1
1/18/2016
Presentation Overview
2
1/18/2016
Presentation Overview
3
1/18/2016
4. General awareness
Session - 1
Process and
Methodology
4
1/18/2016
Vision
market changes
India
ECBC Update 2016 9
12 Jan 2016 - Mumbai
Key objectives
5
1/18/2016
1: 3:
2: 4: 5:
Administration Comfort
and Building Lighting & Electrical &
systems and
Compliance Envelope Controls Renewable
controls
working group working group working group working group
working group
6
1/18/2016
Steering Committee
Planned meetings –
Members
7
1/18/2016
Building Envelope
Members
Members
8
1/18/2016
Members
5. Mr. R. K. Mehta, Mr. Seemant Sharma, and Mr. Rahul Garg, RAMA
Members
9
1/18/2016
Technical Committee
10
1/18/2016
Government
1. Ministry of New and Renewable Energy (MNRE)
NGOs
1. GRIHA Council
11
1/18/2016
Industry Associations
1. The Indian Institute of Architects (IIA)
Industry Associations
12
1/18/2016
6. Indo- EU
13
1/18/2016
14
1/18/2016
Key Steps
2. Market assessment -
Baseline analysis and data
collection
ECBC
2016 3. Stringency Analysis and draft
recommendations
•Market Assessment
Working •Technical analysis
Groups •International practices
•Expert comments
•Regional Workshops
Technical
•National Workshops
committee •Public Review
15
1/18/2016
Step 1 - approach
1. Component Approach
16
1/18/2016
Step 2 - approach
Objective
Scope
Non residential Consider all building Basic material/
buildings as defined components system
in NBC specifications
ECBC Update 2016 34
12 Jan 2016 - Mumbai
17
1/18/2016
Building categorization
Secondary
Resort
school
18
1/18/2016
Building categorization
Commercial
Business Assembly
Shopping Complex
Medium Office
Stand alone Theatre
(10,000 –
retail
30,000 sqm)
Super market
Type 1 - Hospitality
19
1/18/2016
Type 2 - Educational
20
1/18/2016
Type 4 - Business
21
1/18/2016
22
1/18/2016
Rates from
associations and
diversified vendors
Final costing
DSR rates were
checked by key
considered for
construction
labor
companies
Milestone 3 - approach
1. stringency analysis
a. Building envelope
1. Update Priorities, Scope and
Methodology b. Lighting and controls
23
1/18/2016
Milestone 4 - approach
Session 2
Administration and
Compliance
24
1/18/2016
Scope
Sizes of Buildings:
Building complexes with
Exemptions:
The provisions of this Code do not apply to:
1. Equipment and portions of building systems that use energy primarily for
manufacturing processes
Lighting and
Controls
Comfort
Electrical and
Systems and
Renewable
Controls
ECBC
Building Administration
Envelope 2015 and Compliance
Sections
25
1/18/2016
Precedence
26
1/18/2016
Reference Standards
1. National Building Code (NBC) 2005 is the reference
document/standard for –
a. lighting levels,
Administration and
Enforcement
- Compliance Approach
- Compliance Requirement
- Administration Requirement
- Compliance Documents
27
1/18/2016
Compliance Approaches
1. Prescriptive Approach
Final outcome –
Compliance requirement
28
1/18/2016
Mixed Use
Development
New
Addition Alteration
Construction
Self Occupied
New Buildings
•Comply with either the prescriptive or Whole building
performance requirement
29
1/18/2016
Core and shell buildings where the developer or owner will only provide the
base building and its services. Base building will include common areas,
circulation areas, parking, basements, services area, and open site area.
Building envelope
Renewable energy systems
Electrical systems (installed by developer/ owner)
Comfort systems and controls (installed by developer/ owner)
Lighting systems and controls (installed by developer/ owner)
Legal undertaking that fit out manual for the tenant will have a mandatory
requirement of ECBC compliance in interior fit outs
Whole building - Area Weighted averages should comply with ECBC EPI
requirements.
30
1/18/2016
Enforcement jurisdiction
c. Municipal Corporations/ULBs
d. Local Bodies
Compliance forms to
Certified ECBC Owner of the
be submitted to
compliance assessor building also needs
authority along with
to prepare the ECBC to submit the a duly
the submissions
compliance form signed undertaking
drawings
31
1/18/2016
Second phase of the ECBC compliance will be effective after 5 years of ECBC
compliance implementation.
Compliance forms to
Certified ECBC Owner of the
be submitted to
compliance assessor building also needs
authority along with
to prepare the ECBC to submit the a duly
the submissions
compliance form signed undertaking
drawings
Compliance tools
32
1/18/2016
Penalties
1. Owner’s responsibility
Compliance Documents
• Phase 1-
• Plans and specifications shall show all pertinent data and features of
the building, equipment, and systems.
• Phase 2-
• Construction verification compliance documentation
33
1/18/2016
Session 3
Building Envelope
2,922
16 prototypes simulations for
buildings in 5 each building
climatic zones type in 5
climatic zones.
34
1/18/2016
Warm &
Composite Hot and dry humid Temperate Cold
Baseline 1.65 1.65 1.65 1.65 1.97
ECBC 2007 8 hours 0.4 0.4 0.4 0.4 0.4
ECBC 2007 24 hours 0.261 0.261 0.261 0.409 0.261
35
1/18/2016
U value in W/m2-K,
SHGC value is maximum limit ,
VLT value
12 Janis2016
minimum
- Mumbai limit ECBC Update 2016 71
71
Shading Requirements
5 Projection 3 types -
factors Overhangs,
considered fins, and box
0, 0.25, 0.5, 0.75, 1 frame
4800
2 Latitudes
simulations in
considered
energyplus
Equations to
8 Shading easily
Orientations estimate the
analysis SEF
36
1/18/2016
0.25
Example SHGC (say)
28 °N
Box Frame Overhang Fin
0.25 0.5 0.75 1 0.25 0.5 0.75 1 0.25 0.5 0.75 1
South 0.39 0.62 0.90 1 0.32 0.40 0.49 0.57 0.29 0.34 0.36 0.39
South-East 0.37 0.56 0.72 0.92 0.31 0.40 0.49 0.55 0.28 0.32 0.34 0.36
South-West 0.35 0.56 0.78 1 0.31 0.38 0.49 0.53 0.29 0.33 0.34 0.36
Daylighting Requirement
Daylighting Analysis
37
1/18/2016
Daylighting requirement
38
1/18/2016
390
370
350
(kWh/m2)
330
310
290
270
250
0 0.5 1 1.5 2 2.5
U-Value (W/m2-oK)
39
1/18/2016
850
800
750
700
650
600
550
500
0 0.2 0.4 0.6 0.8 1
SHGC
185
180
175
170
165
160
155
150
145
140
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
VLT
Cold & Cloudy - VLT Hot & Dry - VLT Temperate - VLT
Warm
12 Jan 2016 & Humid
- Mumbai - VLT Composite - VLT2016
ECBC Update 80
40
1/18/2016
90
80
70
(kWh/m2)
60
50
40
0 0.5 1 1.5 2 2.5
U-value (W/m2-oK)
Cold & Cloudy - All zones Hot & Dry - All zones
Temperate - All zones Warm & Humid - All zones
Composite - All zones
12 Jan 2016 - Mumbai ECBC Update 2016 81
81
41
1/18/2016
72,000 6,000
71,000 4,000
70,500 3,000
70,000 2,000
69,500 1,000
69,000 0
0 0.2 0.4 0.6 0.8 1
U value (W/m2-K)
6,000
4,000
NPV (Rs./ m2)
2,000
0
0 0.1 0.2 0.3 0.4 0.5 0.6
-2,000
-4,000
SHGC
NPV of Update
ECBC savings2016 84
12 Jan 2016 - Mumbai
42
1/18/2016
134,000
133,500
133,000
132,500
132,000
131,500
131,000
0 0.1 0.2 0.3 0.4 0.5
SHGC
ECBC Update 2016 85
12 Jan 2016 - Mumbai
135,000 10,000
130,000 5,000
125,000 0
120,000 -5,000
0 1 2 3 4 5 6 7
U value (W/m2-K)
43
1/18/2016
15,000 6,000
14,600 4,000
14,400 3,000
14,200 2,000
14,000 1,000
13,800 0
0 0.2 0.4 0.6 0.8
U value (W/m2-K)
44
1/18/2016
Analysis approach
5 combinations were analyzed based on the weightage to LCC and energy saving potential (ESP)
Weightage distribution
100%
0% 30% 50% 70% 100%
80%
Weightage Percentage
60%
ESP
40% LCC
20%
0%
Case 1
12 Jan 2016 - Mumbai
Case 2 Case
ECBC 3 2016
Update Case 4 Case 5 89
100% 2 3 14
Percentage weightage of LCC
80%
2 3 14
60%
4 2 12
40%
10 3 5
20%
0% 16 2 1
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8
-20%
U value (W/m2K)
ECBC Update 2016 90
12 Jan 2016 - Mumbai
45
1/18/2016
Composite - wall
100% 15 3 1
Percentage weightage of LCC
80%
17 1 1
60%
17 2
40%
1 2 15 1
20%
0% 18 1
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8
-20%
UECBC
value (W/m2K)
Update 2016 91
12 Jan 2016 - Mumbai
Composite - Roof
100% 1 17 1
Percentage weightage of LCC
80%
1 18
60%
13 6
40%
13 6
20%
0% 19
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7
-20%
UECBC
value (W/m2K)
Update 2016 92
12 Jan 2016 - Mumbai
46
1/18/2016
Shading Analysis
47
1/18/2016
2.2
Shading equivalent factor
2.0
1.8
1.6
1.4
1.2
1.0
0 0.2 0.4 0.6 0.8 1 1.2
North East P/H South West
ECBC Update 2016 95
12 Jan 2016 - Mumbai
1.6
1.5
1.4
1.3
1.2
1.1
1.0
0 0.2 0.4 0.6 0.8 1 1.2
P/H
North
12 Jan 2016 - Mumbai
EastECBC Update 2016South West 96
48
1/18/2016
4.0
3.5
3.0
2.5
2.0
1.5
1.0
0 0.2 0.4 0.6 0.8 1 1.2
P/H
North East South West
North-East
12 Jan 2016 - Mumbai
South-East South
ECBC Update 2016West North West 97
Image ref:
http://www.ecologicbuild.com
12 Jan 2016 - Mumbai ECBC Update 2016 98
49
1/18/2016
50
1/18/2016
51
1/18/2016
Image ref:
www.treehugger.com 103
12 Jan 2016 - Mumbai ECBC Update 2016 103
Image ref:
www.ecohomedesigns.org 104
12 Jan 2016 - Mumbai ECBC Update 2016 104
52
1/18/2016
Mass wall
PACE-D12TA program
Jan 2016 - Mumbai ECBC Update 2016 106
106
53
1/18/2016
v B A Internal
External
v B A
Internal External
54
1/18/2016
v A B A B
v
Insulation
Upper Limit: 12mm Gypsum
Board, 100 mm Polyurethane, 12
mm Gypsum Board: 0.19 W/m2 0
55
1/18/2016
v
D
PACE-D12TA program
Jan 2016 - Mumbai ECBC Update 2016 111
111
D
v
PACE-D12TA program
Jan 2016 - Mumbai ECBC Update 2016 112
112
56