Documente Academic
Documente Profesional
Documente Cultură
Features &
Capabilities
etap 18 Innovative Platform & Game-Changing Solutions
®
etap.com 2
Power System Modeling etap 18
®
Datablock
• Expanded input data & study results
Geospatial Diagram • Arc Flash & Motor Starting results New
• Intelligent Geospatial Diagram • Display results, input, tags
• Feeder & Substation Diagrams New • User-defined templates
• Geospatial model manager • Auto-adjusting protective device settings
• Import from third-party geodatabases • Independent tooltip & display New
• Synchronized with one-line diagram • Duplicate datablocks across multiple views
• Download background maptiles from Bing or Google
Maps using ETAP MapServer™ (requires API key)
• Edit Geospatial Diagram similar to the one-line diagram,
such as add, modify, & reconnect elements
• Circuit & feeder tracing
• Decluttering, color themes, user-defined symbols
• Graphical display of study results & alerts
• Study result & alert animation
ETAP Application
• Automatic incremental updates
• Installation Wizard New
• Keyless License Manager
• Ribbon bar for Ground Grid & Cable Pulling New
• Windows Active Directory authentication New
3 etap.com
etap 18
®
Elements New
• Series Capacitor
–– User-selectable capacitor location
–– Calculate degree of compensation
–– Consider MOV protection & bypass
• Switched Capacitor
–– Automatic control modes: voltage, current,
power factor
–– Control buses & branches
• Distribution Voltage Regulator
–– Automatic control modes: forward, reverse Rule Book - Harmonic Compliance Limits New
–– Include Line Drop Compensation (LDC) • ANSI/IEEE 519-2014
–– Control based on load side voltage requirements • User-defined grid code & local standards
• Wind Turbine Generator • Over 450 new V&V protective device models
Equipment Warehouse
• Overhead line – phase, ground, tower/pole
• Overhead catenary
• Power cables
• Distribution transformer
• Low-voltage circuit breakers
• Power fuses
• Railway track
• Equipment reliability
etap.com 4
Field Data Collection App - etapApp™ etap 18
®
Composites Components
Nested one-line diagram
using composite networks View, edit & verify data
5 etap.com
etap 18
®
Motor Starting
• Enhanced inverter model
• Plot Manager interface New
Short Circuit
• Compliance with IEC 60909-2016 Ed. 2.0 New
• Variable fault current vs. voltage
• LV to EHV system fault current calculation
etap.com 6
Arc Fault Hazard Evaluation - ArcFault™ etap 18
®
7 etap.com
etap 18
®
Protective Relay Performance & Evaluation New Plots & Reports New
• Simulate model-specific protection settings & functions • Time state plots
including distance, directional & load encroachment • Time distance characteristic plots
• Plot R-X characteristics & seen impedances • Time distance-resistance characteristic plots
• In-depth performance evaluation of impedance relays • Detailed device setting reports
• Evaluate protective device operation & coordination • Export relay settings to xml & Excel formats
• Intelligent alert viewer to identify & resolve setting
& logic errors
Distance Relay New
• Virtually animate protective devices operation
• Distance function
• Breaker failure & relay communication
• Scheme logic (input, output, timer, latch, variables)
• User-editable scheme logic
• Expanded current & voltage inputs
• Use real-time operational data for system evaluation
• Digital inputs
• Intuitive relay setting editor
• Phase current summation
• Primary & secondary relay settings based
on actual model • Up to 6 setting groups with labels & copy/paste
etap.com 8
Renewable & Microgrid etap 18
®
Type 3
9 etap.com
etap 18
®
AC DC
etap.com 10
Power System Monitoring & Control - ETAP - Time™ etap 18 ®
Load Preservation
SCADA System & Architecture • Steady-state & transient response
• MCC / BCC redundancy with disaster recovery • Fast response time (10ms) with secured communication
• Encryption & authentication security • Priority optimization based on number of
• Self-healing strategies trips per time period
• Integrated front-end processor with native
communication drivers Switching Order Management New
• Web services communication • Mobile interface
• Automatic historical data replication • Crew assignment & field confirmation of actions
• Unlimited signals or measurements • Link switching sequences to orders
• Native IEC 60870 protocol New • Scheduled & active order viewer
• Native ICCP protocol New • Control center confirmation of order
• Interface to ADMS & OMS • Estimated time to completion
• Classification & User Access Management including
Visualization & Dashboards Area of Responsibility (AOR)
• Common workstation & Web HMIs
• HMI objects library Switching Sequence Management New
• Alarms & Events displays • Unbalanced system validation
• Service Tags / Operator Notes integrated with • Transfer to Mobile Switching Order Management
advanced applications New
Alarm Management
Real-Time & Historical Reports New
• Prioritizes events via graphical & tabular views
• User-definable scheduled & on-demand reports
• Integrated SMS & e-mail services New
• Real-Time & historical data
• Customizable Alarms & Events reports Generator Operations & Maintenance
• Web-enabled reporting • Track life operating time & cost
• PDF & Excel formats • Multiple maintenance levels notifications
• Alerts for due maintenance schedules
11 etap.com
etap.com
Follow us:
Visit etap.com to view the current events schedule. Events are added throughout the year, so be sure to visit frequently for the latest updates.
Quality Assurance Commitment
ETAP is Verified and Validated (V&V) against field results, real system measurements, established programs, and hand calculations to ensure its
technical accuracy. Each release of ETAP undergoes a complete V&V process using thousands of test cases for each and every calculation module.
ETAP Quality Assurance program is specifically dedicated to meeting the requirements of:
Registered to ISO 9001:2015
ISO 9001:2015 10 CFR 50 Appendix B 10 CFR Part 21 10 CFR Part 50.55 ANSI/ASME N45.2
B12-18NF-DEC2017