Sunteți pe pagina 1din 3

Doc. No.

: CONST/PK/HSE/FRM-
22
JOB SAFETY ANALYSIS Rev.: 01
Date: July 1st, 2016
Page: 1 of 2

Project: NRL CDU Revamp Project Project#: 1166 Area: All Site General Comments: Proper PPE, TBT should be conducted before start the job,
Access control authority would be DEL Site Manager/Site Engineer
Date: 06-02-2017 Supervisor: Ramzan/Adnan

Job Description: Hot jobs (Welding cutting & grinding)


Detail of Equipment & Tools Responsible
Item Risk Involved Preventive Measure Severity Rating
Activity used Person
FLAG MAN SHOULD BE ARRANGED WITH TRAILER/ BOOM Area I/C
1 SHIFTING OF VEHICLES. TRUCK. (Authorized 2
MATERIAL & HAND INJURY.
EQUIPMENTS EMPLOYEES SHOULD BE SKILLED ON CORRECT MANUAL Person).
(WELDING 2
PROPERTY DAMAGED. HANDLING TECHNIQUES.
PLANTS) AT JOB
LOCATION ALL EMPLOYEES MUST BE PERFORMED WORK WITH 3
WELDING PLANT COMPLETE
9REQUIRED) PPES. 3
PERSONNEL INJURY.
EMPLOYEES SHOULD BE TRAINED ON SAFE WORK 3
2 CUTTING,
ELECTROCUTION PRACTICES.
GRINDING,
WELDING WORK 2
POWER TOOLS FIRE. FIRE WATCH WILL BE APPOINTED FOR HOT JOBS.
(GRINDER, DISC PROPERTY DAMAGED. ALL POWER EQUIPMENT SHOULD BE INSPECTED PRIOR
&EXTENSION TO EACH USE.
3
BOARD)
SLIP , TRIP & FALL FREQUENT LEL MONITORING SHOULD BE DONE BY
CLIENT FIRE PROTECTION TEAM. 3

HAND TOOLS COLOR CODED & HEALTHY.

3 HOUSEKEEPING FIRE BLANKETS, FIRE EXTINGUISHERS SHOULD BE 3


ARRANGED.
HAND TOOLS
CABLES MANAGEMENT TO BE IN PLACE PROPERLY
3
AREA MUST BE FREE FROM COMBUSTION MATERIALS.

LEL TTESTING WILL BE DONE PERODICALLY.

JSA MEETING PRIOR TO START OF JOB


This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
Copyrights Ordinance 2002, All Rights Reserved
DAILY TOOL BOX TALK

PROPER EARTHING OF EQUIPMENTS.

PROPER SIZE OF CABLE AVOID TO OVER LOAD.

PROPER HOUSEKEEPING OF AREA


COMPLINACE OF MANDATORY AND ADDITIONAL PPES.

CERTIFIED ELEVATED WORK PLATFORMS SHOULD BE


USED WHILE WORK AT HEIGHT

Severity Rating : (1) First Aid / Minor Property Damage (2) Recordable Accident / Property Damage
(3) Lost Time Accident / Major Property Loss (4) Catastrophic Accident

Are you aware of, and do you have the correct PPE? What are the risks? How do controlled risks?

_______________________________ __________________________
AREA ENGINEER / SUPERVISOR HSE REPRESENTATIVE

This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
Copyrights Ordinance 2002, All Rights Reserved
This document is the intellectual property of Descon Engineering Limited. Any unauthorized use, including modification and reproduction of the content is strictly prohibited.
Copyrights Ordinance 2002, All Rights Reserved

S-ar putea să vă placă și