Name of Firm : COWI A/S

Name of Staff : Ireneo A. Ambrocio

Date of Birth : 28 June 1952

Nationality : Filipino

Manila Address : Block 30, Lot 9 Tarhata St. Pembo Ft.


Bonifacio
Makati City, Philippines

Provincial Address : 188 Barangay Bayanihan, Gapan City


Nueva Ecija Philippines

Email Address : iaa628@yahoo.com

Contact Number (Philippines) : +639219792485


Contact Number (QATAR) : +9746710427

Education :

Bachelor of Science in Civil Engineering, 1975, Feati University, Manila

Training’s Attended :

Completed STAAD – III (Ver. 22.3) Training Course held on 20 May to 24 June
2000 at the ALA Computer Institute Inc,. LL Building 160 Panay Avenue, Cor.
EDSA, Quezon City, Philippines.

Seminar on Metal Welding (06 March 00), Bored Piles and General Bridge
Construction (13 March 00) and on Cable Restrainers for Seismic
Strengthening of Bridges (03 April 00), conducted by Everest International
Consultant, Technical Specialist for the BRIDGE SEISMIC RETROFITTING
PROGRAM, SIXTH ROAD BRIDGE COMPONENT, ADB Assisted.

Resource Speaker, Seminar/Training on Highway Design and Construction, on


the Job Training for Laotian engineers, Savannahket-Pakse Road Project,
September 1-15, 1998

Participated in the 20th NATIONAL CONVENTION on the theme “CIVIL


ENGINEERING FOCUS TODAY” held at the MANILA MIDTOWN HOTEL,
November 10 to 12,1994. Sponsored by PHILIPPINE INSTITUTE OF CIVIL
ENGINEERS, INC. (PICE).

Road Safety Training Program, Inter-Agency Road Safety Committee (IRSC),


Road Engineering Association of the Philippines and SWEROAD, National
Engineering Center, University of the Philippines, Diliman, Quezon City, May –
June 1994

Page 1 of 13
Attended the 1992 ANNUAL CONVENTION of the ROAD ENGINEERING
ASSOCIATION of the PHILIPPINES (REAP) at Asian Institute of Tourism on
February 26 to 29, 1992. Sponsored by ROAD ENGINEERING ASSOCIATION OF
THE PHILIPPINES (REAP).

Seminar on Quantity Surveying Techniques, Philippine Constructors


Association, 1991

Seminar on Technology for the 1990’s, Remote Sensing of Natural Resources,


The Canadian Embassy, 1991

Seminar on Concrete Technology, held at the Architectural Center Club, Inc.,


Makati Metro Manila on October 20, 1990. Sponsored by THE AMERICAN
CONCRETE INSTITUTE, PHILIPPINE CHAPTER.

Seminar on Bridge Design and Construction, Philippine Institute of Civil


Engineers, 1990

SEMINAR WORKSHOP on CONSULTANCY OPPORTUNITIES AT THE ASIAN


DEVELOPMENT BANK held on July 01, 1989 at the WESTIN PHILIPPINE PLAZA
HOTEL, CCP Complex, Manila, Philippines. Sponsored by The
CONFEDERATION OF FILIPINO CONSULTING ORGANIZATIONS, INC. (COFILCO).

Roundtable Seminar on Reinforced Concrete Technology, American Concrete


Institute International, De La Salle University, March 1989 (5 days)

Membership in Professional Societies:

Member, Philippine Institute of Civil Engineers (PICE)

Member, American Concrete Institute, Philippine Chapter (ACI-RP)

Member, Society of Philippine Accredited Consultant (SPAC)

Languages :

English – Excellent in speaking, reading and writing

Filipino – Excellent in speaking, reading and writing

Employment Record :

From: Dec 2007 To: Present

Employer : COWI A/S

Position Held : Quantity Surveyor

Project Undertaken :

Nakilat Ship Repair Yard, Port of Ras Laffan, QATAR.

Description of Duties :

Quantity Calculation
Page 2 of 13
Review and monitor the contractor’s construction program and method
statement.

Planning and execution of construction supervision and Contract


administration, including the effective and regular supervision of the
works, maintenance of project records, correspondence and diaries.

Certify payments for the works and maintain a permanent record of all
measurements of work for which payment is to be made.

Provide timely assistance to the contractor in all matters related to the


interpretation of the contract documents, ground survey controls,
planning, quality control testing and other matters related to the
Project.

Review the weekly and monthly progress report of the Contractor.

From: Jan 2007 To: Nov 2007

Employer : Angel Lazaro and Associates

Position Held : Sr. Quantity/Cost/Documents Engineer

Project Undertaken :

Preliminary Engineering Design Study for C-5, Phase 3 Segment 10 and


8 Client: Manila North Tollways Corporation.

Description of Duties :

Supervised all staffs assigned to the project.

Prepared technical specifications, special conditions of contract and


tender documents

Quantity Calculation

Prepared unit price analysis

Prepared cost estimates

From: Jul 2002 To: Mar 2006

Employer :Meritec Ltd./Lao Consulting Group and


kampsax/Angel Lazaro and Associates

Position Held : Resident/Highway Engineer

Project Undertaken :

Construction Supervision for ADB/9 Rural Roads Access Project, Lao


PDR (Laos), ADB Assisted.
Page 3 of 13
Description of Duties :

Supervised all senior staff and project inspector involves in the project.

Review the detailed design and identify any inconsistencies and advise
the Client on the potential impacts of any differences.

Approve and monitor the contractor’s construction program and


method statement.

Checking out and approve the contractor’s setting-out of the works.

Assist the contractor in the identification of materials sources and


approve all materials for inclusion in the works.

Planning and execution of construction supervision and Contract


administration, including the effective and regular supervision of the
works, maintenance of project records, correspondence and diaries, as
well as quality control testing to ensure that the works are executed in
accordance with the Contract.

Ensure that the contractor’s adheres to all aspects of environmental


and social impact mitigation requirements of the civil works contracts.

Assist the Employer in the implementation of the resettlement plan


and monitor the process of resettlement of people affected by the
works.

Inspect regularly the contractor’s construction equipment,


installations, housing, medical facilities, etc. and ensure that they are
adequate and in accordance with the terms and conditions specified in
the contract for the Works.

Certify payments for the works and maintain a permanent record of all
measurements of work for which payment is to be made.

Keep the Employer and the ADB appraise of implementation problems,


which could jeopardize the Project goals and objectives and make
recommendation on how those goals and objectives can be
safeguarded.

Provide timely assistance to the contractor in all matters related to the


interpretation of the contract documents, ground survey controls,
planning, quality control testing and other matters related to the
Project.

From: Nov 2000 To: Jun 2002

Employer : Angel Lazaro and Associates

Position Held : Construction Supervision and Monitoring


Manager

Project Undertaken :
Page 4 of 13
Detailed Engineering and Construction Supervision, Partido Water
Supply System, Phase I, Partido District, Camarines Sur, Bicol, 15 M
USD. Financed by ABN Amro Bank from Dennmark.

Description of Duties :

Represent the interest of Partido Development Administration in any


matter related to the Supply Contract and the proper execution thereof

Assisted the Employer in the information/dissemination of the project


to the ten (10) towns of the Partido District.

Check and ensure the correctness of:


• Pre-design Phase – establishes the general size and scope of the
project and its location on the site. The services include but is not
limited to reconnaissance, topographical and other engineering and
land surveys, soil investigations, preparation of preliminary
architectural / engineering designs layouts, outline specifications,
preliminary cost estimates and specific recommendations prior to
actual designs;
• Basic Design Phase – this phase includes the detailed plans, design
working drawings, specifications and detailed cost estimates in
consonance with the contract drawing

Conduct/undertake inspection and ensure expediting of the work

Verify and check quantities and qualities of work accomplished by the


contractor as against the approved plans, specifications and programs
of work. Prepare and regularly update a list of the contractor’s
equipment (and its condition) to ensure compliance with the
Contractor’s Commitments in his bid, the list to be submitted to the
Employer quarterly.

Inform Employer if problems arise or potential problems may arise in


connection with the Construction Contract and make recommendations
for possible solutions.

Conduct verification and recommend approval of statements of work


accomplished and certificate of project completed by the contractor.

Review and recommend approval of progress and final billings of the


Contractor.

Provide timely assistance and direction to the Contractor in all matters


related to the interpretation of the Contract Documents, quality control
testing and other matters related to contract compliance and progress
of the project.
Examine and make recommendations to the Employer on all claims
from the Contractor for extension of time, extra compensation, work or
expenses or other similar matters.

Arrange and preside during periodic coordination and progress


meetings on site.

Page 5 of 13
Inspect the security and safety aspects of construction and temporary
works ensure that every reasonable measure has been taken to
protect life and property.

Formulate systems and procedures in interfacing with the contractor’s


requirements, and

Prepare all necessary forms/formats in relation to project


implementation

Employer : Angel Lazaro and Associates

Position Held : Sr. Specification/Quantity/Cost Engineer

Project Undertaken :

Pre-Construction and Construction Supervision, Potter and Clay


Christian School, Malabon, Metro Manila (September 1999 – February
2000). Private

Detailed Engineering Design, Barangay Integrated Development


Approach Nutrition Improvement of the Rural Poor Program (BIDANI)
Building, U.P. Los Banos, College, Laguna. Two-storey reinforced
concrete building (April – August 1999).

Detailed Engineering Design, Potter and Clay Christian School,


Malabon, Metro Manila. Two-storey reinforced concrete building
(January – March 1999)

Description of Duties :

Prepared technical specifications, special conditions of contract and


tender documents

Quantity Calculation

Prepared unit price analysis

Prepared cost estimates

Assisted in pre-bid conference

From: Jan 1996 To: Dec 1998

Employer : Worley International Ltd/Angel Lazaro and


Associates

Position Held : Quantity Surveyor

Project Undertaken :

Construction Supervision, Savannaknet-Pakse Road, Laos, 2nd Highway


Improvement Project, Lao PDR (Laos). World Bank Assisted.

Page 6 of 13
Description of Duties :

Prepared quantification of contractor's accomplishment for billing


purposes.

Prepared variation orders and change orders

Checked all working drawings submitted by the contractor

Supervise survey works

Revised the Horizontal and Vertical alignment to suit actual field


conditions

Prepared monthly and quarterly progress report

Monitor the activities of the contractor to insure that quality of work is


in accordance with plans and specifications.

Prepared working drawing for slope protection

Supervised all the counterpart staff (Laotian engineer) assigned to the


project

Resource speaker for the fifteen days training for the Laotian
engineers involved in the project

From: Jan 1995 To: Dec 1995

Employer : Angel Lazaro and Associates

Position Held : Sr. Cost/Quantity Engineer

Project Undertaken :

Construction Supervision, Highway Management Project, Luzon Area,


Department of Public Works and Highway. IBRD Assisted.

Description of Duties :

Prepared quantification of contractor's accomplishment for billing


purposes

Prepared variation orders and change orders

Checked all working drawings submitted by the contractor

Assisted the Resident Engineer in the preparation of the monthly and final
report

From: Sep 1993 To: Dec 1994

Employer : Angel Lazaro and Associates


Page 7 of 13
Position Held : Sr. Specification/Quantity/Cost Engineer

Project Undertaken :

Detailed Engineering Design, Road Network and Site Development,


Smokey Mountain Reclamation Project, Public Estates Authority

Description of Duties :

Prepared technical specifications, special conditions and tender


documents

Prepared quantity calculations and cost estimates for the project in


pursuance to detailed design tasks

Prepared unit price analysis

From: Jan 1993 To: Aug 1993

Employer : Angel Lazaro and Associates

Position Held : Resident Engineer

Project Undertaken :

Construction Supervision, Second Rural Roads Improvement Project,


Samar, Department of the Interior and Local Government, IBRD
assisted, with the following road sections:

Contract Package 36-A: Balugo-Tarangnan Road, 11 kilometers


Contract Package 36-B: Gandara-Matuguinao Road, 22 kilometers

And the following bridges:

Natimunan Bridge: 1 span, 22 meters, RCDG


Sto. Nino Bridge: 4 spans, 72 meters, RCDG
Palambrag Bridge: 3 spans, 36 meters, RCDG
Barroz Bridge: 2 spans, 36 meters, RCDG
Matuguinao Bridge: 1 span, 18 meters, RCDG

Description of Duties :

Supervised all senior personnel and project inspectors assigned to the


project

Monitored activities of the contractors to insure that quality of work is


in accordance with plans and specifications

Evaluated contractor's accomplishments for billing purposes

Coordinated with Project Management Office keeping them informed of


the status of the work

Page 8 of 13
Prepared change order/variation order

Prepared monthly progress reports

Prepared final report

From: Nov 1991 To: Dec 1992

Employer : Angel Lazaro and Associates

Position Held : Resident Engineer

Project Undertaken :

Construction Supervision, Fifth IBRD Highway Project, Tarlac,


Department of Public Works and Highways. IBRD Assisted.

Description of Duties :

Supervised all senior personnel and project inspectors assigned to the


project

Monitored activities of the contractors to insure that quality of work is


in accordance with plans and specifications

Evaluated contractor’s accomplishments for billing purposes

Coordinated with Project Management Office keeping them informed of


the status of the work

Prepared change order/variation order

Prepared Monthly Progress Reports

Prepared Final Report

From: Jan 1991 To: Oct 1991

Employer : Angel Lazaro and Associates

Position Held : Sr. Specification/Quantity/Cost Engineer

Project Undertaken :

Detailed Engineering Design, South Samar Coastal Road, 97


kilometers, OECF Assisted, Department of Public Works and Highways

Description of Duties :

Prepared unit price analysis, quantity and cost for the project

Prepared technical specifications, special conditions, proposal books,


reports and other documents.
Page 9 of 13
Checked quantifications prepared by junior engineers.

From: Jan 1990 To: Dec 1990

Employer : Angel Lazaro and Associates

Position Held : Sr. Specification/Quantity/Cost Engineer

Project Undertaken :

Detailed Engineering Design, Bohol Interior Roads (Loay-Trinidad and


Tubigon-Balilihan Roads), Bohol, 103 kilometers, Department of Public
Works and Highways

Description of Duties :

Prepared technical specifications, special conditions and tender


documents

Prepared quantity calculations and cost estimates for the project in


pursuance to detailed design tasks

Prepared unit price analysis

From: Jan 1989 To: Dec 1989

Employer : Angel Lazaro and Associates

Position Held : Sr. Specification/Quantity/Cost Engineer

Project Undertaken :

Detailed Engineering Design, Nueva Ecija Roads II Project, Gen. Tinio


Road and Mayapyap – San Ricardo Road, Cabanatuan City. Economic
Support Fund Secretariat

Description of Duties :

Prepared technical specifications, special conditions and tender


documents

Prepared quantity calculations and cost estimates for the project in


pursuance to detailed design tasks

Prepared unit price analysis

From: Jul 1985 To: Dec 1988

Employer : Angel Lazaro and Associates


Page 10 of 13
Position Held : Sr. Cost/Quantity Engineer

Project Undertaken :

Construction Supervision, Third Road Improvement Project, Zambales,


80 kilometers, Department of Local government, ADB assisted.

Description of Duties :

Prepared quantification of contractor's accomplishment for billing


purposes

Checked all working drawings submitted by the contractor

Assisted the Resident Engineer in the preparation of the final report

From: Jan 1985 To: June 1985

Employer : Angel Lazaro and Associates

Position Held : Sr. Specifications/Quantity/Cost Engineer

Project Undertaken :

Detailed Engineering Design, Baguio-Bontoc-Banawe Road (172 km.),


Benguet, Mt. Province and Ifugao, Department of Public Works and
Highways, IBRD Assisted

Description of Duties :

Reviewed and revised as necessary the technical specifications,


special conditions and tender documents

Reviewed and revised the quantity calculations and cost estimates for
the project in pursuance to detailed design tasks

Reviewed and revised the unit price analysis

From: Feb 1982 To: Dec 1984

Employer : Angel Lazaro and Associates

Position Held : Sr. Cost/Quantity. Engineer

Project Undertaken :

Construction Supervision, First Rural Road Improvement Project, Cebu


and Iloilo, 58 kilometers, Department of Local Government, IBRD
Assisted

Description of Duties :

Page 11 of 13
Prepare quantification of contractor's accomplishment for billing
purposes

Prepared variation orders and change orders

Checked all working drawings submitted by the contractor

Assisted the Resident Engineer in the preparation of the final report

From: May 1978 To: Jan 1982

Employer : Certeza Development Corporation

Position Held : Cost/Quantity Engineer

Project Undertaken :

Construction Supervision, Secondary and Feeder Roads, Albay, Bicol


River Basin Development Program, 143 kilometers with four bridges,
Department of Public Works and Highways, USAID assisted

Description of Duties:

Checked PERT/CPM, bar chart, and cash flow submitted by the


contractor

Made regular inspection of completed works for purposes of


measurement and payment

Checked all working drawings submitted by the contractor any


quantity calculation

Prepared change orders and detailed progress payments of the


contractor

From: Dec 1976 To: Apr 1978

Employer : Certeza Development Corporation

Position Held : Specifications/Quantity/Cost Engineer

Project Undertaken :

Detailed Engineering Design, Secondary and Feeder Roads, Bicol River


Basin Development Program, Albay and Camarines Sur, 158
kilometers, Department of Public Works and Highways, USAID Assisted
(July 1977 – April 1978)

Detailed Engineering Design, Fourth IBRD Highway Project, Negros


Occidental, 160 kilometers, Department of Public Works and Highways,
IBRD Assisted (December 1976 – June 1977)

Description of Duties :
Page 12 of 13
Prepared technical specifications, special conditions and tender
documents

Prepared quantity calculations and cost estimates for the project in


pursuance to detailed design tasks

Prepared unit price analysis

From: May 1975 To: Nov 1976

Employer : Certeza-Sauti Consulting Engineers

Position Held : Civil Works Inspector

Project Undertaken :

Construction Supervision, Second IBRD Highway Project, Feeder Roads


in Rizal Province connecting to the Manila East Road, Department of
Public Works and Highways, IBRD Assisted

Description of Duties :

Checking out and approve the contractor’s setting-out of the works.

Assist the contractor in the identification of materials sources and


approve all materials for inclusion in the works.

Inspect regularly the contractor’s construction equipment,


installations, housing, medical facilities, etc. and ensure that they are
adequate and in accordance with the terms and conditions specified in
the contract for the Works.

Provide timely assistance to the contractor in all matters related to the


interpretation of the contract documents, ground survey controls,
planning, quality control testing and other matters related to the
Project