Sunteți pe pagina 1din 5

TABLE OF CONTENT

CLAUSE NO. DESCRIPTION PAGE NO.

1.0.0 SCOPE

2.0.0 GENERAL

3.0.0 INFORMATION TO BE SUBMITTED


TECHNICAL SPECIFICATIONS FOR BOUNDARY WALL
1.0 SCOPE

Scope of work includes manufacture and supply of precast boundary wall panels,
columns etc. as per approved drawings, transportation of precast units at site and
storage identified by owner, excavation for casting of foundation as per drawing,
construction of foundation, erection of columns to plumb and wall panels with
required T&P's, backfilling as per specification etc. all complete.

2.0 GENERAL

2.1.0 Work to be provided by the contractor

The work to be provided for by the Contractor , unless specified otherwise , shall
include but not be limited to the following:

(a) Furnish all labour, supervision, services including facilities as required under
statutory labour regulations, materials, scaffolds, equipment, tools and plants,
transportation, etc. required for the work.

(b) To carry out sampling and testing and submit to the Engineer, results of soil
compaction tests whenever required by the Engineer to assess the degree of
compaction.

(c) Bidder shall deploy adequate number of manpower & T&P to complete the
work as per schedule.

2.2.0 Work to be provided for by others.

No work under this specification will be provided by any agency other than the
contractor unless specifically mentioned elsewhere in the Contract.

2.3.0 Codes and Standards

All works under this specification, unless specified otherwise, shall conform to the
latest revision and/or replacement of the following or any other Indian Standard
Specifications and Codes of Practice. In case of any particular aspect of work is not
covered specifically by Indian Standard Specification any other standard practise as
may be specified by the Engineer shall be followed:-

SP:7 National Building Code - Structural Design (Part 6/Sec.7)


Prefabrication and system building and mixed / composite construction.
IS: 10297 Code of practice for design and construction of floors and roofs
using precast reinforced/prestressed concrete ribbed or cored slab units.
2.4.0 Conformity With Designs

The Contractor is to carry out the work as per the drawings issued to him and/or
Contractor's drawings which are approved by the Engineer and/or the Engineer's
instructions.

2.5.0 Technical

2.5.1 General

The total height of boundary wall shall be 1800 mm above formation level (natural
ground level in case formation level is less than natural ground level). Upto height
of 1800 mm, it shall be constructed with precast reinforced cement concrete panels /
cast in situ RCC panels and over that for 450 mm , concertina coil with maximum
loop spacing of 125 mm shall be provided with 80 micron hot dip galvanized with
ISA 60X60X4 or ISA 40X40X5. The RCC precast/cast in situ reinforced concrete
columns shall be provided at spacing not more than 2225 mm c/c.

The RCC precast/cast in situ reinforced concrete columns and footing shall be
minimum 1000 mm below finished formation level. The precast reinforced
concrete/cast in situ RCC panels shall be at least 600 mm below formation level.
The RCC precast concrete columns/ cast in situ RCC panels of minimum size
300mmX2130 mm so as to receive Precast Concrete RCC panels spanning from
column to column with minimum width of 525 mm and minimum thickness of
100mm as filler wall(non shrink cement grout). The grade of concrete for all
precast/cast in situ work shall be of M30 grade conforming to IS 456.

The precast/ cast in situ reinforced cement concrete coping with minimum
projections of 150mm on each side shall be provided at the top of the precast
reinforced cement concrete panels / cast in situ RCC panels with suitable provision
for MS angle Post for concertina throughout the boundary wall. Opening for
gates/drains and for other crossing has to be suitably provided as per the
requirement/drawing/instructions of engineer in charge.

All exposed concrete surfaces of all precast members/ cast in situ RCC members
have high quality shuttering finish with tolerance of +/- 5mm. Plinth protection of
150mm thickness PCC (M20) shall be provided on both side of boundary wall
extending up to 300mm from centre line of boundary wall.

Bidder has to ensure that damages such as cracks and chipping off of corners do not
happen during handling due to knocking etc. In case, such damages happen, the
same has to be brought to the notice of the owner. In case the damage is minor, the
same has to be made good using approved epoxy resin. Non shrink grout can be used
for chipped off corners. No monetary claim shall however be admissible for such
repairs. The engineer in charge reserves the right to accept or reject any damaged
precast unit and the decision shall be binding on the bidder.
2.6.0 Tolerances

S. NO Item Tolerance Max. Min.


1 Length (+/-) 0.1 %
2 Straightness or bow 1/750 of length
3 Cross sectional dimensions (+/-) 3mm or (+/-) 0.1 % whichever is greater
4 Squareness When considering the squareness of the
corner, length of the two adjacent sides being
checked shall be taken as base line. The
shorter side shall not vary in length from the
perpendicular by more than 5 mm
5 Flatness The maximum deviation from a 1.5 m straight
edge placed in any position on a nominal plant
surface shall not exceed 5 mm

Load test on precast members shall be carried out @ 2% upto 1000 nos., @1% from
more than 1000 nos., for precast members of one type. The load test shall be carried
out as per the provisions of IS-456.

2.7.0 Information regarding site conditions

The Contractor must satisfy himself regarding the character and volume of all work
under this contract and expected soil & surface, sub-surface and / or sub-soil water
to be encountered. He must also satisfy himself about the general conditions of site
and ascertain the existing and future construction likely to come up during the
execution of the contract so that he may evolve a realistic program of execution. No
claim for compensation shall be entertained due to ignorance about site conditions.
Bidder is not eligible for any claim due to variance between sit data furnished with
spec/drawing and actual conditions at site.

3.0 INFORMATION TO BE SUBMITTED

3.1.0 With Tender

Details of Equipment proposed to be used for excavation, erection of boundary wall,


backfilling and compaction have to be submitted along with the tender.

3.2.0 After Award

After award of the Contract the successful tenderer shall submit the following for
approval and adoption :

a) The Contractor shall submit a detailed program of the work as proposed to be


executed giving completion dates of various stretches of boundary wall for
approval of Owner.
b) It is to be noted that the Engineer even after initial approval of the program,
may instruct to enhance or retard the progress of work during the actual
execution , in order to match with the progress of project without attracting
any claims from the Contractor. The initial program being submitted by the
Contractor should have sufficient flexibility to take care of such reasonable
variations.