Sunteți pe pagina 1din 1

Distribution Board Schedule - SOUTH PIER @ BRIDGE HOUSE

Distribution Board
DB(IT):L00-B11-02-EPS-6JD-01 I/C Isolator 100A, TP+N System : TNS
Ref.
ELECTRICAL ROOM L00- Building /
Location South Pier - 260 @ Bridge House I/C RCCB 100A, 100mA,4P 415V AC, 50Hz, 3 PHASE, 4W
B11-02 Zone
1R x 4C x 70 Sq.mm, Cu / XLPE / SWA / LSF, 600 / 1000V Grade
I/C Cable, Type &
Feed From SMSB(IT):L00-252-04e-EPS-6JP-03 MSB:L00-252-04k-EPD-6JP-02 SS-04_TX-02 +
Size
35 Sq.mm CPC, Cu / LSF Green / Yellow, 450 / 750 V Grade

Cable / Rated Load in kW


Outgoing Feeder Type Diversity Diversifie
Phase Wire Size Current Description / Location of Load Qty Type of Load REMARKS
Feeder MCB / RCBO Factor d Load
(mm2) (A) R Y B

FSC (00-B11-01&02&03&04)-PCA PALNT


R 4.0 RCBO, 30mA 20 4 AACS 1.20 1.00 1.20 EI-43
ROOM&ELE.ROOM&IT ROOM&IT ROOM LOBBY

1 Y 4.0 RCBO, 30mA 20 VDGS SIGNAGE CP 1 VDGS-SIGNAGE 0.30 1.00 0.30

B 4.0 MCB 32 32A SPN ISOLATOR (00-B11-03)-IT ROOM 1 IT RACK-BH 1.10 1.00 1.10

R 4.0 RCBO, 30mA 20 CHILLER COMMISIONING LOOP CONTROL PANEL 1 CHILLER LOOP CP 1.00 1.00 1.00

2 Y 4.0 RCBO, 30mA 20 FSC (OUT SIDE PCA ROOM BELOW FIXED BRIDGE) 1 CCTV 0.10 1.00 0.10

REDUNDANT
B 4.0 MCB 32 32A SPN ISOLATOR (00-B11-03)-IT ROOM 1 IT RACK-RES. 0.00 1.00 0.00 SUPPLY

R 4.0 RCBO, 30mA 32 FSC (00-B11-01)- PCA PLANT ROOM 1 BMS DDC 0.60 1.00 0.60

3 Y 4.0 RCBO, 30mA 20 SNC-11 CONTROL PANEL 1 SNC-11 1.00 1.00 1.00

B . RCBO, 30mA 20 SPARE SPARE 0.00 0.00 0.00

R 4.0 RCBO, 30mA 20 TSSO (00-B11-03)-IT ROOM 2 RADIAL SOCKET 0.40 0.30 0.12

4 Y 4.0 RCBO, 30mA 20 FA-POWER SUPPLY UNIT 1 FA-PSU 0.30 1.00 0.30

B 4.0 RCBO, 30mA 20 VDGS CONTROL PANEL 1 VDGS 0.50 1.00 0.50

R 4.0 RCBO, 30mA 32 PSU-VFD STARTER PANEL 1 STARTER PANEL 0.60 1.00 0.60

5 Y 4.0 RCBO, 30mA 32 PSU-DOL STARTER PANEL 1 STARTER PANEL 0.60 1.00 0.60

B 4.0 RCBO, 30mA 32 PSU-STAR/DELTA STARTER PANEL 1 STARTER PANEL 0.60 1.00 0.60

R . RCBO, 30mA 20 SPARE SPARE 0.00 0.00 0.00

6 Y . RCBO, 30mA 20 SPARE SPARE 0.00 0.00 0.00

B . RCBO, 30mA 20 SPARE SPARE 0.00 0.00 0.00

R 0.67

7 Y 4.0 RCBO, 30mA 32 TO FHSCMS PANEL (MC1) 1 FUEL CP-FHSCMS 0.67 0.80 1.60

B 0.67

R 4.0 RCBO, 30mA 20 TO FHSESD PANEL (MC1) 1 FUEL CP-FHSESD 1.00 0.80 0.80

CABLE LAID BY
8 Y 4.0 RCBO, 30mA 32 PCA PIT (MC1) 1 PCA PIT 0.60 1.00 0.60 MC1

CABLE LAID BY
B 4.0 RCBO, 30mA 32 ELECTRICAL PIT (MC1) 1 ELE PIT 0.60 1.00 0.60 MC1

Total load per phase in kW 5.47 3.57 3.47

Total Load in kW 12.50 0.93 11.62

2012Bechtel-Enka-BECConsortium Contents Confidential

S-ar putea să vă placă și