port & Stbd Iwo Slop Tank Hole: 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Apt Peak Tank, Open Access: 2 off railing each @1.2x1.2x1.5
1 LS 192.00 192.00
meters
Main Deck, Port & Stbd Side(Open Holes): 5 off railing each
1 LS 480.00 480.00
@1.2x1.2x1.5 meters
Main Deck, S / Gear Room (Skylight): 1 off railing @2x2x1.5
1 LS 160.00 160.00
meters
Main Deck, Stbd Side Iwo Obt Tank: 1 off railing @1.5x1x1.5
1 LS 100.00 100.00
meters
Main Deck, Bottom Area Open Holes: 1 off railing @1.2x1.2x1.5
1 LS 96.00 96.00
meters
Main Deck, Port & Stbd Open Holes: 4 off railing each
1 LS 384.00 384.00
@1.2x1.2x1.5 meters

Page 20 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Main Deck, Iwo Wbt 5 P/S Open Access: 2 off railing each
1 LS 160.00 160.00
@2x0x1.5 meters
Forepeak, Port & Stbd (Open Cutting Plates): 4 off railing each
1 LS 480.00 480.00
@3x1.2x1.5 meters
Main Deck, Port Side Iwo Mooring Rope(Walkway): 1 off tower
1 LS 672.00 672.00
@5.5x1.8x2.5 meters
Main Deck, Port Side Iwo Mooring Rope(Walkway): 2 off tower
1 LS 960.00 960.00
each @5x1.8x2.5 meters
Main Deck, Port Side Fwd Iwo Mooring Rope(Walkway): 1 off
1 LS 480.00 480.00
tower @5x1.8x2.5 meters
Main Deck, Port & Stbd Iwo Cot 5: 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Poop Deck, Port Side Open Cutting Plate: 1 off railing @3x2x1.5
1 LS 200.00 200.00
meters

A00159 Addl 17/03/2015LIFEBOAT REHOOKING ASSISTANCE


Fabricate and supplied life boot rehooking material, port and
2 Loc 2,142.00 4,284.00
stbd as follows::
Plate Aisi 304 S/S 330 x 90 x 10 x 2 No (A1)
Plate Aisi 304 S/S 320 x 25 x 6 x 4 Nos (A2)
Plate Aisi 304 S/S 144 x 144 x 12 x 2 No (F1)
Plate Aisi 304 S/S 350 x 90 x 10 x 4 Nos (P1)

Angle Bar Support Iwo Life Boat Davit.


Angle 65*65*8 Gr A 170 x 1 No (AB) 1 EA 179.00 179.00

Machining Process:
Mfrd. ( 4 ) s/s bolts, proc. N0. 152433 - 20hrs 20 hrs 75.00 1,500.00

Staging:
Main Deck, Port & Stbd Side Add'L Tower: 4 off tower each
1 LS 1,600.00 1,600.00
@2x1.5x3.5 meters
Main Deck, Port & Stbd Side Iwo Lifeboat Davit: 4 off tower
1 LS 1,120.00 1,120.00
each @2x1.5x5 meters
Safina Dock, Between 2 Towers Lifeboat: 1 off tower
1 LS 480.00 480.00
@2x1.2x2.5 meters
Safina Dock, Fwd & Aft Area: 4 off tower each @1.5x1.2x2.5
1 LS 120.00 120.00
meters

A00160 Addl 17/03/2015STEEL WORK IN WBT


1 Fore Peak Tank Steel Repair
Plate Gr A 2600 x 150 x 12 x 1 No (FPT C-LINE FB) 50 Kgs 6.63 332.00
Plate Gr A 2000 x 150 x 12 x 1 No (FR-111 FB) 50 Kgs 6.63 332.00
Plate Gr A 410 x 225 x 15 x 1 No (FR.111 CRLING) 35 Kgs 6.37 223.00
Plate Gr A 1900 x 400 x 15 x 1 No (FR.111 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 750 x 1500 x 15 x 1 No (FR.111 INS-1) 300 Kgs 5.78 1,734.00
Plate Gr A 4750 x 500 x 13 x 2 Nos (FR.119 INS) 600 Kgs 5.78 3,468.00
- Kgs - -
2 Aft Peak Tank Steel Repair
Plate Gr A 2800 x 200 x 20 x 1 No (6825 CL FLG) 90 Kgs 5.55 497.00
Plate Gr A 700 x 900 x 14 x 1 No (6825 CL INS) 200 Kgs 5.78 1,156.00
Plate Gr A 900 x 100 x 16 x 1 No (FLG) 35 Kgs 6.37 223.00
Plate Gr A 4700 x 125 x 18 x 1 No (FLG 4) 85 Kgs 5.55 470.00
Plate Gr A 3300 x 100 x 16 x 1 No (FLG-1) 50 Kgs 6.37 319.00
Plate Gr A 600 x 100 x 16 x 1 No (FLG-2) 35 Kgs 6.37 223.00
Plate Gr A 1000 x 100 x 16 x 1 No (FLG-3) 35 Kgs 6.37 223.00
Plate Gr A 1400 x 125 x 18 x 1 No (FLG-5) 50 Kgs 6.11 306.00
Plate Gr A 700 x 125 x 18 x 1 No (FLG-6) 35 Kgs 6.11 214.00
Angle 200*90*9/14 Gr A 600 x 2 Nos (FR -4 STIFF) 70 Kgs 6.63 464.00
Plate Gr A 700 x 900 x 14 x 1 No (FR . -3INS) 200 Kgs 5.78 1,156.00
Plate Gr A 2700 x 700 x 18 x 1 No (FR 5 INS1) 300 Kgs 5.55 1,665.00
Plate Gr A 700 x 900 x 14 x 1 No (FR-1 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 2700 x 700 x 18 x 1 No (FR-1 INS-1) 300 Kgs 5.55 1,665.00
Plate Gr A 1400 x 700 x 18 x 1 No (FR-2 INS-1) 300 Kgs 5.55 1,665.00
Plate Gr A 700 x 900 x 14 x 1 No (FR-3 INS) 200 Kgs 5.78 1,156.00

Page 21 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Plate Gr A 1900 x 700 x 18 x 1 No (FR-4 INS-1) 300 Kgs 5.55 1,665.00
Plate Gr A 700 x 900 x 14 x 1 No (FR-5 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 1800 x 1200 x 14 x 1 No (FR1 INS2) 300 Kgs 5.78 1,734.00
Plate Gr A 600 x 125 x 18 x 1 No (S/S PORT LG5) 35 Kgs 6.11 214.00
Plate Gr A 900 x 125 x 18 x 1 No (S/S PORT LG6) 35 Kgs 6.11 214.00
Plate Gr A 900 x 384 x 12 x 1 No (WEB) 50 Kgs 6.63 332.00
Plate Gr A 3300 x 434 x 12 x 1 No (WEB-1) 137 Kgs 6.02 828.00
Plate Gr A 600 x 434 x 12 x 1 No (WEB-2) 50 Kgs 6.63 332.00
Plate Gr A 1000 x 434 x 12 x 1 No (WEB-3) 50 Kgs 6.63 332.00
Plate Gr A 4700 x 432 x 12 x 1 No (WEB-4) 195 Kgs 6.02 1,173.00
Plate Gr A 1400 x 432 x 12 x 1 No (WEB-5) 58 Kgs 6.02 350.00
Plate Gr A 700 x 432 x 12 x 1 No (WEB-6) 50 Kgs 6.63 332.00
3 Poop Deck Stbd Steel Repair
Plate Gr A 2500 x 950 x 13 x 1 No (STBD INSERT) 300 Kgs 5.78 1,734.00
4 No.1 Port Wing Water Ballast Tank
Plate Eh 36 1300 x 1300 x 23 x 1 No (1P FWD MH INS) 311 Kgs 5.99 1,863.00
Plate Gr A 700 x 400 x 12 x 1 No (1P S/S WEB INS) 200 Kgs 6.02 1,204.00
Plate Gr A 500 x 300 x 14 x 1 No (1P.FR 101 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 1400 x 250 x 14 x 1 No (1P.FR 101 INS-1) 200 Kgs 5.78 1,156.00
5 No.1 Port Wing Water Ballast Tank
Plate Gr A 500 x 300 x 14 x 1 No (MK 01) 200 Kgs 5.78 1,156.00
Plate Gr A 1400 x 250 x 14 x 1 No (MK 02) 200 Kgs 5.78 1,156.00
Plate Gr A 900 x 115 x 16 x 1 No (MK 03) 200 Kgs 5.78 1,156.00
6 Steel Repair Iwo 1stbd Wing Water Ballast Tank
Plate Gr A 2000 x 800 x 16 x 1 No (1S FR 95 INS) 300 Kgs 5.78 1,734.00
Plate Gr A 600 x 500 x 16 x 1 No (1S FR 95 INS1) 200 Kgs 5.78 1,156.00
Plate Gr A 800 x 800 x 21 x 1 No (1S FR 95 TP) 300 Kgs 5.31 1,593.00
Plate Gr A 450 x 260 x 21 x 1 No (1S FR95 TP) 200 Kgs 5.31 1,062.00
Plate Eh 36 1300 x 1300 x 23 x 1 No (1S FWD MH INS) 311 Kgs 5.99 1,863.00
Plate Gr A 300 x 200 x 12 x 3 Nos (1S LBH L1) 105 Kgs 6.63 696.00
Plate Gr A 300 x 200 x 12 x 11 Nos (1S LBH L2) 385 Kgs 6.63 2,553.00
Plate Gr A 300 x 200 x 13 x 1 No (1S LBH L3) 35 Kgs 6.37 223.00
Plate Gr A 4350 x 800 x 21 x 1 No (1S S/S INS-1) 585 Kgs 5.31 3,104.00
Plate Eh 36 500 x 800 x 20 x 1 No (1S S/S INS) 200 Kgs 5.99 1,198.00
Plate Gr A 600 x 175 x 18 x 1 No (FLG-1) 35 Kgs 6.11 214.00
Plate Gr A 1000 x 175 x 18 x 1 No (FLG-2) 50 Kgs 6.11 306.00
Plate Gr A 600 x 662 x 12 x 1 No (WEB-1) 200 Kgs 6.02 1,204.00
Plate Gr A 1000 x 662 x 12 x 1 No (WEB-2) 200 Kgs 6.02 1,204.00
7 Wbt No:5stbd Steel Repair
Plate Gr A 700 x 500 x 14 x 1 No (FR 58 P2) 50 Kgs 6.37 319.00
Plate Gr A 1900 x 250 x 14 x 1 No (FR 58S2) 53 Kgs 5.78 307.00
Plate Gr A 1000 x 600 x 14 x 1 No (FR 59) 67 Kgs 5.78 388.00
Plate Gr A 700 x 500 x 16 x 1 No (FR 65 P1) 45 Kgs 5.78 259.00
Plate Gr A 650 x 250 x 14 x 3 Nos (FR58S1) 105 Kgs 6.37 669.00
Plate Gr A 700 x 250 x 14 x 3 Nos (FR66 S1) 105 Kgs 6.37 669.00
Plate Gr A 300 x 200 x 12 x 2 Nos (LL 37/38) 70 Kgs 6.63 464.00
Plate Gr A 2000 x 750 x 12 x 1 No (LL35) 300 Kgs 6.02 1,806.00
Plate Gr A 1000 x 750 x 12 x 1 No (LL35A) 200 Kgs 6.02 1,204.00
Plate Gr A 300 x 200 x 12 x 4 Nos (LL42 TO 45) 140 Kgs 6.63 928.00
Plate Eh 36 300 x 200 x 12 x 13 Nos (LL46 TO 53) 455 Kgs 7.40 3,367.00
Plate Gr A 300 x 200 x 12 x 1 No (LL49) 35 Kgs 6.63 232.00
Plate Eh 36 4200 x 680 x 13 x 1 No (LL54) 300 Kgs 6.52 1,956.00
Plate Eh 36 300 x 200 x 13 x 3 Nos (LL54A) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 13 x 4 Nos (LL56) 140 Kgs 7.11 995.00
Plate Eh 36 300 x 200 x 13 x 1 No (LL56A) 35 Kgs 7.11 249.00
Plate Gr A 5250 x 3000 x 20 x 1 No (S SHL P5) 2,520 Kgs 5.55 13,986.00
Plate Eh 36 800 x 3400 x 20 x 1 No (S:SHL P1) 435 Kgs 6.25 2,720.00
Plate Eh 36 1500 x 2800 x 20 x 1 No (S:SHL P2) 672 Kgs 6.25 4,200.00
Plate Gr A 2000 x 1000 x 20 x 1 No (S:SHL P4) 320 Kgs 5.55 1,776.00
Plate Gr A 1500 x 500 x 12 x 1 No (SL 50A) 200 Kgs 6.02 1,204.00
Plate Gr A 2100 x 175 x 20 x 1 No (SL 50F) 200 Kgs 5.55 1,110.00
Plate Gr A 2100 x 500 x 12 x 1 No (SL-50) 300 Kgs 6.02 1,806.00

Page 22 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Plate Eh 36 300 x 200 x 13 x 2 Nos (SL/54/55) 70 Kgs 7.11 498.00
Plate Gr A 1500 x 175 x 20 x 1 No (SL50AF) 50 Kgs 6.11 306.00
Plate Eh 36 300 x 200 x 12 x 2 Nos (SL;49/50L2) 70 Kgs 7.40 518.00
8 Water Ballast Tank No.3port Repair Repair
Angle 80*80*10 Eh 36 500 x 4 Nos (AB) 140 Kgs 6.63 928.00
Plate Gr A 300 x 200 x 12 x 3 Nos (L1) 105 Kgs 6.63 696.00
Plate Gr A 1600 x 150 x 15 x 3 Nos (L2) 150 Kgs 6.37 956.00
Plate Eh 36 600 x 400 x 16 x 3 Nos (P1) 150 Kgs 7.11 1,067.00
Bar Flat Comm 9*65mm Ms 2290 x 2 Nos (PL.1) 70 Kgs 6.63 464.00
Plate Eh 36 700 x 250 x 14 x 2 Nos (S1) 70 Kgs 7.11 498.00
Bar Square 22mm Ss400 374 x 8 Nos (SQ.) 280 Kgs 6.63 1,856.00
9 Wing Water Ballast Tank Repair 3 Stbd
Plate Eh 36 300 x 200 x 13 x 3 Nos (L1) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 125 x 18 x 1 No (L1A) 35 Kgs 6.82 239.00
Plate Eh 36 300 x 200 x 12 x 4 Nos (L2) 140 Kgs 7.40 1,036.00
Plate Eh 36 1800 x 150 x 15 x 2 Nos (L3) 70 Kgs 7.11 498.00
Plate Eh 36 1100 x 150 x 15 x 1 No (L4) 35 Kgs 7.11 249.00
Plate Eh 36 650 x 150 x 15 x 1 No (L5) 35 Kgs 7.11 249.00
Plate Eh 36 1300 x 1300 x 23 x 1 No (M.H PLT) 311 Kgs 5.99 1,863.00
Plate Eh 36 2600 x 450 x 14 x 1 No (S1) 131 Kgs 7.11 932.00
10 Steel Repair Iwo 5 Port Wbt Internal
Plate Eh 36 1300 x 1300 x 23 x 1 No (DECK 1) 311 Kgs 5.99 1,863.00
Plate Eh 36 1100 x 200 x 14 x 2 Nos (FR 58) 70 Kgs 7.11 498.00
Plate Eh 36 600 x 250 x 14 x 4 Nos (FR 59) 140 Kgs 7.11 995.00
Plate Gr A 710 x 825 x 14 x 1 No (FR 60) 200 Kgs 5.78 1,156.00
Plate Gr A 1500 x 1800 x 14 x 1 No (FR 60A) 302 Kgs 5.78 1,748.00
Plate Gr A 700 x 1100 x 14 x 1 No (FR 60B) 200 Kgs 5.78 1,156.00
Plate Gr A 250 x 430 x 14 x 1 No (FR 60TP) 200 Kgs 5.78 1,156.00
Plate Gr A 772 x 600 x 14 x 1 No (FR 61) 52 Kgs 5.78 300.00
Plate Gr A 517 x 223 x 14 x 1 No (FR 61 TP) 200 Kgs 5.78 1,156.00
Plate Gr A 3220 x 500 x 18 x 1 No (FR 61A) 300 Kgs 5.55 1,665.00
Plate Gr A 772 x 600 x 14 x 1 No (FR 63) 200 Kgs 5.78 1,156.00
Plate Gr A 900 x 1150 x 16 x 1 No (FR 63A) 300 Kgs 5.78 1,734.00
Plate Gr A 430 x 248 x 16 x 1 No (FR 63A1) 35 Kgs 6.37 223.00
Plate Gr A 517 x 223 x 14 x 1 No (FR 63TP) 35 Kgs 6.37 223.00
Plate Eh 36 1000 x 150 x 20 x 1 No (LL 49) 35 Kgs 6.82 239.00
Plate Eh 36 1000 x 150 x 15 x 3 Nos (LL 50/52) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 13 x 1 No (LL 54) 35 Kgs 7.11 249.00
Plate Eh 36 300 x 200 x 13 x 8 Nos (LL 56) 280 Kgs 7.11 1,991.00
Plate Gr A 2100 x 500 x 12 x 1 No (SL 47) 101 Kgs 6.02 607.00
Plate Gr A 2100 x 175 x 20 x 1 No (SL 47F) 59 Kgs 5.55 326.00
Plate Eh 36 300 x 200 x 13 x 1 No (SL 55) 35 Kgs 7.11 249.00
11 Steel Repair Iwo 4 Port Wbt Internal
Plate Eh 36 300 x 200 x 13 x 2 Nos (DL W1) 70 Kgs 7.11 498.00
Plate Gr A 1000 x 250 x 14 x 1 No (FR 68) 200 Kgs 5.78 1,156.00
Plate Gr A 1100 x 850 x 16 x 1 No (FR 73) 300 Kgs 5.78 1,734.00
Plate Gr A 1500 x 850 x 16 x 1 No (FR 73A) 300 Kgs 5.78 1,734.00
Plate Gr A 1573 x 500 x 14 x 1 No (FR 74) 200 Kgs 5.78 1,156.00
Bar Flat Comm 9*65mm Ms 2255 x 2 Nos (FWD LDR) 70 Kgs 6.63 464.00
Plate Eh 36 2500 x 150 x 15 x 2 Nos (LL F1) 100 Kgs 7.11 711.00
Plate Eh 36 1500 x 150 x 15 x 1 No (LL F2) 50 Kgs 7.11 356.00
Plate Eh 36 1000 x 150 x 15 x 3 Nos (LL F4) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 13 x 11 Nos (LL TYP 2) 385 Kgs 7.11 2,737.00
Plate Eh 36 300 x 200 x 12 x 2 Nos (LL TYP 3) 70 Kgs 7.40 518.00
Plate Eh 36 300 x 200 x 12 x 14 Nos (LL49) 490 Kgs 7.40 3,626.00
Plate Gr A 110 x 110 x 10 x 4 Nos (PAD) 140 Kgs 6.63 928.00
Plate Gr A 3000 x 150 x 17 x 1 No (SL F2) 61 Kgs 5.55 340.00
Plate Gr A 3200 x 150 x 17 x 1 No (SL F1) 65 Kgs 5.55 362.00
Plate Eh 36 2000 x 150 x 15 x 1 No (SL F2) 50 Kgs 7.11 356.00
Plate Gr A 3500 x 150 x 17 x 1 No (SL F3) 71 Kgs 5.55 396.00
Plate Gr A 800 x 150 x 17 x 1 No (SL F4) 35 Kgs 6.11 214.00
Plate Gr A 300 x 200 x 12 x 7 Nos (SL W1) 245 Kgs 6.63 1,624.00

Page 23 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Bar Square 22mm Ss400 388 x 8 Nos (STEP) 280 Kgs 6.63 1,856.00
Angle 80*80*8 Gr A 500 x 4 Nos (SUPT) 140 Kgs 6.63 928.00
12 Steel Repair Iwo 4 Stbd Wbt Internal
Plate Gr A 1000 x 250 x 14 x 1 No (FR 75) 35 Kgs 5.78 202.00
Bar Flat Comm 9*65mm Ms 2255 x 2 Nos (FWD LDR) 70 Kgs 6.02 421.00
Plate Gr A 300 x 200 x 12 x 1 No (LL 36) 35 Kgs 6.02 211.00
Plate Eh 36 300 x 200 x 13 x 5 Nos (LL 54/56) 175 Kgs 6.52 1,141.00
Plate Gr A 110 x 110 x 10 x 4 Nos (PAD) 140 Kgs 6.02 843.00
Bar Square 22mm Ss400 388 x 8 Nos (STEP) 280 Kgs 6.02 1,686.00
Angle 80*80*8 Gr A 500 x 4 Nos (SUPT) 140 Kgs 6.02 843.00
13 Wing Water Ballast Tank Repair 2 Stbd
Plate Eh 36 300 x 200 x 13 x 4 Nos (DH.L1) 140 Kgs 7.11 995.00
Plate Eh 36 300 x 200 x 12 x 1 No (DH.L3) 35 Kgs 7.40 259.00
Bar Round 20mm Ms 1200 x 1 No (G.RAIL S1B) 2 Mtrs 112.00 224.00
Plate Eh 36 900 x 100 x 18 x 1 No (L44) 35 Kgs 6.82 239.00
Plate Eh 36 1250 x 450 x 12 x 1 No (MK-1) 200 Kgs 6.78 1,356.00
Plate Eh 36 500 x 382 x 13 x 1 No (MK-1A) 200 Kgs 6.52 1,304.00
Plate Eh 36 1250 x 150 x 15 x 1 No (MK-2) 200 Kgs 6.52 1,304.00
Plate Eh 36 500 x 150 x 18 x 1 No (MK-2A) 200 Kgs 6.25 1,250.00
Plate Eh 36 1000 x 250 x 14 x 1 No (S1) 35 Kgs 7.11 249.00
Plate Eh 36 900 x 250 x 14 x 1 No (S2) 35 Kgs 7.11 249.00
Plate Eh 36 300 x 200 x 13 x 2 Nos (SC.L1) 70 Kgs 7.11 498.00
Plate Eh 36 400 x 200 x 13 x 1 No (SC.L2) 35 Kgs 7.11 249.00
14 Wing Ballast Tank No:2 Port Steel Repair
Plate Eh 36 1000 x 1000 x 15 x 1 No (FR 85 P1) 300 Kgs 6.52 1,956.00
Plate Eh 36 500 x 250 x 16 x 1 No (FR 88 S2A) 35 Kgs 7.11 249.00
Plate Gr A 1500 x 600 x 12 x 5 Nos (INS-P1) 1,000 Kgs 6.02 6,020.00
Plate Eh 36 300 x 200 x 13 x 3 Nos (LBH L1) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 12 x 4 Nos (LBH L2) 140 Kgs 7.40 1,036.00
Plate Gr A 300 x 200 x 12 x 9 Nos (LBH L2A) 315 Kgs 6.63 2,088.00
Plate Eh 36 300 x 200 x 12 x 1 No (LBH L2B) 35 Kgs 7.40 259.00
Plate Gr A 300 x 200 x 12 x 5 Nos (LBH L2C) 175 Kgs 6.63 1,160.00
Plate Eh 36 1000 x 200 x 18 x 1 No (LONGI-S3) 35 Kgs 7.11 249.00
Plate Eh 36 1500 x 628 x 12 x 1 No (MK-1) 200 Kgs 6.78 1,356.00
Plate Eh 36 500 x 382 x 13 x 1 No (MK-1A) 200 Kgs 6.52 1,304.00
Plate Eh 36 1500 x 175 x 26 x 1 No (MK-2) 200 Kgs 5.99 1,198.00
Plate Eh 36 500 x 115 x 18 x 1 No (MK-2A) 35 Kgs 6.82 239.00
Plate Eh 36 1200 x 450 x 12 x 1 No (MK-A) 200 Kgs 6.78 1,356.00
Plate Eh 36 1200 x 150 x 17 x 1 No (MK-B) 200 Kgs 6.25 1,250.00
Plate Eh 36 700 x 100 x 14 x 2 Nos (S1A) 70 Kgs 7.11 498.00
15 Steel Repair Iwo Fpt Port/Stbd
Plate Eh 36 2300 x 732 x 12 x 3 Nos (FR 103A) 485 Kgs 6.78 3,287.00
Plate Eh 36 1000 x 1550 x 12 x 1 No (FR 119) 149 Kgs 6.78 1,009.00
Plate Eh 36 1861 x 732 x 12 x 2 Nos (FR :103) 262 Kgs 6.78 1,773.00
16 Railling Iwo 4 Port Wbt
Bar Round 22mm Ms 6000 x 2 Nos (RB 1) 12 Mtrs 210.00 2,520.00
Bar Round 16mm Ms 6000 x 2 Nos (RB 2)
17 Railling Iwo 5 Port Wbt
Bar Round 22mm Ms 6000 x 12 Nos (RB 1) 60 Mtrs 210.00 12,600.00
Bar Round 16mm Ms 6000 x 10 Nos (RB 2)
18 Aft Peak Tank Transom Fr-8 Repair
Plate Gr A 3300 x 140 x 16 x 1 No (APT FR-8 F.S1) 59 Kgs 5.78 342.00
Plate Gr A 600 x 140 x 16 x 1 No (APT FR-8 F.S2) 35 Kgs 6.37 223.00
Plate Gr A 1000 x 140 x 16 x 1 No (APT FR-8 F.S3) 35 Kgs 6.37 223.00
19 Wbt.2p Trv. Bhd#94 Bkt. Renewal
Plate Eh 36 900 x 900 x 21 x 1 No (A) 136 Kgs 5.99 815.00
Plate Eh 36 700 x 100 x 16 x 1 No (B) 35 Kgs 7.11 249.00
20 Forepeak Tank Fr.119 Tie Plate
Plate Gr A 410 x 225 x 15 x 1 No (FPT F119 TP) 35 Kgs 5.78 202.00
21 Material For Aft Peak Tank.Port Side.
Plate Eh 36 200 x 300 x 12 x 2 Nos (INS) 70 Kgs 6.78 475.00
22 Aft Peak Tank Steel Repair

Page 24 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Plate Gr A 940 x 544 x 12 x 1 No (APT FR7 BKT) 50 Kgs 6.63 332.00
22 Fpt Steel Repair.
Plate Gr A 410 x 225 x 15 x 1 No (MKL 01) 35 Kgs 5.78 202.00
23 Wbt No. 1s Steel Repair
Plate Gr A 200 x 150 x 13 x 1 No (L1) 35 Kgs 6.37 223.00
Plate Gr A 200 x 188 x 12 x 11 Nos (L2) 385 Kgs 6.63 2,553.00
Plate Gr A 200 x 188 x 13 x 1 No (L3) 35 Kgs 6.37 223.00
Plate Gr A 874 x 1063 x 12 x 1 No (PL.1) 200 Kgs 6.02 1,204.00
Plate Gr A 1170 x 175 x 18 x 1 No (PL.2) 35 Kgs 5.55 194.00
25 Wbt No. 1p Steel Repair
Plate Gr A 200 x 179 x 13 x 1 No (L1) 35 Kgs 6.37 223.00
Plate Gr A 200 x 179 x 12 x 4 Nos (L2) 140 Kgs 6.63 928.00
25 Water Ballast Tank #1s,3p,4p&4s Repair
Plate Gr A 300 x 200 x 12 x 1 No (FB) 35 Kgs 6.63 232.00
Plate Eh 36 300 x 200 x 14 x 4 Nos (FR100 S4) 140 Kgs 7.11 995.00
Plate Eh 36 3020 x 510 x 14 x 1 No (FR95 S1) 173 Kgs 6.52 1,125.00
Plate Gr A 300 x 200 x 12 x 9 Nos (SB) 315 Kgs 6.63 2,088.00
26 Water Ballast Tank #1stbd Repair
Plate Gr A 700 x 250 x 14 x 1 No (T.WEB.FR.100) 35 Kgs 6.37 223.00
27 Wbt No:5 Stbd Side Shell Plating
Plate Gr A 3000 x 800 x 20 x 1 No (S.SHL P3) 384 Kgs 6.37 2,446.00
28 Steel Plate Repair
Plate Gr A 600 x 250 x 14 x 1 No (MK 01) 35 Kgs 6.37 223.00
29 Wbt No.5p Handrailing Inside Tank To Renew
Bar Round 20mm Ms 6000 x 15 Nos (H.RAIL) 45 Mtrs 110.00 4,950.00
30 Water Ballast Tank No.5p Steel Repair
Plate Gr A 750 x 250 x 20 x 1 No (5P F.61 INS) 150 Kgs 6.02 903.00
Plate Gr A 1150 x 1150 x 16 x 1 No (5P F.63 INS) 300 Kgs 6.02 1,806.00
31 5 Port Fr 61 Insert.
Plate Gr A 900 x 255 x 18 x 1 No (MK 01) 50 Kgs 6.37 319.00

Cleaning Work:
Cargo tank- 1p/s,2p/s,3p/s & 5p/s Bottom, Under Deck, Side
BHD cleaning for hot work as per safety
Scraping Area- 2181 m2 2181 m2 7.00 15,267.00
Sludge disposal Nett 2 tons 450.00 900.00

Water1 p/s to 5p/s Ballast tank cleaning for Steel as per request;
Nett 80 Mhrs 13.50 1,080.00
80mhrs

Remove/refit and Blanking of Bellmouth for access of hotwork


works:
20" dia x 1 No 1 Nos 1,200.00 1,200.00
10" x 1 No 1 Nos 450.00 450.00

Painting assistance for power tooling of burn marks as follows:


24 March 2015 - 30mhrs (1port) (Day shift) Nett 30 Mhrs 15.00 450.00
24 March 2015 - 50mhrs (1stbd, 3 stbd, 1port) Nett 50 Mhrs 15.00 750.00
25 March 2015 - 50mhrs (3 stbd, 1stbd) Nett 50 Mhrs 15.00 750.00
30 March 2015 - 50mhrs (Aft , 5 P/S) Nett 50 Mhrs 15.00 750.00
30 March 2015 - 60mhrs (Night - WBT NO 4 P/S) Nett 60 Mhrs 15.00 900.00
31 March 2015 - 50mhrs (Day - Aft) Nett 50 Mhrs 15.00 750.00
31 March 2015 - 40mhrs (Night - Aft) Nett 40 Mhrs 15.00 600.00
1 April 2015 - 50mhrs (Day shift-WBT 5 Stbd) Nett 50 Mhrs 15.00 750.00
1 April 2015 - 50mhrs (Night shift-Hull external new steel) Nett 50 Mhrs 15.00 750.00

Staging:
Forepeak, Inside Tank Bottom Area: 3 off hanging each
1 LS 1,050.00 1,050.00
@3x1x1.5 meters - total 21 planks
Wbt 1 S, 1St Bay Frame# 94: 1 off hanging @3x1.5x1.5 meters
1 LS 500.00 500.00
- total 10 planks

Page 25 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Wbt 1 S, 1St Bay Frame# 95 Iwo Ladder: 2 off hanging each
1 LS 1,000.00 1,000.00
@3x1.5x1.5 meters - total 20 planks
Wbt 1 S, 2Nd Bay Frame# 95 Aft Area : 2 off hanging each
1 LS 700.00 700.00
@3x1.2x1.5 meters - total 12 planks
Wbt 1 S, 4Th Bay Frame# 97: 1 off hanging @3x1.5x1.5 meters
1 LS 500.00 500.00
- total 10 planks
Wbt 1 S, 4Th Bay Frame# 97: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 1 S, 6Th Bay Frame# 99: 2 off hanging each @2x1x1.5
1 LS 700.00 700.00
meters - total 12 planks
Wbt 1 S, 2Nd Stringer Frame# 97: 1 off tower @2x1.5x3 meters 1 LS 300.00 300.00
Wbt 1 S, 2Nd Stringer Frame# 97: 1 off hanging @2x1.2x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 1 S, 3Rd Stringer Frame# 97: 2 off hanging each @2x1x1.5
1 LS 700.00 700.00
meters - total 10 planks
Wbt 1 P, 1St Bay Frame# 95: 1 off hanging @3x1.5x1.5 meters -
1 LS 400.00 400.00
total 8 planks
Wbt 1 P, Fwd Bay Frame# 101: 1 off hanging @3x1.5x4 meters
1 LS 950.00 950.00
- total 18 planks, 1 ladder
Wbt 1 P, Frame# 100: 1 off tower @3x1.5x3 meters 1 LS 300.00 300.00
Wbt 1 P, Frame# 100: 1 off hanging @3x1.2x1.5 meters - total 8
1 LS 400.00 400.00
planks
Wbt 5 S, Frame# 63: 1 off tower @2x2x5 meters 1 LS 500.00 500.00
Wbt 5 S, Frame# 65: 1 off hanging @3x1.2x1.5 meters - total 5
1 LS 350.00 350.00
planks
Wbt 5 S, Frame# 58 To 59: 1 off tower @5x1.5x5 meters 1 LS 1,000.00 1,000.00
Side Shell, Stbd Side Fwd Area: 1 off hanging @11x2x1.5
1 LS 1,500.00 1,500.00
meters - total 30 planks
Side Shell, Stbd Side Fwd Area(Access Platform): 1 off hanging
1 LS 750.00 750.00
@2x2x12 meters - total 13 planks, 2 ladders
Side Shell, Iwo 5 S Aft Area: 1 off hanging @13x2x1.5 meters -
1 LS 3,850.00 3,850.00
total 76 planks, 1 ladder
Side Shell, Stbd Side Aft Area(Access Platform): 1 off hanging
1 LS 500.00 500.00
@2x1.5x12 meters - total 9 planks, 1 ladder
Side Shell, Stbd Side Iwo Wbt # 5: 1 off hanging @8x1.5x1.5
1 LS 1,750.00 1,750.00
meters - total 34 planks, 1 ladder
Side Shell, Stbd Side Aft Area(Access Platform): 1 off hanging
1 LS 350.00 350.00
@2x1.5x4 meters - total 5 planks
Wbt 1 S, Frame # 95 Aft Area: 1 off tower @3x1.5x3 meters 1 LS 300.00 300.00
Wbt 1 S, Frame # 100 Aft Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 1 S, Frame # 100 To 101: 1 off hanging @6x1.5x1.5 meters
1 LS 950.00 950.00
- total 19 planks
Wbt 1 P, Frame # 100 Fwd Area: 1 off hanging @3x1.5x1.5
1 LS 600.00 600.00
meters - total 12 planks
Wbt 1 P, Frame # 97 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 2 P, Frame # 85 Aft Area: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 7 planks
Wbt 2 P, Frame # 86 Aft Area : 1 off tower @3x1x3 meters 1 LS 150.00 150.00
Wbt 2 P, Frame # 86 Aft Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 2 P, Frame # 92 Fwd Area: 1 off tower @2x1x3 meters 1 LS 150.00 150.00
Wbt 2 P, Frame # 92 Fwd Area Top: 1 off hanging @3x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 2 P, Frame # 89 Fwd Area Top: 1 off hanging @3x3x1.5
1 LS 700.00 700.00
meters - total 14 planks
Wbt 2 P, Frame # 89 Aft Area Top: 1 off hanging @3x2.5x1.5
1 LS 600.00 600.00
meters - total 12 planks
Wbt 2 P, Frame # 87 Fwd Area 2Nd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.2x1.5 meters - total 8 planks
Wbt 2 P, Frame # 90 Fwd Area 2Nd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.2x1.5 meters - total 8 planks
Wbt 2 P, Frame # 86 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 400.00 400.00
@3x1.2x1.5 meters - total 8 planks
Wbt 3 S, Frame # 82 Iwo Access: 1 off tower @3x1.8x3 meters 1 LS 300.00 300.00
Wbt 3 S, Frame # 82 Aft Area: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Wbt 3 S, Frame # 81 Aft Area: 1 off hanging @3x1.5x1.5 meters
1 LS 600.00 600.00
- total 12 planks
Wbt 3 S, Frame # 79 Fwd Area: 1 off hanging @1.5x1.2x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 3 S, Frame # 78 Fwd Area: 1 off hanging @2x1.5x4 meters
1 LS 750.00 750.00
- total 14 planks, 1 ladder

Page 26 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Wbt 3 S, Frame # 79 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.5x1.5 meters - total 8 planks
Wbt 4 S, Frame # 75 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 S, Frame # 75 Aft Area: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 4 planks
Wbt 4 S, Frame # 75 Fwd Area: 1 off hanging @2x1.2x1.5
1 LS 350.00 350.00
meters - total 7 planks
Wbt 4 S, Frame # 70 Fwd Area: 2 off hanging each @2x1.5x1.5
1 LS 800.00 800.00
meters - total 16 planks
Wbt 4 S, Frame # 67 Fwd Area: 1 off hanging @2x2x1.5 meters
1 LS 500.00 500.00
- total 10 planks
Wbt 4 S, Frame # 71 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.5x1.5 meters - total 8 planks
Wbt 3 P, Frame # 83 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 400.00 400.00
- total 8 planks
Wbt 3 P, Frame # 85 Fwd Area : 1 off hanging @3x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 3 P, Frame # 82 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Wbt 3 P, Frame # 81 Fwd Area: 1 off hanging @2x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 3 P, Frame # 81 Aft Area: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 6 planks
Wbt 3 P, Frame # 77 Aft Area: 1 off hanging @3x2x1.5 meters -
1 LS 600.00 600.00
total 12 planks
Wbt 3 P, Frame # 77 Fwd Area: 1 off hanging @3x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 P, Frame # 76 Aft Area: 1 off tower @2x2x5 meters 1 LS 500.00 500.00
Wbt 4 P, Frame # 75 Fwd Area: 1 off hanging @3x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 P, Frame # 75 Fwd Area Top: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 P, Frame # 74 Fwd Area : 1 off hanging @3x1.8x1.5
1 LS 500.00 500.00
meters - total 10 planks
Wbt 4 P, Frame # 74 Fwd Area Top: 1 off hanging @2x1.8x1.5
1 LS 500.00 500.00
meters - total 10 planks
Wbt 4 P, Frame # 74 Aft Area Top: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 4 P, Frame # 73 Fwd Area: 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Wbt 4 P, Frame # 72 Fwd Area: 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Wbt 4 P, Frame # 72 Fwd Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 4 P, Frame # 70 Fwd Area: 2 off hanging each @2x1x1.5
1 LS 700.00 700.00
meters - total 10 planks
Wbt 4 P, Frame # 70 To 71: 1 off hanging @6x3x1.5 meters -
1 LS 1,350.00 1,350.00
total 27 planks
Wbt 4 P, Frame # 69 Fwd Area: 2 off hanging each @3x1x1.5
1 LS 700.00 700.00
meters - total 10 planks
Wbt 4 P, Frame # 68 Fwd Area : 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Wbt 4 P, Frame # 68 To 69: 1 off hanging @6x1.8x1.5 meters -
1 LS 900.00 900.00
total 18 planks
Wbt 5 S, Frame # 54: 1 off tower @3.5x1.5x2 meters 1 LS 600.00 600.00
Wbt 5 S, Frame # 61 To 62 : 1 off hanging @5x1.5x1.5 meters -
1 LS 600.00 600.00
total 12 planks
Wbt 5 S, Frame # 65 Aft Area : 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 5 S, Frame # 64 To 65 Iwo Ladder Area: 1 off hanging
1 LS 700.00 700.00
@5x1.5x1.5 meters - total 14 planks
Wbt 5 S, Frame # 64 Iwo Ladder Area: 1 off hanging @2x2x1.5
1 LS 500.00 500.00
meters - total 10 planks
Apt Peak Tank, Aft Area: 2 off tower each @2x1x2.5 meters 1 LS 300.00 300.00
Apt Peak Tank, Center Aft Area: 1 off tower @3x1x2.5 meters 1 LS 150.00 150.00
Apt Peak Tank, Fwd Area: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Apt Peak Tank, Port & Stbd Aft Area: 2 off hanging each
1 LS 700.00 700.00
@1.5x1.5x1.5 meters - total 12 planks
Apt Peak Tank, Port Side Aft Area: 1 off tower @2x1x2.5 meters 1 LS 150.00 150.00
Apt Peak Tank, Port Side Aft Area: 2 off tower each @2x1x2.5
1 LS 300.00 300.00
meters
Apt Peak Tank, Port Side Aft Area: 3 off hanging each
1 LS 1,050.00 1,050.00
@1.5x0.5x1.5 meters - total 6 planks
Cot 2 P, Port Side 3Rd Stringer: 1 off hanging @4x1.5x1.5
1 LS 700.00 700.00
meters - total 14 planks

Page 27 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Engine Room, Aft Area Iwo S/Gear Room: 1 off tower @4x3x4
1 LS 1,080.00 1,080.00
meters
Wbt 1 P, Frame # 101 Aft Area: 1 off hanging @2x1.5x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 1 P, Frame # 97 Aft Area: 1 off hanging @2x2x1.5 meters -
1 LS 350.00 350.00
total 7 planks
Wbt 2 P, Frame # 86 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 350.00 350.00
@3x1.2x1.5 meters - total 7 planks
Wbt 2 P, Frame # 91 Aft Area 3Rd Stringer Top: 2 off hanging
1 LS 800.00 800.00
each @2x1.2x1.5 meters - total 16 planks
Wbt 2 P, Frame # 91 Aft Area 3Rd Stringer: 1 off tower
1 LS 150.00 150.00
@2x1.2x2 meters
Wbt 2 P, Port Side Double Bottom Fwd Area: 1 off tower
1 LS 300.00 300.00
@2x1.5x3 meters
Wbt 2 P, Straight Type Open Railing: 1 off railing @2x0x1.5
1 LS 80.00 80.00
meters
Wbt 2 S, Frame # 86 Aft Area: 1 off tower @2x1.5x2.5 meters 1 LS 300.00 300.00
Wbt 2 S, Frame # 86 Aft Area: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Wbt 2 S, Frame # 86 Fwd Area Top: 3 off hanging each
1 LS 1,350.00 1,350.00
@2x1.5x1.5 meters - total 27 planks
Wbt 2 S, Frame # 87 Fwd Area Top: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 2 S, Frame # 88 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 350.00 350.00
- total 6 planks
Wbt 2 S, Frame # 88 Fwd Area: 1 off tower @3x1.5x4.5 meters 1 LS 450.00 450.00
Wbt 2 S, Frame # 89 Aft Area: 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 2 S, Frame # 89 Fwd Area: 1 off hanging @2x1x1.5 meters
1 LS 350.00 350.00
- total 5 planks
Wbt 2 S, Frame # 90 Fwd Area: 1 off hanging @4x1.2x1.5
1 LS 650.00 650.00
meters - total 13 planks
Wbt 2 S, Frame # 94 Aft Area: 1 off hanging @3x1.5x1.5 meters
1 LS 400.00 400.00
- total 8 planks
Wbt 5 S, Frame # 58 Aft Area Top: 1 off hanging @2x1.5x4
1 LS 850.00 850.00
meters - total 16 planks, 1 ladder
Wbt 5 S, Frame # 59 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 5 S, Frame # 60 Fwd Area Top: 1 off hanging @2x1.5x4
1 LS 850.00 850.00
meters - total 16 planks, 1 ladder
Wbt 5 S, Frame # 62 To 63 2Nd Stringer (Provide Ladder): 1 off
1 LS 150.00 150.00
structure @0.5x0.5x3 meters
Wbt 5 S, Frame # 63 Fwd Area Top: 1 off hanging @1.5x1.5x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 S, Frame # 63 Fwd Area: 1 off hanging @2.5x0.75x1.5
1 LS 350.00 350.00
meters - total 4 planks
Wbt 5 S, Frame # 64 Aft Area Top: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 5 S, Frame # 64 Aft Area: 1 off hanging @3.5x1x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Wbt 5 S, Frame # 64 Aft Area: 1 off hanging @3x2x1.5 meters -
1 LS 450.00 450.00
total 9 planks
Apt Peak Tank, Port Side Aft Area: 1 off hanging @1.5x0.5x1.5
1 LS 350.00 350.00
meters - total 2 planks
Wbt 1 S, Frame # 94 To 95 2Nd Stringer: 1 off hanging
1 LS 550.00 550.00
@5.5x1.2x1.5 meters - total 11 planks
Wbt 1 S, Frame # 95 Fwd Area 2Nd Stringer: 1 off hanging
1 LS 350.00 350.00
@2x1.2x1.5 meters - total 6 planks
Wbt 2 P, Frame # 87 To 88 Straigth Type: 1 off railing
1 LS 48.00 48.00
@1.2x0x1.5 meters
Wbt 2 S, Frame # 89 Fwd Area: 1 off tower @2x1x3 meters 1 LS 150.00 150.00
Wbt 3 P, Frame # 85 Aft Area Top: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 7 planks
Wbt 3 S, Frame # 76 Fwd Area: 1 off tower @3.5x1.2x4 meters 1 LS 400.00 400.00
Wbt 4 P, Frame # 67 Fwd Area Top: 1 off hanging @1.5x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 4 P, Frame # 67 Fwd Area: 1 off tower @3x1.2x5 meters 1 LS 250.00 250.00
Wbt 4 P, Frame # 68 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 550.00 550.00
- total 11 planks
Wbt 4 P, Frame # 68 Fwd Area Top: 1 off hanging @3x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 4 P, Frame # 69 Fwd Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 4 P, Frame # 70 Aft Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 6 planks

Page 28 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Wbt 4 P, Frame # 70 Aft Area: 1 off hanging @4x2.8x1.5 meters
1 LS 850.00 850.00
- total 17 planks
Wbt 4 P, Frame # 73 Fwd Area Top: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 P, Frame # 59 Aft Area 2Nd Stringer: 1 off hanging
1 LS 350.00 350.00
@2x1.2x1.5 meters - total 5 planks
Wbt 5 P, Frame # 59 Aft Area: 2 off hanging each @4x1x1.5
1 LS 1,200.00 1,200.00
meters - total 22 planks, 1 ladder
Wbt 5 P, Frame # 60 Aft Area: 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 6 planks
Wbt 5 P, Frame # 60 Fwd Area: 1 off tower @3x1x3 meters 1 LS 150.00 150.00
Wbt 5 P, Frame # 61 Aft Area: 1 off hanging @3.5x1.2x1.5
1 LS 600.00 600.00
meters - total 12 planks
Wbt 5 P, Frame # 62 Fwd Area Top: 1 off hanging @3x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 P, Frame # 62 Top: 1 off hanging @1.5x1x1.5 meters -
1 LS 350.00 350.00
total 6 planks
Wbt 5 P, Frame # 63 Fwd Are: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Wbt 5 P, Frame # 64 Fwd Area Iwo Ladder: 1 off hanging
1 LS 600.00 600.00
@3x1.8x1.5 meters - total 12 planks
Wbt 5 P, Frame # 64 Safety Platform: 1 off platform @2x1x1.5
1 LS 120.00 120.00
meters
Wbt 5 P, Frame # 65 Fwd Area: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 P, Frame # 66 Aft Area Top: 1 off hanging @1.5x1.5x1.5
1 LS 350.00 350.00
meters - total 7 planks
Wbt 5 P, Frame # 66 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Wbt 5 P, Frame # 66 Fwd Area: 1 off hanging @2x1.2x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 5 S, Frame # 58 Fwd Area Top: 1 off hanging @1.5x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 5 S, Frame # 64 Aft Area Top: 1 off hanging @1.5x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 S, Frame # 66 Aft Area: 1 off hanging @2x1.2x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Side Shell, Iwo 5 S Aft Area(Additional Lift): 1 off hanging
1 LS 1,250.00 1,250.00
@12x1.8x1.5 meters - total 25 planks
Wbt 4 P, Frame # 71 To 70: 1 off hanging @4x1.2x1.5 meters -
1 LS 500.00 500.00
total 10 planks
Wbt 4 P, Frame # 70 Aft Area: 1 off hanging @2x1.2x1.5 meters
1 LS 350.00 350.00
- total 6 planks
Wbt 3 P, Iwo Access Ladder: 1 off tower @1.5x1.5x2 meters 1 LS 300.00 300.00
Forepeak, Port & Stbd 1St / 2Nd Stringer: 4 off tower each
1 LS 1,400.00 1,400.00
@2x2x3.5 meters
Wbt 5 S, Frame # 65 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 500.00 500.00
meters - total 10 planks
Wbt 5 S, Frame # 66 Aft Area(Walk Way): 1 off hanging
1 LS 400.00 400.00
@3x1.5x1.5 meters - total 8 planks
Wbt 5 S, Frame # 65 3Rd Stringer: 1 off tower @2x1x3 meters 1 LS 150.00 150.00
Wbt 5 P, Frame # 65 1St Stringer: 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Main Deck, Port & Stbd Iwo F.Peak Open Plate Cutting: 2 off
1 LS 416.00 416.00
railing each @4x1.2x1.5 meters
Side Shell, Iwo 5 S 2Nd Erection(Add'L Lift): 1 off hanging
1 LS 1,250.00 1,250.00
@12x1.8x1.5 meters - total 25 planks
Wbt 5 P, Fwd Area Iwo Access: 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 5 P, Fwd Area Iwo Access: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks

A00161 Addl 18/03/2015PORT CARGO CRANE LEVEL OVERHAUL


Port Midship crane
Arrange technicians to carry out troubleshooting Port midhsip
1 Nett 1 EA 845.00 845.00
crane x 1 no
Disconnect, blank and remove 01 Nos main hyd control block
(Danfoss PVG 32) from port midship crane, transport to GOS
2 Nett 1 EA 1,320.00 1,320.00
workshop, dismantle control block, clean overhaul, test, return
onboard and reinstall. (x 1 Nos)

Spares for midship control block:


01 Set - SEAL KIT FOR PVG32 3 SECTION VALVE BLOCK Nett 1 EA 203.00 203.00
03 Set - MECH.ACTUATION WITH BASE PVM32 - 157B3171 Nett 1 EA 506.00 506.00

Page 29 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
03 Set - COVER PVMD - 157B0001 Nett 1 EA 121.50 122.00
01 Set - PVS END PLATE MODULE - 157B2000 Nett 1 EA 162.00 162.00

Electrical assistance to Isolate crane system starter panel with


3 1 EA 240.00 240.00
tag and Pad lock and reconnect upon completion.

4 Staging:
Main Deck, Port & Stbd Iwo Deck Crane: 1 off tower
1 EA 140.00 140.00
@3x0.75x3.5 meters
Main Deck, Port Iwo Deck Crane: 1 off hanging @3x2x1.5
1 EA 800.00 800.00
meters - total 16 planks

A00162 Addl 18/03/2015CRANES STAGING


Main Deck, Port & Stbd Side Iwo Boom Crane: 2 off tower each
1 EA 800.00 800.00
@1.8x1.8x5 meters
Main Deck, Stbd Side Iwo Midship Crane: 1 off tower
1 EA 200.00 200.00
@2.5x1.2x5 meters
Main Deck, Stbd Side Iwo Midship Crane: 1 off hanging
1 EA 700.00 700.00
@4x1.2x1.5 meters - total 14 planks
Engine Room, Port & Stbd Fwd Inside E/R Fan: 2 off hanging
1 EA 700.00 700.00
each @2x1.5x1.5 meters - total 14 planks

A00163 Addl 19/03/2015STBD WINCH FWD CLUTCH

A00164 Addl 19/03/2015DECK LINES PRESSURE TEST - BUDGETARY


Piping assistance during testing - Allow 2500mhrs Nett 2500 Mhrs 15.00 37,500.00
For your info: up to 28 March 2015 - consumed 2212mhrs

Consumable: 1 LS 2,000.00 2,000.00

Provide Cleaners Man power assistance to Pipe fitter on Main


deck for Bunker line opening period oil collecting & oil cleaning Nett 112 Mhrs 13.50 1,512.00
as per pipe fitter request .

Staging:
Pump Room, 1St Level: 1 off hanging @3x2x1.5 meters - total
1 LS 550.00 550.00
11 planks
Main Deck, Center Fwd Area: 1 off tower @2x0.75x2 meters 1 LS 120.00 120.00
Main Deck, Center Iwo Pipe Racks: 1 off tower @4x1.5x3
1 LS 480.00 480.00
meters
Main Deck, Center Iwo Pipe Racks: 1 off tower @3x1x2 meters 1 LS 120.00 120.00
Main Deck, Center Aft Area: 1 off tower @4x1.2x2 meters 1 LS 240.00 240.00
Main Deck, Center Iwo Pipe Racks: 3 off tower each @2x1x2
1 LS 360.00 360.00
meters
Main Deck, Stbd Side Iwo Manifold: 2 off tower each
1 LS 480.00 480.00
@1.5x1.5x2 meters
Main Deck, Center Aft Area Iwo Pipe Racks: 1 off tower
1 LS 240.00 240.00
@4x1.2x2 meters
Main Deck, Center Area Iwo Pipe Racks: 1 off tower @2.5x2x2
1 LS 240.00 240.00
meters
Main Deck, Center Area Iwo Pipe Racks: 1 off tower @2x1.8x2
1 LS 240.00 240.00
meters

A00165 Addl 19/03/2015SLOP P/SB CLEANING


Slop p/s cleaning for inspection
Connection and disconnection of pump x 2 nos 2 Time 250.00 500.00
Pumping approx.- 06 Hours 6 hrs 30.00 180.00
Dispose of oily water (Port: 10m3, Stbd: 2m3)- 12 TONS 12 Tons 60.00 720.00
Dispose of Sludge (Cot- 2 port : 02 tons &
25.76 Tons 450.00 11,592.00

P/s tanks Bottom Scraping area- 130 m2 130 m2 6.00 780.00


P/s tanks Bottom Moping area- 130 m2 130 m2 5.00 650.00

Sludge analysis x 1 sample Nett 1 EA 286 286.00

A00166 Addl 20/03/2015WBT HP WASH

A00167 Addl 20/03/2015CHERRY PICKER ASSISTANCE

Page 30 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

A00168 Addl 20/03/2015CHAIN LOCKER STEELWORK


Crop and renew plates:
Plate Gr A 2744 x 2050 x 20 x 2 Nos (PLT-1) 1,800 Kgs 7.55 13,590.00
Plate Gr A 2744 x 2050 x 20 x 4 Nos (PLT-2) 3,600 Kgs 7.55 27,181.00
Plate Gr A 2744 x 2450 x 20 x 2 Nos (PLT-3) 2,151 Kgs 7.55 16,242.00
Plate Gr A 2744 x 2450 x 20 x 4 Nos (PLT-4) 4,303 Kgs 7.55 32,485.00
Plate Gr A 2744 x 2650 x 20 x 2 Nos (PLT-5) 2,327 Kgs 7.55 17,568.00
Plate Gr A 2744 x 2650 x 20 x 4 Nos (PLT-6) 4,654 Kgs 7.55 35,136.00
Plate Gr A 2744 x 2535 x 20 x 2 Nos (PLT-7) 2,226 Kgs 7.55 16,806.00
Plate Gr A 2744 x 2535 x 20 x 4 Nos (PLT-8) 4,452 Kgs 7.55 33,612.00
Chain Locker Fitting Materials () - Kgs 7.55 -
Plate Gr A 554 x 174 x 12 x 80 Nos (MK1) 2,800 Kgs 7.55 21,140.00
Plate Gr A 240 x 150 x 12 x 80 Nos (MK2) 2,800 Kgs 7.55 21,140.00

Staging:
Chain Locker , Port & Stbd Inside: 2 off tower each
1 LS 2,700.00 2,700.00
@1.8x1.8x15 meters
Chain Locker , Stbd Side Provide Temp.Platform: 1 off hanging
1 LS 350.00 350.00
@1.5x0.75x1.5 meters - total 4 planks
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 700.00 700.00
each @3x1x7 meters
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 700.00 700.00
each @2x1x7 meters
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 1,400.00 1,400.00
each @3x2x7 meters
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 1,400.00 1,400.00
each @2x1.5x7 meters
Forepeak, Port & Stbd Provide (Safety Platform): 2 off platform
1 LS 160.00 160.00
each @1x1x1.5 meters
Chain Locker , Inside Of Chain Locker: 2 off tower each
1 LS 500.00 500.00
@3x1x5 meters
Chain Locker , Inside Of Chain Locker: 2 off hanging each
1 LS 700.00 700.00
@3x1x1.5 meters - total 10 planks
Chain Locker , Port Side Inside C. Locker: 1 off tower @2x1.5x5
1 LS 500.00 500.00
meters
Forepeak, Port Side Temp.Covering Open Cutting Plate: 1 off
1 LS 120.00 120.00
platform @2x1x1.5 meters
Chain Locker , Stbd Side Inside C.Locker: 1 off tower @2x1.5x5
1 LS 500.00 500.00
meters
Forepeak, Stbd Side Temp.Covering Open Cutting Plate: 1 off
1 LS 120.00 120.00
platform @2x1x1.5 meters

A00169 Addl 21/03/2015PROTECTION COVERING FOR SILICON APPLICATION


Masking of hull 2340 m2 15.00 35,100.00

A00170 Addl 21/03/2015ADDL STEEL WORK ON DECK


1 E/Room Hatch Cover Ss Pin Renewal.
Bar Round 40mm Aisi 304 S/S 94 x 2 Nos (PIN) 2 Nos 204.00 408.00

2 Dismantled onboard 01-no. steering gear hatch cover + 01-no.


pump room portside + 01-no. engine room vent wall cover, and 3 Nos 600.00 1,800.00
delivered to steel shop prior for repair.;

1.) cropped-out, and renewed wasted retainers.^2.) welded as


required.^3.) straightening after welding^4.) delivered to hull
treatment prior for blasting and painting (as per owner specs., 1 LS 1,428.00 1,428.00
^5.) delivered back, and re-fitted back onboard^as per o/r
requirements.
Plate Gr A 1010 x 30 x 6 x 1 No (ER INR-1 TNR)
Plate Gr A 450 x 30 x 6 x 1 No (ER INR-2 TNR)
Plate Gr A 1090 x 30 x 6 x 4 Nos (ER OUTRTNR)
Plate Gr A 1090 x 30 x 6 x 4 Nos (PR OUTRTNR)
Plate Gr A 1590 x 30 x 6 x 4 Nos (SG OUTRTNR)

3 Misc Stl Works On Deck Save All On Sunken Deck


Cropped-out, and renewed wasted top section of save all at
sunken deck near transom area as per o/r requirements.

Page 31 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Plate Gr A 1501 x 100 x 6 x 2 Nos (SAVE ALL) 1 LS 1,530.00 1,530.00

Machining Process:
Mfrd. ( 2 ) s/s pins proc. N0. 152436. ( 5 hrs. ) 5 hrs 75.00 375.00

A00171 Addl 21/03/2015STEAM PIPE PRESSURE TEST IN SHOP


Remove/refit pipe and send to workshop:
C.S Pipe 10" sch 80 x 1200 mm L x 1 Nos 2.10 Mtrs 432.00 907.00
Blanking and pressure tested 1 LS 544.32 544.00
-
A00172 Addl 21/03/2015CYLINDER HEAD INJ. REMOVAL -
Cylinder head injection removal 10 EA 250.00 2,500.00
Unit nos. #3, 5 and 1 spare = total 6 injectors, done onboard
Unit nos. #6, 7 = total 4 injectors, done in workshop.
( 1 ) injector from cylinder head #7, removed ( 2 )exhaust valve
studs and ( 2 ) injector studs for access, jack - off
injector using a 30 ton jack and takes 1 x 2 fitter full shift to
remove.
Injector studs and exhaust valve studs refitted upon completion

A00173 Addl 21/03/2015WINCH GAP CLEARANCES 1 EA 300.00 300.00


STBD. WINDLASS:
Prepared hydraulic jack, hoses and hand pump and transported
to jetty and to onboard.
Prepared pipe spacers, set dial indicator on top of the pinion
gear shaft and jack to check the clearances
between shaft and pedestal bearings. ( 2 ) locations.

A00174 Addl 22/03/2015HYDRO BLASTING OF BALLAST TANKS -


Location: -
WBT No 3 P/S - 2 tanks -
WBT No 2 P/S - 2 tanks -
-
HP fresh water wash (200bar), 300m2 x 2 tanks Nett 600 m2 2.50 1,500.00
-
Hydro blasting to WJ 2 (Touch Up), on DB deck head weld
Nett 600 m2 33.60 20,160.00
seams x 2 tanks
Hosing down - x 2 tanks Nett 600 m2 2.00 1,200.00
-
Apply touch up coat 150 mic, 2coats 300m2 x 2 tanks Nett 1200 m2 2.50 3,000.00

Timesheet for power tooling of burn mark:


27 march 2015 - 30mhrs (new steel 2 stbd & 4stbd) Nett 30 m2 15.00 450.00
28 march 2015 - 30mhrs (new steel 2 port &4port) Nett 30 m2 15.00 450.00
28 march 2015 - 30mhrs (new steel 3 port ) Nett 30 m2 15.00 450.00
29 march 2015 - 30mhrs (new steel 2 port & 3 stbd ) Nett 30 m2 15.00 450.00

A00175 Addl 23/03/2015ACCOMMODATION LADDERS - LOAD TEST


To remove/refit ladders 2 EA 1,147.50 2,295.00
Ladder load test 1 time(2nos) 2 EA 1,620.00 3,240.00
Deflection test 1 time(2nos) 2 EA 1,620.00 3,240.00

A00176 Addl 24/03/2015SB WINDLASS OVERHAUL - BUDGETARY 1 EA 15,000.00 15,000.00

A00177 Addl 24/03/2015CHAIN STOPPER SB SIDE REPAIR - CANCELLED


Cropped out and renewed damaged handle of stbdside chain
0 EA 2,650.00 -
stopper. Straighten de-formedstbdside chain stopper

A00178 Addl 25/03/2015COW LINE PIPE REPAIR


Remove/refit pipe to workshop:
C.S Pipe 4" sch 80 x 6000 mm L x 1 Nos 6.00 Mtrs 136.00 816.00
Remove/refit dresser coupling x 1 No 1.00 EA 136.00 136.00

Page 32 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)
Partial repair of Pipe
C.S Pipe 4" sch 80 x 1200 mm L x 1 Nos 2.10 Mtrs 170.00 357.00

A00179 Addl 25/03/2015P/R FAN CASING REPAIR

A00180 Addl 25/03/2015SB WINDLASS TROUBLE SHOOT

A00181 Addl 25/03/2015WBT ANODES INSTALLATION - CANCELLED 0 -

BALLAST TANK BELLMOUTH REMOVE REFIT FOR


A00182 Addl 25/03/2015
INSPECTION

A00183 Addl 25/03/2015LSHFO TANK CLEANING


Connection and disconnection of pump x 1 no 1 Time 250.00 250.00
Pumping approx.- 01 Hours 1 hrs 30.00 30.00
Scraping area- 103 m2 103 m2 6.00 618.00
Moping with Diesel and cleaning area- 206m2 206 m2 5.00 1,030.00
Dispose of oily water approx.- 1 tons 10 Tons 60.00 600.00
Sludge disposal approx.- 500kgs NETT 1 Tons 450.00 450.00

A00184 Addl 28/03/2015SB BREAST WINCH OVERHAUL 1 EA 7,500.00 7,500.00


Cropped out damaged strips and renewed. Built up worn out
-
areas of 1 nos cable drum & 2nos dog clutch - Allow 20hrs
Built up pinion shaft - Allow 20Hrs -
Provide 2 steel ring plates, size 240mm OD x 190mm ID x
-
30mm thk

A00185 Addl 28/03/2015CABLE LAYING ASSISTANCE


Electrical assistance :
28 March 2015 - 2hrs Nett 2 Mhrs 15.00 30.00
29 March 2015 - 19hrs Nett 19 Mhrs 15.00 285.00
30 March 2015 - 19hrs Nett 19 Mhrs 15.00 285.00

A00186 Addl 28/03/2015AUTOMATIC UNLOADING SYSTEM CALIBRATION Nett 3 Nos 350.00 1,050.00

A00187 Addl 28/03/2015E/R STAGING

A00188 Addl 28/03/2015HATCH COVERS CHANNEL REPAIRS


Removed existing hatch cover/dome rigged to the workshop for
repair and returned back to onboard and installed back x 13 13 Nos 1,800.00 23,400.00
Nos
Renewed channel c/w removed/refitted gaskets

A00189 Addl 28/03/2015P/R BALLAST PIPE RENEWAL

A00190 Addl 29/03/2015SHEAVE FABRICATION

A00191 Addl 29/03/2015CARGO SEPARATOR INSERT

A00192 Addl 31/03/2015SCUPPER PIPE RENEWAL

Staging:
Main Deck, Stbd Side Iwo Provision Store: 1 off tower @2x1x3.5
1 LS 140.00 140.00
meters
Main Deck, Stbd Side Iwo Provision Store: 1 off tower @1.5x1x2
1 LS 120.00 120.00
meters

A00193 Addl 31/03/2015MATERIAL REMOVAL - buDGETARY 1 LS 2,500.00 2,500.00


Provide rigger, transportation trailer, forklift, cranage and
disposal space to dispose Owner material

ESTIMATED COST FOR MACHINING, STAGINGS AND


100,000.00
ITEMS THE DETAILS YET TO BE RECEIVED

Page 33 to 162
ORIGINAL
ADDITIONAL
RATE QUOTED
SEQ NO O.REF. DESCRIPTION QTY UNIT WORKS
(US$) PRICE
(US$)
(US$)

TOTAL FOR OWNER'S REPAIRS ACCOUNT 1,428,630 296,642.00

Amount Not Subject To Discount (Nett Items)

Less: 20% Tender Discount


Additional Lumpsum discount

Add: Amount Not Subject To Discount (Nett Items)

TOTAL NETT AMOUNT (US $)

Page 34 to 162
2-Apr-15

ESTIMATED
TOTAL
(US$)

-
17,550.00
78,975.00
-
-

-
-
1,350.00
6,975.00
1,000.00
158.00
-
-
1,350.00
6,975.00
500.00
225.00
-
-
1,350.00
6,525.00
1,000.00
158.00
-
-
360.00
4,550.00
-
-
-
-
-
-
-
-
-
-
-
145.00
1,170.00
-
-
4,680.00
-
-
-
600.00
-
-
155.00
4,500.00
-
6,533.00

Page 35 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
-
-
140.00
-
-

170.00

630.00
-

85.00

140.00
-
170.00
420.00
-

170.00

630.00
-
170.00
630.00
-
-
140.00
1,350.00
-
-
4,680.00
2,380.00
-
-
-
-
-
-
-

540.00

-
-
1,170.00
-
-

810.00
-
-
-
-
-
-
-
-
-
810.00

Page 36 to 162
ESTIMATED
TOTAL
(US$)

-
-
880.00
-
-
-
3,863.00
6,750.00
9,450.00
712.00
712.00
1,375.00
6,625.00
-
-
172.00
4,626.00
175.00
175.00
-
169.00
169.00
-
-
49,020.00
21,569.00
40,107.00
3,268.00
-
-
3,139.00
9,592.00
-
-
2,354.00
2,354.00
12,938.00
23,601.00
-
-
-
-
4,000.00
8,340.00
-

11,600.00

-
-
660.00
530.00
51.00
51.00
220.00
740.00
-
-

Page 37 to 162
ESTIMATED
TOTAL
(US$)

3,795.00
7,079.00
622.00
622.00
1,265.00
4,140.00
-
-
8,030.00
-
850.00
-
-
-

4,380.00

276.00

-
6,550.00
-
-
-
2,304.00
624.00
-
3,600.00
975.00
-
-

3,050.00

-
960.00
-
-
-
-

-
-
-

2,850.00

1,200.00
-
-

700.00

1,500.00

270.00

-
-
-
740.00
-

Page 38 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
-
-
-

1,920.00

720.00

128.00

-
-
-
-
700.00
-
525.00
-

320.00

-
-
-

560.00

500.00

-
-
730.00
1,418.00
65.00
180.00
271.00
100.00
200.00
100.00
100.00
200.00
110.00
60.00
730.00
200.00
65.00
470.00
1,300.00
100.00
370.00
1,757.00
340.00
1,757.00
280.00
100.00
65.00
210.00
-
-
-

Page 39 to 162
ESTIMATED
TOTAL
(US$)

840.00
1,303.00
75.00
913.00
-
81.00
-
1,231.00
1,520.00
1,231.00
-
-
316.00
-
316.00
-
316.00
-
121.00
121.00
121.00
121.00
121.00
-
-

800.00

500.00

-
-

4,675.00

-
600.00
-
-

560.00

440.00

640.00

400.00

280.00

-
-

660.00

144.00
-
-
-
-
-
-
-

1,280.00

Page 40 to 162
ESTIMATED
TOTAL
(US$)

700.00

-
-

2,400.00
-
-
195.00
300.00
135.00
-
-
-
-

1,920.00

1,320.00

1,440.00
-
-
600.00
-
-

-
-
1,785.00
-
-
450.00
20.00
128.00
326.00
-
-
-
-

-
-
-

-
-
-
3,680.00
-
-
-
250.00
-
-
-

160.00

-
-
-
-
1,340.00

Page 41 to 162
ESTIMATED
TOTAL
(US$)

-
-
2,600.00
-
-
-
-
-
-
-
-
-
1,200.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-

7,500.00
-
-
-
-
-
1,200.00
1,200.00
900.00
-
-

14,400.00

-
2,850.00
-
-
-
-
-
-
13,500.00
-
-

Page 42 to 162
ESTIMATED
TOTAL
(US$)

7,350.00

225.00

-
-
-
-
-
-
-
-
-
-

-
-
-
-
-

2,850.00

2,250.00

2,100.00

-
-
1,800.00

110.00

-
400.00
1,050.00
-
-
440.00
-
-
-
-
-
-
-
-
-
-
-
1,175.00
-
-
-
-
-
1,330.00
-
-
12,950.00

800.00
-
-
-

Page 43 to 162
ESTIMATED
TOTAL
(US$)

-
7,200.00
-
-
1,800.00
80.00

276.00
236.00
-
-

-
820.00
-
-
-
6,400.00
-
-
-
-
-
-
-
-
-

-
-
5,200.00
-
-
-
2,200.00
-
-
-

672.00
208.00
208.00
832.00
832.00
208.00
208.00
208.00
208.00
432.00
336.00
336.00
336.00
832.00
336.00
336.00
336.00
336.00
208.00
208.00
-
-

Page 44 to 162
ESTIMATED
TOTAL
(US$)

2,100.00

675.00

-
-
1,100.00
-
-

1,400.00
-
-
525.00
375.00
1,125.00
-
-
3,000.00
-
-
-
-

520.00
168.00
336.00
104.00
-
-
675.00
-
-
9,750.00

-
-
-

3,300.00

-
-

1,400.00

700.00

-
-
-
1,530.00
-
-
720.00
-
-
8,400.00
-
3,600.00

Page 45 to 162
ESTIMATED
TOTAL
(US$)

-
4,140.00
-
-
-
450.00
225.00
220.00
50.00
-
-
900.00
225.00
220.00
50.00
-
-
875.00
-
100.00
20.00
15.00
-
-

3,312.00

828.00
-
1,800.00
-
-
6,900.00

-
-
267.00
-
-
-
-
-
1,350.00
-
-
1,850.00
-
-
300.00
-
-
1,200.00

150.00
300.00
150.00
1,500.00

Page 46 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4,300.00
-
-
-
-
750.00
-
-
-
-
-
-
3,850.00
-

-
-
-
-
1,050.00
2,040.00
1,200.00
780.00
360.00

Page 47 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
-
-
2,200.00
1,575.00
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

3,600.00
-
-
-
-
-

900.00

-
-
479.00

418.00
63.00
590.00
295.00
-
-
480.00
-
-
-
-
-
-
-
-

Page 48 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
-
-
-
600.00
-
-

3,160.00

-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
1,200.00
1,800.00
2,200.00
-
-
-
-
-
-
3,366.00

-
-
-
2,142.00
-
-
-
-
-
-

-
-
-

Page 49 to 162
ESTIMATED
TOTAL
(US$)

-
-
-

-
-
10,500.00
-
-
-

-
-
864.00
154.00
77.00
-
-
864.00
-
-
547.00
77.00
-
-
695.00
308.00
-
-
810.00
77.00
-
-
236.00
-
900.00
900.00
-
-
144.00
226.00
158.00
1,500.00

1,200.00

-
-

Page 50 to 162
ESTIMATED
TOTAL
(US$)

-
551.00
92.00
102.00
-
-
470.00
92.00
-
-
486.00
-
-
486.00
-
-
512.00
92.00
-
-
742.00
184.00
-
-
324.00
-
-
578.00
184.00
-
-
446.00
92.00
-
-
429.00
92.00
-
-
486.00
92.00
102.00
-
1,620.00

1,200.00

508.00

486.00
750.00
-
-

100.00

135.00

350.00
270.00

840.00

Page 51 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
-
-
-
-
-
-
1,020.00
-
-
-
-
-
-
-
-

2,300.00

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

332.00
1,480.00
332.00
332.00
332.00
332.00
1,480.00
332.00
663.00
663.00
663.00
332.00
332.00
332.00
1,480.00
518.00
4,440.00
740.00
682.00
Page 52 to 162
ESTIMATED
TOTAL
(US$)

2,728.00
259.00
332.00
332.00
332.00
1,480.00
341.00
332.00
663.00
518.00
2,046.00
3,803.00
1,480.00
-
-
1,480.00
1,364.00
259.00
-
-
4,400.00
-

520.00

3,375.00
-

4,429.00
-
4,920.00
-
-

1,215.00

405.00

400.00

1,000.00

400.00

1,100.00

540.00
-
-
528.00
-
-
-
-
-
360.00
-
-

-
-

675.00

270.00

Page 53 to 162
ESTIMATED
TOTAL
(US$)

675.00

300.00

240.00

375.00

540.00

405.00

300.00

675.00

450.00

810.00

420.00

810.00

540.00

-
-

192.00

1,536.00

96.00

240.00
240.00

640.00

192.00

192.00

192.00

192.00

192.00

192.00

480.00

160.00
100.00

96.00

384.00

Page 54 to 162
ESTIMATED
TOTAL
(US$)

160.00

480.00

672.00

960.00

480.00

192.00

200.00

-
-

4,284.00

-
-
-
-
-
-
179.00
-
-
-
1,500.00
-
-

1,600.00

1,120.00

480.00

120.00
-
-
-
332.00
332.00
223.00
1,156.00
1,734.00
3,468.00
-
-
497.00
1,156.00
223.00
470.00
319.00
223.00
223.00
306.00
214.00
464.00
1,156.00
1,665.00
1,156.00
1,665.00
1,665.00
1,156.00

Page 55 to 162
ESTIMATED
TOTAL
(US$)

1,665.00
1,156.00
1,734.00
214.00
214.00
332.00
828.00
332.00
332.00
1,173.00
350.00
332.00
-
1,734.00
-
1,863.00
1,204.00
1,156.00
1,156.00
-
1,156.00
1,156.00
1,156.00
-
1,734.00
1,156.00
1,593.00
1,062.00
1,863.00
696.00
2,553.00
223.00
3,104.00
1,198.00
214.00
306.00
1,204.00
1,204.00
-
319.00
307.00
388.00
259.00
669.00
669.00
464.00
1,806.00
1,204.00
928.00
3,367.00
232.00
1,956.00
747.00
995.00
249.00
13,986.00
2,720.00
4,200.00
1,776.00
1,204.00
1,110.00
1,806.00

Page 56 to 162
ESTIMATED
TOTAL
(US$)

498.00
306.00
518.00
-
928.00
696.00
956.00
1,067.00
464.00
498.00
1,856.00
-
747.00
239.00
1,036.00
498.00
249.00
249.00
1,863.00
932.00
-
1,863.00
498.00
995.00
1,156.00
1,748.00
1,156.00
1,156.00
300.00
1,156.00
1,665.00
1,156.00
1,734.00
223.00
223.00
239.00
747.00
249.00
1,991.00
607.00
326.00
249.00
-
498.00
1,156.00
1,734.00
1,734.00
1,156.00
464.00
711.00
356.00
747.00
2,737.00
518.00
3,626.00
928.00
340.00
362.00
356.00
396.00
214.00
1,624.00

Page 57 to 162
ESTIMATED
TOTAL
(US$)

1,856.00
928.00
-
202.00
421.00
211.00
1,141.00
843.00
1,686.00
843.00
-
995.00
259.00
224.00
239.00
1,356.00
1,304.00
1,304.00
1,250.00
249.00
249.00
498.00
249.00
-
1,956.00
249.00
6,020.00
747.00
1,036.00
2,088.00
259.00
1,160.00
249.00
1,356.00
1,304.00
1,198.00
239.00
1,356.00
1,250.00
498.00
-
3,287.00
1,009.00
1,773.00
-
2,520.00
-
-
12,600.00
-
-
342.00
223.00
223.00
-
815.00
249.00
-
202.00
-
475.00
-

Page 58 to 162
ESTIMATED
TOTAL
(US$)

332.00
-
202.00
-
223.00
2,553.00
223.00
1,204.00
194.00
-
223.00
928.00
-
232.00
995.00
1,125.00
2,088.00
-
223.00
-
2,446.00
-
223.00
-
4,950.00
-
903.00
1,806.00
-
319.00
-
-

15,267.00
900.00
-
1,080.00

-
-
1,200.00
450.00
-
-
450.00
750.00
750.00
750.00
900.00
750.00
600.00
750.00
750.00
-
-
-
-

1,050.00

500.00

Page 59 to 162
ESTIMATED
TOTAL
(US$)

1,000.00

700.00

500.00

350.00

700.00

300.00

350.00

700.00

400.00

950.00
300.00

400.00

500.00
350.00
1,000.00

1,500.00

750.00

3,850.00

500.00

1,750.00

350.00

300.00

400.00

950.00

600.00

400.00

350.00

150.00

350.00

150.00

350.00

700.00

600.00

400.00

400.00

400.00

300.00
150.00

600.00

400.00

750.00

Page 60 to 162
ESTIMATED
TOTAL
(US$)

400.00

400.00

350.00

350.00

800.00

500.00

400.00

400.00

400.00

350.00

350.00

350.00

600.00

400.00

500.00

400.00

400.00

500.00

500.00

350.00

200.00
200.00

350.00

700.00

1,350.00

700.00

200.00

900.00

600.00

600.00

350.00

700.00

500.00

300.00
150.00
150.00

700.00

150.00
300.00
1,050.00

700.00

Page 61 to 162
ESTIMATED
TOTAL
(US$)

1,080.00

350.00

350.00

350.00

800.00

150.00

300.00

80.00
300.00
150.00

1,350.00

400.00

350.00

450.00

350.00

350.00

650.00

400.00

850.00

400.00

850.00

150.00

350.00

350.00

400.00

350.00

450.00

350.00

550.00

350.00

48.00
150.00

350.00

400.00

350.00

250.00

550.00

350.00

350.00

350.00

Page 62 to 162
ESTIMATED
TOTAL
(US$)

850.00

350.00

350.00

1,200.00

350.00

150.00

600.00

350.00

350.00

150.00

600.00
120.00

350.00

350.00

350.00

400.00

350.00

350.00

350.00

1,250.00

500.00

350.00

300.00

1,400.00

500.00

400.00

150.00
200.00

416.00

1,250.00

350.00

350.00

-
-
-

845.00

1,320.00

-
-
203.00
506.00

Page 63 to 162
ESTIMATED
TOTAL
(US$)

122.00
162.00
-

240.00

-
-

140.00

800.00

-
-

800.00

200.00

700.00

700.00

-
-
-
-
37,500.00
-
-
2,000.00
-

1,512.00

-
-

550.00

120.00
480.00
120.00
240.00
360.00
480.00

240.00

240.00

240.00

-
-
-
500.00
180.00
720.00

11,592.00

780.00
650.00
-
286.00
-
-
-
-

Page 64 to 162
ESTIMATED
TOTAL
(US$)

-
-
-
13,590.00
27,181.00
16,242.00
32,485.00
17,568.00
35,136.00
16,806.00
33,612.00
-
21,140.00
21,140.00
-
-
2,700.00

350.00

700.00

700.00

1,400.00

1,400.00

160.00

500.00

700.00

500.00

120.00

500.00

120.00
-
-
35,100.00
-
-
-
408.00
-

1,800.00

1,428.00

-
-
-
-
-
-
-

Page 65 to 162
ESTIMATED
TOTAL
(US$)

1,530.00
-
-
375.00
-
-
-
907.00
544.00
-
-
2,500.00
-
-

-
-
-
300.00
-

-
-
-
-
-
-
-
1,500.00
-

20,160.00

1,200.00
-
3,000.00
-
-
450.00
450.00
450.00
450.00
-
-
2,295.00
3,240.00
3,240.00
-
15,000.00
-
-

-
-
-
-
816.00
136.00
-

Page 66 to 162
ESTIMATED
TOTAL
(US$)

-
357.00
-
-
-
-
-
-
-
-
-
-
250.00
30.00
618.00
1,030.00
600.00
450.00
-
7,500.00

-
-
-
-
-
-
-
30.00
285.00
285.00
-
1,050.00
-
-
-
-

23,400.00

-
-
-
-
-
-
-
-
-
-
-

140.00

120.00

-
2,500.00

100,000.00

Page 67 to 162
ESTIMATED
TOTAL
(US$)

1,725,272

121,827

1,603,445

320,689

50,000

1,232,756

121,827

1,354,583

Page 68 to 162
Project No.S7948 Vessel Name: "Overseas Raphael" (Tender # S021822)
Arrived On :- 17/03/2015, Docked on:- 17/03/2015, Undock on:- 26/03/2015, Sailing:- 12/04/2015,
BUDGET 3 (REV 1)
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

E00001 3.3 DRYDOCK DUES :


- Drydock for first (1st) day 1 LS 17,550.00 17,550.00
- Subsequent docking days 9 days 8,775.00 78,975.00

E00003 3.1 TUGS AND PILOTS


Provided tugs, pilot, launches and rigger assistance for shifting
of vessel.

1) From Sea to Dock No 3 on 17th March 2015


- Pilotage 1 Time 1,350.00 1,350.00
- Tug assistance 15.5 hrs 450.00 6,975.00
- Rigger assistance 20 Nos 50.00 1,000.00
- Launches 3.5 hrs 45.00 158.00

2) From Dock No 3 to Berth No. 2 on 26th March 2015


- Pilotage 1 Time 1,350.00 1,350.00
- Tug assistance 15.5 hrs 450.00 6,975.00
- Rigger assistance 10 Nos 50.00 500.00
- Launches 5 hrs 45.00 225.00

3) From Berth No.6 to sea on 29 Feb 2013 (Est)


- Pilotage 1 Time 1,350.00 1,350.00
- Tug assistance 14.5 hrs 450.00 6,525.00
- Rigger assistance 20 Nos 50.00 1,000.00
- Launches 3.5 hrs 45.00 158.00

E00007 2.17 GAS-FREE CERTIFICATE -


First gas free certificate 1 EA 360.00 360.00
Following certificates, allow 1 times per day 26 EA 175.00 4,550.00
Motor boat service to transport Chemist hrs 180.00 -

E00008 37.02 VENTILATION


Hire of ventilators, Allow 1days x 19 fans 0 hrs 4.00 -
Connect/disconnect, Allow 19 fans 0 Nos 90.00 -

E00008 37.04 LIGHTING


Hire of heating lamps, Allow 1days x 18 fans 0 days 3.00 -
Connect/disconnect x 18 sets 0 set 90.00 -

E00009 2.6 FIRE LINE


Connected & disconnected - 1 lines x 1 times 1 line 145.00 145.00
Kept line under pressure during the repair-1line 26 days 45.00 1,170.00

E00009 2.7 FIRE WATCHMAN


Provided fire watchman during repair period - one man 26 days 180.00 4,680.00

E00010 3.5 TEMPORARY GANGWAY


One gangway free of charge during repair period FOC
Additional one no. gangway to provide during period of repairs 1 No 600.00 600.00

E00011 2.4 SHORE POWER / GENERATOR HIRE


Mobilization/remobilization, Allow one engine one time 1 time 155.00 155.00
Hire of portable generator (440V/60HZ/ 600AMPS) 10 days 450.00 4,500.00
10days; from 17/03/15 to 26/03/15
Supplied of Diesel 5444 ltrs 1.20 6,532.80

Page 69 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

17 March 2015 - 3223ltrs


23 March 2015 - 2014ltrs
25 March 2015 - 207ltrs

E00012 2.12 TELEPHONE CONNECTION


Provided telephone connection to the vessel 2 times 70.00 140.00

E00013 2.1 COOLING WATER CONNECTION


ACCOMMODATION - A/C x 2 lines (in and out) -
1 2 lines 85.00 170.00
connection/disconnection
Suppllied : Connected from 18 March 15 - 26 March 15 9 days 70.00 630.00

HYDROLIC COOLING for lower down windlass x 1 Nos -


2 1 lines 85.00 85.00
connection/disconnection
Suppllied : on 18 March 15 and 26 March 15 2 days 70.00 140.00

3 L.T. COOLER x 2 lines (in and out) - connection/disconnection 2 lines 85.00 170.00
Suppllied : Connected from 21 March 15 - 26 March 15 6 days 70.00 420.00

AC ENGINE CONTROL ROOM x 2 lines (in and out) -


4 2 lines 85.00 170.00
connection/disconnection
Suppllied : Connected from 18 March 15 - 26 March 15 9 days 70.00 630.00

5 PROVISION x 2 lines (in and out) - connection/disconnection 2 lines 85.00 170.00


Suppllied : Connected from 18 March 15 - 26 March 15 9 days 70.00 630.00

E00014 2.3 FRESH WATER SUPPLY -


Connect/disconnect, 1 140.00 140.00
Supply from yard's main, approx 500m3 500 ton 2.70 1,350.00

E00015 2.2 BALLAST WATER SUPPLY


Connection and disconnection charges - 4 tanks 4 time 1,170.00 4,680.00
Supply from Yard's main , 17000ton 17000 ton 0.14 2,380.00
Remove/refit air vent head

E00016 2.14 COMPRESSED AIR SUPPLY - NA


Connection and disconnection charges - 0 times 95.00 -
Supply from yard's main Hrs 10.00

E00019 2.11 SEWAGE DISCHARGE CONNECTION


Connection and disconnection of sewage discharge line during 3 180.00 540.00
in drydock

E00020 2.9 GARBAGE REMOVAL.


Galley refuses during the repair period. 26 45.00 1,170.00

E00021 2.13 SHORE CRANE SERVICE


Crane services provided for lifting vessel's stores, provisions
and Owner's spare parts
Crane usage 18.00 hrs 45.00 810.00
19 March 2015 - 3hrs
20 March 2015 - 2hrs
21 March 2015 - 2hrs
22 March 2015 - 3hrs
23 March 2015 - 2hrs
25 March 2015 - 2hrs
26 March 2015 - 2hrs
28 March 2015 - 2hrs

Yard's riggers, per normal manhour (3 men per hr) Nett 54 Mhrs 15.00 810.00

Page 70 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

E00024 SEA TRIALS ASSISTANCE.


Sea trial allow - Allow 44mhrs (If required) NETT 44 Mhrs 20.00 880.00

E00035 4 HULL BLASTING AND PAINT


4.2.1 Flat Bottom
Hand scraping 3750 m2 1.03 3,863.00
HP washing up to 300bar pressure 12500 m2 0.54 6,750.00
Spot blasting to SA2.0 1125 m2 8.40 9,450.00
1st T/U coat 1294 m2 0.55 712.00
2nd T/U coat 1294 m2 0.55 712.00
Hosing down with fresh water 12500 m2 0.11 1,375.00
Apply 1 F/C A/F SPC 12500 m2 0.53 6,625.00

Rudder blade - 319m2 -


HP washing up to 300bar pressure 319 m2 0.54 172.00
Spot hydroblasting WJ2, per m 319 m2 14.50 4,626.00
1st T/U coat 319 m2 0.55 175.00
2nd T/U coat 319 m2 0.55 175.00
Hosing down with fresh water 0 m2 0.11 -
1st F/C A/F SPC 319 m2 0.53 169.00
2nd F/C A/F SPC 319 m2 0.53 169.00

4.2.2 Vertical Area


Wash down oil stain with Yards chemical 16340 m2 3.00 49,020.00
HP washing up to 300bar pressure x 2 times 32680 m2 0.66 21,569.00
Spot hydroblasting WJ2, per m 2766 m2 14.50 40,107.00
Hosing down with fresh water 16340 m2 0.20 3,268.00

From 22.6m to 14m:


1st coat international red, 100 4360 m2 0.72 3,139.00
2nd coat intersleek 970, 150 4360 m2 2.20 9,592.00

From 22.6m to bilge keel (spot)


1st T/U coat Intershield 300, 125, 3181 m2 0.74 2,354.00
2nd T/U coat Intershield 300, 125, 3181 m2 0.74 2,354.00
1 T/U coat Intersleek 731, 100, 5881 m2 2.20 12,938.00
1 F/C coat Intersleek 970, 150, 11980 m2 1.97 23,601.00

Painting Preparation (refer to tender S021822/001)


Cleaning of dock bottom - NA LS 15,000.00 -
Removal of grit from dock & hosing down NA m2 0.90 -
Propeller protection during application 1 LS 4,000.00 4,000.00
Paint mixing station for silicon based paint / station 6 EA 1,390.00 8,340.00

Temporary covering of Yokohama Fenders using heavy duty


plastic and providing a manifold with hoses to spray water in 4 EA 2,900.00 11,600.00
order to avoid contact damages of silicon based painting on
hull, during vessel at alongside of berth.

Addl Fender areas :


HP washing up to 300bar pressure 1000 m2 0.66 660.00
Grit blast to SA 2.0 spot 50 m2 10.60 530.00
1st T/U coat intershield 300 ALu, 150, 58 m2 0.88 51.00
2nd T/U coat Intergard 263, 100, 58 m2 0.88 51.00
Hosing down with fresh water 1000 m2 0.22 220.00
1 F/C coat Intersmooth SPC, 145, 1000 m2 0.74 740.00

4.2.3 Top side

Page 71 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

HP washing up to 300bar pressure 5750 m2 0.66 3,795.00


Grit blast to SA2.0 621 m2 11.40 7,079.00
Apply 1st T/U coat 150mic 662 m2 0.94 622.00
Apply 2nd T/U coat 75mic 662 m2 0.94 622.00
Hosing down with fresh water 5750 m2 0.22 1,265.00
Apply 1 F/C 150mic, 5750 m2 0.72 4,140.00

Additional:
Cutting line x 2 Coats x 1606Meter run 1606 mtrs run 5.00 8,030.00

Provided protection covering of following items :- 1 Ls 850.00 850.00


- Speed Log, Echo Sounder
- Anodes, ICCP

Provided protection covering of plywood on handrails (2.4m x 292 LS 15.00 4,380.00


1.2m)

12 pcs 23.00 276.00


Fit/remove wooden plugs with stand off pipes, 12 Nos

E00036 4.2.7 HULL MARKING 1 Ls 6,550.00 6,550.00


Repainted with Owners supply paint

E00037 37.13 HULL ANODES


Renew welded type zinc anodes, 18kgs x 40nos 720 Kgs 3.20 2,304.00
Renew welded type zinc anodes, 13kgs x 15nos 195 Kgs 3.20 624.00

Supply of anodes @18kgs each NETT 40 Pcs 90.00 3,600.00


Supply of anodes @13kgs each NETT 15 Pcs 65.00 975.00

E00038 11.1 ANCHOR CHAINS


Lower and range anchors and chains on dock bottom for
examination, clean with HP fresh water jet mark shots by white 1 Ls 3,050.00 3,050.00
paint and restow on completion.
Grit sweep anchor chains EA 600.00 -
Calibrate anchor chains. 2 EA 480.00 960.00

Reweld loose link studs EA 30.00 -

Disconnect from bitter ends and change first lengths to end, EA 840.00 -
Renewal of anchor chains with Owner supply, i.c. w anchor
Lgths 650.00 -
chain rangeon dock, per each length

E00039 11.1 CHAIN LOCKER


Chain lockers to clean by hosing down and coat with 1 coat of
Owner's paint up to 2 mtrs high, including scrapping of the 1 LS 2,850.00 2,850.00
bottom
Remove/dispose mud, 12 Tons 100.00 1,200.00

Staging:
Chain Locker , Port & Stbd Side Provide Temp.Platform: 2 off
1 Ls 700.00 700.00
hanging each @1.5x0.75x1.5 meters - total 6 planks
Chain Locker , Port & Stbd Side Provide Access Ladder: 2 off
structure each @0.75x0.75x15 meters 1 Ls 1,500.00 1,500.00

Main Deck, Port & Stbd Side Iwo Windlass: 2 off tower each
@2x1x2 meters 1 Ls 270.00 270.00

E00040 9.02 RUDDER CLEARANCES


Open/ close manholes with new yard supplied Gaskets, 1pc 0 EA 100.00 -
Measure and record rudder clearances 1 LS 740.00 740.00
Remove/refit pintle access plates, 2 nos. 0 EA 420.00 -

Page 72 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

Remove cement from nuts and recement 0 LS 790.00 -


Check tightness of pintle nut 0 LS 580.00 -
Renew gland packing with Owner supply materials 0 LS 740.00 -
Carry out pressure test of rudder 0 LS 285.00 -

Staging:
Dock Bottom, Port Side Rudder Area: 1 off tower @3x3x16
1 LS 1,920.00 1,920.00
meters
Dock Bottom, Port Side (Outrigger): 1 off structure @3x3x6
1 LS 720.00 720.00
meters

Dock Bottom, Top Area: 1 off railing @2x1.2x1.5 meters 1 LS 128.00 128.00

Remove/refit bottom plug and hydrotest rudder. 0 LS 325.00 -

E00041 10.01.01 TAIL SHAFT CLEARANCES


Measure and record werdown clearance before and aft repairs 1 LS 700.00 700.00

Cut and reweld rope guard for access 1 EA 525.00 525.00


Magnaflux test of shaft cone 0 LS 580.00 -
4 nos anodes supplied and installed on rope guards with Yard's
4 EA 80.00 320.00
supplied anodes
Fit and weld net cutter using ship supply 0 LS 400.00 -

Staging:

Dock Bottom, Port Side Fwd Area: 1 off tower @3x2x7 meters 1 LS 560.00 560.00

Dock Bottom, Center Rope Guard Area: 1 off hanging


1 LS 500.00 500.00
@4x0.75x1.5 meters - total 10 planks

E00042 8 SEA VALVES


1. Low sea chest SW suction. B'fly, 600 1 EA 730.00 730.00
Elbow pipe 90 deg. 600 x 500 removed. 1.85 Mtrs 766.49 1,418.00
2. Low sea chest cleaning steam Globe , 40 1 EA 65.00 65.00
3. FWG cooling overboard. B'fly, 125 1 EA 180.00 180.00
Spool . 1 mtr. removed for access 1.75 Mtrs 154.80 271.00
4. Waste water discharge ovbd. Storm 100 1 EA 100.00 100.00
Renewed brass flap shaft, dia, 12 mm x 200 1 EA 200.00 200.00
5. Galley water discharge ovbd. Storm 100 1 EA 100.00 100.00
6. Sewage water discharge ovbd. Storm 100 1 EA 100.00 100.00
Renewed brass flap shaft, dia. 10 mm x 150 1 EA 200.00 200.00
7. Aft draft gauge SW inlet. Gate, 80 1 EA 110.00 110.00
8. Boiler blowdown ovbd.. Globe, 50 1 EA 60.00 60.00
9. High sea chest SW suction. B'fly, 600 1 EA 730.00 730.00
Opened strainer cover and removed element 1 EA 200.00 200.00
10. High sea chest cleaning steam Globe , 40 1 EA 65.00 65.00
11. COPT cooling SW disch. ovbd. B'fly, 450 1 EA 470.00 470.00
Elbow pipe 90 deg. 500 x 700, access 1.85 Mtrs 702.62 1,300.00
12. Waste water discharge ovbd. Storm 100 1 EA 100.00 100.00
13. Central cooling sw overboard B'fly, 350 1 EA 370.00 370.00
. Elbow pipe 90 deg. 500 x 2 mtr, access 2.50 Mtrs 702.62 1,757.00
14. Scruber overboard.. B'fly, 300 1 EA 340.00 340.00
. Elbow pipe 90 deg. 500 x 2 mtr, access 2.50 Mtrs 702.62 1,757.00
15. Bilge, fire & GS pump ovbd. B'fly, 250 1 EA 280.00 280.00
16. Hyd. Oil cooler ovbd.. Globe, 65 1 EA 100.00 100.00
17. OWS discharge ovbd.. Globe, 50 1 EA 65.00 65.00
18. Emerg. Fire pump sea suction Globe , 250 1 EA 210.00 210.00

Sea Chest & Overboard valves in Pump Room:

Page 73 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
1. Cargo seachest suction. B'fly 600 1 EA 840.00 840.00
. Removed spool pipe for access. 1.70 Mtrs 766.49 1,303.00
2. Sea chest blowing. . Globe 40 1 EA 75.00 75.00
3. Ballast seachest suction. B'fly 600 1 EA 913.00 913.00
Located inside the double bottom
4. Sea chest blowing. . Globe 40 1 EA 81.00 81.00
. Located insode the double bottom
5.. Ballast discharge ovbd.. B'fly 700 1 EA 1,231.00 1,231.00
Removed spool pipe for access 1.70 Mtrs 894.24 1,520.00
7.. Ballast discharge ovbd.. Check 700 1 EA 1,231.00 1,231.00

Other overboard valves:


1. Fwd. draft level gauge ( F.P tk ) Gate 80 1 EA 316.00 316.00
. Removed to workshop,ovhl and press, tested
2. Mid. draft level gauge ( 4S WBT ) Gate 80 1 EA 316.00 316.00
. Removed to workshop,ovhl and press, tested
3. Mid. draft level gauge ( 4P WBT ) Gate 80 1 EA 316.00 316.00
. Removed to workshop,ovhl and press, tested
4. Hyd.. Cooler ovbd. ( P ). Globe 65 1 EA 121.00 121.00
5. Hyd.. Cooler ovbd. ( S ). Globe 65 1 EA 121.00 121.00
6. Chain locker eductor ovbd. ( S ) Globe 65 1 EA 121.00 121.00
7. Chain locker eductor ovbd. ( p ) Globe 65 1 EA 121.00 121.00
8. Chain locker eductor ovbd. ( S ) Globe 65 1 EA 121.00 121.00

Staging:
Engine Room, Port Side Bottom Area: 2 off hanging each
1 LS 800.00 800.00
@2x1.5x1.5 meters - total 16 planks
Pump Room, Bottom Area: 1 off hanging @2x2x1.5 meters -
1 LS 500.00 500.00
total 10 planks

E00043 8.2 SEA CHEST


Remove/refit grids, cleam and paint as per bottom paint
5 EA 935.00 4,675.00
scheme, 5 sea chests

Supplied cutter pin Split pin AISI 316 SS x 30mm x 2mm x 60 Nos 10.00 600.00
60Nos
Staging:
Dock Bottom, Port & Stbd Side Fwd Area: 2 off tower each
@3x1.6x3.5 meters 1 LS 560.00 560.00

Dock Bottom, Port Side Aft Area: 1 off tower @3x2x5.5 meters
1 LS 440.00 440.00

Dock Bottom, Port Side Aft Area: 1 off tower @3x2x8 meters
1 LS 640.00 640.00

Dock Bottom, Port Side Aft Top Area: 1 off extension


@3x1.2x1.5 meters - total 8 planks 1 LS 400.00 400.00

Dock Bottom, Stbd Side Aft Area: 1 off tower @3x2x3.5 meters
1 LS 280.00 280.00

E00044 2.16 BOTTOM PLUGS

Remove/refit including vacuum test and cementing 12 Nos 55.00 660.00

Manufacture lead washers x 12 Nos 12 Nos 12.00 144.00


-
E00045 10.1.04 PROPELLER POLISHING
Propeller normal polishing Ls 3,500.00 -
DPT of blades roots and tips Ls 550.00 -
Dye check blade tips i.c.w above item a)

Staging:
Dock Bottom, Port & Stbd Side : 2 off tower each @3x2x8
1 LS 1,280.00 1,280.00
meters

Page 74 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

Dock Bottom, Port & Stbd Side: 2 off extension each


1 LS 700.00 700.00
@4x0.5x1.5 meters - total 4 planks

IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM


E00053 4.03 -
(ICCP)
Scrapped, HP wash, spot 2.0 and apply filler and paint as per
3 Loc 800.00 2,400.00
vertical side

Electrical Assistance:
25 March 2015 - 13mhrs Nett 13 Mhrs 15.00 195.00
25 March 2015 (night)- 20mhrs Nett 20 Mhrs 15.00 300.00
27 March 2015 - 9mhrs Nett 9 Mhrs 15.00 135.00

Open/ close manholes with new yard supplied Gaskets, 4pcs EA 100.00 -

Staging:
Dock Bottom, Port & Stbd Side Fwd Area: 2 off tower each
1 LS 1,920.00 1,920.00
@3x3x8 meters
Dock Bottom, Port & Stbd Side Fwd Area: 2 off tower each
1 LS 1,320.00 1,320.00
@3x3x5.5 meters
Dock Bottom, Stbd Side Aft Area: 1 off tower @6x3x6 meters 1 LS 1,440.00 1,440.00

E00054 9.01 STEERING GEAR CLEARANCES


Yard assistance per normal man hour (Nett) Nett 30 Mhrs 20.00 600.00

E00055 9.01 STEERING GEAR PUMPS OVERHAUL 2 NOS - CANCELLED


Overhaul steering gear pump by locally available specialized
Nett 0 LS 7,800.00 -
workshop with Owner supply spares, 1pct (Nett)

E00056 9.01 STEERING GEAR PUMP MOTORS OVERHAUL 2 NOS


Overhaul electric motor 160kw 1 EA 1,785.00 1,785.00

Additional:
1. Resleeved NDE end cover bearing housing. 1 EA 450.00 450.00
2. Renewed 2 nos. V-rings V90 & V75, Yard supply Nett 2 EA 10.00 20.00
3. Supplied of Bearing - 6318 C3 SNR - 1 nos. Nett 1 EA 128.00 128.00
4. Supplied of Bearing - 7315 BG NSK Japan- 1 nos. Nett 1 EA 326.00 326.00

E00057 9.02 RUDDER AND RUDDER PINTLE (REF E00040 ABOVE) 0

TAIL AND INTERMEDIATE SHAFTS ALIGNMENT - USING


E00058 10.01 LS 1,150.00 -
LASER - CANCELLED

E00059 10.01.01 TAILSHAFT WITHDRAWAL LS 17,000.00 -

TAILSHAFT JACK UP TEST TO BE CONDUCTED ON THE


E00060 10.01 SHAFTING PRIOR TO THE VESSEL ENTERING THE
DRYDOCK
Jack up test, 1 test 0 TIME 1,100.00 -

E00061 10.01.02 SEAL RENEWAL


Overhaul seals with Owner supply spares 1 LS 3,680.00 3,680.00
Skim chrome liners 0 LS 420.00 -

Access Works:
Removed ( 1 ) platform access iwo fwd. seals 1 EA 250.00 250.00

Staging:
Engine Room, Bottom Area Iwo Tailshaft: 1 off platform
1 LS 160.00 160.00
@2x2x1.5 meters

E00062 10.01.04 PROPELLER BLADE REPAIRS - CANCELLED

E00063 11.01 PORT AND STBD BILGE EJECTORS CLEANING


Port & stbd bilge ejectors/valves 2 EA 670.00 1,340.00

Page 75 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

E00064 12.01 CARGO CRANE LOAD TEST


Load test with dynamometer, 1 test 1 LS 2,600.00 2,600.00

E00065 12.01 CARGO CRANE OVERHAUL


Overhaul cargo hook with Owner supply spares 0 LS 1,250.00 -
Overhaul hoist block with Owner supply spares EA 600.00 -
Remove/refit bolts of slew ring EA 50.00
Check tightness of bolts EA 30.00
Remove refit wire ropes, EA 1,200.00

E00066 12.02 PROVISION CRANE LOAD TEST


Load test with dynamometer, 1 test 1 LS 1,200.00 1,200.00

E00067 12.02 PROVISION CRANE OVERHAUL


Overhaul hoist block with Owner supply spares EA 400.00 -
Overhaul cargo hook with Owner supply spares, 1No. EA 950.00 -
Remove/refit bolts of slew ring, per bolt EA 50.00
Check tightness of bolts, per bolt EA 30.00
Remove refit wire ropes, each EA 900.00

E00068 12.03 WINDLASS BRAKE LININGS - CANCELLED LS 4,800.00 -

E00069 12.03 PAINT BRAKE BANDS


Power tool brake drums. 2Nos 0 LS 360.00 -
Clean brake bands and apply Owner supply paint, 2sets 0 LS 420.00 -

E00070 12.04 ANCHOR WINDLASS / MOORING WINCH


A. Inboard shaft
Remove to workshop, overhaul assemble with Owner supply
0 EA 8,500.00 -
spares and reinstall, per shaft assembly
Renew mooring winch break lining with Owner supply materials,
0 EA 2,000.00 -
per drum
Power tool brake drums. Each EA 180.00

B. Outboard shaft
Remove to workshop, overhaul assemble with Owner supply
1 7,500.00 7,500.00
spares and reinstall, per shaft assembly

C. Final testing
Renew break lining with owner supply materials, per each drum 2,000.00
Gritblast brake bands and apply O/S paints, each 240.00

Built up worn out areas of 1 nos dog clutch - Allow 20hrs 20 hrs 60.00 1,200.00
Built up pinion shaft - Allow 20Hrs 20 hrs 60.00 1,200.00
Provide 2 steel ring plates, size 240mm OD x 190mm ID x
2 Nos 450.00 900.00
30mm thk

MACHINING PROCESS:
Normalized bore on ( 1 ) wire rope drum, machine / build /
machined ( 1 ) existg. shaft, build up / machined on ( 1 ) existg.
192 hrs 75.00 14,400.00
dog clutch, mfrd. ( 1 + 1 ) stl. Spacer and ( 5 ) brz. Sleeves,
proc. N0. 152298. ( 192 hrs. )

Mfrd. ( 1 ) brz. split pedestal bearing, proc. No. 152399. ( 38 hrs.


38 hrs 75.00 2,850.00
)

E00071 12.04 FWD WINCH BRAKE TEST


Break holding test, per test time 450.00 -

E00072 14.01 PV VALVES OVERHAUL


Overhaul PV valves, 18 EA 750.00 13,500.00

MACHINING PROCESS:

Page 76 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Skimmed - off seat in ( 15 + 14 ) valve bodies and ( 14 + 14 )
98 hrs 75.00 7,350.00
existg. valve discs, proc. N0. 152300. ( 98 hrs. )
Drill - out broken bolt & retapped holes on ( 1 ) existg. vac.
3 hrs 75.00 225.00
Valve body, proc. no. 152331. ( 3 hrs. )

E00073 14.02 CARGO TANK BELL MOUTHS RENEWAL


Remove/refit bell mouths in tanks for inspection:
dia 500 mm, 12pcs 0 LS 10,920.00 -
dia 450 mm, 2pcs 0 LS 1,490.00 -
dia 400 mm, 16pcs 0 LS 10,560.00 -
dia 300 mm, 1pc 0 LS 580.00 -
dia 250 mm, 18pcs 0 LS 8,100.00 -

Repair pits with Owner supply epoxy filler 100mm dia x 4mm
EA 30.00
deep, each
Repair pits by welding 100mm dia x 4mm deep, each EA 50.00

E00074 14.02 CARGO TANK WELL REPAIR 0 LS - -

E00075 19.02 MAIN ENGINE PISTON OVERHAUL (No 6 & 7)


Open up cylinder cover, withdraw piston, cleaning, check ,
A 2 EA 1,425.00 2,850.00
measure and renew Owner supply rings and reinstall
Transport cylinder heads to workshop and overhaul, pressure
2 EA 1,125.00 2,250.00
test,
Transport pistons to workshop and Overhaul & pressure test
2 EA 1,050.00 2,100.00
i.c.w ABOVE ITEM

ADDITIONAL JOBS:
( 2 ) spare piston crowns lifted from ship and transported to yard
2 EA 900.00 1,800.00
workshop, cleaned and ring grooves measured.
( 1 ) spare exhaust valve assembly lifted from ship and
1 EA 110.00 110.00
transported to yard workshop and cleaned.

B Clean and calibrate cyl liners, (No 6 & 7) 2 EA 200.00 400.00


Piston rod stuffing box overhaul, per unit 2 EA 525.00 1,050.00
Withdraw cyl liners and install, per unit EA 1,200.00 -
-
C Overhaul starting air valves, (No 6 & 7) 2 EA 220.00 440.00

E00076 19.03-19.06 M/E BEARINGS


19.03 MAIN ENGINE CROSSHEAD BEARING
Open/close for survey, 4 units 0 EA 600.00 -
Dress up scratches on pins: Price after inspection.

19.04 M/E CRANK PIN AND BEARINGS


Open/close crank pin bearing for survey, 3units 0 EA 475.00 -
Dress up scratches on pins: Price after inspection.

19.05 M/E MAIN BEARINGS


Open/close main bearing for survey 2 EA 587.50 1,175.00

19.06 M/E THRUST BEARING


Open/close and remove/refit, one each fwd and aft pads for
0 EA 1,250.00 -
inspection

E00077 19.01 MAIN ENGINE DEFLECTIONS


Measure and record twice 1 LS 1,330.00 1,330.00

E00078 19.07 M/E HIGH PRESSURE FUEL PUMPS


Allow to overhaul by yard personnel using O/S spares 7 EA 1,850.00 12,950.00
Addt'l. ( 4 ) HP pipes and polishing of shock absorbers pistons
4 EA 200.00 800.00
iwo scratches and access

E00079 19.08 M.E TURBOCHARGER - CANCELLED LS 18,000.00 -

Page 77 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
E00080 19.09 MAIN ENGINE AUX BLOWERS
Overhaul with Owners supply spares, 2Nos 2 EA 3,600.00 7,200.00

Additional for both blowers:


Resleeved both end covers bearing housing. 4 EA 450.00 1,800.00
Renewed flange gasket,V-rings V65- 4 nos. & oil seals 80 x 100
Nett 8 EA 10.00 80.00
x 10- 4 nos., Yard supply
Manufacture and Supplied gas lock bush x 2nos Nett 2 EA 138.00 276.00
Yard Supplied- 6313 ZC3 SNR 4 nos. Nett 4 EA 59.00 236.00

E00081 19.11 MAIN ENGINE SCAVANGE SPACE CLEANING


Open under piston space doors, clean scavenge spaces and
0 LS 1,980.00 -
reclose doors

E00082 19.12 INTERMEDIATE SHAFT BEARING SURVEY 1 LS 820.00 820.00


Open/close intermediate shaft bearing for inspection, 1pc

E00083 19.13 MAIN ENGINE STAY BOLTS AND HOLDING DOWN BOLTS
Check tightness with ships tools, each 80 EA 80.00 6,400.00
Holding down bolts = 64 pcs.
Stay bolts = 16 pcs.

E00084 19.14 M/E CAMSHAFT DRIVE INSPECTION - CANCELLED LS 1,520.00 -

E00085 23.01 M/E AXIAL VIBRATION UNIT ( REPEAT OF SEQ. # E00088 )

DIESEL GENERATOR TURBOCHARGER OVERHAUL -


E00086 21.01 LS - -
CANCELLED

E00087 23.02 AUX BOILER INSPECTION


Open, clean, fresh water wash and close boilers, 1No 1 LS 5,200.00 5,200.00
Pressure testing of boiler, per time EA 1,260.00

E00088 23.01 AUX BOILER SAFETY VALVE OVERHAUL - -


Overhaul and test 4 EA 550.00 2,200.00

E00089 23.02 OVERHAUL BOILER MOUNTINGS IN SITU


Boiler mounting valves overhaul in place and refitted back with
new ship supply gaskets.
Main stop steam valve Angle check 250 dia 2 EA 336.00 672.00
Steam line warning valve Globe 15 dia 2 EA 104.00 208.00
Boiler air vent valve Globe 25 dia 2 EA 104.00 208.00
Steam pressure tranmitter valve Globe 10 dia 8 EA 104.00 832.00
Level transmitter valve Globe 15 dia 8 EA 104.00 832.00
Surface blow down check valve Globe 25 dia 2 EA 104.00 208.00
Surface blow down valve Globe 25 dia 2 EA 104.00 208.00
Blow down check valve Globe 50 dia 2 EA 104.00 208.00
Bottom blow down valve Globe 50 dia 2 EA 104.00 208.00
Boilet Aux. Feed water stop valve Globe 100 dia 2 EA 216.00 432.00
Boilet Aux. Feed water check valve Globe 100 dia 2 EA 168.00 336.00
Boiler main feed water stop valve Globe 100 dia 2 EA 168.00 336.00
Boiler main feed water check valve Globe 100 dia 2 EA 168.00 336.00
Level gauge stop valve Globe 15 dia 8 EA 104.00 832.00
Boiler water circulation valve Globe 100 dia 2 EA 168.00 336.00
Boiler water circulation return valve Globe 100 dia 2 EA 168.00 336.00
Circulating pump suction Globe 80 dia 2 EA 168.00 336.00
Sampling outlet Globe 80 dia 2 EA 168.00 336.00
Dosing stop valve Globe 15 dia 2 EA 104.00 208.00
Dosing check valve Globe 15 dia 2 EA 104.00 208.00

Machining Process:

Page 78 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Mfrd. ( 66 ) pcs. Copper washers, proc. N0. 152324. ( 28 hrs. ) 28 Hrs 75.00 2,100.00
Skimmed - off ( 1 ) valve body and ( 5 ) valve discs, proc. No.
9 Hrs 75.00 675.00
152367.( 9 hrs. )

E00090 23.03 EGE SAFETY VALVES 2 NOS


Overhaul and test, 2pcs 2 LS 550.00 1,100.00

E00091 23.04 EGE SOOT BLOWERS OVERHAUL


Remove to workshop, overhaul with Owner supply spares and
2 EA 700.00 1,400.00
reinstall, each

MACHINING PROCESS:
Manufacture steel valve disc as per process number 152357 -
7 hrs 75.00 525.00
7hrs
Mfrd. ( 1 ) stl. fitting, proc. No. 152403. ( 7hrs) 5 hrs 75.00 375.00
Mfrd. ( 2 ) stl. Yoke plates, proc. No. 152420. ( 15 hrs. ) 15 hrs 75.00 1,125.00

E00092 23.05 EGE INSPECTION


Open, clean, fresh water wash and close, 1No. 1 EA 3,000.00 3,000.00
Pressure test, per test EA 575.00

E00093 23.05 EGE MOUNTINGS OVERHAUL


EGE bolier valves overhaul in place and refitted back with new
ship supply gaskets.
EGE boiler Globe 15 dia 5 EA 104.00 520.00
EGE boiler Globe 80 dia 1 EA 168.00 168.00
EGE boiler Globe 65 dia 2 EA 168.00 336.00
EGE boiler Globe 25 dia 1 EA 104.00 104.00

Machining Process:
Mfrd. ( 10 ) pcs. Copper washers, proc. N0. 152325. ( 9 hrs. ) 9 hrs 75.00 675.00

E00094 25.01 ALTERNATOR INSPECTIONS 3 NOS.


Open up end covers, clean alternators windings in place, dry up
3 LS 3,250.00 9,750.00
by heating lamps and box up. Excluding removal of rotor, 3Nos

E00095 25.02 MAIN AND EMERGENCY S.BOARD SERVICE


MAIN SWITCH BOARD
Main switchboard cleaning ; To clean and retighten connections
1 EA 3,300.00 3,300.00
by yard technicians

EMERGENCY SWITCHBOARD
Emergency switchboard cleaning ; To clean and retighten
1 EA 1,400.00 1,400.00
connections by yard technicians

Trouble shooting and testing of alarm Panel x 1No 1 EA 700.00 700.00

E00096 25.02 METERS CALIBRATION 25 NOS.


MAIN SWITCH BOARD
Calibration of meters, 17pcs 17 EA 90.00 1,530.00

EMERGENCY SWITCHBOARD
Calibration of meters, 8pcs 8 EA 90.00 720.00

E00097 25.03 MAIN CIRCUIT BREAKERS 2000A/1250A - 7 NOS.


Overhaul by yard technicians, 7pcs 7 LS 1,200.00 8,400.00
Additional:
Reverse power relay; as follows: 3 EA 1,200.00 3,600.00
Reverse Power Relay - D/G # 1; Omron K2WR-R-R2 4000/5A,
460/115V
Reverse Power Relay - D/G # 2; Omron K2WR-R-R2 4000/5A,
460/115V
Reverse Power Relay - D/G # 3; Omron K2WR-R-R2 4000/5A,
460/115V

Page 79 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
E00098 26.01 E/R SUPPLY FAN MOTORS - 4NOS
Overhaul with Owners supply spares 2 EA 2,070.00 4,140.00

Additional:
Fan NO1:
Resleeved NDE end cover bearing housing. 1 EA 450.00 450.00
Washed and painted the impeller 1 EA 225.00 225.00
Renewed fan guard Frame-200 & 2 nos. V-rings V50, Yard
2 sets 110.00 220.00
supply
Yard Supplied- 6310 ZZC3 SNR- 2 nos. Nett 2 EA 25.00 50.00

Fan No2:
Resleeved both end covers bearing housing. 2 EA 450.00 900.00
Washed and painted the impeller 1 EA 225.00 225.00
Renewed fan guard Frame-200 & 2 nos. V-rings V50, Yard
2 sets 110.00 220.00
supply
Yard Supplied- 6310 ZZC3 SNR- 2 nos. Nett 2 EA 25.00 50.00

E00099 26.02 PURIFIER ROOM EXHAUST FAN MOTOR - 1 NO


Overhaul with Owners supply spares, 1pc 1 EA 875.00 875.00
Additional:
Washed and painted the impeller. 1 EA 100.00 100.00
Renewed 2 nos. oil seals 25 x 40 x 5, Yard supply 2 EA 10.00 20.00
Yard Supplied - 6205 ZZC3 SNR- 2 Nos. Nett 1 EA 15.00 15.00

E00100 26.03 PUMP ROOM FAN MOTORS


Old pump room exhaust fan motor dismantled, sent to
2 LS 1,656.00 3,312.00
workshop, dismantled and reassembled back, No 1 and No 2

New motor rigged out from jetty and installed x 2 Nos 2 LS 414.00 828.00

Fan casing repair x 2 plaff Nett 1 EA 1,800.00 1,800.00

E00101 27.02 CCR INSTRUMENT CALIBRATION


Calibrate by locally available specialized workshop, (Nett) Nett 46 EA 150.00 6,900.00
Charges for calibration and certification of pumproom
transmitters x 20 Nos
Charges for calibration and certification of CCR repeater gauge
x 20 nos
Charges for calibration and certification of engine room local
gauge x 6 nos

E00102 27.05 E/R TEMPERATURE CONTROL VALVES


Overhaul by yard personnel 2 EA 133.33 267.00

Central cooling temp. control valve W-41v, 5k-300a


Jacket cooling temp. control valve W-14v, 5K-150a

E00103 27.06 AUX BOILER PRESSURE GAUGES


Calibrate gauges, 9pcs 9 EA 150.00 1,350.00

E00104 27.07 M/E FUEL OIL PRESS CONTROL VALVE - OVERHAUL


Overhaul by yard technicians with Owner supply spares, 1pc 1 LS 1,850.00 1,850.00

MACHINING PROCESS;
Skim - off seat on ( 1 ) existg. valve body, proc. N0. 152402. ( 4
4 hrs 75.00 300.00
hrs. )

E00105 27.08 PORTABLE EQUIPMENT & GAUGES - CALIBRATION


Calibrate portable equipment 8 EA 150.00 1,200.00

Temp calibrator x 1 No 1 EA 150.00 150.00


Pressure calibrator x 2Nos 2 EA 150.00 300.00
Temp gauge x 1 No 1 EA 150.00 150.00
Pressure gauge x 10 NO 10 EA 150.00 1,500.00

Page 80 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
E00106 28.01 PUMPS - 32 NOS - CANCELLED LS 39,565.00 -

E00107 29.01 EDUCTORS - 6 NOS - CANCELLED


Open up, overhaul in place and reinstall, 6pcs 0 LS 1,850.00 -

E00108 29.02 INCINERATOR DIESEL OIL TANK - CANCELLED 0 LS 500.00 -

EMERGENCY GENERATOR FUEL TANK CLEANING -


E00109 29.02 0 LS 500.00 -
CANCELLED

STEERING GEAR HYDRUALIC OIL DAILY TANK CLEANING -


E00110 29.03 0 EA 500.00 -
CANCELLED

FWD AND AFT MACHINERY HYDRAULIC OIL TANKS X 2


E00111 29.04 0 EA 500.00 -
TANKS - CANCELLED
Local cleaning of 30m
E00112 29.05 INCINERATOR W.O TANKS - CANCELLED 0 EA 700.00 -

E00113 29.06 H.F.O SETTLING TANK


Local cleaning of 30m - CANCELLED 0 EA 950.00 -

E00114 29.07 HFO SERVICE TANK - CANCELLED


Local cleaning of 30m 0 EA 950.00 -

E00115 29.08 BILGE HOLDING TANK CLEANING - CANCELLED 0 EA 700.00 -

E00116 29.09 OILY BILGE TANK - CANCELLED 0 EA 700.00 -

E00117 29.10 PURIFIER SLUDGE TANK - CANCELLED 0 EA 700.00 -

E00118 29.11 INERT GAS FAN AND MOTOR


overhaul 240KW 1 EA 4,300.00 4,300.00

E00119 29.11 IG CASING COATING - GLASS FLAKE - CANCELLED 0 - -

E00120 29.12 ENGINE ROOM OVERHEAD CRANE


Load test, 1 test 1 EA 750.00 750.00
Remove/refit wire - CANCELLED 0 EA 900.00 -

E00121 29.12 E/R WIRE HOOK OVERHAUL


Overhaul hook with Owner supply spares, 1 No. 0 EA 840.00 -

E00122 29.13 RELIEF VALVE TESTING


Overhaul and test relief valves in E/R 11.00 EA 350.00 3,850.00

1. Heavy Fuel oil Purifier heaters relief valves 3 nos.


1/2" 16 bar
2. M/E Fuel oil Purifier heaters relief valves 2 nos.
1/2" 16 bar
3. AE Fuel oil Purifier heaters relief valves 2 nos.
1/2" 16 bar
4. Lube oil Purifier heaters relief valves 2 nos.
1/2" 16 bar
5. Boiler Heavy Fuel oil heaters relief valves 2 nos.
1/2" 30 bar

E00123 29.14 LIFTING GEAR LOAD TEST


1st Batch:
Chain blocks, 10 pcs 10 EA 105.00 1,050.00
Eye bolts, 34 pcs 34 EA 60.00 2,040.00
Shackles, 20 pcs 20 EA 60.00 1,200.00
Wire slings, 13 pcs 13 EA 60.00 780.00
Nylon straps, 6 pcs 6 EA 60.00 360.00

Page 81 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

2nd batches to be updated

E00124 30.01 MAIN ENGINE AIR COOLERS - 2 NOS - CANCELLED LS 7,020.00 -

E00125 30.02 START AIR RECEIVER & SAFETY DEVICES


Open/close and clean start air receiver, 1No - CANCELLED 0 EA 1,800.00 -
Overhaul relief valve, 4 EA 550.00 2,200.00
Overhaul drain valve, 9 EA 175.00 1,575.00

Safety valve as follows:


M/E Air receiver #1 20 x 25
M/E Air receiver #2 20 x 25
Control Air receiver 15 x 20
A/E Air receiver 15 x 20

Drain valve as follows:


M/E Air receiver #1 20 mm. x 3 pcs. 2
valves found not good, renewed with ship's spares.
M/E Air receiver #2 20 mm. x 2 pcs.
Control Air receiver 15 mm. x 2 pcs.
A/E Air receiver 15 mm. x 2 pcs.

E00126 30.03 VACUUM CONDENSER


Clean and test 0 EA 4,875.00 -
Staging, 1.2m x 2m x 2m x 1No. 0 EA 135.00 -

Drill out tubes EA 10.00 -


Plug tubes EA 15.00 -
Renew tubes with Owner supply materials EA 30.00 -

AIR EJECTOR CONDENSER - INCLUDE ANODE RENEWAL -


E00127 30.04 LS 2,850.00 -
CANCELLED

E00128 30.05 ATMOSPHERIC CONDENSER - INCLUDE ANODE RENEWAL

Clean and test 1 EA 3,600.00 3,600.00

Drill out tubes EA 10.00 -


Plug tubes EA 15.00 -
Renew tubes with Owner supply materials EA 30.00 - -

Rubber Lining Repairing of central cooler FW cooler Inlet cover


Nett 2 EA 450.00 900.00
X 2 NOS

Access Works:
1 pc. 90 deg. elbow pipe 500 x 250 x dia. 250 mm. 1.63 Mtr 295.00 479.00
1 pc. Branched pipe with 4 flanges and valve, 600 x 250 x dia.
2.00 EA 209.00 418.00
200 mm.
1 pc. Globe valve, angle, dia. 100 mm. 1.00 EA 63.00 63.00
1. pc. T- piece with valve, 4 flanges, 1 ntr. X 400, dia. 90 x dia.
2.00 EA 295.00 590.00
65 mm.
1 pc. branched elbow pipe with 3 flanges and valve, 1 mtr. X 1
1.00 EA 295.00 295.00
mtr.

MACHINING PROCESS:
Mfrd. ( 4 ) zinc anodes,proc. No. 152310. ( 4 hrs. ) 4 EA 120.00 480.00

FWD AND AFT CENTRAL F.W. COOLERS - 2 NOS -


E00129 30.06 LS 21,000.00 -
CANCELLED

E00130 30.07 MAIN L.O. COOLER - CANCELLED LS 12,565.00 -

E00131 30.08 STERN TUBE L.O. COOLER - CANCELLED LS 1,800.00 -

Page 82 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
E00132 30.09 LOWER AUX. BOILER F.O. HEATER - CANCELLED LS 2,200.00 -

E00133 30.1 FWD & AFT MAIN ENGINE F.O. HEATERS - CANCELLED LS 4,400.00 -

E00134 30.11 HFO PURIFIER OUTER HEATER - CANCELLED LS 2,200.00 -

E00135 33.01 ENGINE ROOM FAN FIRE DAMPERS


Open up and overhaul, 4pcs 1 EA 600.00 600.00

Fire damper repair:


Cropped out existing wasted materials from flap assy, and mesh
frame assy. cut and fabricated new materials installed. after 1 NOs 3,160.00 3,160.00
repair assembiled the parts and send back to onboard installed.
Bar Flat Stl 6*25mm Gr A 2736 x 6 Nos (1)
Bar Flat Stl 6*25mm Gr A 1483 x 6 Nos (2)
Bar Flat Stl 6*25mm Gr A 623 x 12 Nos (3)
Bar Flat Stl 6*25mm Gr A 572 x 6 Nos (4)
Plate Gr A 605 x 178 x 6 x 1 No (5)
Plate Gr A 586 x 214 x 6 x 1 No (6)
Plate Gr A 269 x 162 x 6 x 1 No (7)
Plate Gr A 300 x 300 x 6 x 1 No (8)
Plate Gr A 500 x 40 x 6 x 1 No (9)
Pipe 1.5" Sch 40 Api 5l Gr -B 500 x 1 No (10)
Bar Flat Stl 6*25mm Gr A 60 x 24 Nos (11)
Gasket N/P (Neoprene) 1550 x 1550 x 6 x 1 No (12)

E/R FAN PULLEY WHEELS OVERHAUL 6 NOS. - INCLUDE


E00136 33.01
RENEWAL AT WIRE
Overhaul pulley wheels, 12 pcs 0 EA 90.00 -

E00137 33.02 LIFEBOAT LOAD TEST


Remove/refit life boats ashore, 1 EA 1,200.00 1,200.00
Yard assistance for load testing of Davits 1 EA 1,800.00 1,800.00
Load test boats with weights 1 EA 2,200.00 2,200.00

E00138 33.02 LIFEBOAT DAVIT LOAD TEST 1 LS - -

E00139 33.03 LIFEBOAT AIR CYLINDER HYDRO TEST - CANCELLED LS 720.00 -

E00140 34.01 PORT AND STBD PILOT ACCESS POINT


Croppedout and replace with new steel iwo port and stbd pilot
1 LS 3,366.00 3,366.00
access point repair
Angle 100*75*8 Gr A 1000 x 2 Nos (A1)
Plate Gr A 1500 x 590 x 8 x 2 Nos (P1)

Cut and installed stiffeners iwo port and stbd pilot access point. 1 LS 2,142.00 2,142.00
Plate Gr A 424 x 186 x 6 x 6 Nos (1)
Plate Gr A 250 x 50 x 6 x 4 Nos (2)
Plate Gr A 500 x 50 x 6 x 4 Nos (3)

E00141 34.02 BALLAST EXCHANGE VALVE DECK STAND


Renew deck stands, with vertical angle bar supports 4pcs per
0 units 525.00 -
unit, Total 10 units
Renew pump room bilge suction valve deck stands, with vertical
0 units 120.00 -
angle bar supports 6pcs, 1 unit

E00142 34.03 BUNKER TANKS OIL COAMING


Renew coaming plates
Low Sulphur Fuel Oil Bunker tank coaming on sunken deck
(Frame 25) 1900 mm x 330 mm x 6mm thick
1 0 LS 840.00 -
Renew vent coaming drain pipe
25A steel pipe 2 meters

Page 83 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

Low Sulphur Fuel Oil Bunker tank air pipe coaming on sunken
deck (Frame 20) 800 mm x 330 mm x 6mm thick
2 0 LS 840.00 -
700 mm x 330 mm x 6mm thick Renew vent coaming drain pipe
25A steel pipe 2 meters

No. 3 HFO Bunker tank coaming on upper deck (Frame 38)


3 0 LS 540.00 -
500 mm x 330 mm x 6mm thick

No. 3 HFO Bunker tank air pipe coaming on upper deck (Frame
4 36) 0 LS 540.00 -
800 mm x 330 mm x 6mm thick
700 mm x 330 mm x 6mm thick

Renew vent coaming drain pipe


0 LS 840.00 -
25A steel pipe 2 meters

No. 1 HFO Bunker tank coaming on upper deck (Frame 21)


5 700 mm x 330 mm x 6mm thick Renew vent coaming drain pipe 0 LS 840.00 -
25A steel pipe 2 meters

E00143 34.04 EXHAUST GAS ECONOMIZER HEATING TUBES


Heating tubes using yard supplied material (Rev) Nett 1 LS 10,500.00 10,500.00

E00144 34.05 BUNKER LINE MODIFICATIONS.


Fabricate and modification of bunker lines:
Identification, preparation construction drawing and fabricate
new lbunker line on Main deck and in engine room using ship
suppied material:
1 New Line on Main Deck
Spool 1:
C.S Pipe 4" sch 40 x 6400 mm L x 1 Nos 6.40 Mtrs 135.00 864.00
C.S Elbow 4" x 2 Nos 2.00 EA 77.00 154.00
C.S Reducer 6" x 4" x 1 Nos 1.00 EA 77.00 77.00

Spool 2:
C.S Pipe 4" sch 40 x 6400 mm L x 1 Nos 6.40 Mtrs 135.00 864.00

Spool 3:
C.S Pipe 4" sch 40 x 4050 mm L x 1 Nos 4.05 Mtrs 135.00 547.00
C.S Elbow 4" x 1 Nos 1.00 EA 77.00 77.00

Spool 4:
C.S Pipe 4" sch 40 x 5150 mm L x 1 Nos 5.15 Mtrs 135.00 695.00
C.S Elbow 4" x 1 Nos 4.00 EA 77.00 308.00

Spool 5:
C.S Pipe 4" sch 40 x 6000 mm L x 1 Nos 6.00 Mtrs 135.00 810.00
C.S Elbow 4" x 1 Nos 1.00 EA 77.00 77.00

Spool 6:
C.S Pipe 4" sch 40 x 500 mm L x 1 Nos 1.75 Mtrs 135.00 236.00

M.S Angle bar support + U bolts x 200 x75x75x5 x 5 Nos 5 EA 180.00 900.00
M.S Angle bar support + U bolts x 500 x75x75x5 x 5 Nos 5 EA 180.00 900.00

Access Works:
Remove/refit existing valve 6" x 1 no on main deck 1 EA 144.00 144.00
Remove/refit existing pipe 6" x 1 no on main deck 1.75 Mtrs 129.00 226.00
Remove/refit existing pipe 4" x 1 no on main deck 1.75 Mtrs 90.00 158.00
Provide and blanking size 280 mm dia x 20mm thk 2 EA 750.00 1,500.00

Carried out Pressure test x 2 times 1 LS 1,200.00 1,200.00

2 New Line in Engine room ( to be revised as per actual)

Page 84 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Spool 1:
C.S Pipe 4" sch 40 x 3400 mm L x 1 Nos 3.40 Mtrs 162.00 551.00
C.S Elbow 4" x 1 Nos 1 EA 92.00 92.00
C.S Reducer 6" x 4" x 1 Nos (Yard supplied) 1.00 EA 102.00 102.00

Spool 2:
C.S Pipe 4" sch 40 x 2800 mm L x 1 Nos 2.9 Mtrs 162.00 470.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 3:
C.S Pipe 4" sch 40 x 3000 mm L x 1 Nos 3.00 Mtrs 162.00 486.00

Spool 4:
C.S Pipe 4" sch 40 x 3000 mm L x 1 Nos 3.00 Mtrs 162.00 486.00

Spool 5:
C.S Pipe 4" sch 40 x 3160 mm L x 1 Nos 3.16 Mtrs 162.00 512.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 6:
C.S Pipe 4" sch 40 x 4580 mm L x 1 Nos 4.58 Mtrs 162.00 742.00
C.S Elbow 4" x 2 Nos 2.00 EA 92.00 184.00

Spool 7:
C.S Pipe 4" sch 40 x 1000 mm L x 1 Nos 2.00 Mtrs 162.00 324.00

Spool 8:
C.S Pipe 4" sch 40 x 3570 mm L x 1 Nos 3.57 Mtrs 162.00 578.00
C.S Elbow 4" x 2 Nos 2.00 EA 92.00 184.00

Spool 9:
C.S Pipe 4" sch 40 x 2500 mm L x 1 Nos 2.75 Mtrs 162.00 446.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 10:
C.S Pipe 4" sch 40 x 2300 mm L x 1 Nos 2.65 Mtrs 162.00 429.00
C.S Elbow 4" x 1 Nos 1.00 EA 92.00 92.00

Spool 11:
C.S Pipe 4" sch 40 x 3000mm L x 1 Nos 3.00 Mtrs 162.00 486.00
C.S Elbow 4" x 1 Nos 1 EA 92.00 92.00
C.S Reducer 6" x 4" x 1 Nos (Yard supplied) 1.00 EA 102.00 102.00

M.S Angle bar support +U bolts x 200 x75x75x5 x 9 Nos 9 EA 180.00 1,620.00

Carried out Pressure test x 2 times 1.00 LS 1,200.00 1,200.00

Fabricated and installed coaming x 8" dia x 500mmL 1.75 Mtrs 290.00 508.00

Access Works:
Remove/refit:
C.S Pipe 4" sch 40 x 3000mm L x 1 Nos 3 Mtrs 162.00 486.00
Fabricate and install blank flanges 1 Nos 750.00 750.00

Staging:
Engine Room, Stbd Side (Landing Platform): 1 off platform
1 LS 100.00 100.00
@1.5x1x1.5 meters
Engine Room, Stbd Side 2Nd Level: 1 off tower @2x1x3 meters
1 LS 135.00 135.00
Engine Room, Stbd Side Bottom Area: 1 off hanging
1 LS 350.00 350.00
@2x0.75x1.5 meters - total 5 planks
Engine Room, Stbd Side Bottom Area: 1 off tower @3x1.2x6
1 LS 270.00 270.00
meters
Main Deck, Stbd Side Iwo Accommodation: 1 off tower
1 LS 840.00 840.00
@15.5x1.2x3.5 meters

Page 85 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

E00145 34.06 ANCHOR HAWSE PIPE COVER HINGES - CANCELLED


Renew hinges, total 8 hinges 0 EA 240.00 -

E00146 34.07 MDO AFT MANIFOLD FILLING VALVES - CANCELLED


Modify pipe line and install Owner supply valves, 2 sets 0 EA 360.00 -

E00147 34.08 PUMP ROOM MUSHROOM VENT - CANCELLED


Crop and renew guide boxes 370mm x 150mm x 80mm x 2pcs 0 EA 640.00 -

E00148 34.09 AIR HANDLING UNIT REPAIR. 1 LS 1,020.00 1,020.00


Carried out doubling of AHU plate
Plate Galvanized 910 x 146 x 2 x 2 Nos (DOUBLER) - bending

E00149 34.10 REMOTE GAUGES FOR BUNKER TANKS IN CCR - -

E00150 34.11 FIRE DETECTION SYSTEM IN LAUNDRY AND GALLEY - -

Access Works:
Remove the existing ceiling panel and save for reuse from
various locations in way of electrical works. After completion of 1.00 LS 2,300.00 2,300.00
electrical works, reinstall back the same ceiling panel in place.
Area/size:
Officer's laundry
Ceiling panel - 1820 x 750 x 1 mm thick - 1 no.
1820 x 360 x 1 mm thick - 1 no.
Crew's laundry
Ceiling panel - 1820 x 920 x 1 mm thick - 3 nos.
950 x 920 x 1 mm thick - 2 nos.
A/c diffuser - 180 x 80 mm - 5 nos.
Sunken deck passage
Ceiling panel - 1150 x 300 x 25 mm thick - 6 nos.
Crew mess room
Ceiling panel - 2370 x 300 x 25 mm thick - 2 nos.
Service space room
Ceiling panel - 1750 x 300 x 25 mm thick - 4 nos.
Galley
Ceiling panel - 4050 x 300 x 25 mm thick - 8 nos.
C deck passage
Ceiling panel - 1150 x 300 x 25 mm thick - 2 nos.

SEPARATE STRONG POINTS AND CHOCKS FOR TUG


E00151 34.12 - -
ESCORTS
Cut fabricate and installed additional under deck stiff iwo aft port
towing equipment
Angle 300*90*11/16 Gr A 890 x 1 No (3615) 50 Kgs 6.63 332.00
Plate Eh 36 700 x 1027 x 11 x 1 No (3615 C) 200 Kgs 7.40 1,480.00
Angle 300*90*11/16 Gr A 890 x 1 No (3615A) 50 Kgs 6.63 332.00
Angle 350*100*12/17 Gr A 890 x 1 No (3615D) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (4615) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (4615 A) 50 Kgs 6.63 332.00
Plate Eh 36 700 x 995 x 11 x 1 No (4615 C) 200 Kgs 7.40 1,480.00
Angle 350*100*12/17 Gr A 890 x 1 No (4615 D) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 2 Nos (DL 1/2) 100 Kgs 6.63 663.00
Angle 300*90*11/16 Gr A 890 x 2 Nos (DL 1/2A) 100 Kgs 6.63 663.00
Angle 350*100*12/17 Gr A 890 x 2 Nos (DL 1/2B) 100 Kgs 6.63 663.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 3) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 3A) 50 Kgs 6.63 332.00
Angle 350*100*12/17 Gr A 890 x 1 No (DL 3B) 50 Kgs 6.63 332.00
Plate Eh 36 700 x 799 x 11 x 1 No (DL 3C) 200 Kgs 7.40 1,480.00
Plate Eh 36 385 x 260 x 11 x 2 Nos (DL 4) 70 Kgs 7.40 518.00
Plate Eh 36 3440 x 800 x 11 x 2 Nos (DL 4/5B) 600 Kgs 7.40 4,440.00
Plate Eh 36 850 x 547 x 11 x 2 Nos (DL 4/5C) 100 Kgs 7.40 740.00
Plate Eh 36 898 x 150 x 20 x 2 Nos (DL 4/5CF) 100 Kgs 6.82 682.00
Page 86 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Plate Eh 36 3300 x 150 x 20 x 2 Nos (DL 4/5F) 400 Kgs 6.82 2,728.00
Plate Eh 36 435 x 260 x 11 x 1 No (DL 4A) 35 Kgs 7.40 259.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 5) 50 Kgs 6.63 332.00
Angle 300*90*11/16 Gr A 890 x 1 No (DL 5A) 50 Kgs 6.63 332.00
Angle 350*100*12/17 Gr A 890 x 1 No (DL 5B) 50 Kgs 6.63 332.00
Plate Eh 36 878 x 800 x 11 x 1 No (DL 5D) 200 Kgs 7.40 1,480.00
Plate Eh 36 907 x 150 x 20 x 1 No (DL 5DF) 50 Kgs 6.82 341.00
Angle 250*90*12/16 Gr A 971 x 1 No (DL AB 1) 50 Kgs 6.63 332.00
Angle 250*90*12/16 Gr A 971 x 2 Nos (DL AB 2) 100 Kgs 6.63 663.00
Plate Eh 36 300 x 305 x 11 x 2 Nos (FR 4/5) 70 Kgs 7.40 518.00
Plate Eh 36 Z 900 x 1780 x 20 x 1 No (M DK 1) 300 Kgs 6.82 2,046.00
Plate Eh 36 Z 2050 x 1700 x 20 x 1 No (M DK 2) 558 Kgs 6.82 3,803.00
Plate Eh 36 708 x 737 x 11 x 1 No (SL 5C) 200 Kgs 7.40 1,480.00

Add'L Material Iwo. Aft Port Towing Equipment.


Plate Eh 36 850 x 547 x 11 x 1 No (1) 200 Kgs 7.40 1,480.00
Plate Eh 36 898 x 150 x 20 x 1 No (2) 200 Kgs 6.82 1,364.00
Plate Eh 36 300 x 305 x 11 x 1 No (3) 35 Kgs 7.40 259.00

Install Owner supplied bollard and Chock 1 LS 4,400.00 4,400.00


-
Carry out MPI check on insert plate 4 corner - 2 meters length -
1 LS 520.00 520.00
BUDGETARY
Carried out RT(2 shots) - BUDGETARY 1 LS 3,375.00 3,375.00
-
Carry out blasting SA 2.5 of under deck stiffeners and apply 2
1 LS 4,429.00 4,429.00
coats of Owner paint at workshop - BUDGETARY

Engineering calculation Nett 1 LS 4,920.00 4,920.00

Staging:
Engine Room, Port Side Iwo S.Gear Room: 1 off tower
1 LS 1,215.00 1,215.00
@5.5x3x4.5 meters
Poop Deck, Port Side (Counter Weight): 1 off structure
1 LS 405.00 405.00
@3x3x1.5 meters
Side Shell, Stern Area: 1 off hanging @3x1x2 meters - total 8
1 LS 400.00 400.00
planks
Engine Room, Port Side Iwo S.Gear Room: 1 off extension
1 LS 1,000.00 1,000.00
@4x1.8x1.5 meters - total 20 planks
Engine Room, Port Side Iwo S.Gear Room: 1 off extension
1 LS 400.00 400.00
@2.5x1.5x1.5 meters - total 8 planks
Engine Room, Aft Area Iwo S/Gear Room: 1 off hanging
1 LS 1,100.00 1,100.00
@6.5x1.2x1.5 meters - total 22 planks
Engine Room, Aft Area Iwo S/Gear Room: 1 off tower @4x2x3
1 LS 540.00 540.00
meters
SAMPLING PORTS FOR BALLAST TANKS AND FORE PEAK
E00152 34.13
TANK
Modify ballast tank manholes, 1pc 1 set 528.00 528.00

E00153 34.14 OFFICER SMOKING ROOM GLASS RENEWAL - CANCELLED


Renew broken glass with Owner supply new glass, 1pc 0 LS 420.00 -

E00154 34.15 WHEELHOUSE WEATHER DOORS LOCK RENEWAL


Renew locks of sliding door with Owner supply spare locks x 1
1 LS 360.00 360.00
no

E00155 34.16 DECK PIPE TRAY PROTECTIVE PLATE


Renew Steel angle Plates
EA 90.00 -
70 mm x 120 mm x 6mm thick, per mtr

E00156 STAGING ASSISTANCE - BUDGETARY


23 March 2015 - ASSISTANCES AND PROVIDE 24 PCS. OF
PLANKS IN WBT # 3 PORT AND STBD SIDE DOUBLE Nett 45 Mhrs 15.00 675.00
BOTTOM - A00174 - 45mhrs
23 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN SIDE SHEEL FOR RIGGING OUT THE THE
Nett 18 Mhrs 15.00 270.00
CUTTING PLATE AS PER TRADE REQUEST- A00160 -
18mhrs

Page 87 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

24 March 2015 - ASSISTANCES AND MODIFICATION OF


STAGING 7 LOCATION IN WBT 5 P/ S AND 4 PORT TO FIT Nett 45 Mhrs 15.00 675.00
UP PLATE AS PER TRADE REQUEST.- A00160 - 45mhrs
25 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN WBT 5 PORT & STBD TO RIGGING DOWN AND Nett 20 Mhrs 15.00 300.00
FIT UP THE PLATE - A00160 - 20mhrs
26 March 2015 ASSISTANCES AND MODIFICATION OF
STAGING IN ENGINE ROOM BOTTOM FOR TEMPORARY
Nett 16 Mhrs 15.00 240.00
DISMANTLING AND ERECTION AGAIN AS PER TRADE
REQUEST. - E0144 - 16mhrs
28 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN WBT 5 PORT TO PIT UP NEW PLATE - A00160 - Nett 25 Mhrs 15.00 375.00
25mhrs
29 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR
Nett 36 Mhrs 15.00 540.00
TEMPORARY DISMANTLING OF STAGING AND PUTTING
BACK - A00168 - 36mhrs
29 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN WBT 5 PORT & STBD SIDE FROM FRAME NO. Nett 27 Mhrs 15.00 405.00
62 66 67 72 AND 88.- A00160 - 27mhrs
29 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR CUTTING Nett 20 Mhrs 15.00 300.00
THE PLATES - A00168 - 20mhrs
30 March 2015 - ASSISTANCES AND MODIFICATION PLUS
DISMANTLING OF STAGING IN CHAIN LOCKER PORT & Nett 45 Mhrs 15.00 675.00
STBD SIDE TO INSTALL NEW PLATE - A00168 - 45mhrs
30 March 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER FOLLOW UP BY 2ND SHIFT Nett 30 Mhrs 15.00 450.00
FOR INSTALLING NEW PLATE - A0168 - 30mhrs
31 march 2015 (st shift)- ASSISTANCES AND MODIFICATION
OF STAGING IN CHAIN LOCKER PORT & STBD FOR FIT- UP Nett 54 Mhrs 15.00 810.00
NEW PLATE -A00168 - 54Mhrs
31 march 2015 (2nd shift)- ASSISTANCES AND MODICATION
OF STAGING IN CHAIN LOCKER PORT & STBD SIDE
Nett 28 Mhrs 15.00 420.00
FOLLOW UP BY 2ND SHIFT FOR CONTINUES FIT-UP NEW
PLATE - A00168 - 28mhrs
1 April 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR FIT-UP Nett 54 Mhrs 15.00 810.00
NEW PLATE AS PER TRADE REQUEST - A00168 - 54mhrs
1 April 2015 - ASSISTANCES AND MODIFICATION OF
STAGING IN CHAIN LOCKER PORT & STBD FOR FIT- UP
Nett 36 Mhrs 15.00 540.00
NEW PLATE CONTINUES AS PER TRADE REQUEST- A00168
- 36mhrs

E00157 SAFETY HANDRAIL


Main Deck, Port & Stbd Side Iwo Void Space: 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Main Deck, Port & Stbd Iwo Wbt 1 To 5 Open Access: 16 off
1 LS 1,536.00 1,536.00
railing each @1.2x1.2x1.5 meters
Main Deck, Stbd Side Iwo Slop Tank(Open Hole): 1 off railing
1 LS 96.00 96.00
@1.2x1.2x1.5 meters
Main Deck, Pump Room (Skyligth): 1 off railing @3x3x1.5
1 LS 240.00 240.00
meters
Main Deck, Engine Room (Skylight): 1 off railing @3x3x1.5
1 LS 240.00 240.00
meters
Main Deck, Port & Stbd Iwo Lifeboat Davit: 2 off railing each
1 LS 640.00 640.00
@8x0x1.5 meters
Engine Room, Iwo Apt Tank (Open Access): 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Main Deck, Port & Stbd Iwo C.Locker Open Access: 2 off railing
1 LS 192.00 192.00
each @1.2x1.2x1.5 meters
Forepeak, Provide Railings (Open Holes): 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Forepeak, Provide Railings (Open Access): 4 off railing each
1 LS 192.00 192.00
@1.2x0x1.5 meters
Main Deck, Port & Stbd Iwo Slop Tank Hole: 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Apt Peak Tank, Open Access: 2 off railing each @1.2x1.2x1.5
1 LS 192.00 192.00
meters
Main Deck, Port & Stbd Side(Open Holes): 5 off railing each
1 LS 480.00 480.00
@1.2x1.2x1.5 meters
Main Deck, S / Gear Room (Skylight): 1 off railing @2x2x1.5
1 LS 160.00 160.00
meters
Main Deck, Stbd Side Iwo Obt Tank: 1 off railing @1.5x1x1.5
1 LS 100.00 100.00
meters
Main Deck, Bottom Area Open Holes: 1 off railing @1.2x1.2x1.5
1 LS 96.00 96.00
meters
Main Deck, Port & Stbd Open Holes: 4 off railing each
1 LS 384.00 384.00
@1.2x1.2x1.5 meters

Page 88 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Main Deck, Iwo Wbt 5 P/S Open Access: 2 off railing each
1 LS 160.00 160.00
@2x0x1.5 meters
Forepeak, Port & Stbd (Open Cutting Plates): 4 off railing each
1 LS 480.00 480.00
@3x1.2x1.5 meters
Main Deck, Port Side Iwo Mooring Rope(Walkway): 1 off tower
1 LS 672.00 672.00
@5.5x1.8x2.5 meters
Main Deck, Port Side Iwo Mooring Rope(Walkway): 2 off tower
1 LS 960.00 960.00
each @5x1.8x2.5 meters
Main Deck, Port Side Fwd Iwo Mooring Rope(Walkway): 1 off
1 LS 480.00 480.00
tower @5x1.8x2.5 meters
Main Deck, Port & Stbd Iwo Cot 5: 2 off railing each
1 LS 192.00 192.00
@1.2x1.2x1.5 meters
Poop Deck, Port Side Open Cutting Plate: 1 off railing @3x2x1.5
1 LS 200.00 200.00
meters

A00159 Addl 17/03/2015LIFEBOAT REHOOKING ASSISTANCE


Fabricate and supplied life boot rehooking material, port and
2 Loc 2,142.00 4,284.00
stbd as follows::
Plate Aisi 304 S/S 330 x 90 x 10 x 2 No (A1)
Plate Aisi 304 S/S 320 x 25 x 6 x 4 Nos (A2)
Plate Aisi 304 S/S 144 x 144 x 12 x 2 No (F1)
Plate Aisi 304 S/S 350 x 90 x 10 x 4 Nos (P1)

Angle Bar Support Iwo Life Boat Davit.


Angle 65*65*8 Gr A 170 x 1 No (AB) 1 EA 179.00 179.00

Machining Process:
Mfrd. ( 4 ) s/s bolts, proc. N0. 152433 - 20hrs 20 hrs 75.00 1,500.00

Staging:
Main Deck, Port & Stbd Side Add'L Tower: 4 off tower each
1 LS 1,600.00 1,600.00
@2x1.5x3.5 meters
Main Deck, Port & Stbd Side Iwo Lifeboat Davit: 4 off tower
1 LS 1,120.00 1,120.00
each @2x1.5x5 meters
Safina Dock, Between 2 Towers Lifeboat: 1 off tower
1 LS 480.00 480.00
@2x1.2x2.5 meters
Safina Dock, Fwd & Aft Area: 4 off tower each @1.5x1.2x2.5
1 LS 120.00 120.00
meters

A00160 Addl 17/03/2015STEEL WORK IN WBT


1 Fore Peak Tank Steel Repair
Plate Gr A 2600 x 150 x 12 x 1 No (FPT C-LINE FB) 50 Kgs 6.63 332.00
Plate Gr A 2000 x 150 x 12 x 1 No (FR-111 FB) 50 Kgs 6.63 332.00
Plate Gr A 410 x 225 x 15 x 1 No (FR.111 CRLING) 35 Kgs 6.37 223.00
Plate Gr A 1900 x 400 x 15 x 1 No (FR.111 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 750 x 1500 x 15 x 1 No (FR.111 INS-1) 300 Kgs 5.78 1,734.00
Plate Gr A 4750 x 500 x 13 x 2 Nos (FR.119 INS) 600 Kgs 5.78 3,468.00
2 Aft Peak Tank Steel Repair
Plate Gr A 2800 x 200 x 20 x 1 No (6825 CL FLG) 90 Kgs 5.55 497.00
Plate Gr A 700 x 900 x 14 x 1 No (6825 CL INS) 200 Kgs 5.78 1,156.00
Plate Gr A 900 x 100 x 16 x 1 No (FLG) 35 Kgs 6.37 223.00
Plate Gr A 4700 x 125 x 18 x 1 No (FLG 4) 85 Kgs 5.55 470.00
Plate Gr A 3300 x 100 x 16 x 1 No (FLG-1) 50 Kgs 6.37 319.00
Plate Gr A 600 x 100 x 16 x 1 No (FLG-2) 35 Kgs 6.37 223.00
Plate Gr A 1000 x 100 x 16 x 1 No (FLG-3) 35 Kgs 6.37 223.00
Plate Gr A 1400 x 125 x 18 x 1 No (FLG-5) 50 Kgs 6.11 306.00
Plate Gr A 700 x 125 x 18 x 1 No (FLG-6) 35 Kgs 6.11 214.00
Angle 200*90*9/14 Gr A 600 x 2 Nos (FR -4 STIFF) 70 Kgs 6.63 464.00
Plate Gr A 700 x 900 x 14 x 1 No (FR . -3INS) 200 Kgs 5.78 1,156.00
Plate Gr A 2700 x 700 x 18 x 1 No (FR 5 INS1) 300 Kgs 5.55 1,665.00
Plate Gr A 700 x 900 x 14 x 1 No (FR-1 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 2700 x 700 x 18 x 1 No (FR-1 INS-1) 300 Kgs 5.55 1,665.00
Plate Gr A 1400 x 700 x 18 x 1 No (FR-2 INS-1) 300 Kgs 5.55 1,665.00
Plate Gr A 700 x 900 x 14 x 1 No (FR-3 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 1900 x 700 x 18 x 1 No (FR-4 INS-1) 300 Kgs 5.55 1,665.00

Page 89 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Plate Gr A 700 x 900 x 14 x 1 No (FR-5 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 1800 x 1200 x 14 x 1 No (FR1 INS2) 300 Kgs 5.78 1,734.00
Plate Gr A 600 x 125 x 18 x 1 No (S/S PORT LG5) 35 Kgs 6.11 214.00
Plate Gr A 900 x 125 x 18 x 1 No (S/S PORT LG6) 35 Kgs 6.11 214.00
Plate Gr A 900 x 384 x 12 x 1 No (WEB)- FR15 50 Kgs 6.63 332.00
Plate Gr A 3300 x 434 x 12 x 1 No (WEB-1) 137 Kgs 6.02 828.00
Plate Gr A 600 x 434 x 12 x 1 No (WEB-2) 50 Kgs 6.63 332.00
Plate Gr A 1000 x 434 x 12 x 1 No (WEB-3) 50 Kgs 6.63 332.00
Plate Gr A 4700 x 432 x 12 x 1 No (WEB-4) 195 Kgs 6.02 1,173.00
Plate Gr A 1400 x 432 x 12 x 1 No (WEB-5) 58 Kgs 6.02 350.00
Plate Gr A 700 x 432 x 12 x 1 No (WEB-6) 50 Kgs 6.63 332.00
3 Poop Deck Stbd Steel Repair
Plate Gr A 2500 x 950 x 13 x 1 No (STBD INSERT) 300 Kgs 5.78 1,734.00
4 No.1 Port Wing Water Ballast Tank
Plate Eh 36 1300 x 1300 x 23 x 1 No (1P FWD MH INS) 311 Kgs 5.99 1,863.00
Plate Gr A 700 x 400 x 12 x 1 No (1P S/S WEB INS) 200 Kgs 6.02 1,204.00
Plate Gr A 500 x 300 x 14 x 1 No (1P.FR 101 INS) 200 Kgs 5.78 1,156.00
Plate Gr A 1400 x 250 x 14 x 1 No (1P.FR 101 INS-1) 200 Kgs 5.78 1,156.00
5 No.1 Port Wing Water Ballast Tank
Plate Gr A 500 x 300 x 14 x 1 No (MK 01) 200 Kgs 5.78 1,156.00
Plate Gr A 1400 x 250 x 14 x 1 No (MK 02) 200 Kgs 5.78 1,156.00
Plate Gr A 900 x 115 x 16 x 1 No (MK 03) 200 Kgs 5.78 1,156.00
6 Steel Repair Iwo 1stbd Wing Water Ballast Tank
Plate Gr A 2000 x 800 x 16 x 1 No (1S FR 95 INS) 300 Kgs 5.78 1,734.00
Plate Gr A 600 x 500 x 16 x 1 No (1S FR 95 INS1) 200 Kgs 5.78 1,156.00
Plate Gr A 800 x 800 x 21 x 1 No (1S FR 95 TP) 300 Kgs 5.31 1,593.00
Plate Gr A 450 x 260 x 21 x 1 No (1S FR95 TP) 200 Kgs 5.31 1,062.00
Plate Eh 36 1300 x 1300 x 23 x 1 No (1S FWD MH INS) 311 Kgs 5.99 1,863.00
Plate Gr A 300 x 200 x 12 x 3 Nos (1S LBH L1) 105 Kgs 6.63 696.00
Plate Gr A 300 x 200 x 12 x 11 Nos (1S LBH L2) 385 Kgs 6.63 2,553.00
Plate Gr A 300 x 200 x 13 x 1 No (1S LBH L3) 35 Kgs 6.37 223.00
Plate Gr A 4350 x 800 x 21 x 1 No (1S S/S INS-1) 585 Kgs 5.31 3,104.00
Plate Eh 36 500 x 800 x 20 x 1 No (1S S/S INS) 200 Kgs 5.99 1,198.00
Plate Gr A 600 x 175 x 18 x 1 No (FLG-1) 35 Kgs 6.11 214.00
Plate Gr A 1000 x 175 x 18 x 1 No (FLG-2) 50 Kgs 6.11 306.00
Plate Gr A 600 x 662 x 12 x 1 No (WEB-1) 200 Kgs 6.02 1,204.00
Plate Gr A 1000 x 662 x 12 x 1 No (WEB-2) 200 Kgs 6.02 1,204.00
7 Wbt No:5stbd Steel Repair
Plate Gr A 700 x 500 x 14 x 1 No (FR 58 P2) 50 Kgs 6.37 319.00
Plate Gr A 1900 x 250 x 14 x 1 No (FR 58S2) 53 Kgs 5.78 307.00
Plate Gr A 1000 x 600 x 14 x 1 No (FR 59) 67 Kgs 5.78 388.00
Plate Gr A 700 x 500 x 16 x 1 No (FR 65 P1) 45 Kgs 5.78 259.00
Plate Gr A 650 x 250 x 14 x 3 Nos (FR58S1) 105 Kgs 6.37 669.00
Plate Gr A 700 x 250 x 14 x 3 Nos (FR66 S1) 105 Kgs 6.37 669.00
Plate Gr A 300 x 200 x 12 x 2 Nos (LL 37/38) 70 Kgs 6.63 464.00
Plate Gr A 2000 x 750 x 12 x 1 No (LL35) 300 Kgs 6.02 1,806.00
Plate Gr A 1000 x 750 x 12 x 1 No (LL35A) 200 Kgs 6.02 1,204.00
Plate Gr A 300 x 200 x 12 x 4 Nos (LL42 TO 45) 140 Kgs 6.63 928.00
Plate Eh 36 300 x 200 x 12 x 13 Nos (LL46 TO 53) 455 Kgs 7.40 3,367.00
Plate Gr A 300 x 200 x 12 x 1 No (LL49) 35 Kgs 6.63 232.00
Plate Eh 36 4200 x 680 x 13 x 1 No (LL54) 300 Kgs 6.52 1,956.00
Plate Eh 36 300 x 200 x 13 x 3 Nos (LL54A) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 13 x 4 Nos (LL56) 140 Kgs 7.11 995.00
Plate Eh 36 300 x 200 x 13 x 1 No (LL56A) 35 Kgs 7.11 249.00
Plate Gr A 5250 x 3000 x 20 x 1 No (S SHL P5) 2,520 Kgs 5.55 13,986.00
Plate Eh 36 800 x 3400 x 20 x 1 No (S:SHL P1) 435 Kgs 6.25 2,720.00
Plate Eh 36 1500 x 2800 x 20 x 1 No (S:SHL P2) 672 Kgs 6.25 4,200.00
Plate Gr A 2000 x 1000 x 20 x 1 No (S:SHL P4) 320 Kgs 5.55 1,776.00
Plate Gr A 1500 x 500 x 12 x 1 No (SL 50A) 200 Kgs 6.02 1,204.00
Plate Gr A 2100 x 175 x 20 x 1 No (SL 50F) 200 Kgs 5.55 1,110.00
Plate Gr A 2100 x 500 x 12 x 1 No (SL-50) 300 Kgs 6.02 1,806.00
Plate Eh 36 300 x 200 x 13 x 2 Nos (SL/54/55) 70 Kgs 7.11 498.00

Page 90 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Plate Gr A 1500 x 175 x 20 x 1 No (SL50AF) 50 Kgs 6.11 306.00
Plate Eh 36 300 x 200 x 12 x 2 Nos (SL;49/50L2) 70 Kgs 7.40 518.00
8 Water Ballast Tank No.3port Repair Repair
Angle 80*80*10 Eh 36 500 x 4 Nos (AB) - FR79 140 Kgs 6.63 928.00
Plate Gr A 300 x 200 x 12 x 3 Nos (L1) 105 Kgs 6.63 696.00
Plate Gr A 1600 x 150 x 15 x 3 Nos (L2) 150 Kgs 6.37 956.00
Plate Eh 36 600 x 400 x 16 x 3 Nos (P1) 150 Kgs 7.11 1,067.00
Bar Flat Comm 9*65mm Ms 2290 x 2 Nos (PL.1) - FR79 70 Kgs 6.63 464.00
Plate Eh 36 700 x 250 x 14 x 2 Nos (S1) 70 Kgs 7.11 498.00
Bar Square 22mm Ss400 374 x 8 Nos (SQ.)- FR79 280 Kgs 6.63 1,856.00
9 Wing Water Ballast Tank Repair 3 Stbd
Plate Eh 36 300 x 200 x 13 x 3 Nos (L1) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 125 x 18 x 1 No (L1A) 35 Kgs 6.82 239.00
Plate Eh 36 300 x 200 x 12 x 4 Nos (L2) 140 Kgs 7.40 1,036.00
Plate Eh 36 1800 x 150 x 15 x 2 Nos (L3) 70 Kgs 7.11 498.00
Plate Eh 36 1100 x 150 x 15 x 1 No (L4) 35 Kgs 7.11 249.00
Plate Eh 36 650 x 150 x 15 x 1 No (L5) 35 Kgs 7.11 249.00
Plate Eh 36 1300 x 1300 x 23 x 1 No (M.H PLT) 311 Kgs 5.99 1,863.00
Plate Eh 36 2600 x 450 x 14 x 1 No (S1) 131 Kgs 7.11 932.00
10 Steel Repair Iwo 5 Port Wbt Internal
Plate Eh 36 1300 x 1300 x 23 x 1 No (DECK 1) 311 Kgs 5.99 1,863.00
Plate Eh 36 1100 x 200 x 14 x 2 Nos (FR 58) 70 Kgs 7.11 498.00
Plate Eh 36 600 x 250 x 14 x 4 Nos (FR 59) 140 Kgs 7.11 995.00
Plate Gr A 710 x 825 x 14 x 1 No (FR 60) 200 Kgs 5.78 1,156.00
Plate Gr A 1500 x 1800 x 14 x 1 No (FR 60A) 302 Kgs 5.78 1,748.00
Plate Gr A 700 x 1100 x 14 x 1 No (FR 60B) 200 Kgs 5.78 1,156.00
Plate Gr A 250 x 430 x 14 x 1 No (FR 60TP) 200 Kgs 5.78 1,156.00
Plate Gr A 772 x 600 x 14 x 1 No (FR 61) 52 Kgs 5.78 300.00
Plate Gr A 517 x 223 x 14 x 1 No (FR 61 TP) 200 Kgs 5.78 1,156.00
Plate Gr A 3220 x 500 x 18 x 1 No (FR 61A) 300 Kgs 5.55 1,665.00
Plate Gr A 772 x 600 x 14 x 1 No (FR 63) 200 Kgs 5.78 1,156.00
Plate Gr A 900 x 1150 x 16 x 1 No (FR 63A) 300 Kgs 5.78 1,734.00
Plate Gr A 430 x 248 x 16 x 1 No (FR 63A1) 35 Kgs 6.37 223.00
Plate Gr A 517 x 223 x 14 x 1 No (FR 63TP) 35 Kgs 6.37 223.00
Plate Eh 36 1000 x 150 x 20 x 1 No (LL 49) 35 Kgs 6.82 239.00
Plate Eh 36 1000 x 150 x 15 x 3 Nos (LL 50/52) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 13 x 1 No (LL 54) 35 Kgs 7.11 249.00
Plate Eh 36 300 x 200 x 13 x 8 Nos (LL 56) 280 Kgs 7.11 1,991.00
Plate Gr A 2100 x 500 x 12 x 1 No (SL 47) 101 Kgs 6.02 607.00
Plate Gr A 2100 x 175 x 20 x 1 No (SL 47F) 59 Kgs 5.55 326.00
Plate Eh 36 300 x 200 x 13 x 1 No (SL 55) 35 Kgs 7.11 249.00
11 Steel Repair Iwo 4 Port Wbt Internal
Plate Eh 36 300 x 200 x 13 x 2 Nos (DL W1) 70 Kgs 7.11 498.00
Plate Gr A 1000 x 250 x 14 x 1 No (FR 68) 200 Kgs 5.78 1,156.00
Plate Gr A 1100 x 850 x 16 x 1 No (FR 73) 300 Kgs 5.78 1,734.00
Plate Gr A 1500 x 850 x 16 x 1 No (FR 73A) 300 Kgs 5.78 1,734.00
Plate Gr A 1573 x 500 x 14 x 1 No (FR 74) 200 Kgs 5.78 1,156.00
Bar Flat Comm 9*65mm Ms 2255 x 2 Nos (FWD LDR) 70 Kgs 6.63 464.00
Plate Eh 36 2500 x 150 x 15 x 2 Nos (LL F1) 100 Kgs 7.11 711.00
Plate Eh 36 1500 x 150 x 15 x 1 No (LL F2) 50 Kgs 7.11 356.00
Plate Eh 36 1000 x 150 x 15 x 3 Nos (LL F4) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 13 x 11 Nos (LL TYP 2) 385 Kgs 7.11 2,737.00
Plate Eh 36 300 x 200 x 12 x 2 Nos (LL TYP 3) 70 Kgs 7.40 518.00
Plate Eh 36 300 x 200 x 12 x 14 Nos (LL49) 490 Kgs 7.40 3,626.00
Plate Gr A 110 x 110 x 10 x 4 Nos (PAD) 140 Kgs 6.63 928.00
Plate Gr A 3000 x 150 x 17 x 1 No (SL F2) 61 Kgs 5.55 340.00
Plate Gr A 3200 x 150 x 17 x 1 No (SL F1) 65 Kgs 5.55 362.00
Plate Eh 36 2000 x 150 x 15 x 1 No (SL F2) 50 Kgs 7.11 356.00
Plate Gr A 3500 x 150 x 17 x 1 No (SL F3) 71 Kgs 5.55 396.00
Plate Gr A 800 x 150 x 17 x 1 No (SL F4) 35 Kgs 6.11 214.00
Plate Gr A 300 x 200 x 12 x 7 Nos (SL W1) 245 Kgs 6.63 1,624.00
Bar Square 22mm Ss400 388 x 8 Nos (STEP) 280 Kgs 6.63 1,856.00

Page 91 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Angle 80*80*8 Gr A 500 x 4 Nos (SUPT) 140 Kgs 6.63 928.00
12 Steel Repair Iwo 4 Stbd Wbt Internal
Plate Gr A 1000 x 250 x 14 x 1 No (FR 75) 35 Kgs 5.78 202.00
Bar Flat Comm 9*65mm Ms 2255 x 2 Nos (FWD LDR) 70 Kgs 6.02 421.00
Plate Gr A 300 x 200 x 12 x 1 No (LL 36) 35 Kgs 6.02 211.00
Plate Eh 36 300 x 200 x 13 x 5 Nos (LL 54/56) 175 Kgs 6.52 1,141.00
Plate Gr A 110 x 110 x 10 x 4 Nos (PAD) 140 Kgs 6.02 843.00
Bar Square 22mm Ss400 388 x 8 Nos (STEP) 280 Kgs 6.02 1,686.00
Angle 80*80*8 Gr A 500 x 4 Nos (SUPT) 140 Kgs 6.02 843.00
13 Wing Water Ballast Tank Repair 2 Stbd
Plate Eh 36 300 x 200 x 13 x 4 Nos (DH.L1) 140 Kgs 7.11 995.00
Plate Eh 36 300 x 200 x 12 x 1 No (DH.L3) 35 Kgs 7.40 259.00
Bar Round 20mm Ms 1200 x 1 No (G.RAIL S1B) 2 Mtrs 112.00 224.00
Plate Eh 36 900 x 100 x 18 x 1 No (L44) 35 Kgs 6.82 239.00
Plate Eh 36 1250 x 450 x 12 x 1 No (MK-1) 200 Kgs 6.78 1,356.00
Plate Eh 36 500 x 382 x 13 x 1 No (MK-1A) 200 Kgs 6.52 1,304.00
Plate Eh 36 1250 x 150 x 15 x 1 No (MK-2) 200 Kgs 6.52 1,304.00
Plate Eh 36 500 x 150 x 18 x 1 No (MK-2A) 200 Kgs 6.25 1,250.00
Plate Eh 36 1000 x 250 x 14 x 1 No (S1) 35 Kgs 7.11 249.00
Plate Eh 36 900 x 250 x 14 x 1 No (S2) 35 Kgs 7.11 249.00
Plate Eh 36 300 x 200 x 13 x 2 Nos (SC.L1) 70 Kgs 7.11 498.00
Plate Eh 36 400 x 200 x 13 x 1 No (SC.L2) 35 Kgs 7.11 249.00
14 Wing Ballast Tank No:2 Port Steel Repair
Plate Eh 36 1000 x 1000 x 15 x 1 No (FR 85 P1) 300 Kgs 6.52 1,956.00
Plate Eh 36 500 x 250 x 16 x 1 No (FR 88 S2A) 35 Kgs 7.11 249.00
Plate Gr A 1500 x 600 x 12 x 5 Nos (INS-P1) 1,000 Kgs 6.02 6,020.00
Plate Eh 36 300 x 200 x 13 x 3 Nos (LBH L1) 105 Kgs 7.11 747.00
Plate Eh 36 300 x 200 x 12 x 4 Nos (LBH L2) 140 Kgs 7.40 1,036.00
Plate Gr A 300 x 200 x 12 x 9 Nos (LBH L2A) 315 Kgs 6.63 2,088.00
Plate Eh 36 300 x 200 x 12 x 1 No (LBH L2B) 35 Kgs 7.40 259.00
Plate Gr A 300 x 200 x 12 x 5 Nos (LBH L2C) 175 Kgs 6.63 1,160.00
Plate Eh 36 1000 x 200 x 18 x 1 No (LONGI-S3) 35 Kgs 7.11 249.00
Plate Eh 36 1500 x 628 x 12 x 1 No (MK-1) 200 Kgs 6.78 1,356.00
Plate Eh 36 500 x 382 x 13 x 1 No (MK-1A) 200 Kgs 6.52 1,304.00
Plate Eh 36 1500 x 175 x 26 x 1 No (MK-2) 200 Kgs 5.99 1,198.00
Plate Eh 36 500 x 115 x 18 x 1 No (MK-2A) 35 Kgs 6.82 239.00
Plate Eh 36 1200 x 450 x 12 x 1 No (MK-A) 200 Kgs 6.78 1,356.00
Plate Eh 36 1200 x 150 x 17 x 1 No (MK-B) 200 Kgs 6.25 1,250.00
Plate Eh 36 700 x 100 x 14 x 2 Nos (S1A) 70 Kgs 7.11 498.00
15 Steel Repair Iwo Fpt Port/Stbd
Plate Eh 36 2300 x 732 x 12 x 3 Nos (FR 103A) 485 Kgs 6.78 3,287.00
Plate Eh 36 1000 x 1550 x 12 x 1 No (FR 119) 149 Kgs 6.78 1,009.00
Plate Eh 36 1861 x 732 x 12 x 2 Nos (FR :103) 262 Kgs 6.78 1,773.00
16 Railling Iwo 4 Port Wbt
Bar Round 22mm Ms 6000 x 2 Nos (RB 1) 12 Mtrs 210.00 2,520.00
Bar Round 16mm Ms 6000 x 2 Nos (RB 2)
17 Railling Iwo 5 Port Wbt
Bar Round 22mm Ms 6000 x 12 Nos (RB 1) 60 Mtrs 210.00 12,600.00
Bar Round 16mm Ms 6000 x 10 Nos (RB 2)
18 Aft Peak Tank Transom Fr-8 Repair
Plate Gr A 3300 x 140 x 16 x 1 No (APT FR-8 F.S1) 59 Kgs 5.78 342.00
Plate Gr A 600 x 140 x 16 x 1 No (APT FR-8 F.S2) 35 Kgs 6.37 223.00
Plate Gr A 1000 x 140 x 16 x 1 No (APT FR-8 F.S3) 35 Kgs 6.37 223.00
19 Wbt.2p Trv. Bhd#94 Bkt. Renewal
Plate Eh 36 900 x 900 x 21 x 1 No (A) 136 Kgs 5.99 815.00
Plate Eh 36 700 x 100 x 16 x 1 No (B) 35 Kgs 7.11 249.00
20 Forepeak Tank Fr.119 Tie Plate
Plate Gr A 410 x 225 x 15 x 1 No (FPT F119 TP) 35 Kgs 5.78 202.00
21 Material For Aft Peak Tank.Port Side.
Plate Eh 36 200 x 300 x 12 x 2 Nos (INS) 70 Kgs 6.78 475.00
22 Aft Peak Tank Steel Repair
Plate Gr A 940 x 544 x 12 x 1 No (APT FR7 BKT) 50 Kgs 6.63 332.00

Page 92 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
22 Fpt Steel Repair.
Plate Gr A 410 x 225 x 15 x 1 No (MKL 01) 35 Kgs 5.78 202.00
23 Wbt No. 1s Steel Repair
Plate Gr A 200 x 150 x 13 x 1 No (L1) 35 Kgs 6.37 223.00
Plate Gr A 200 x 188 x 12 x 11 Nos (L2) 385 Kgs 6.63 2,553.00
Plate Gr A 200 x 188 x 13 x 1 No (L3) 35 Kgs 6.37 223.00
Plate Gr A 874 x 1063 x 12 x 1 No (PL.1) 200 Kgs 6.02 1,204.00
Plate Gr A 1170 x 175 x 18 x 1 No (PL.2) 35 Kgs 5.55 194.00
25 Wbt No. 1p Steel Repair
Plate Gr A 200 x 179 x 13 x 1 No (L1) 35 Kgs 6.37 223.00
Plate Gr A 200 x 179 x 12 x 4 Nos (L2) 140 Kgs 6.63 928.00
25 Water Ballast Tank #1s,3p,4p&4s Repair
Plate Gr A 300 x 200 x 12 x 1 No (FB) 35 Kgs 6.63 232.00
Plate Eh 36 300 x 200 x 14 x 4 Nos (FR100 S4) 140 Kgs 7.11 995.00
Plate Eh 36 3020 x 510 x 14 x 1 No (FR95 S1) 173 Kgs 6.52 1,125.00
Plate Gr A 300 x 200 x 12 x 9 Nos (SB) 315 Kgs 6.63 2,088.00
26 Water Ballast Tank #1stbd Repair
Plate Gr A 700 x 250 x 14 x 1 No (T.WEB.FR.100) 35 Kgs 6.37 223.00
27 Wbt No:5 Stbd Side Shell Plating
Plate Gr A 3000 x 800 x 20 x 1 No (S.SHL P3) 384 Kgs 6.37 2,446.00
28 Steel Plate Repair 6.37
Plate Gr A 600 x 250 x 14 x 1 No (MK 01) 35 Kgs 6.37 223.00
29 Wbt No.5p Handrailing Inside Tank To Renew
Bar Round 20mm Ms 6000 x 15 Nos (H.RAIL) 45 Mtrs 110.00 4,950.00
30 Water Ballast Tank No.5p Steel Repair
Plate Gr A 750 x 250 x 20 x 1 No (5P F.61 INS) 150 Kgs 6.02 903.00
Plate Gr A 1150 x 1150 x 16 x 1 No (5P F.63 INS) 300 Kgs 6.02 1,806.00
31 5 Port Fr 61 Insert.
Plate Gr A 900 x 255 x 18 x 1 No (MK 01) 50 Kgs 6.37 319.00

Cleaning Work:
Cargo tank- 1p/s,2p/s,3p/s & 5p/s Bottom, Under Deck, Side
BHD cleaning for hot work as per safety
Scraping Area- 2181 m2 2181 m2 7.00 15,267.00
Sludge disposal Nett 2 tons 450.00 900.00

Water1 p/s to 5p/s Ballast tank cleaning for Steel as per request;
Nett 80 Mhrs 13.50 1,080.00
80mhrs

Remove/refit and Blanking of Bellmouth for access of hotwork


works:
20" dia x 1 No 1 Nos 1,200.00 1,200.00
10" x 1 No 1 Nos 450.00 450.00

Painting assistance for power tooling of burn marks as follows:


24 March 2015 - 30mhrs (1port) (Day shift) Nett 30 Mhrs 15.00 450.00
24 March 2015 - 50mhrs (1stbd, 3 stbd, 1port) Nett 50 Mhrs 15.00 750.00
25 March 2015 - 50mhrs (3 stbd, 1stbd) Nett 50 Mhrs 15.00 750.00
30 March 2015 - 50mhrs (Aft , 5 P/S) Nett 50 Mhrs 15.00 750.00
30 March 2015 - 60mhrs (Night - WBT NO 4 P/S) Nett 60 Mhrs 15.00 900.00
31 March 2015 - 50mhrs (Day - Aft) Nett 50 Mhrs 15.00 750.00
31 March 2015 - 40mhrs (Night - Aft) Nett 40 Mhrs 15.00 600.00
1 April 2015 - 50mhrs (Day shift-WBT 5 Stbd) Nett 50 Mhrs 15.00 750.00
1 April 2015 - 50mhrs (Night shift-Hull external new steel) Nett 50 Mhrs 15.00 750.00

Staging:
Forepeak, Inside Tank Bottom Area: 3 off hanging each
1 LS 1,050.00 1,050.00
@3x1x1.5 meters - total 21 planks
Wbt 1 S, 1St Bay Frame# 94: 1 off hanging @3x1.5x1.5 meters
1 LS 500.00 500.00
- total 10 planks
Wbt 1 S, 1St Bay Frame# 95 Iwo Ladder: 2 off hanging each
1 LS 1,000.00 1,000.00
@3x1.5x1.5 meters - total 20 planks

Page 93 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Wbt 1 S, 2Nd Bay Frame# 95 Aft Area : 2 off hanging each
1 LS 700.00 700.00
@3x1.2x1.5 meters - total 12 planks
Wbt 1 S, 4Th Bay Frame# 97: 1 off hanging @3x1.5x1.5 meters
1 LS 500.00 500.00
- total 10 planks
Wbt 1 S, 4Th Bay Frame# 97: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 1 S, 6Th Bay Frame# 99: 2 off hanging each @2x1x1.5
1 LS 700.00 700.00
meters - total 12 planks
Wbt 1 S, 2Nd Stringer Frame# 97: 1 off tower @2x1.5x3 meters 1 LS 300.00 300.00
Wbt 1 S, 2Nd Stringer Frame# 97: 1 off hanging @2x1.2x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 1 S, 3Rd Stringer Frame# 97: 2 off hanging each @2x1x1.5
1 LS 700.00 700.00
meters - total 10 planks
Wbt 1 P, 1St Bay Frame# 95: 1 off hanging @3x1.5x1.5 meters -
1 LS 400.00 400.00
total 8 planks
Wbt 1 P, Fwd Bay Frame# 101: 1 off hanging @3x1.5x4 meters
1 LS 950.00 950.00
- total 18 planks, 1 ladder
Wbt 1 P, Frame# 100: 1 off tower @3x1.5x3 meters 1 LS 300.00 300.00
Wbt 1 P, Frame# 100: 1 off hanging @3x1.2x1.5 meters - total 8
1 LS 400.00 400.00
planks
Wbt 5 S, Frame# 63: 1 off tower @2x2x5 meters 1 LS 500.00 500.00
Wbt 5 S, Frame# 65: 1 off hanging @3x1.2x1.5 meters - total 5
1 LS 350.00 350.00
planks
Wbt 5 S, Frame# 58 To 59: 1 off tower @5x1.5x5 meters 1 LS 1,000.00 1,000.00
Side Shell, Stbd Side Fwd Area: 1 off hanging @11x2x1.5
1 LS 1,500.00 1,500.00
meters - total 30 planks
Side Shell, Stbd Side Fwd Area(Access Platform): 1 off hanging
1 LS 750.00 750.00
@2x2x12 meters - total 13 planks, 2 ladders
Side Shell, Iwo 5 S Aft Area: 1 off hanging @13x2x1.5 meters -
1 LS 3,850.00 3,850.00
total 76 planks, 1 ladder
Side Shell, Stbd Side Aft Area(Access Platform): 1 off hanging
1 LS 500.00 500.00
@2x1.5x12 meters - total 9 planks, 1 ladder
Side Shell, Stbd Side Iwo Wbt # 5: 1 off hanging @8x1.5x1.5
1 LS 1,750.00 1,750.00
meters - total 34 planks, 1 ladder
Side Shell, Stbd Side Aft Area(Access Platform): 1 off hanging
1 LS 350.00 350.00
@2x1.5x4 meters - total 5 planks
Wbt 1 S, Frame # 95 Aft Area: 1 off tower @3x1.5x3 meters 1 LS 300.00 300.00
Wbt 1 S, Frame # 100 Aft Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 1 S, Frame # 100 To 101: 1 off hanging @6x1.5x1.5 meters
1 LS 950.00 950.00
- total 19 planks
Wbt 1 P, Frame # 100 Fwd Area: 1 off hanging @3x1.5x1.5
1 LS 600.00 600.00
meters - total 12 planks
Wbt 1 P, Frame # 97 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 2 P, Frame # 85 Aft Area: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 7 planks
Wbt 2 P, Frame # 86 Aft Area : 1 off tower @3x1x3 meters 1 LS 150.00 150.00
Wbt 2 P, Frame # 86 Aft Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 2 P, Frame # 92 Fwd Area: 1 off tower @2x1x3 meters 1 LS 150.00 150.00
Wbt 2 P, Frame # 92 Fwd Area Top: 1 off hanging @3x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 2 P, Frame # 89 Fwd Area Top: 1 off hanging @3x3x1.5
1 LS 700.00 700.00
meters - total 14 planks
Wbt 2 P, Frame # 89 Aft Area Top: 1 off hanging @3x2.5x1.5
1 LS 600.00 600.00
meters - total 12 planks
Wbt 2 P, Frame # 87 Fwd Area 2Nd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.2x1.5 meters - total 8 planks
Wbt 2 P, Frame # 90 Fwd Area 2Nd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.2x1.5 meters - total 8 planks
Wbt 2 P, Frame # 86 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 400.00 400.00
@3x1.2x1.5 meters - total 8 planks
Wbt 3 S, Frame # 82 Iwo Access: 1 off tower @3x1.8x3 meters 1 LS 300.00 300.00
Wbt 3 S, Frame # 82 Aft Area: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Wbt 3 S, Frame # 81 Aft Area: 1 off hanging @3x1.5x1.5 meters
1 LS 600.00 600.00
- total 12 planks
Wbt 3 S, Frame # 79 Fwd Area: 1 off hanging @1.5x1.2x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 3 S, Frame # 78 Fwd Area: 1 off hanging @2x1.5x4 meters
1 LS 750.00 750.00
- total 14 planks, 1 ladder
Wbt 3 S, Frame # 79 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.5x1.5 meters - total 8 planks

Page 94 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Wbt 4 S, Frame # 75 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 S, Frame # 75 Aft Area: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 4 planks
Wbt 4 S, Frame # 75 Fwd Area: 1 off hanging @2x1.2x1.5
1 LS 350.00 350.00
meters - total 7 planks
Wbt 4 S, Frame # 70 Fwd Area: 2 off hanging each @2x1.5x1.5
1 LS 800.00 800.00
meters - total 16 planks
Wbt 4 S, Frame # 67 Fwd Area: 1 off hanging @2x2x1.5 meters
1 LS 500.00 500.00
- total 10 planks
Wbt 4 S, Frame # 71 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 400.00 400.00
@2x1.5x1.5 meters - total 8 planks
Wbt 3 P, Frame # 83 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 400.00 400.00
- total 8 planks
Wbt 3 P, Frame # 85 Fwd Area : 1 off hanging @3x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 3 P, Frame # 82 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Wbt 3 P, Frame # 81 Fwd Area: 1 off hanging @2x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 3 P, Frame # 81 Aft Area: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 6 planks
Wbt 3 P, Frame # 77 Aft Area: 1 off hanging @3x2x1.5 meters -
1 LS 600.00 600.00
total 12 planks
Wbt 3 P, Frame # 77 Fwd Area: 1 off hanging @3x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 P, Frame # 76 Aft Area: 1 off tower @2x2x5 meters 1 LS 500.00 500.00
Wbt 4 P, Frame # 75 Fwd Area: 1 off hanging @3x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 P, Frame # 75 Fwd Area Top: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 4 P, Frame # 74 Fwd Area : 1 off hanging @3x1.8x1.5
1 LS 500.00 500.00
meters - total 10 planks
Wbt 4 P, Frame # 74 Fwd Area Top: 1 off hanging @2x1.8x1.5
1 LS 500.00 500.00
meters - total 10 planks
Wbt 4 P, Frame # 74 Aft Area Top: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 4 P, Frame # 73 Fwd Area: 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Wbt 4 P, Frame # 72 Fwd Area: 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Wbt 4 P, Frame # 72 Fwd Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 4 P, Frame # 70 Fwd Area: 2 off hanging each @2x1x1.5
1 LS 700.00 700.00
meters - total 10 planks
Wbt 4 P, Frame # 70 To 71: 1 off hanging @6x3x1.5 meters -
1 LS 1,350.00 1,350.00
total 27 planks
Wbt 4 P, Frame # 69 Fwd Area: 2 off hanging each @3x1x1.5
1 LS 700.00 700.00
meters - total 10 planks
Wbt 4 P, Frame # 68 Fwd Area : 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Wbt 4 P, Frame # 68 To 69: 1 off hanging @6x1.8x1.5 meters -
1 LS 900.00 900.00
total 18 planks
Wbt 5 S, Frame # 54: 1 off tower @3.5x1.5x2 meters 1 LS 600.00 600.00
Wbt 5 S, Frame # 61 To 62 : 1 off hanging @5x1.5x1.5 meters -
1 LS 600.00 600.00
total 12 planks
Wbt 5 S, Frame # 65 Aft Area : 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 5 S, Frame # 64 To 65 Iwo Ladder Area: 1 off hanging
1 LS 700.00 700.00
@5x1.5x1.5 meters - total 14 planks
Wbt 5 S, Frame # 64 Iwo Ladder Area: 1 off hanging @2x2x1.5
1 LS 500.00 500.00
meters - total 10 planks
Apt Peak Tank, Aft Area: 2 off tower each @2x1x2.5 meters 1 LS 300.00 300.00
Apt Peak Tank, Center Aft Area: 1 off tower @3x1x2.5 meters 1 LS 150.00 150.00
Apt Peak Tank, Fwd Area: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Apt Peak Tank, Port & Stbd Aft Area: 2 off hanging each
1 LS 700.00 700.00
@1.5x1.5x1.5 meters - total 12 planks
Apt Peak Tank, Port Side Aft Area: 1 off tower @2x1x2.5 meters 1 LS 150.00 150.00
Apt Peak Tank, Port Side Aft Area: 2 off tower each @2x1x2.5
1 LS 300.00 300.00
meters
Apt Peak Tank, Port Side Aft Area: 3 off hanging each
1 LS 1,050.00 1,050.00
@1.5x0.5x1.5 meters - total 6 planks
Cot 2 P, Port Side 3Rd Stringer: 1 off hanging @4x1.5x1.5
1 LS 700.00 700.00
meters - total 14 planks
Engine Room, Aft Area Iwo S/Gear Room: 1 off tower @4x3x4
1 LS 1,080.00 1,080.00
meters

Page 95 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Wbt 1 P, Frame # 101 Aft Area: 1 off hanging @2x1.5x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 1 P, Frame # 97 Aft Area: 1 off hanging @2x2x1.5 meters -
1 LS 350.00 350.00
total 7 planks
Wbt 2 P, Frame # 86 Fwd Area 3Rd Stringer: 1 off hanging
1 LS 350.00 350.00
@3x1.2x1.5 meters - total 7 planks
Wbt 2 P, Frame # 91 Aft Area 3Rd Stringer Top: 2 off hanging
1 LS 800.00 800.00
each @2x1.2x1.5 meters - total 16 planks
Wbt 2 P, Frame # 91 Aft Area 3Rd Stringer: 1 off tower
1 LS 150.00 150.00
@2x1.2x2 meters
Wbt 2 P, Port Side Double Bottom Fwd Area: 1 off tower
1 LS 300.00 300.00
@2x1.5x3 meters
Wbt 2 P, Straight Type Open Railing: 1 off railing @2x0x1.5
1 LS 80.00 80.00
meters
Wbt 2 S, Frame # 86 Aft Area: 1 off tower @2x1.5x2.5 meters 1 LS 300.00 300.00
Wbt 2 S, Frame # 86 Aft Area: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Wbt 2 S, Frame # 86 Fwd Area Top: 3 off hanging each
1 LS 1,350.00 1,350.00
@2x1.5x1.5 meters - total 27 planks
Wbt 2 S, Frame # 87 Fwd Area Top: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 2 S, Frame # 88 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 350.00 350.00
- total 6 planks
Wbt 2 S, Frame # 88 Fwd Area: 1 off tower @3x1.5x4.5 meters 1 LS 450.00 450.00
Wbt 2 S, Frame # 89 Aft Area: 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 2 S, Frame # 89 Fwd Area: 1 off hanging @2x1x1.5 meters
1 LS 350.00 350.00
- total 5 planks
Wbt 2 S, Frame # 90 Fwd Area: 1 off hanging @4x1.2x1.5
1 LS 650.00 650.00
meters - total 13 planks
Wbt 2 S, Frame # 94 Aft Area: 1 off hanging @3x1.5x1.5 meters
1 LS 400.00 400.00
- total 8 planks
Wbt 5 S, Frame # 58 Aft Area Top: 1 off hanging @2x1.5x4
1 LS 850.00 850.00
meters - total 16 planks, 1 ladder
Wbt 5 S, Frame # 59 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 5 S, Frame # 60 Fwd Area Top: 1 off hanging @2x1.5x4
1 LS 850.00 850.00
meters - total 16 planks, 1 ladder
Wbt 5 S, Frame # 62 To 63 2Nd Stringer (Provide Ladder): 1 off
1 LS 150.00 150.00
structure @0.5x0.5x3 meters
Wbt 5 S, Frame # 63 Fwd Area Top: 1 off hanging @1.5x1.5x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 S, Frame # 63 Fwd Area: 1 off hanging @2.5x0.75x1.5
1 LS 350.00 350.00
meters - total 4 planks
Wbt 5 S, Frame # 64 Aft Area Top: 1 off hanging @2x1.5x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 5 S, Frame # 64 Aft Area: 1 off hanging @3.5x1x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Wbt 5 S, Frame # 64 Aft Area: 1 off hanging @3x2x1.5 meters -
1 LS 450.00 450.00
total 9 planks
Apt Peak Tank, Port Side Aft Area: 1 off hanging @1.5x0.5x1.5
1 LS 350.00 350.00
meters - total 2 planks
Wbt 1 S, Frame # 94 To 95 2Nd Stringer: 1 off hanging
1 LS 550.00 550.00
@5.5x1.2x1.5 meters - total 11 planks
Wbt 1 S, Frame # 95 Fwd Area 2Nd Stringer: 1 off hanging
1 LS 350.00 350.00
@2x1.2x1.5 meters - total 6 planks
Wbt 2 P, Frame # 87 To 88 Straigth Type: 1 off railing
1 LS 48.00 48.00
@1.2x0x1.5 meters
Wbt 2 S, Frame # 89 Fwd Area: 1 off tower @2x1x3 meters 1 LS 150.00 150.00
Wbt 3 P, Frame # 85 Aft Area Top: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 7 planks
Wbt 3 S, Frame # 76 Fwd Area: 1 off tower @3.5x1.2x4 meters 1 LS 400.00 400.00
Wbt 4 P, Frame # 67 Fwd Area Top: 1 off hanging @1.5x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 4 P, Frame # 67 Fwd Area: 1 off tower @3x1.2x5 meters 1 LS 250.00 250.00
Wbt 4 P, Frame # 68 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 550.00 550.00
- total 11 planks
Wbt 4 P, Frame # 68 Fwd Area Top: 1 off hanging @3x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 4 P, Frame # 69 Fwd Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 4 P, Frame # 70 Aft Area Top: 1 off hanging @2x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 4 P, Frame # 70 Aft Area: 1 off hanging @4x2.8x1.5 meters
1 LS 850.00 850.00
- total 17 planks

Page 96 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Wbt 4 P, Frame # 73 Fwd Area Top: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 P, Frame # 59 Aft Area 2Nd Stringer: 1 off hanging
1 LS 350.00 350.00
@2x1.2x1.5 meters - total 5 planks
Wbt 5 P, Frame # 59 Aft Area: 2 off hanging each @4x1x1.5
1 LS 1,200.00 1,200.00
meters - total 22 planks, 1 ladder
Wbt 5 P, Frame # 60 Aft Area: 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 6 planks
Wbt 5 P, Frame # 60 Fwd Area: 1 off tower @3x1x3 meters 1 LS 150.00 150.00
Wbt 5 P, Frame # 61 Aft Area: 1 off hanging @3.5x1.2x1.5
1 LS 600.00 600.00
meters - total 12 planks
Wbt 5 P, Frame # 62 Fwd Area Top: 1 off hanging @3x1x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 P, Frame # 62 Top: 1 off hanging @1.5x1x1.5 meters -
1 LS 350.00 350.00
total 6 planks
Wbt 5 P, Frame # 63 Fwd Are: 1 off tower @2x1x2 meters 1 LS 150.00 150.00
Wbt 5 P, Frame # 64 Fwd Area Iwo Ladder: 1 off hanging
1 LS 600.00 600.00
@3x1.8x1.5 meters - total 12 planks
Wbt 5 P, Frame # 64 Safety Platform: 1 off platform @2x1x1.5
1 LS 120.00 120.00
meters
Wbt 5 P, Frame # 65 Fwd Area: 1 off hanging @3x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 P, Frame # 66 Aft Area Top: 1 off hanging @1.5x1.5x1.5
1 LS 350.00 350.00
meters - total 7 planks
Wbt 5 P, Frame # 66 Aft Area: 1 off hanging @3x1.2x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Wbt 5 P, Frame # 66 Fwd Area: 1 off hanging @2x1.2x1.5
1 LS 400.00 400.00
meters - total 8 planks
Wbt 5 S, Frame # 58 Fwd Area Top: 1 off hanging @1.5x1x1.5
1 LS 350.00 350.00
meters - total 5 planks
Wbt 5 S, Frame # 64 Aft Area Top: 1 off hanging @1.5x1.2x1.5
1 LS 350.00 350.00
meters - total 6 planks
Wbt 5 S, Frame # 66 Aft Area: 1 off hanging @2x1.2x1.5 meters
1 LS 350.00 350.00
- total 7 planks
Side Shell, Iwo 5 S Aft Area(Additional Lift): 1 off hanging
1 LS 1,250.00 1,250.00
@12x1.8x1.5 meters - total 25 planks
Wbt 4 P, Frame # 71 To 70: 1 off hanging @4x1.2x1.5 meters -
1 LS 500.00 500.00
total 10 planks
Wbt 4 P, Frame # 70 Aft Area: 1 off hanging @2x1.2x1.5 meters
1 LS 350.00 350.00
- total 6 planks
Wbt 3 P, Iwo Access Ladder: 1 off tower @1.5x1.5x2 meters 1 LS 300.00 300.00
Forepeak, Port & Stbd 1St / 2Nd Stringer: 4 off tower each
1 LS 1,400.00 1,400.00
@2x2x3.5 meters
Wbt 5 S, Frame # 65 Fwd Area: 1 off hanging @2x1.5x1.5
1 LS 500.00 500.00
meters - total 10 planks
Wbt 5 S, Frame # 66 Aft Area(Walk Way): 1 off hanging
1 LS 400.00 400.00
@3x1.5x1.5 meters - total 8 planks
Wbt 5 S, Frame # 65 3Rd Stringer: 1 off tower @2x1x3 meters 1 LS 150.00 150.00
Wbt 5 P, Frame # 65 1St Stringer: 1 off tower @2x1x4 meters 1 LS 200.00 200.00
Main Deck, Port & Stbd Iwo F.Peak Open Plate Cutting: 2 off
1 LS 416.00 416.00
railing each @4x1.2x1.5 meters
Side Shell, Iwo 5 S 2Nd Erection(Add'L Lift): 1 off hanging
1 LS 1,250.00 1,250.00
@12x1.8x1.5 meters - total 25 planks
Wbt 5 P, Fwd Area Iwo Access: 1 off hanging @3x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks
Wbt 5 P, Fwd Area Iwo Access: 1 off hanging @2x1x1.5 meters -
1 LS 350.00 350.00
total 5 planks

A00161 Addl 18/03/2015PORT CARGO CRANE LEVEL OVERHAUL


Port Midship crane
Arrange technicians to carry out troubleshooting Port midhsip
1 Nett 1 EA 845.00 845.00
crane x 1 no
Disconnect, blank and remove 01 Nos main hyd control block
(Danfoss PVG 32) from port midship crane, transport to GOS
2 Nett 1 EA 1,320.00 1,320.00
workshop, dismantle control block, clean overhaul, test, return
onboard and reinstall. (x 1 Nos)

Spares for midship control block:


01 Set - SEAL KIT FOR PVG32 3 SECTION VALVE BLOCK Nett 1 EA 203.00 203.00
03 Set - MECH.ACTUATION WITH BASE PVM32 - 157B3171 Nett 1 EA 506.00 506.00
03 Set - COVER PVMD - 157B0001 Nett 1 EA 121.50 122.00
01 Set - PVS END PLATE MODULE - 157B2000 Nett 1 EA 162.00 162.00

Page 97 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

Electrical assistance to Isolate crane system starter panel with


3 1 EA 240.00 240.00
tag and Pad lock and reconnect upon completion.

4 Staging:
Main Deck, Port & Stbd Iwo Deck Crane: 1 off tower
1 EA 140.00 140.00
@3x0.75x3.5 meters
Main Deck, Port Iwo Deck Crane: 1 off hanging @3x2x1.5
1 EA 800.00 800.00
meters - total 16 planks

A00162 Addl 18/03/2015CRANES STAGING


Main Deck, Port & Stbd Side Iwo Boom Crane: 2 off tower each
1 EA 800.00 800.00
@1.8x1.8x5 meters
Main Deck, Stbd Side Iwo Midship Crane: 1 off tower
1 EA 200.00 200.00
@2.5x1.2x5 meters
Main Deck, Stbd Side Iwo Midship Crane: 1 off hanging
1 EA 700.00 700.00
@4x1.2x1.5 meters - total 14 planks
Engine Room, Port & Stbd Fwd Inside E/R Fan: 2 off hanging
1 EA 700.00 700.00
each @2x1.5x1.5 meters - total 14 planks

A00163 Addl 19/03/2015STBD WINCH FWD CLUTCH

A00164 Addl 19/03/2015DECK LINES PRESSURE TEST - BUDGETARY


Piping assistance during testing - Allow 2500mhrs Nett 2500 Mhrs 15.00 37,500.00
For your info: up to 28 March 2015 - consumed 2212mhrs

Consumable: 1 LS 2,000.00 2,000.00

Provide Cleaners Man power assistance to Pipe fitter on Main


deck for Bunker line opening period oil collecting & oil cleaning Nett 112 Mhrs 13.50 1,512.00
as per pipe fitter request .

Staging:
Pump Room, 1St Level: 1 off hanging @3x2x1.5 meters - total
1 LS 550.00 550.00
11 planks
Main Deck, Center Fwd Area: 1 off tower @2x0.75x2 meters 1 LS 120.00 120.00
Main Deck, Center Iwo Pipe Racks: 1 off tower @4x1.5x3
1 LS 480.00 480.00
meters
Main Deck, Center Iwo Pipe Racks: 1 off tower @3x1x2 meters 1 LS 120.00 120.00
Main Deck, Center Aft Area: 1 off tower @4x1.2x2 meters 1 LS 240.00 240.00
Main Deck, Center Iwo Pipe Racks: 3 off tower each @2x1x2
1 LS 360.00 360.00
meters
Main Deck, Stbd Side Iwo Manifold: 2 off tower each
1 LS 480.00 480.00
@1.5x1.5x2 meters
Main Deck, Center Aft Area Iwo Pipe Racks: 1 off tower
1 LS 240.00 240.00
@4x1.2x2 meters
Main Deck, Center Area Iwo Pipe Racks: 1 off tower @2.5x2x2
1 LS 240.00 240.00
meters
Main Deck, Center Area Iwo Pipe Racks: 1 off tower @2x1.8x2
1 LS 240.00 240.00
meters

A00165 Addl 19/03/2015SLOP P/SB CLEANING


Slop p/s cleaning for inspection
Connection and disconnection of pump x 2 nos 2 Time 250.00 500.00
Pumping approx.- 06 Hours 6 hrs 30.00 180.00
Dispose of oily water (Port: 10m3, Stbd: 2m3)- 12 TONS 12 Tons 60.00 720.00
Dispose of Sludge (Cot- 2 port : 02 tons &
25.76 Tons 450.00 11,592.00
P/s tanks Bottom Scraping area- 130 m2 130 m2 6.00 780.00
P/s tanks Bottom Moping area- 130 m2 130 m2 5.00 650.00

Sludge analysis x 1 sample Nett 1 EA 286 286.00

A00166 Addl 20/03/2015WBT HP WASH

A00167 Addl 20/03/2015CHERRY PICKER ASSISTANCE

A00168 Addl 20/03/2015CHAIN LOCKER STEELWORK

Page 98 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Crop and renew plates:
Plate Gr A 2744 x 2050 x 20 x 2 Nos (PLT-1) 1,800 Kgs 7.55 13,590.00
Plate Gr A 2744 x 2050 x 20 x 4 Nos (PLT-2) 3,600 Kgs 7.55 27,181.00
Plate Gr A 2744 x 2450 x 20 x 2 Nos (PLT-3) 2,151 Kgs 7.55 16,242.00
Plate Gr A 2744 x 2450 x 20 x 4 Nos (PLT-4) 4,303 Kgs 7.55 32,485.00
Plate Gr A 2744 x 2650 x 20 x 2 Nos (PLT-5) 2,327 Kgs 7.55 17,568.00
Plate Gr A 2744 x 2650 x 20 x 4 Nos (PLT-6) 4,654 Kgs 7.55 35,136.00
Plate Gr A 2744 x 2535 x 20 x 2 Nos (PLT-7) 2,226 Kgs 7.55 16,806.00
Plate Gr A 2744 x 2535 x 20 x 4 Nos (PLT-8) 4,452 Kgs 7.55 33,612.00
Chain Locker Fitting Materials () - Kgs 7.55 -
Plate Gr A 554 x 174 x 12 x 80 Nos (MK1) 2,800 Kgs 7.55 21,140.00
Plate Gr A 240 x 150 x 12 x 80 Nos (MK2) 2,800 Kgs 7.55 21,140.00

Staging:
Chain Locker , Port & Stbd Inside: 2 off tower each
1 LS 2,700.00 2,700.00
@1.8x1.8x15 meters
Chain Locker , Stbd Side Provide Temp.Platform: 1 off hanging
1 LS 350.00 350.00
@1.5x0.75x1.5 meters - total 4 planks
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 700.00 700.00
each @3x1x7 meters
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 700.00 700.00
each @2x1x7 meters
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 1,400.00 1,400.00
each @3x2x7 meters
Forepeak, Port & Stbd 3Rd Stringer Iwo C.Locker: 2 off tower
1 LS 1,400.00 1,400.00
each @2x1.5x7 meters
Forepeak, Port & Stbd Provide (Safety Platform): 2 off platform
1 LS 160.00 160.00
each @1x1x1.5 meters
Chain Locker , Inside Of Chain Locker: 2 off tower each
1 LS 500.00 500.00
@3x1x5 meters
Chain Locker , Inside Of Chain Locker: 2 off hanging each
1 LS 700.00 700.00
@3x1x1.5 meters - total 10 planks
Chain Locker , Port Side Inside C. Locker: 1 off tower @2x1.5x5
1 LS 500.00 500.00
meters
Forepeak, Port Side Temp.Covering Open Cutting Plate: 1 off
1 LS 120.00 120.00
platform @2x1x1.5 meters
Chain Locker , Stbd Side Inside C.Locker: 1 off tower @2x1.5x5
1 LS 500.00 500.00
meters
Forepeak, Stbd Side Temp.Covering Open Cutting Plate: 1 off
1 LS 120.00 120.00
platform @2x1x1.5 meters

A00169 Addl 21/03/2015PROTECTION COVERING FOR SILICON APPLICATION

Masking of hull 2340 m2 15.00 35,100.00

A00170 Addl 21/03/2015ADDL STEEL WORK ON DECK


1 E/Room Hatch Cover Ss Pin Renewal.
Bar Round 40mm Aisi 304 S/S 94 x 2 Nos (PIN) 2 Nos 204.00 408.00

2 Dismantled onboard 01-no. steering gear hatch cover + 01-no.


pump room portside + 01-no. engine room vent wall cover, and 3 Nos 600.00 1,800.00
delivered to steel shop prior for repair.;

1.) cropped-out, and renewed wasted retainers.^2.) welded as


required.^3.) straightening after welding^4.) delivered to hull
treatment prior for blasting and painting (as per owner specs., 1 LS 1,428.00 1,428.00
^5.) delivered back, and re-fitted back onboard^as per o/r
requirements.
Plate Gr A 1010 x 30 x 6 x 1 No (ER INR-1 TNR)
Plate Gr A 450 x 30 x 6 x 1 No (ER INR-2 TNR)
Plate Gr A 1090 x 30 x 6 x 4 Nos (ER OUTRTNR)
Plate Gr A 1090 x 30 x 6 x 4 Nos (PR OUTRTNR)
Plate Gr A 1590 x 30 x 6 x 4 Nos (SG OUTRTNR)

3 Misc Stl Works On Deck Save All On Sunken Deck


Cropped-out, and renewed wasted top section of save all at
sunken deck near transom area as per o/r requirements.
Plate Gr A 1501 x 100 x 6 x 2 Nos (SAVE ALL) 1 LS 1,530.00 1,530.00

Page 99 to 162
ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)
Machining Process:
Mfrd. ( 2 ) s/s pins proc. N0. 152436. ( 5 hrs. ) 5 hrs 75.00 375.00

A00171 Addl 21/03/2015STEAM PIPE PRESSURE TEST IN SHOP


Remove/refit pipe and send to workshop:
C.S Pipe 10" sch 80 x 1200 mm L x 1 Nos 2.10 Mtrs 432.00 907.00
Blanking and pressure tested 1 LS 544.32 544.00
-
A00172 Addl 21/03/2015CYLINDER HEAD INJ. REMOVAL -
Cylinder head injection removal 10 EA 250.00 2,500.00
Unit nos. #3, 5 and 1 spare = total 6 injectors, done onboard
Unit nos. #6, 7 = total 4 injectors, done in workshop.
( 1 ) injector from cylinder head #7, removed ( 2 )exhaust valve
studs and ( 2 ) injector studs for access, jack - off
injector using a 30 ton jack and takes 1 x 2 fitter full shift to
remove.
Injector studs and exhaust valve studs refitted upon completion

A00173 Addl 21/03/2015WINCH GAP CLEARANCES 1 EA 300.00 300.00


STBD. WINDLASS:
Prepared hydraulic jack, hoses and hand pump and transported
to jetty and to onboard.
Prepared pipe spacers, set dial indicator on top of the pinion
gear shaft and jack to check the clearances
between shaft and pedestal bearings. ( 2 ) locations.

A00174 Addl 22/03/2015HYDRO BLASTING OF BALLAST TANKS -


Location: -
WBT No 3 P/S - 2 tanks -
WBT No 2 P/S - 2 tanks -
-
HP fresh water wash (200bar), 300m2 x 2 tanks Nett 600 m2 2.50 1,500.00
-
Hydro blasting to WJ 2 (Touch Up), on DB deck head weld
Nett 600 m2 33.60 20,160.00
seams x 2 tanks
Hosing down - x 2 tanks Nett 600 m2 2.00 1,200.00
-
Apply touch up coat 150 mic, 2coats 300m2 x 2 tanks Nett 1200 m2 2.50 3,000.00

Timesheet for power tooling of burn mark:


27 march 2015 - 30mhrs (new steel 2 stbd & 4stbd) Nett 30 m2 15.00 450.00
28 march 2015 - 30mhrs (new steel 2 port &4port) Nett 30 m2 15.00 450.00
28 march 2015 - 30mhrs (new steel 3 port ) Nett 30 m2 15.00 450.00
29 march 2015 - 30mhrs (new steel 2 port & 3 stbd ) Nett 30 m2 15.00 450.00

A00175 Addl 23/03/2015ACCOMMODATION LADDERS - LOAD TEST


To remove/refit ladders 2 EA 1,147.50 2,295.00
Ladder load test 1 time(2nos) 2 EA 1,620.00 3,240.00
Deflection test 1 time(2nos) 2 EA 1,620.00 3,240.00

A00176 Addl 24/03/2015SB WINDLASS OVERHAUL - BUDGETARY 1 EA 15,000.00 15,000.00

A00177 Addl 24/03/2015CHAIN STOPPER SB SIDE REPAIR - CANCELLED


Cropped out and renewed damaged handle of stbdside chain
0 EA 2,650.00 -
stopper. Straighten de-formedstbdside chain stopper

A00178 Addl 25/03/2015COW LINE PIPE REPAIR


Remove/refit pipe to workshop:
C.S Pipe 4" sch 80 x 6000 mm L x 1 Nos 6.00 Mtrs 136.00 816.00
Remove/refit dresser coupling x 1 No 1.00 EA 136.00 136.00

Partial repair of Pipe


C.S Pipe 4" sch 80 x 1200 mm L x 1 Nos 2.10 Mtrs 170.00 357.00

Page 100 to 162


ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

A00179 Addl 25/03/2015P/R FAN CASING REPAIR

A00180 Addl 25/03/2015SB WINDLASS TROUBLE SHOOT

A00181 Addl 25/03/2015WBT ANODES INSTALLATION - CANCELLED 0 -

BALLAST TANK BELLMOUTH REMOVE REFIT FOR


A00182 Addl 25/03/2015
INSPECTION

A00183 Addl 25/03/2015LSHFO TANK CLEANING


Connection and disconnection of pump x 1 no 1 Time 250.00 250.00
Pumping approx.- 01 Hours 1 hrs 30.00 30.00
Scraping area- 103 m2 103 m2 6.00 618.00
Moping with Diesel and cleaning area- 206m2 206 m2 5.00 1,030.00
Dispose of oily water approx.- 1 tons 10 Tons 60.00 600.00
Sludge disposal approx.- 500kgs NETT 1 Tons 450.00 450.00

A00184 Addl 28/03/2015SB BREAST WINCH OVERHAUL 1 EA 7,500.00 7,500.00


Cropped out damaged strips and renewed. Built up worn out
-
areas of 1 nos cable drum & 2nos dog clutch - Allow 20hrs
Built up pinion shaft - Allow 20Hrs -
Provide 2 steel ring plates, size 240mm OD x 190mm ID x
-
30mm thk

A00185 Addl 28/03/2015CABLE LAYING ASSISTANCE


Electrical assistance :
28 March 2015 - 2hrs Nett 2 Mhrs 15.00 30.00
29 March 2015 - 19hrs Nett 19 Mhrs 15.00 285.00
30 March 2015 - 19hrs Nett 19 Mhrs 15.00 285.00

A00186 Addl 28/03/2015AUTOMATIC UNLOADING SYSTEM CALIBRATION Nett 3 Nos 350.00 1,050.00

A00187 Addl 28/03/2015E/R STAGING

A00188 Addl 28/03/2015HATCH COVERS CHANNEL REPAIRS


Removed existing hatch cover/dome rigged to the workshop for
repair and returned back to onboard and installed back x 13 13 Nos 1,800.00 23,400.00
Nos
Renewed channel c/w removed/refitted gaskets

A00189 Addl 28/03/2015P/R BALLAST PIPE RENEWAL

A00190 Addl 29/03/2015SHEAVE FABRICATION

A00191 Addl 29/03/2015CARGO SEPARATOR INSERT

A00192 Addl 31/03/2015SCUPPER PIPE RENEWAL

Staging:
Main Deck, Stbd Side Iwo Provision Store: 1 off tower @2x1x3.5
1 LS 140.00 140.00
meters
Main Deck, Stbd Side Iwo Provision Store: 1 off tower @1.5x1x2
1 LS 120.00 120.00
meters

A00193 Addl 31/03/2015MATERIAL REMOVAL - buDGETARY 1 LS 2,500.00 2,500.00


Provide rigger, transportation trailer, forklift, cranage and
disposal space to dispose Owner material

ESTIMATED COST FOR MACHINING, STAGINGS AND


100,000.00
ITEMS THE DETAILS YET TO BE RECEIVED

TOTAL FOR OWNER'S REPAIRS ACCOUNT 1,428,630 296,642.00

Page 101 to 162


ORIGINAL ADDITIONA
RATE QUOTED L
SEQ NO O.REF. DESCRIPTION QTY UNIT
(US$) PRICE WORKS
(US$) (US$)

Amount Not Subject To Discount (Nett Items)

Less: 20% Tender Discount


Additional Lumpsum discount

Add: Amount Not Subject To Discount (Nett Items)

TOTAL NETT AMOUNT (US $)

Page 102 to 162


2-Apr-15 17-Mar-15
Arrive
Only for Steeel work Calculations

ESTIMATED TOTAL DRAWING Weight cal@


(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

-
17,550.00 0 17,550.00
78,975.00 0 78,975.00
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
1,350.00 0 1,350.00
6,975.00 0 6,975.00
1,000.00 0 1,000.00
158.00 0 158.00
- 0 -
- 0 -
1,350.00 0 1,350.00
6,975.00 0 6,975.00
500.00 0 500.00
225.00 0 225.00
- 0 -
- 0 -
1,350.00 0 1,350.00
6,525.00 0 6,525.00
1,000.00 0 1,000.00
158.00 0 158.00
- 0 -
- 0 -
360.00 0 360.00
4,550.00 0 4,550.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
145.00 0 145.00
1,170.00 0 1,170.00
- 0 -
- 0 -
4,680.00 0 4,680.00
- 0 -
- 0 -
- 0 -
600.00 0 600.00
- 0 -
- 0 -
155.00 0 155.00
4,500.00 0 2,025.00
- 0 -
6,533.00 0 6,533.00

Page 103 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
140.00 0 140.00
- 0 -
- 0 -
170.00
0 170.00
630.00 0 Report to be submitted 630.00
- 0 -
85.00
0
140.00 0
- 0 -
170.00 0 170.00
420.00 0 420.00
- 0 -
170.00
0 170.00
630.00 0 630.00
- 0 -
170.00 0 170.00
630.00 0 630.00
- 0 -
- 0 -
140.00 0 140.00
1,350.00 0 1,350.00
- 0 -
- 0 -
4,680.00 0 4,680.00
2,380.00 0 2,380.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
540.00
0 Report to be submitted 540.00
- 0 -
- 0 -
1,170.00 0 1,170.00
- 0 -
- 0 -
-
0 -
810.00 0 810.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
810.00 810 810.00

Page 104 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
880.00 880 880.00
- 0 -
- 0 -
- 0 -
3,863.00 0 3,863.00
6,750.00 0 6,750.00
9,450.00 0 9,450.00
712.00 0 712.00
712.00 0 712.00
1,375.00 0 1,375.00
6,625.00 0 6,625.00
- 0 -
- 0 -
172.00 0 172.00
4,626.00 0 4,626.00
175.00 0
175.00 0
- 0 -
169.00 0 169.00
169.00 0 169.00
- 0 -
- 0 -
49,020.00 0 Signed report to be submitted
21,569.00 0 21,569.00
40,107.00 0 40,107.00
3,268.00 0 3,268.00
- 0 -
- 0 -
3,139.00 0 3,139.00
9,592.00 0 9,592.00
- 0 -
- 0 -
2,354.00 0 2,354.00
2,354.00 0 2,354.00
12,938.00 0 12,938.00
23,601.00 0 23,601.00
- 0 -
- 0 -
- 0 -
- 0 -
4,000.00 0 4,000.00
8,340.00 0 8,340.00
- 0 -

11,600.00
0
- 0 -
- 0 -
660.00 0 660.00
530.00 0 530.00
51.00 0 51.00
51.00 0 51.00
220.00 0 220.00
740.00 0 740.00
- 0 -
- 0 -

Page 105 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

3,795.00 0 3,795.00
7,079.00 0 7,079.00
622.00 0 622.00
622.00 0 622.00
1,265.00 0 1,265.00
4,140.00 0 4,140.00
- 0 -
- 0 -
8,030.00 0 Signed report to be submitted
- 0 -
850.00 0 Signed report to be submitted 850.00
- 0 -
- 0 -
- 0 -
4,380.00
0 Signed report to be submitted 2,250.00
- 0 -
276.00
0 Signed report to be submitted 276.00
- 0 -
6,550.00 0 6,550.00
- 0 -
- 0 -
- 0 -
2,304.00 0 2,304.00
624.00 0 624.00
- 0 -
3,600.00 3,600 3,600.00
975.00 975 975.00
- 0 -
- 0 -

3,050.00
0 3,050.00
- 0 -
960.00 0 960.00
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
2,850.00
0 To be painted after fabrication 2,850.00
1,200.00 0 1,200.00
- 0 -
- 0 -
700.00
0 700.00
1,500.00
0 1,500.00
270.00
0 270.00
- 0 -
- 0 -
- 0 -
740.00 0 740.00
- 0 -

Page 106 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,920.00
0 Report to be submitted 1,920.00
720.00
0 Report to be submitted 720.00
128.00
0 Report to be submitted 128.00
- 0 -
- 0 -
- 0 -
- 0 -
700.00 0 700.00
- 0 -
525.00 0 525.00
- 0 -
320.00
0 320.00
- 0 -
- 0 -
- 0 -
560.00
0 560.00
500.00
0 500.00
- 0 -
- 0 -
730.00 0 730.00
1,418.00 0 1,418.00
65.00 0 65.00
180.00 0 180.00
271.00 0 271.00
100.00 0 100.00
200.00 0 200.00
100.00 0 100.00
100.00 0 100.00
200.00 0 200.00
110.00 0 110.00
60.00 0 60.00
730.00 0 730.00
200.00 0 200.00
65.00 0 65.00
470.00 0 470.00
1,300.00 0 1,300.00
100.00 0 100.00
370.00 0 370.00
1,757.00 0 1,757.00
340.00 0 340.00
1,757.00 0 1,757.00
280.00 0 280.00
100.00 0 100.00
65.00 0 65.00
210.00 0 210.00
- 0 -
- 0 -
- 0 -
Page 107 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

840.00 0 840.00
1,303.00 0 1,303.00
75.00 0 75.00
913.00 0 913.00
- 0 -
81.00 0 81.00
- 0 -
1,231.00 0 1,231.00
1,520.00 0 1,520.00
1,231.00 0 1,231.00
- 0 -
- 0 -
316.00 0 316.00
- 0 -
316.00 0 316.00
- 0 -
316.00 0 316.00
- 0 -
121.00 0 121.00
121.00 0 121.00
121.00 0 121.00
121.00 0 121.00
121.00 0 121.00
- 0 -
- 0 -
800.00
0 800.00
500.00
0 500.00
- 0 -
- 0 -
4,675.00
0 4,675.00
- 0 -
600.00 0 600.00
- 0 -
- 0 -
560.00
0 560.00
440.00
0 440.00
640.00
0 640.00
400.00
0 400.00
280.00
0 280.00
- 0 -
- 0 -
660.00
0 660.00
144.00 0 144.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,280.00
0 Report to be submitted

Page 108 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

700.00
0 Report to be submitted
- 0 -
- 0 -
2,400.00
0 Signed report to be submitted 2,400.00
- 0 -
- 0 -
195.00 195 195.00
300.00 300 300.00
135.00 135 135.00
- 0 -
- 0 -
- 0 -
- 0 -
1,920.00
0 1,920.00
1,320.00
0 1,320.00
1,440.00 0 1,440.00
- 0 -
- 0 -
600.00 600
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
1,785.00 0 1,785.00
- 0 -
- 0 -
450.00 0 450.00
20.00 20 20.00
128.00 128 128.00
326.00 326 326.00
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
3,680.00 0 3,680.00
- 0 -
- 0 -
- 0 -
250.00 0 250.00
- 0 -
- 0 -
- 0 -
160.00
0 160.00
- 0 -
- 0 -
- 0 -
- 0 -
1,340.00 0 Report to be submitted 1,340.00

Page 109 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
2,600.00 0 2,600.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,200.00 0 1,200.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
-
0 -
- 0 -
- 0 -
- 0 -
7,500.00
0 7,500.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,200.00 0
1,200.00 0
900.00 0
- 0 -
- 0 -

14,400.00
0 14,400.00
- 0 -
2,850.00 0 2,850.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
13,500.00 0 13,500.00
- 0 -
- 0 -

Page 110 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

7,350.00
0 Machining process to be submitted 7,350.00
225.00
0 Machining process to be submitted 225.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
2,850.00
0 2,850.00
2,250.00 0 2,250.00
2,100.00
0 2,100.00
- 0 -
- 0 -
1,800.00
0 1,800.00
110.00
0 110.00
- 0 -
400.00 0 400.00
1,050.00 0 Report to be submitted 1,050.00
- 0 -
- 0 -
440.00 0
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,175.00 0 1,175.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,330.00 0 1,330.00
- 0 -
- 0 -
12,950.00 0 12,950.00
800.00
0 800.00
- 0 -
- 0 -
- 0 -

Page 111 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
7,200.00 0 7,200.00
- 0 -
- 0 -
1,800.00 0 1,800.00
80.00
80 80.00
276.00 276 276.00
236.00 236 236.00
- 0 -
- 0 -
-
0 -
- 0 -
820.00 0 820.00
- 0 -
- 0 -
- 0 -
6,400.00 0 6,400.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
5,200.00 0 5,200.00
- 0 -
- 0 -
- 0 -
2,200.00 0 2,200.00
- 0 -
- 0 -
-
0 -
672.00 0 672.00
208.00 0 208.00
208.00 0 208.00
832.00 0 832.00
832.00 0 832.00
208.00 0 208.00
208.00 0 208.00
208.00 0 208.00
208.00 0 208.00
432.00 0 432.00
336.00 0 336.00
336.00 0 336.00
336.00 0 336.00
832.00 0 832.00
336.00 0 336.00
336.00 0 336.00
336.00 0 336.00
336.00 0 336.00
208.00 0 208.00
208.00 0 208.00
- 0 -
- 0 -
Page 112 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

2,100.00 0 2,100.00
675.00
0 675.00
- 0 -
- 0 -
1,100.00 0 1,100.00
- 0 -
- 0 -
1,400.00
0 1,400.00
- 0 -
- 0 -
525.00 0 Machining process to be submitted
375.00 0 Machining process to be submitted
1,125.00 0 Machining process to be submitted
- 0 -
- 0 -
3,000.00 0 3,000.00
- 0 -
- 0 -
- 0 -
-
0 -
520.00 0 520.00
168.00 0 168.00
336.00 0 336.00
104.00 0 104.00
- 0 -
- 0 -
675.00 0 675.00
- 0 -
- 0 -
9,750.00
0
- 0 -
- 0 -
- 0 -
3,300.00
0 3,300.00
- 0 -
- 0 -
1,400.00
0 1,400.00
-
700.00 0 700.00
-
- 0 -
- 0 -
- 0 -
1,530.00 0 1,530.00
- 0 -
- 0 -
720.00 0 720.00
- 0 -
- 0 -
8,400.00 0 8,400.00
- 0 -
3,600.00 0 Done. Report to be submitted
-
0 -
-
0 -
-
0 -
- 0 -
Page 113 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
4,140.00 0 4,140.00
- 0 -
- 0 -
- 0 -
450.00 0 450.00
225.00 0 225.00
220.00 0 220.00
50.00 50 50.00
- 0 -
- 0 -
900.00 0 900.00
225.00 0 225.00
220.00 0 220.00
50.00 50 50.00
- 0 -
- 0 -
875.00 0 875.00
- 0 -
100.00 0 100.00
20.00 0 20.00
15.00 15 15.00
- 0 -
- 0 -
3,312.00
0 Decide to renew after dismantled of motor -
828.00
0 -
- 0 -
1,800.00 1,800 1,800.00
- 0 -
- 0 -
6,900.00 6,900 6,900.00
-
0 -
-
0 -
-
0 -
- 0 -
- 0 -
267.00 0 267.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,350.00 0 1,350.00
- 0 -
- 0 -
1,850.00 0 1,850.00
- 0 -
- 0 -
300.00 0 300.00
- 0 -
- 0 -
1,200.00 0 1,200.00
-
150.00 0 150.00
300.00 0 300.00
150.00 0 150.00
1,500.00 0 1,500.00
-
Page 114 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
-
0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
4,300.00 0 4,300.00
- 0 -
- 0 -
- 0 -
- 0 -
750.00 0 750.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
3,850.00 0 3,850.00
- 0 -
-
0 -
-
0 -
-
0 -
-
0 -
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,050.00 0 1,050.00
2,040.00 0 2,040.00
1,200.00 0 1,200.00
780.00 0 780.00
360.00 0 360.00

Page 115 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

-
-
-
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
2,200.00 0 2,200.00
1,575.00 0 1,575.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
-
0 -
3,600.00 0 3,600.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
900.00
900 900.00
- 0 -
- 0 -
479.00 0 479.00
418.00
0 418.00
63.00 0 63.00
590.00 0 590.00
295.00 0 295.00
- 0 -
- 0 -
480.00 0 480.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -

Page 116 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
600.00 0 600.00
- 0 -
- 0 -

3,160.00
0 3,160.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
1,200.00 0 1,200.00
1,800.00 0 1,800.00
2,200.00 0 2,200.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
3,366.00
0 3,366.00
- 0 -
- 0 -
- 0 -
2,142.00 0 2,142.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
-
0 -
- 0 -
- 0 -
- 0 -

-
0 -
- 0 -

Page 117 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

-
0 -
- 0 -
-
0 -
- 0 -
-
0 -
- 0 -
- 0 -
-
0 -
- 0 -

-
0 -
- 0 -
- 0 -
10,500.00 10,500 10,500.00
- 0 -
- 0 -
- 0 -

-
0 -
- 0 -
- 0 -
864.00 0 0
154.00 0 0
77.00 0 0
- 0 0
- 0 0
864.00 0 0
- 0 0
- 0 0
547.00 0 0
77.00 0 0
- 0 0
- 0 0
695.00 0 0
308.00 0 0
- 0 0
- 0 0
810.00 0 0
77.00 0 0
- 0 0
- 0 0
236.00 0 0
- 0 0
900.00 0 900.00
900.00 0 900.00
- 0 -
- 0 -
144.00 0 144.00
226.00 0 226.00
158.00 0 158.00
1,500.00 0 1,500.00
0 -
1,200.00 0 600.00
0 -
- 0 -
- 0 -

Page 118 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0
551.00 0 0
92.00 0 0
102.00 0 0
- 0 0
- 0 0
470.00 0 0
92.00 0 0
- 0 0
- 0 0
486.00 0 0
- 0 0
- 0 0
486.00 0 0
- 0 0
- 0 0
512.00 0 0
92.00 0 0
- 0 0
- 0 0
742.00 0 0
184.00 0 0
- 0 0
- 0 0
324.00 0 0
- 0 0
- 0 0
578.00 0 0
184.00 0 0
- 0 0
- 0 0
446.00 0 0
92.00 0 0
- 0 0
- 0 0
429.00 0 0
92.00 0 0
- 0 0
- 0 0
486.00 0 0
92.00 0 0
102.00 0
- 0 0
1,620.00 0
0 0
1,200.00 0 0
0
508.00 508.00
0 -
- 0 -
0 -
486.00 0 486.00
750.00 0 750.00
- 0 -
- 0 -
100.00
0 100.00
135.00 0 135.00
350.00
0 350.00
270.00 0 270.00
840.00
0 840.00
Page 119 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,020.00 0 1,020.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -

2,300.00
0 2,300.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
332.00 0 332.00
1,480.00 0 1,480.00
332.00 0 332.00
332.00 0 332.00
332.00 0 332.00
332.00 0 332.00
1,480.00 0 1,480.00
332.00 0 332.00
663.00 0 663.00
663.00 0 663.00
663.00 0 663.00
332.00 0 332.00
332.00 0 332.00
332.00 0 332.00
1,480.00 0 1,480.00
518.00 0 518.00
4,440.00 0 4,440.00
740.00 0 740.00
682.00 0 682.00
Page 120 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

2,728.00 0 2,728.00
259.00 0 259.00
332.00 0 332.00
332.00 0 332.00
332.00 0 332.00
1,480.00 0 1,480.00
341.00 0 341.00
332.00 0 332.00
663.00 0 663.00
518.00 0 518.00
2,046.00 0 2,046.00
3,803.00 0 3,803.00
1,480.00 0 1,480.00
- 0 -
- 0 -
1,480.00 0 1,480.00
1,364.00 0 1,364.00
259.00 0 259.00
- 0 -
- 0 -
4,400.00 0 4,400.00
- 0 -
520.00
0 520.00
3,375.00 0 3,375.00
- 0 -
4,429.00
0 4,429.00
- 0 -
4,920.00 4,920 4,920.00
- 0 -
- 0 -
1,215.00
0 1,215.00
405.00
0 405.00
400.00 0 400.00
1,000.00
0 1,000.00
400.00
0 400.00
1,100.00
0 1,100.00
540.00 0 540.00
- 0 -
- 0 -
528.00 0 528.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
360.00 0 360.00
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -

675.00
675 675.00

270.00
270 270.00

Page 121 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

675.00
675 675.00

300.00
300 300.00

240.00
240 240.00
375.00
375 375.00

540.00
540 540.00

405.00
405 405.00

300.00
300 300.00

675.00
675 675.00

450.00
450 450.00

810.00
810 810.00

420.00
420 420.00

810.00
810 810.00

540.00
540 540.00
- 0 -
- 0 -
192.00
0 192.00
1,536.00
0 1,536.00
96.00
0 96.00
240.00 0 240.00
240.00 0 240.00
640.00
0 640.00
192.00
0 192.00
192.00
0 192.00
192.00
0 192.00
192.00
0 192.00
192.00
0 192.00
192.00 0 192.00
480.00
0 480.00
160.00 0 160.00
100.00 0 100.00
96.00
0 96.00
384.00
0 384.00

Page 122 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

160.00
0 160.00
480.00
0 480.00
672.00
0 672.00
960.00
0 960.00
480.00
0 480.00
192.00
0 192.00
200.00
0 200.00
- 0 -
- 0 -
4,284.00
0 4,284.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
179.00 0 179.00
- 0 -
- 0 -
- 0 -
1,500.00 0 1,500.00
- 0 -
- 0 -
1,600.00
0 1,600.00
1,120.00
0 1,120.00
480.00
0 480.00
120.00 0 120.00
- 0 -
- 0 -
- 0 -
332.00 0 D4-S1 2600 150 12 37.44 1 248.23
332.00 0 D1-S1 2000 150 12 28.8 1 190.94
223.00 0 0 1 -
1,156.00 0 D1-P1 1900 400 15 91.2 1 527.14
1,734.00 0 D1-P2 750 1500 15 135 1 780.30
3,468.00 0 D2-P1 4750 500 13 247 2 2,855.32
- 0 -
497.00 0 D10-S1 2800 200 20 89.6 1 497.28
1,156.00 0 D10-P1 700 900 12.5 63 1 364.14
223.00 0 D1-S1 900 100 16 11.52 1 73.38
470.00 0 D11-L2 4700 125 18 84.6 1 469.53
319.00 0 D9-S1 3300 100 16 42.24 1 269.07
223.00 0 D9-S2 600 100 16 7.68 1 48.92
223.00 0 D9-S3 1000 100 16 12.8 1 81.54
306.00 0 D11-L3 1400 125 18 25.2 1 153.97
214.00 0 D11-L4 700 125 18 12.6 1 76.99
464.00 0 D7-S1 600 200 14 464 -
1,156.00 0 D6-P1 700 900 14 70.56 1 407.84
1,665.00 0 D7-P3 2700 700 14 211.68 1 1,174.82
1,156.00 0 D4-P1 700 900 14 70.56 1 407.84
1,665.00 0 D4-P3 2700 700 18 272.16 1 1,510.49
1,665.00 0 D5-P1 1400 700 18 141.12 1 783.22
1,156.00 0 D3-P1 700 900 14 70.56 1 407.84
1,665.00 0 D7-P1 1900 700 18 191.52 1 1,062.94

Page 123 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

1,156.00 0 D7-P2 700 900 14 70.56 1 407.84


1,734.00 0 D4-P2 1800 1200 14 241.92 1 1,398.30
214.00 0 D11-L5 600 125 18 10.8 1 65.99
214.00 0 D11-L6 900 125 18 16.2 1 98.98
332.00 0 D1-S1 900 384 12 33.1776 1 219.97
828.00 0 D9-S1 3300 434 12 137.4912 1 827.70
332.00 0 D11-L1 300 200 12 5.76 2 76.38
332.00 0 D9-S3 1000 434 12 41.664 1 276.23
1,173.00 0 D11-L2 4700 432 12 194.9184 1 1,173.41
350.00 0 D11-L3 1400 432 12 58.0608 1 349.53
332.00 0 D11-L4 700 432 12 29.0304 1 192.47
- 0 0 -
1,734.00 0 D1-P1 0 -
- 0 0 -
1,863.00 0 D3-P1 1300 1300 23 310.96 1 1,862.65
1,204.00 0 D1-L1 700 400 12 26.88 1 161.82
1,156.00 0 D4-P1 500 300 14 16.8 1 97.10
1,156.00 0 D4-S1 1400 250 14 39.2 1 226.58
- 0 0 -
1,156.00 0 0 -
1,156.00 0 0 -
1,156.00 0 0 -
- 0 0 -
1,734.00 0 D2-P1 2000 900 16 230.4 1 1,331.71
1,156.00 0 D2-P2 600 500 16 38.4 1 221.95
1,593.00 0 D3-P3 800 800 21 107.52 1 570.93
1,062.00 0 D3-P2A 450 260 16 14.976 1 79.52
1,863.00 0 D4-P1 1300 1300 23 310.96 1 1,862.65
696.00 0 D1-L1 300 200 12 5.76 3 114.57
2,553.00 0 D1-L2 250 200 12 4.8 11 350.06
223.00 0 D1-L3 250 200 13 5.2 1 33.12
3,104.00 0 D3-P2 4350 800 21 584.64 1 3,104.44
1,198.00 0 D3-P1 500 800 20 64 1 383.36
214.00 0 D1-L4 600 175 18 15.12 1 92.38
306.00 0 D1-L5 1000 175 18 25.2 1 153.97
1,204.00 0 D1-L4 600 662 12 38.1312 1 229.55
1,204.00 0 D1-L5 1000 662 12 63.552 1 382.58
- 0 0 -
319.00 0 D3-P2 700 500 14 39.2 1 249.70
307.00 0 D3-S2 1750 250 14 49 1 283.22
388.00 0 D3-P1 1000 600 14 67.2 1 388.42
259.00 0 D2-P1 700 500 16 44.8 1 258.94
669.00 0 D3-S1 500 250 14 14 3 267.54
669.00 0 D2-S1 600 250 14 16.8 3 321.05
464.00 0 0 -
1,806.00 0 D1-L4 2000 700 12 134.4 1 809.09
1,204.00 0 D1-L5 1000 700 12 67.2 1 404.54
928.00 0 0 -
3,367.00 0 D1-L3 300 200 12 5.76 13 554.11
232.00 0 0 -
1,956.00 0 D1-L2 4200 680 13 297.024 1 1,936.60
747.00 0 D1-L1 300 200 13 6.24 3 133.10
995.00 0 D1-L1 300 200 13 6.24 4 177.47
249.00 0 D1-L1 300 200 13 6.24 1 44.37
13,986.00 0 D4-P4 5250 3000 20 2520 1 13,986.00
2,720.00 0 D4-P1 700 3400 20 380.8 1 2,380.00
4,200.00 0 D4-P3 0 -
1,776.00 0 D4-P5 2000 1000 20 320 1 1,776.00
1,204.00 0 D4-L3 1200 500 12 57.6 1 346.75
1,110.00 0 D4-L4 2000 175 20 56 1 310.80
1,806.00 0 D4-L4 2000 500 12 96 1 577.92
498.00 0 D4-L1 300 200 13 6.24 2 88.73
Page 124 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

306.00 0 D4-L3 1200 175 20 33.6 1 205.30


518.00 0 D4-L2 300 200 12 5.76 2 85.25
- 0 0 -
928.00 0 D4-S3 0 1 928.00
696.00 0 D1-L1/D3-L1 300 200 12 5.76 3 114.57
956.00 0 D1-L2 1600 150 15 28.8 2 366.91
1,067.00 0 D2-P1 600 400 16 30.72 3 655.26
464.00 0 D4-S1 2190 65 9 10.2492 2 464.00
498.00 0 D2-S1 700 250 14 19.6 3 418.07
1,856.00 0 D4-S2 0 1 1,856.00
- 0 0 -
747.00 0 D1-L1 300 200 13 6.24 3 133.10
239.00 0 D3-L1 300 125 18 5.4 1 36.83
1,036.00 0 D1-L2 300 200 12 5.76 4 170.50
498.00 0 D1-L3 1800 150 15 32.4 2 460.73
249.00 0 D1-L4 1100 150 15 19.8 1 140.78
249.00 0 D1-L5 650 150 15 11.7 1 83.19
1,863.00 0 D4-P1 1300 1300 23 310.96 1 1,862.65
932.00 0 D2-S1 2600 450 14 131.04 1 931.69
- 0 0 1 -
1,863.00 0 D5-P1 1300 1300 23 310.96 1 1,862.65
498.00 0 D4-S3 1000 200 14 22.4 2 318.53
995.00 0 D4-S1 400 250 14 11.2 4 318.53
1,156.00 0 D4-S2 900 200 14 20.16 1 116.52
1,748.00 0 D3-P5 1500 1600 14 268.8 1 1,553.66
1,156.00 0 D3-P4 600 1000 14 67.2 1 388.42
1,156.00 0 0 -
300.00 0 D3-P3 600 400 14 26.88 1 155.37
1,156.00 0 0 1 -
1,665.00 0 D3-S1 4000 500 18 288 1 1,598.40
1,156.00 0 D3-P3 600 400 14 26.88 1 155.37
1,734.00 0 D3-P1 850 1100 16 119.68 1 691.75
223.00 0 D3-P2 400 600 16 30.72 1 195.69
223.00 0 0 -
239.00 0 0 -
747.00 0 D1-L3 800 150 15 14.4 3 307.15
249.00 0 D1-L2 300 200 12 5.76 2 81.91
1,991.00 0 D1-L1 300 200 13 6.24 7 310.56
607.00 0 D2-L2 1800 500 12 86.4 1 520.13
326.00 0 D2-L2 1800 175 20 50.4 1 279.72
249.00 0 D2-L1 300 200 13 6.24 1 44.37
- 0 0 -
498.00 0 D2-L1 300 200 13 6.24 2 88.73
1,156.00 0 D4-S1 800 550 14 49.28 1 284.84
1,734.00 0 D4-P1 1100 800 16 112.64 1 651.06
1,734.00 0 D4-P2 1400 800 16 143.36 1 828.62
1,156.00 0 D4-S2 1100 550 14 67.76 1 391.65
464.00 0 D8-S1 2190 65 9 10.2492 2 464.00
711.00 0 D1-L10 2400 150 15 43.2 2 614.30
356.00 0 D1-L9 1300 150 15 23.4 3 499.12
747.00 0 D1-L5+L6+L8 1000 150 15 18 3 383.94
2,737.00 0 D1-L1+L3 300 200 13 6.24 14 621.13
518.00 0 0 -
3,626.00 0 D1-L2+L4 300 200 12 5.76 4 170.50
928.00 0 0 -
340.00 0 D3-L3 2800 150 17 57.12 1 317.02
362.00 0 D3-L2 3100 150 17 63.24 1 350.98
356.00 0 D1-L7 1000 150 15 18 1 127.98
396.00 0 D3-L4 3350 150 17 68.34 1 379.29
214.00 0 D3-L5 600 150 17 12.24 1 74.79
1,624.00 0 D3-L1 300 200 12 5.76 7 267.32
1,856.00 0 D8-S2 0 1 1,856.00
Page 125 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

928.00 0 D8-S3 0 1 928.00


- 0 0 -
202.00 0 D2-S1 600 250 14 16.8 1 97.10
421.00 0 D3-S1 0 2 421.00
211.00 0 D1-L2 300 200 12 5.76 1 34.68
1,141.00 0 D1-L1 300 200 13 6.24 5 203.42
843.00 0 0 843.00
1,686.00 0 D3-S2 0 1 1,686.00
843.00 0 D3-S3 0 1 843.00
- 0 0 -
995.00 0 D1-L1 300 200 13 6.24 4 177.47
259.00 0 D1-L3 300 200 12 5.76 1 42.62
224.00 0 D4-S1 0 1 224.00
239.00 0 D1-L4 900 100 18 12.96 1 88.39
1,356.00 0 D1-L5 1250 450 12 54 1 366.12
1,304.00 0 D3-S1 500 382 13 19.864 1 129.51
1,304.00 0 D1-L5 1250 150 15 22.5 1 146.70
1,250.00 0 D3-S1 500 100 18 7.2 1 45.00
249.00 0 D2-S1 1000 250 14 28 1 199.08
249.00 0 D2-S2 900 250 14 25.2 1 179.17
498.00 0 D1-L1 300 200 13 6.24 2 88.73
249.00 0 D1-L2 400 200 13 8.32 1 59.16
- 0 0 -
1,956.00 0 D2-P1 1000 1000 15 120 1 782.40
249.00 0 D4-S2 500 250 16 16 2 227.52
6,020.00 0 D2A-L2 1500 600 21 151.2 1 910.22
747.00 0 D1-L1 300 200 13 6.24 3 133.10
1,036.00 0 D1-L2 300 200 12 5.76 4 170.50
2,088.00 0 D1-L2 300 200 12 5.76 9 343.70
259.00 0 D1-L2 300 200 12 5.76 1 42.62
1,160.00 0 D1-L2 300 200 12 5.76 5 190.94
249.00 0 D3-S3 1000 200 18 28.8 1 204.77
1,356.00 0 D1-L3 1500 650 12 93.6 1 634.61
1,304.00 0 D3-S1 500 400 13 20.8 1 135.62
1,198.00 0 D1-L3 1500 175 26 54.6 1 327.05
239.00 0 D3-S1 500 100 18 7.2 1 49.10
1,356.00 0 D3-S2 1200 450 12 51.84 1 351.48
1,250.00 0 D3-S2 1200 150 17 24.48 1 153.00
498.00 0 D4-S1 700 100 14 7.84 2 111.48
- 0 0 -
3,287.00 0 D3-S1 1260 720 12 87.0912 1 590.48
1,009.00 0 D2-P2 1400 800 12 107.52 1 728.99
1,773.00 0 D3-S2 1850 750 12 133.2 1 903.10
- 0 0 -
2,520.00 0 D5+D6+D7 0 1 2,520.00
- 0 0 -
- 0 0 -
12,600.00 0 D6+D7+D8 0 1 12,600.00
- 0 0 -
- 0 0 -
342.00 0 D9-S1 3300 140 16 59.136 1 341.81
223.00 0 D9-S2 600 140 16 10.752 1 68.49
223.00 0 D9-S3 1000 140 16 17.92 1 114.15
- 0 0 -
815.00 0 D2-P2 1000 1000 21 168 1 1,006.32
249.00 0 D2-S1 700 100 16 8.96 1 63.71
- 0 0 -
202.00 0 410 225 15 11.07 1 63.98
- 0 0 -
475.00 0 0 -
- 0 0 -
332.00 0 D2-B1 800 540 12 41.472 1 274.96
Page 126 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 0 -
202.00 0 0 -
- 0 0 -
223.00 0 0 -
2,553.00 0 0 -
223.00 0 0 -
1,204.00 0 0 -
194.00 0 0 -
- 0 0 -
223.00 0 0 -
928.00 0 0 -
- 0 0 -
232.00 0 D3-L1 300 200 12 5.76 1 38.19
995.00 0 D2-S4 700 250 14 19.6 4 557.42
1,125.00 0 D2-S1 310 510 14 17.7072 1 115.45
2,088.00 0 CHECK WITH 2P 0 -
- 0 0 -
223.00 0 D2-S3 700 250 14 19.6 1 124.85
- 0 0 -
2,446.00 0 300 300 14 10.08 2 128.42
- 0 0 -
223.00 0 1350 300 14 45.36 1 288.94
- 0 0 -
4,950.00 0 D9+D10 0 1 4,950.00
- 0 0 -
903.00 0 D1-L4 800 150 20 19.2 1 115.58
1,806.00 0 0
- 0 0
319.00 0 0
- 0
- 0 -
-
0 -
15,267.00 0 15,267.00
900.00 900 900.00
- 0 -
1,080.00
1,080 1,080.00
- 0 -
- 0 -
1,200.00 0 1,200.00
450.00 0 450.00
- 0 -
- 0 -
450.00 450 450.00
750.00 750 750.00
750.00 750 750.00
750.00 750 750.00
900.00 900 900.00
750.00 750 750.00
600.00 600 600.00
750.00 750 750.00
750.00 750 750.00
- 0 -
- 0 -
- 0 -
- 0 -
1,050.00
0 1,050.00
500.00
0 500.00
1,000.00
0 1,000.00

Page 127 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

700.00
0 700.00
500.00
0 500.00
350.00
0 350.00
700.00
0 700.00
300.00 0 300.00
350.00
0 350.00
700.00
0 700.00
400.00
0 400.00
950.00
0 950.00
300.00 0 300.00
400.00
0 400.00
500.00 0 500.00
350.00 0 350.00
1,000.00 0 1,000.00
1,500.00
0 1,500.00
750.00
0 750.00
3,850.00
0 3,850.00
500.00
0 500.00
1,750.00
0 1,750.00
350.00
0 350.00
300.00 0 300.00
400.00
0 400.00
950.00
0 950.00
600.00
0 600.00
400.00
0 400.00
350.00
0 350.00
150.00 0 150.00
350.00
0 350.00
150.00 0 150.00
350.00
0 350.00
700.00
0 700.00
600.00
0 600.00
400.00
0 400.00
400.00
0 400.00
400.00
0 400.00
300.00 0 300.00
150.00 0 150.00
600.00
0 600.00
400.00
0 400.00
750.00
0 750.00
400.00
0 400.00

Page 128 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

400.00
0 400.00
350.00
0 350.00
350.00
0 350.00
800.00
0 800.00
500.00
0 500.00
400.00
0 400.00
400.00
0 400.00
400.00
0 400.00
350.00
0 350.00
350.00
0 350.00
350.00
0 350.00
600.00
0 600.00
400.00
0 400.00
500.00 0 500.00
400.00
0 400.00
400.00
0 400.00
500.00
0 500.00
500.00
0 500.00
350.00
0 350.00
200.00 0 200.00
200.00 0 200.00
350.00
0 350.00
700.00
0 700.00
1,350.00
0 1,350.00
700.00
0 700.00
200.00 0 200.00
900.00
0 900.00
600.00 0 600.00
600.00
0 600.00
350.00
0 350.00
700.00
0 700.00
500.00
0 500.00
300.00 0 300.00
150.00 0 150.00
150.00 0 150.00
700.00
0 700.00
150.00 0 150.00
300.00 0 300.00
1,050.00
0 1,050.00
700.00
0 700.00
1,080.00 0 1,080.00

Page 129 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

350.00
0 350.00
350.00
0 350.00
350.00
0 350.00
800.00
0 800.00
150.00
0 150.00
300.00
0 300.00
80.00 0 80.00
300.00 0 300.00
150.00 0 150.00
1,350.00
0 1,350.00
400.00
0 400.00
350.00
0 350.00
450.00 0 450.00
350.00
0 350.00
350.00
0 350.00
650.00
0 650.00
400.00
0 400.00
850.00
0 850.00
400.00
0 400.00
850.00
0 850.00
150.00
0 150.00
350.00
0 350.00
350.00
0 350.00
400.00
0 400.00
350.00
0 350.00
450.00
0 450.00
350.00
0 350.00
550.00
0 550.00
350.00
0 350.00
48.00
0 48.00
150.00 0 150.00
350.00
0 350.00
400.00 0 400.00
350.00
0 350.00
250.00 0 250.00
550.00
0 550.00
350.00
0 350.00
350.00
0 350.00
350.00
0 350.00
850.00
0 850.00
Page 130 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

350.00
0 350.00
350.00
0 350.00
1,200.00
0 1,200.00
350.00
0 350.00
150.00 0 150.00
600.00
0 600.00
350.00
0 350.00
350.00
0 350.00
150.00 0 150.00
600.00
0 600.00
120.00 0 120.00
350.00
0 350.00
350.00
0 350.00
350.00
0 350.00
400.00
0 400.00
350.00
0 350.00
350.00
0 350.00
350.00
0 350.00
1,250.00
0 1,250.00
500.00
0 500.00
350.00
0 350.00
300.00 0 300.00
1,400.00
0 1,400.00
500.00
0 500.00
400.00
0 400.00
150.00 0 150.00
200.00 0 200.00
416.00
0 416.00
1,250.00
0 1,250.00
350.00
0 350.00
350.00
0 350.00
- 0 -
- 0 -
- 0 -
845.00
845 845.00

1,320.00
1,320 1,320.00
- 0 -
- 0 -
203.00 203 203.00
506.00 506 506.00
122.00 122 122.00
162.00 162 162.00

Page 131 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
240.00
0 240.00
- 0 -
- 0 -
140.00
0 140.00
800.00
0 800.00
- 0 -
- 0 -
800.00
0 800.00
200.00
0 200.00
700.00
0 700.00
700.00
0 700.00
- 0 -
- 0 -
- 0 -
- 0 -
37,500.00 37,500 Time sheet to be submitted 37,500.00
- 0 -
- 0 -
2,000.00 0 2,000.00
- 0 -

1,512.00
1,512 1,512.00
- 0 -
- 0 -
550.00
0 550.00
120.00 0 120.00
480.00 0 480.00
120.00 0 120.00
240.00 0 240.00
360.00 0 360.00
480.00
0 480.00
240.00
0 240.00
240.00
0 240.00
240.00
0 240.00
- 0 -
- 0 -
- 0 -
500.00 0 500.00
180.00 0 180.00
720.00 0 720.00
11,592.00
0 11,592.00
780.00 0 780.00
650.00 0 650.00
- 0 -
286.00 286 286.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -

Page 132 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
13,590.00 0 2744 2050 20 900.032 2 13,590.48
27,181.00 0 2744 2050 20 900.032 4 27,180.97
16,242.00 0 2744 2450 20 1075.648 2 16,242.28
32,485.00 0 2744 2450 20 1075.648 4 32,484.57
17,568.00 0 2744 2650 20 1163.456 2 17,568.19
35,136.00 0 2744 2650 20 1163.456 4 35,136.37
16,806.00 0 2744 2535 20 1112.9664 2 16,805.79
33,612.00 0 2744 2535 20 1112.9664 4 33,611.59
- 0 0 -
21,140.00 0 554 174 12 9.254016 80 5,589.43
21,140.00 0 240 150 12 3.456 80 2,087.42
- 0 -
- 0 -
2,700.00
0 2,700.00
350.00
0 350.00
700.00
0 700.00
700.00
0 700.00
1,400.00
0 1,400.00
1,400.00
0 1,400.00
160.00
0 160.00
500.00
0 500.00
700.00
0 700.00
500.00
0 500.00
120.00
0 120.00
500.00
0 500.00
120.00
0 120.00
- 0 -
-
0 -
35,100.00 0 Signed report to be submitted
- 0 -
- 0 -
- 0 -
408.00 0 408.00
- 0 -

1,800.00
0 1,800.00
- 0 -

1,428.00
0 1,428.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
-
0 -
1,530.00 0 1,530.00
- 0 -
Page 133 to 162
ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
375.00 0 375.00
- 0 -
- 0 -
- 0 Remove/refit by Yard, please check ship's staff -
907.00 0
544.00 0 544.00
- 0 -
- 0 -
2,500.00 0 2,500.00
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
300.00 0 300.00
- 0 -
-
0 -
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
1,500.00 1,500 Signed report to be submitted
- 0 -
20,160.00
20,160 20,160.00
1,200.00 1,200 Signed report to be submitted 1,200.00
- 0 -
3,000.00 3,000 Signed report to be submitted 3,000.00
- 0 -
- 0 -
450.00 450 450.00
450.00 450 450.00
450.00 450 Signed report to be submitted 450.00
450.00 450 Signed report to be submitted 450.00
- 0 -
- 0 -
2,295.00 0 2,295.00
3,240.00 0 3,240.00
3,240.00 0 3,240.00
- 0 -
15,000.00 0 15,000.00
- 0 -
- 0 -
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
816.00 0 816.00
136.00 0 136.00
- 0 -
- 0 -
357.00 0 357.00

Page 134 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
250.00 0 250.00
30.00 0 30.00
618.00 0 618.00
1,030.00 0 1,030.00
600.00 0 600.00
450.00 450 450.00
- 0 -
7,500.00 0 7,500.00
-
0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
30.00 30 Signed report to be submitted 30.00
285.00 285 Signed report to be submitted 285.00
285.00 285 Signed report to be submitted 285.00
- 0 -
1,050.00 1,050 Signed report to be submitted 1,050.00
- 0 -
- 0 -
- 0 -
- 0 -
23,400.00
0 23,400.00
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
- 0 -
140.00
0 140.00
120.00
0 120.00
- 0 -
2,500.00 0 2,500.00
-
0 -
- 0 -
100,000.00
0
0 -
1,725,272 121,827.00
1,322,520.80

Page 135 to 162


ESTIMATED TOTAL DRAWING Weight cal@
(US$) nett Length Breadth Thick Qty OWNER'S COST
Ref NO. 8000kg/m3

121,827 121,827

1,603,445 1,200,693.80
320,689 240,138.76
50,000 50000
1,232,756 910,555.04
121,827 121,827

1,354,583
1,032,382.04

Page 136 to 162


Yard's minimum
cost

Page 137 to 162


Yard's minimum
cost

332.00
1,989.00
222.95
1,734.00
1,734.00
3,468.00
-
1,665.00
1,734.00
222.95
1,665.00
1,911.00
222.95
222.95
1,833.00
213.85
-
1,734.00
1,665.00
1,734.00
1,665.00
1,665.00
1,734.00
1,665.00

Page 138 to 162


Yard's minimum
cost

1,734.00
1,734.00
213.85
213.85
1,989.00
1,806.00
332.00
1,989.00
1,806.00
1,806.00
1,989.00
-
-
-
1,797.00
1,806.00
1,156.00
1,734.00
-
-
-
-
-
1,734.00
1,734.00
1,593.00
185.85
1,797.00
696.15
2,552.55
222.95
1,593.00
1,797.00
213.85
1,833.00
1,806.00
1,806.00
-
1,911.00
1,734.00
1,734.00
1,734.00
668.85
668.85
-
1,806.00
1,806.00
-
3,367.00
-
1,956.00
746.55
995.40
248.85
1,665.00
1,875.00
-
1,665.00
1,806.00
1,665.00
1,806.00
497.70
Page 139 to 162
Yard's minimum
cost

1,833.00
518.00
-
232.05
696.15
3,822.00
6,399.00
464.10
498.00
1,856.00
-
746.55
238.70
1,036.00
4,266.00
248.85
248.85
1,797.00
2,133.00
-
1,797.00
497.70
995.40
202.30
1,734.00
1,734.00
-
1,734.00
202.30
1,665.00
1,734.00
1,734.00
1,911.00
-
-
746.55
497.70
1,741.95
1,806.00
1,665.00
248.85
-
497.70
1,734.00
1,734.00
1,734.00
1,734.00
464.10
4,266.00
746.55
746.55
2,737.00
-
1,036.00
-
1,665.00
1,665.00
248.85
1,665.00
213.85
1,624.35
232.05
Page 140 to 162
Yard's minimum
cost

232.05
-
202.30
421.40
210.70
1,141.00
843.00
1,686.00
843.00
-
995.40
259.00
224.00
238.70
2,034.00
228.20
228.20
218.75
2,133.00
2,133.00
497.70
248.85
-
1,956.00
497.70
1,806.00
746.55
1,036.00
2,088.45
259.00
1,160.25
2,133.00
2,034.00
228.20
1,797.00
238.70
2,034.00
218.75
497.70
-
2,034.00
2,034.00
2,034.00
-
2,520.00
-
-
12,600.00
-
-
1,734.00
222.95
222.95
-
1,797.00
248.85
-
202.30
-
-
-
1,989.00
Page 141 to 162
Yard's minimum
cost

-
-
-
-
-
-
-
-
-
-
-
-
232.05
995.40
228.20
-
-
222.95
-
445.90
-
1,911.00
-
3,850.00
-
210.70

Page 142 to 162


REMARKS

Shore generator run for 4.5days

Page 143 to 162


REMARKS

Not Applicable to vessel


Not Applicable to vessel

Page 144 to 162


REMARKS

Not carry out on vessel's hull

Not carry out properly.

Page 145 to 162


REMARKS

To deduct 5S WBT side shell plate renewal ares

To deduct 5S WBT side shell plate renewal ares

150mtr total length.

Page 146 to 162


REMARKS

Not Done

Page 147 to 162


REMARKS

Not Done

Not carry out.

Page 148 to 162


REMARKS

NA
NA
NA

Page 149 to 162


REMARKS

Not under work scope

Page 150 to 162


REMARKS

Not done
Not done
Not done

Not Done, only clearence measurement taken.

Not done

Page 151 to 162


REMARKS

Motor still not opened. Strictly instructed not to


overhaul removed motor.
New motor delivere to electrical workshop by
WSS from Airport.

Page 152 to 162


REMARKS

All Materials supply by Owners.

Pressure test carry out one time.

Page 153 to 162


REMARKS

All Materials supply by Owners

Page 154 to 162


REMARKS

Actual Size: 900X700X12.5

Actual Size: 2700X700X14

Page 155 to 162


REMARKS

FR15

Actual Size: 300X200X11.5, 2 Nos

Job was Cancelled

Not found under given specs & project number


Not found under given specs & project number
Not found under given specs & project number

Actual Size: 2000X900X16

Actual Size: 450 X 260 X 16

Actual Size: 250X200X12


Actual Size: 250X200X13

Actual Size:1700X250X14, Cost TBC.

Actual Size: 500X250X14; Cost: TBC


Actual Size: 600X250X14; QTY=1; Cost TBC
Not found under given specs & project number
Actual Size: 2000X700X12; Cost TBC
Actual Size: 1000X700X12 ; Cost TBC
Not found under given specs & project number

Not found under given specs & project number

Actual Size: 3400X700X20


Job Cancelled

Actual Size:1200X500
Actual Size:2000X175
Actual Size:2000X500

Page 156 to 162


REMARKS

Actual Size:1200X175

Actual Size:450x80x80x9/9

Actual Size:350x380; Qty:8

Actual Size:1000X200
Actual Size:400X250
Actual Size:900X200
Actual Size:1500X1600; NOT 1800
Actual Size: 600X1000; NOT 700
Not found under given specs & project number
600X400
Not found under given specs & project number
4000X450X14
600X400
850X1100
400X600
Not found under given specs & project number
Not found under given specs & project number
Actual Size:800X150X15

300X200X13; QTY:7
Actual Size:1800X500
Actual Size:1800X175

800X550X14
1100X800X16
1400X800X16
1100X550X14
2190; NOT 2225
2400X150X15; QTY=2
1300X150X15; NOT 1500
500+600+1900 = 3000
QTY SHOULD BE 12+ 250X200X13, QTY:2
Not found under given specs & project number
L4: 250X200X12 = QTY:4
Not found under given specs & project number
2800X150X17; 3000
3100X150X17; 3200
1000X150X15; NOT 2000
3350X150X17; NOT 3500
600X150X17; NOT 800

350x3800; Qty:8
Page 157 to 162
REMARKS

450X80X80X9/9

600X250X14; NOT 1000


2190; NOT 2225

350x3800; Qty:8
450x80x80x9/9, not 500

500X100X18

P1=(500X300X15)???

????? SHOULD BE 1 PLATE 21MM

1500X650X12
500X400X13
1500X175X26
500X100X18

Gr A 1260 x 720 x 12 x 1 Nos


Gr A 1400 x 800 x 12 x 1 Nos
Gr A 1850 x 750 x 12 x 1 Nos

TOTAL LENGTH= 10690MM

Not found under given specs & project number

800X540X12
Page 158 to 162
REMARKS

Not found under given specs & project number

Double entry from No 6.


Double entry from No 6.
Double entry from No 6.
Not found under given specs & project number
Not found under given specs & project number

Not found under given specs & project number


Not found under given specs & project number

310X510X14
????? SHOULD BE 1 PLATE 21MM

Not found under given specs & project number

Not found under given specs & project number

Not found under given specs & project number

Not found under given specs & project number

Page 159 to 162


REMARKS

Pls Clarify on area calculation

Page 160 to 162


REMARKS

Pipe remove and fit by Ship Staff

No HP water wash requested and not done.

Page 161 to 162


Density of ste 8000 kg/m3