Sunteți pe pagina 1din 6

MUHAMMAD ASIF

Aramco Approved Procurement Quality Supervisor


JSDP Approved Material Receiving Inspector
Aramco approved (SAPID) Mechanical Inspector
Aramco Approved Plumbing Inspector
Saudi Aramco SAP # 70013186
Location: Al Rehab, Jeddah
Email:asif.ctn@gmai.com
Cell: +966 581309888, +966 501997482
Skype: asif.ctn

ACADEMIC CREDENTIALS

Associate Mechanical Engineering from Lahore Pakistan in 1st Division.

COURSES, CERTIFICATIONS AND MEMBERSHIP


QMS (Quality Management System) ISO 9001: 2008.
Saudi Arabian Quality Council (SAQC) Membership # 10304
CSWIP 3.2 Welding Inspector Certification Result Awaiting
ASNT Level-II Radiographic Testing.
ASNT Level-II Liquid Penetrant Testing.
ASNT Level-II Magnetic Particle Testing.
Diploma in Auto Cad from Government College of Technology Lahore.

KNOWLEDGE OF CODES, SPECIFICATION & PROCEDURE


Familiar with Saudi Aramco Standards and International Standards.
Saudi Aramco Engineering Standard (SAES)
Saudi Aramco Engineering Procedure (SAEP)
Saudi Aramco Material System Specifications (SAMSS)
Saudi Aramco Inspection Form 175
Saudi Aramco Schedule Q Requirements
ASME/ API / AWS/ ASTM / BS / ISO

PROFESSIONAL EXPERIENCE

11 years of extensive and professional experience in Quality Assurance & Quality Control of
project procurement, vendor management, materials, welding, piping, equipment, plumbing,
HVAC activities as Procurement quality supervisor, material receiving inspector and QA/QC
Inspector.

1|Page
WORK EXPERIENCE:

More than 11 years of experience as Procurement Quality Supervisor & Senior QAQC Inspector, QC
Supervisor at different and construction Projects.

Dec, 2014 to till


Working with Nesma & Partners Contracting Company Ltd. at King Abdullah University of Science &
Technology Thuwal Jeddah as Procurement Quality Supervisor
Client: Saudi Aramco

Sep 17, 2013 to Dec. 2014


Working with China Communications Construction Company Ltd. (CCCC) at Jeddah Storm Water
Drainage Program (JSDP) Package 13 as Material Receiving Inspector
Client: JDDP, Saudi Aramco

Dec 15, 2012 to 31 Aug 2013


Working with Saudi Pan Kingdom (SAPAC) at Jeddah Storm Water Drainage Program (JSDP) as
Material/Equipment Receiving Inspector
Client: JSDP, Saudi Aramco

May, 2010 to 04 Dec 2012


Working with (ABS Group Saudi Arabia) Saudi Aramco at KAPSARC Project Riyadh and KAUST Project
Jeddah as Mechanical Inspector

February 15, 2009 to May 05, 2010


Working with TANMIA for oil & construction Ltd at TT 11 CCU Extension project TOTAL E&P Kharir
Block 10 Yemen as Vendor QC Supervisor

August 19, 2008 to February, 2009


Worked with FLUOR MIDEAST LIMITED at QATAR GAS Berth-6 Project, Abu Dhabi (UAE) as QA/QC
Mechanical Inspector (piping, welding)

October 10, 2007 - August 06, 2008


Worked with OLAYAN-DESCON Engineering at PC-1/3 (Polymer Plants) Rabigh Refining & Petrochemicals Rabigh
Saudi Arabia as QA/QC Inspector (Plant Equipment & Welding)

January 05, 2007 September 15, 2007


Worked with DESCON ENGINEERING LIMITED worked as QC Inspector for Annual shutdown at FFBL (Fuji
Fertilizer bin Qasim) and PTA Plant Karachi, Pakistan, 200TPH Water Tube Boiler at Bulleh Shah Paper Mill
Kasur Pakistan.

Sep, 2006 Dec, 2007


Worked with INSPECTEST (Pvt.) Limited as QC Inspector at DEW Lahore, Pakistan

2|Page
JOB RESPONSIBILITIES:

Procurement QC Supervisor on Saudi Aramco Project:

Reviewing Technical submittal prior to client submission.


Reviewing of purchase requisition prior to client submission.
Evaluating suppliers/manufacturers status and their approval.
Submitting technical specifications, inspection requirement and other legal documents to the
selected supplier
Preparing complete Inspection Assignment Package (IAP) which includes; Approval sheet, IAP
Checklist, Un-priced Purchase Order, Material Requisition approval, Technical Specifications,
Data Sheet, Drawings, Inspection and Testing Plan, Applicable Specifications, Pre-Inspection
Meeting Agenda, Assigned Inspectors Resume (Lead Inspector and Back up).
Checking of vendors ITP against applicable standards and requirements.
Ensuring that inspections are performed as specified in Quality Plan and as per level of
inspection as required while receiving the materials and equipment.
Checking for any need or requirement for waiver or concession.
Preparing of Non Material Requisition for submittal and approval.
Checking the approval status of drawings.
Reviewing and Checking suppliers/manufacturers quality procedures and personnel approvals
and other requirement prior to client submission.
Scheduling & attending Pre Inspection Meeting and submission of Minutes of Meeting to client.
Scheduling of Inspections as per ITP, in consideration of the different activities whether review,
witness and hold points.
Expediting inspection report and its supporting documents.
Reviewing and Submitting inspection report along with its supporting document to client
Preparing final Inspection Disposition Report (IDR).
Preparing and submitting two-week-look-ahead inspection and fabrication schedule to client
including all detail of the vendor, level of Inspection, purchase order, status of open NCRs, and
material status.

Material/Equipment Receiving Inspector on Saudi Aramco Project:


Review vendor documents received along shipments.
Receiving material inspection (Civil, Piping, and Mechanical).
Checking the material as per the purchase order and packing list.
Responsible for all kinds of inspection activities for incoming material as per Saudi Aramco
checklist and standards.
Responsible for inspection of contractor supplied material and their site.
Material receiving and checking as per the standards.
Preparing of daily receiving report, preparing of material receiving report.
Document control and data record.
Preparing daily activity report, update material quality control logbook and charts.
Co-ordinate and concerned dept. in regard to gate passes and works permits for preparing
monthly material received material reports.
Finalize monthly material reports and other reports.
Correspondence with various dealers regarding their material requirement, material enquiry,
and material acceptance.

3|Page
Material daily S stock reports.
Preserving material at suitable place.
Checking the material as per the packing list.
Location of spare upon creating of stock numbers, fixing locations.
Issuing material as per the request slip approved by material manager.
Generate material code & Bin location as per coding index.
Responsible for handling all the receipts in the warehouse.
Co-ordination with site engineer/supervisors.
Receiving material as per the delivery note and purchase order.
Reporting of overage, shortage &damage of material to manager.

QC Plumbing & HVAC Inspector


Fire Water Piping, RTR/FRP/GRP Piping & Drainage System, Storm Water Drainage
Inspection for the construction, installation and pipe laying of Fiberglass Reinforced
Thermosetting Pipes (RTR) for firewater and oily water & Storm Water Drainage lines including
all of its metallic connections and fittings as per detailed drawing.
Installation & Inspection of RTR piping for Oily water drainage
Inspection of FRP manholes & Inspections Chambers as per standards & project specifications.
Installation & inspection of HDPE piping for IRW,PW,FW,RW
Installation & Inspection of RTR piping up to 3.5M by coupling joints & wrapping Method, Joint
test, Stiffness Test, Hydro Test for RTR pipes.
Calculation of Deflection in installed piping by deflection test.
Installation & Inspection of Corrugated HDPE piping for Sanitary Sewer line.
Inspection of Layout and assembly of IRW,PW,RW,FW piping system
Preparation/review of Hydro test package for all type of water supply systems.
Inspection of Water Hammer Arresters.
Material Inspection of HDPE,UPVC,CPVC,PVC and GRP/RTR
Material Inspection of valves/fittings as per project specifications.
Material inspection of lifting station and its installation inspection.
Installation Inspection of Back flow Preventers at irrigation water piping, Fire Hydrants in fire
water lines, Sprinklers of Pendent type & Concealed type, Cooling Pipes, Gas Pipes etc.
Inspection of Sewer lines UPVC & corrugated HDPE, DWV piping inside the building, Plumbing
fixtures, storm water drainage systems & catch basins.
Inspection of water supply system with valve box and its instruments ( Valves/water meters),
Wet Fire Water Sprinkler System and dry Fire Water Sprinkler System, Pre-Action Water
Sprinkler System. All Type of Chiller (TRANE, Mc QWAY, CARRIER, YORK), AHU, FCU, VAV, VFD,
Cooling Tower system. Chilled water system chilled water primary & secondary pump.
Pressurization unit and exhaust fan, Split unit, window A/C
Installation Inspection of Cooling Pipes, Gas Pipes etc, duct installations, air Balancing of HVAC
system, Hydro testing, Leak testing,
Periodic inspection for exit building and equipment (HVAC, Mech, Plumbing)
Filtration System and Pump, Fountains. Sump Pump, Potable pump, Transfer pump and Booster
pump
Inspection of duct installations.
Air Balancing of HVAC system, Hydro testing, Leak testing.(Light Test, Smoke Test)

4|Page
QC Mechanical & Welding Inspector
Perform Hold, Witness and Surveillance inspections and tests at construction sites to ensure
compliance with SAUDI ARAMCO requirements and project specifications requirements for proper
handling, storage and protection at SAUDI ARAMCO facilities and/or construction sites.
Monitor Contractors Quality Systems, records and Quality Personnel for compliance with
Inspection of welding consumable as per approved WPS.
To verify the required equipment for welding, like welding machine, baking equipment, welding
torch or holder, clamping, etc.
To inspect backing of low hydrogen electrodes and handling of consumables.
Witness of joint preheating, post heating and purging as required.
Witness the welding activities.
Visual inspection of completed weld joints.
Issuance of inspection reports and arranging client inspection and NDT as required.
Preparation & Review of method statements for equipment installations & erection.
Visual inspection of foundation level, anchors, as per approved construction drawings.
Visual inspection of equipment and verification alignments.
Ensuring implementation of quality inspection plan (QIP).
Blasting and coating inspection according to standard and client specifications.
Review of test packages and witness the pneumatic testing, hydro testing / flushing & air
blowing the pipe spools.
Site inspections for Stationary & Rotatory Equipment regarding quality (Leveling alignments
including Radial & Axial) prior to installations & after installation.
Physical Inspections of equipment.
Internal inspections of equipment (Vessels / Columns) before final Box up.
Physical Inspections for Secondary Reformer & Waste Heat Boiler Package (Exchangers&
Vessels).
Internal Inspections for Secondary Reformer & related accessories.
Review of WPS for welding of Waste Heat Boiler & Inspections of activity.
Inspections of Cooling Tower Fans & Motor Assemblies before & after Installations.
Inspections for Vertical Pumps (Physical & Axial/Radial).
Internal Inspections for columns before & after installations of accessories.
Welding inspection of chimney tray inside the absorber.
Physical Inspections for Reformer & Welding Inspections for Reformer Tubes.
Coordination of QC activities by meeting the requirements of project specifications as per
related Codes & standards.
Signing of daily welding report.
Inspection of incoming material according to the specifications & standard.
Monitoring & record review for hydro testing.
Monitoring Hydro Testing activity for underground piping by manual & digital Recorder.

Projects Completed:
Jeddah Storm Water Drainage Program (JSDP) (2013)
King Abdullah Petroleum Studies and Research Center (KAPSARC) (2012)
King Abdullah University of Science and Technology (KAUST). (2011)
Sawan Gas Field Compression Project of OMV (2010)
Rehmat Gas Field saqib-1A EWT Flow Line installation Project (2009)

5|Page
QATAR GAS Berth-6 Project (2008)
PC-1/3 (Polymer Plants) Rabigh Refining & Petrochemicals (2008)
Erection of 200TPH Water Tube Boiler (2007)

PERSONNAL INFORMATIONS

Name Muhammad Asif


Father Name Muhammad Anwar Akhtar
Date of Birth August 22, 1982
NIC No. 31102-0613071-3
Mobile (KSA) +966501997481, 0581309888

6|Page

S-ar putea să vă placă și