Documente Academic
Documente Profesional
Documente Cultură
EQUIPMENT/SYSTEM
PROTOCOL No.
Page 1 of 6
FACILITY QUALIFICATION PROTOCOL STAMP HERE
EQUIPMENT/SYSTEM
PROTOCOL No.
Observed Checked
Parameter As per design Observation by (Sign/ by (Sign/
Date) Date)
Are doors provided with
Yes/ No
locks/ latches.
Location: As per drawing no.:
Window/ View Panel 44QS1701/A.01/0013/A0
location & Quantity Size: 1200 x 1100 mm
Quantity: 05 nos.
Page 2 of 6
FACILITY QUALIFICATION PROTOCOL STAMP HERE
EQUIPMENT/SYSTEM
PROTOCOL No.
Observed Checked
Parameter As per design Observation by (Sign/ by (Sign/
Date) Date)
SS table – 02 nos.; SS Chairs – 02
Other fixtures/ furniture nos.; Piping cutouts (200 x 200) –
03 nos.
Clean room status of
equipment, fixtures and
Should comply
utility supply (as
applicable) *
C. Lighting
Location: As per drawing no.:
44QS1701/E.01/0201/A0
Switch location, type and
Type: Normal light switch board
quantity
with 16A switches (3 Module)
Quantity: 02 nos.
Location: As per drawing no.:
44QS1701/E.01/0210/A0
1. Type: 32A, 240 V, 3 Pin (SPN
+ E) Industrial Metal Clad type
socket outlet with associated
plug top with DP MCB within
Polycarbonate enclosure (On
Power socket location,
Raw power)
type and quantity
Quantity: 02 nos.
2. Type: 32A, 415 V, 5 Pin (TPN
+ E) Industrial socket outlet
with associated plug top,
within 4P ELMCB in
Polycarbonate enclosure
Quantity: 01 no.
Location: As per drawing no.:
44QS1701/E.01/0201/A0
1. Type: 3600 Lumens 40W LED
Light fixture location, type Batten Fixture/ IP20/ Surface/
and quantity Ceiling Mounted/ Frosted
Diffuser
Quantity: 09 nos.
2. Type: 3600 Lumens 40W LED
Page 3 of 6
FACILITY QUALIFICATION PROTOCOL STAMP HERE
EQUIPMENT/SYSTEM
PROTOCOL No.
Observed Checked
Parameter As per design Observation by (Sign/ by (Sign/
Date) Date)
Batten Fixture/ IP20/ Surface/
Ceiling Mounted/ Frosted
Diffuser (Emergency Supply)
Quantity: 02 nos.
Sodium/ Diffuse Lamp
NA
Available
D. Environmental Features
Supplied AHU No. AHU -16
Classification Unclassified
Temperature NMT 30°C
RH NA
Page 4 of 6
FACILITY QUALIFICATION PROTOCOL STAMP HERE
EQUIPMENT/SYSTEM
PROTOCOL No.
Observed Checked
Parameter As per design Observation by (Sign/ by (Sign/
Date) Date)
44QS1701/A.01/0013/A0
Emergency Door
Type: Solid Filled Metallic
Powder coated Emergency Exit
Single leaf door with view panel
and panic push bar (2 hrs. fire
rated)
Size: 1200 x 2100 mm
Quantity: 01 no.
Wall safety railing NA
Breathing Air NA
Eye Wash/ Emergency
NA
Shower
Fire Extinguishers NA
Smoke Detector NA
Oxygen Detector NA
Sprinkler NA
Emergency Light point NA
F. Other Features
LAN 02 nos.
Phone 02 nos.
Digital Clock NA
Speaker NA
CCTV NA
Addressable Manual Call
NA
point
Addressable Loop
NA
Powered Sounder
Addressable type multi-
08 nos.
criteria detector
Access Control NA
Page 5 of 6
FACILITY QUALIFICATION PROTOCOL STAMP HERE
EQUIPMENT/SYSTEM
PROTOCOL No.
# Clean room status indicate that construction of ceiling, walls, floor, doors & View panels/ windows, should be free from
seams, cracks or holes (to prevent dirt accumulation and pest entry) and washable, cleanable and free from rust or corrosion.
Walls should be smooth, rigid, and resistant to impact and abrasion. Walls should be easy to clean and resistant to repeated
exposure to disinfectants. Floor-wall joints, building columns, equipment pads and other obstruction should be completely
sealed. Ceiling should be smooth, non-perforated and properly sealed to the framing. Windows/ View panel material should be
durable, washable and cleanable.
* Clean room status indicate that equipment, fixture or utility pipelines should be free from crevices, cleanable and physical
status of the installation should not be damaged and should not shed or accumulate particles. Horizontal or other surfaces on
which dust can accumulate shall be kept to an absolute minimum, and shall be completely avoided in areas where the product
or washed product containers are exposed. Exposed piping and conduit should be avoided as much as possible.
Note: Section A, B, C, E & F shall be verified under Facility Qualification Protocol and Section D –
“Environment Features” shall be verified under HVAC Qualification documents.
Conclusion: _________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
Concluded by
Department Name Sign/ Date
Engineering
User Department
QA
Page 6 of 6