PIPING
CONTRACTOR : DYNACIATE ENGINEERING SDN. BHD.
SIGNATURE
ISSUED TO SCEM( 1 )
CC TO DESB(1 ) DKSB (1 )
TABLE OF CONTENT
1. Preface
2. Objectives
3. References/Supporting Documents
4. Personnel Involved
4.1 Roles/Trades
4.2 Responsibility
1.0 Preface
NG pipeline replacement project, owned by Eastman Chemical (M) Sdn. Bhd., were
identified as leaking at minor range point (not longer than 2 meters) of the pipeline
system. At this point, Dynaciate Engineering Sdn. Bhd. being awarded for the piping
replacement works.
2.0 Objectives
The work and procedure which to be carry out for NG Piping Replacement Works
shall consists of:
a) Visual Inspection Report
b) Blasting & Painting Report
c) NDE – Holiday Test Report
This Method Statement is however to read and applied in conjunction with Job Safety
Analysis, inspection and test plan and other relevant documents.
4.2 Responsibilities
5.3.1 Safety
a) The Mo-Check operation must take place outdoors or in a well
ventilated area
b) Individual who work and handle the Mo-Check (Moly-Drop Test
960) chemical agent should be equipped with chemical resistant
rubber gloves, rubber boots, rubber apron and a full face covering
chemical resistant face shield.
c) In cases where a closed vessel has to be Mo-check (Moly-Drop Test
960) on the inside, it is essential that good ventilation be provided,
and that operators wear respirators equipped with filter of the “acid
gases” type. Neoprene and Natural Rubber gloves and aprons offer
the best protection.
d) Bottles containing chemicals must be stored in a upright position and
must always be carefully closed. Mo-Check (Moly-Drop Test 960)
chemicals has strong acid properties and must be handled with great
caution. If an accident does occur and paste splashes onto the skin or
into the eyes, the affected area must be immediately and
continuously rinsed with large volumes of running water. Seek
immediate medical attention.
5.7 Accidently Touch / Push / Press on the Manual valve / Devices / Switch
a) All workers / inspector is prohibited to touch, push, press, and
operate any manual valve, devices nor switches without Kaneka
approval and supervision.
b) However, in case accidently touch / push / press on the manual
valve / devices / switch, Kaneka must be informed immediately.
5.11 Housekeeping
a) Housekeeping works shall be carried out by end of day because
works permit closing.