Project :-
Place puna
Cantilever retaining wall of 5 m height Date 1/1/2018
Beaver Client hydrabad township Revision
Dimentions of Retainwall
Required height of retainwall above GL 5000 mm Main requirement of client
Depth of foundation top below GL 0 mm 0 mm 0 mm fill manually from
Height of stem, hs 5000 mm -
Top width of stem, Tst 300 mm Hence safe
Slope angle of retaining wall at earthfill side 0° 406400
Slope angle of retaining wall at opposite
0° X
earthfill side
Inclined length at earthfill side, Lei 300 mm 300 mm
Inclined length at opposite side of earthfill, L 0 mm -
Bottom width of stem, Tsb 600 mm - 1446 723
Length of toe, Lt 1300 mm -
Length of heel, Lh 2020 mm -
Length of base, Lb 3920 mm -
Thickness of foundation, Tb 600 mm 600 mm 2.559 req
Total height of earthfill above RW, hsr 1166 mm 1166 mm
Total height of retaining wall, hR 5600 mm
% of steel
Description Diameter Resultant spacing
considered
Steam design
Main Steel 20 150
Distribution steel 20 480 0.12%
Toe design
Main Steel 20 240
Distribution steel 20 240 0.12%
Heel design
Main Steel 20 180
Distribution steel 20 240 0.12%
Curtailment of bars
Available no. of bars in stem 7
No. of bars to be curtailed 3 - Place - if automatic needed
if surcharge = 0, hr = H
hr = hagl +Df or hs+Db
X
Ws5
150
Wst
300 Ws4 Ws3
hs
5000
5000 hagl Ws2 Ws1
1667 Wsb
600
600 Df 1300 0 300 2020
Li Lei
Wc2 Db 600
Lb
3920
anually from h36 to d a
### ###
formula
&[Page]Page no
&[Page]Total pages
&[Tab] tab name
&[File] File name
&[Path]Path of the file
Properties of concrete
Density of Concrete (ρcon) 25000 N/m³
Effective cover 50 mm
Grade of concrete M 25
steel
Grade of Steel Fe 500
Permissible compressive stress in 8.5 N/mm²
concrete in bending
Tensile stress in steel(σ(σ )
cbcst) 275 N/mm²
Modular ratio (m) = 280 /(3.σcbc) 10.98
Direct loads
Live load 0 N/m²
Surcharge load 0 N/m²
Surcharge angle 26.34°
Dimentions of Retainwall
Required height of retainwall 5000 mm
Depth of foundation below GL 0 mm
Height of stem 5000 mm Considerd above ground level
Top width of stem 300 mm
Bottom width of stem 600 mm
Length of toe 1300 mm
Length of heel 2020 mm
Length of base 3920 mm
Thickness of foundation 600 mm
Total height of retaining wall 5600 mm
Inclined length at earthfill side 300 mm
Inclined length at opposite side of earthfil 0 mm
Total height of earthfill above RW 1166 mm
Total height of surcharge 6766 mm
Total height of retaining wall
Height of wall above GL (hagl) 5m
Proposed depth of foundation, Df 0.6 m (Calculated below)
Total height of retaining wall, H = hagl + Df 5.6 m
retain wall
Stem height
Base thickness
total height
stem thickness(Top)
Stem thickness(bottom)
Base width
Earthfill
Heel length
Tow length
Surcharge load
〖𝐹� _�𝑙𝑖𝑑𝑖𝑛𝑔=(ƩF_R)/(ƩF_d ) 〗
_ = 〖 "μ.ƩW" 〗 _ /"P" _𝑎
〖 Ʃ𝐹_𝑑=�_𝑎∗((𝑊∗ℎ^2)/2) 〗
_
FS Sliding = Un-Safe
〖� =Ʃ𝑀/Ʃ�
〗_
z = 327677.001 / 408480.82
z= 0.802 m
The minimum pressure at base should not be less than zero to avoid tension at the base. From
this e=b/6, resultant should cut the base within the middle third. Otherwise the wall tends to
separate from the base due to tension.
bbase/6 = 0.653 m
𝐸𝑐𝑐𝑒𝑛𝑡𝑟𝑖𝑐𝑖𝑡�, 𝑒 =
(𝑏_𝑏𝑎�𝑒/2−�)
Eccentricity (e) = 1.158 m
Re-design
�_𝑚𝑖𝑛 = 〖𝑊 /𝑏_𝑏𝑎�𝑒 〗
( 1− 〖 6𝑒/𝑏_𝑏𝑎�𝑒 〗 )
W 310350 N
Eccentricity, e 1.158 m
Breadth of foundation, bbase 3.92 m
Minimum pressure at the base, Pmin -61156 N/m²
This should not be less than zero to avoid tension at the base. From this e=b/6, resultant should
cut the base within the middle third. Otherwise the wall tends to separate from the base due to
tension.
Pmin<0, hence tension will be their in the base and the structure is un-safe
-61156 N/m²
83467
219497 N/m² 126424 N/m²
219497 N/m²
Cohesion, c₂ = 1.00
Depth foundation below GL, D =
Therefore,
Pp =0.5*18000*3*D² + 2*1*D*1.73 = 27000 * D² …...1
For equilibrium,
Therefore,
Pp = Factor of safety x Horizontal driving force - μ.W
〖𝐹� _�𝑙𝑖𝑑𝑖𝑛𝑔=(Ʃ𝐹_𝑅
)/(Ʃ𝐹_𝑑 ) 〗 _
FS Sliding = μ.ƩW/Pa
μ= 0.65
ƩW = 408480.82
Pa = 221166.3259872
Factor of safety Sliding = 2 As per IS:14458 (part 2) :1997
Pp = 176820.1189744 ……2
D= 2.559
Hence,
Proposed depth of foundation, Df = 0.6 m
Maximum bending moment at the bottom of the stem due to lateral earth pressure alone
�𝑀_(�𝑡𝑎𝑚(𝑑𝑢𝑒 𝑡𝑜 𝑙𝑒𝑝))= 〖� _𝑎∗𝑊 〗 _�
∗𝐻^3/6
Height of wall (H) 5.6 m
Weight of Soil (Ws) 18000 N/m³
Angle of repose in fully wet( φ) 0°
BMsteam(due to lep) =0.5368*18000*(5.6)^3/6
BMsteam(due to lep) 282812 N-m
This bending moment produces tension away frtom the water face
Permissible compressive stress in concrete in bending
8.5 N/mm²
(σcbc)
Tensile stres in steel (σst) 275 N/mm²
Modular ratio (m) = 280 /(3.σcbc) 10.98
k = m*σcbc/(m*σcbc+σst) 0.253
j = 1 - k/3 0.916
R = 0.5 x σcbc x j x k 0.986
Equating MR to BM
= 0.986 x 1000 x d ^2 = 282812 x 1000
d= 536 mm
Effective cover 50 mm
Depth provided 600 mm
Effective depth available 550 mm >536 mm Hence safe
𝐴𝑟𝑒𝑎 𝑜� �𝑡𝑒𝑒𝑙 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 �𝑜𝑟 �𝑀(𝑎𝑤𝑎�)=(�𝑒𝑛𝑑𝑖𝑛𝑔 𝑀𝑜𝑚𝑒𝑛𝑡)/
((𝜎�𝑡 𝑥 𝐿𝑒𝑣𝑒𝑟 𝑎𝑟𝑚)" " )
Level arm = j * Effective depth available 503.55 mm
Area of steel required (Ast) 2042 mm²
Minimum reinforcement @ 0.12% 660 mm²
Provide steel 2042 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 150 mm
Provided spacing 150 mm
Provide Dia20mm @150mm spacing
Distribution steel
Area of distribution steel = 0.12% of gross area
Area of distribution steel = 660 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 480 mm
Provided spacing 300 mm
Provide Dia20mm @300mm spacing
Toe slab
Bending moment calculations for toe slab per metre run of wall
Heel slab
Bending Moment calculations for Heel Slab per metre run of wall
Distribution steel
Area of distribution steel = 0.12% of gross area
Area of distribution steel = 1320 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 240 mm
Provided spacing 240 mm
Provide Dia20mm @240mm spacing
Curtaiment of bars
Ast2 2042 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
No. of 20mm diameter bars 6.5 No.
Provided no. of bars 7 No.
Reinforcement details
S.no Item Diameter Spacing Remarks
1 Stem
Main bars 20 mm 150 mm 1,2
Distribution bars 20 mm 300 mm 3,4
2 Toe slab
Main bars 20 mm 240 mm 6,8
Distribution bars 20 mm 240 mm 7,9
3 Heel slab
Main bars 20 mm 180 mm 10,12
Distribution bars 20 mm 240 mm 11,13
Properties of concrete
Density of Concrete (ρcon) 25000 N/m³
Effective cover 50 mm
Grade of concrete M 25
steel
Grade of Steel Fe 500
Permissible compressive stress in 8.5 N/mm²
concrete in bending
Tensile stress in steel(σ(σ )
cbcst) 275 N/mm²
Modular ratio (m) = 280 /(3.σcbc) 10.98
Direct loads
Live load 0 N/m²
Surcharge load 0 N/m²
Surcharge angle 26.34°
Dimentions of Retainwall
Required height of retainwall 5000 mm
Depth of foundation below GL 0 mm
Height of stem 5000 mm Considerd above ground level
Top width of stem 300 mm
Bottom width of stem 600 mm
Length of toe 1300 mm
Length of heel 2020 mm
Length of base 3920 mm
Thickness of foundation 600 mm
Total height of retaining wall 5600 mm
Inclined length at earthfill side 300 mm
Inclined length at opposite side of earthfil 0 mm
Total height of earthfill above RW 1166 mm
Total height of surcharge 6766 mm
Total height of retaining wall
Height of wall above GL (hagl) 5m
Proposed depth of foundation, Df 0.6 m (Calculated below)
Total height of retaining wall, H = hagl + Df 5.6 m
retain wall
Stem height
Base thickness
total height
stem thickness(Top)
Stem thickness(bottom)
Base width
Earthfill
Heel length
Tow length
Surcharge load
〖𝐹� _�𝑙𝑖𝑑𝑖𝑛𝑔=(ƩF_R)/(ƩF_d ) 〗
_ = 〖 "μ.ƩW" 〗 _ /"P" _𝑎
〖 Ʃ𝐹_𝑑=�_𝑎∗((𝑊∗ℎ^2)/2) 〗
_
FS Sliding = Un-Safe
〖� =Ʃ𝑀/Ʃ�
〗_
z = 500813.2 / 370676.33
z= 1.351 m
The minimum pressure at base should not be less than zero to avoid tension at the base. From
this e=b/6, resultant should cut the base within the middle third. Otherwise the wall tends to
separate from the base due to tension.
bbase/6 = 0.653 m
𝐸𝑐𝑐𝑒𝑛𝑡𝑟𝑖𝑐𝑖𝑡�, 𝑒 =
(𝑏_𝑏𝑎�𝑒/2−�)
Eccentricity (e) = 0.609 m
�_𝑚𝑖𝑛 = 〖𝑊 /𝑏_𝑏𝑎�𝑒 〗
( 1− 〖 6𝑒/𝑏_𝑏𝑎�𝑒 〗 )
W 310350 N
Eccentricity, e 0.609 m
Breadth of foundation, bbase 3.92 m
Minimum pressure at the base, Pmin 5372 N/m²
This should not be less than zero to avoid tension at the base. From this e=b/6, resultant should
cut the base within the middle third. Otherwise the wall tends to separate from the base due to
tension.
Pmin>0, hence no tension in base and the structure is safe
5372 N/m²
81430
152970 N/m² 104021 N/m²
152970 N/m²
Cohesion, c₂ = 1.00
Depth foundation below GL, D =
Therefore,
Pp =0.5*18000*3*D² + 2*1*D*1.73 = 27000 * D² …...1
For equilibrium,
Therefore,
Pp = Factor of safety x Horizontal driving force - μ.W
〖𝐹� _�𝑙𝑖𝑑𝑖𝑛𝑔=(Ʃ𝐹_𝑅
)/(Ʃ𝐹_𝑑 ) 〗 _
FS Sliding = μ.ƩW/Pa
μ= 0.65
ƩW = 370676.33
Pa = 135962.90532
Factor of safety Sliding = 2 As per IS:14458 (part 2) :1997
Pp = 30986.19614 ……2
D= 1.071
Hence,
Proposed depth of foundation, Df = 0.6 m
Maximum bending moment at the bottom of the stem due to lateral earth pressure alone
�𝑀_(�𝑡𝑎𝑚(𝑑𝑢𝑒 𝑡𝑜 𝑙𝑒𝑝))= 〖� _𝑎∗𝑊 〗 _�
∗𝐻^3/6
Height of wall (H) 5.6 m
Weight of Soil (Ws) 18000 N/m³
Angle of repose in fully wet( φ) 0°
BMsteam(due to lep) =0.33*18000*(5.6)^3/6
BMsteam(due to lep) 173860 N-m
This bending moment produces tension away frtom the water face
Permissible compressive stress in concrete in bending
9 N/mm²
(σcbc)
Tensile stres in steel (σst) 275 N/mm²
Modular ratio (m) = 280 /(3.σcbc) 10.98
k = m*σcbc/(m*σcbc+σst) 0.253
j = 1 - k/3 0.916
R = 0.5 x σcbc x j x k 0.986
Equating MR to BM
= 0.986 x 1000 x d ^2 = 173860 x 1000
d= 420 mm
Effective cover 50 mm
Depth provided 600 mm
Effective depth available 550 mm >420 mm Hence safe
𝐴𝑟𝑒𝑎 𝑜� �𝑡𝑒𝑒𝑙 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 �𝑜𝑟 �𝑀(𝑎𝑤𝑎�)=(�𝑒𝑛𝑑𝑖𝑛𝑔 𝑀𝑜𝑚𝑒𝑛𝑡)/
((𝜎�𝑡 𝑥 𝐿𝑒𝑣𝑒𝑟 𝑎𝑟𝑚)" " )
Level arm = j * Effective depth available 503.55 mm
Area of steel required (Ast) 1256 mm²
Minimum reinforcement @ 0.12% 660 mm²
Provide steel 1256 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 250 mm
Provided spacing 250 mm
Provide Dia20mm @250mm spacing
Distribution steel
Area of distribution steel = 0.12% of gross area
Area of distribution steel = 660 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 480 mm
Provided spacing 300 mm
Provide Dia20mm @300mm spacing
Toe slab
Bending moment calculations for toe slab per metre run of wall
Heel slab
Bending Moment calculations for Heel Slab per metre run of wall
Distribution steel
Area of distribution steel = 0.12% of gross area
Area of distribution steel = 1320 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 240 mm
Provided spacing 240 mm
Provide Dia20mm @240mm spacing
Curtaiment of bars
Ast2 1256 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
No. of 20mm diameter bars 3.99l No.
Provided no. of bars 4 No.
Bearing strensm of soil for horizontal loading = 0.7 * SBC for vertical loading
140 kN/m²
Let the height of key be "y"
140000 * y = 510280.19
Therefore y = 3.64 m
So, provide a key of 650 mm
Properties of concrete
Density of Concrete (ρcon) 25000 N/m³
Effective cover 50 mm
Grade of concrete M 25
Properties of steel
Grade of Steel Fe 500
Permissible compressive stress in 8.5 N/mm²
concrete in bending
Tensile stress in steel(σ(σ )
cbcst) 275 N/mm²
Modular ratio (m) = 280 /(3.σcbc) 10.98
Direct loads
Live load 0 N/m²
Dimentions of Retainwall
Required height of retainwall 5000 mm Considerd above ground level
Depth of foundation below GL 0 mm
Height of stem 5000 mm
Top width of stem 300 mm
Bottom width of stem 600 mm
Length of toe 1300 mm
Length of heel 2020 mm
Length of base 3920 mm
Thickness of foundation 600 mm
Total height of retaining wall 5600 mm
Inclined length at earthfill side 300 mm
Inclined length at opposite side of earthfil 0 mm
retain wall
Stem height
Base thickness
total height
stem thickness(Top)
Stem thickness(bottom)
Base width
Earthfill
Heel length
Tow length
Surcharge load
Live Load
= 1.3 x 0 0 0.65 0
Total (ƩFR) 310350 Total (ƩMR) 754836
Moments of forces tending to overturning about point 'd'
Movement of lateral active earth pressure
=ka*((w*h^3)/6) = 0.33 * ((18000 * 5.6^3)/6) 173859.84
Total (ƩMO) 173859.84
Total (ƩV) 310350 Total (ƩM) 580976.16
FS overturning = Safe
〖𝐹� _�𝑙𝑖𝑑𝑖𝑛𝑔=(ƩF_R)/(ƩF_d ) 〗
_ = 〖 "μ.ƩW" 〗 _ /"P" _𝑎
〖 Ʃ𝐹_𝑑=�_𝑎∗((𝑊∗ℎ^2)/2) 〗
_
FS Sliding = Safe
〖� =Ʃ𝑀/Ʃ�
〗_
z = 580976.16 / 310350
z= 1.872 m
The minimum pressure at base should not be less than zero to avoid tension at the base. From
this e=b/6, resultant should cut the base within the middle third. Otherwise the wall tends to
separate from the base due to tension.
bbase/6 = 0.653 m
𝐸𝑐𝑐𝑒𝑛𝑡𝑟𝑖𝑐𝑖𝑡�, 𝑒 =
(𝑏_𝑏𝑎�𝑒/2−�)
�_𝑚𝑖𝑛 = 〖𝑊 /𝑏_𝑏𝑎�𝑒 〗
( 1− 〖 6𝑒/𝑏_𝑏𝑎�𝑒 〗 )
W 310350 N
Eccentricity, e ###
Breadth of foundation, bbase 3.92 m
Minimum pressure at the base, Pmin 68507 N/m²
This should not be less than zero to avoid tension at the base. From this e=b/6, resultant should
cut the base within the middle third. Otherwise the wall tends to separate from the base due to
tension.
Pmin>0, hence no tension in base and the structure is safe
68507 N/m²
79497
89835 N/m² 82762 N/m²
89835 N/m²
Stem design
Maximum bending moment at the bottom of the stem due to lateral earth pressure alone
�𝑀_(�𝑡𝑎𝑚(𝑑𝑢𝑒 𝑡𝑜 𝑙𝑒𝑝))= 𝑊_� ∗𝐻^3/6
∗((1−�𝑖𝑛(𝜑))/(1+�𝑖𝑛(𝜑)))
Height of wall (H) 5.6 m
Weight of Soil (Ws) 18000 N/m³
Angle of repose in fully wet( φ) 0°
BMsteam(due to lep) =18000*(5.6)^3/6*((1-SIN(0))/(1+SIN(0)))
BMsteam(due to lep) 526848 N-m
This bending moment produces tension away frtom the water face
Permissible compressive stress in concrete in bending (σcbc) 9 N/mm²
Tensile stres in steel (σst) 275 N/mm²
Modular ratio (m) = 280 /(3.σcbc) 10.98
k = m*σcbc/(m*σcbc+σst) 0.253
j = 1 - k/3 0.916
R = 0.5 x σcbc x j x k 0.986
Equating MR to BM
= 0.986 x 1000 x d ^2 = 526848 x 1000
d= 731 mm
Effective cover 50 mm
Depth provided 600 mm
Effective depth available 550 mm >731 mm Redesign
𝐴𝑟𝑒𝑎 𝑜� �𝑡𝑒𝑒𝑙 𝑟𝑒𝑞𝑢𝑖𝑟𝑒𝑑 �𝑜𝑟 �𝑀(𝑎𝑤𝑎�)=(�𝑒𝑛𝑑𝑖𝑛𝑔 𝑀𝑜𝑚𝑒𝑛𝑡)/
((𝜎�𝑡 𝑥 𝐿𝑒𝑣𝑒𝑟 𝑎𝑟𝑚)" " )
Level arm = j * Effective depth available 503.55 mm
Area of steel required (Ast) 3805 mm²
Minimum reinforcement @ 0.12% 660 mm²
Provide steel 3805 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 80 mm
Provided spacing 80 mm
Provide Dia20mm @80mm spacing
Distribution steel
Area of distribution steel = 0.12% of gross area
Area of distribution steel = 660 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
Spacing of 20mm diameter bars 480 mm
Provided spacing 300 mm
Provide Dia20mm @300mm spacing
Toe slab
Bending moment calculations for toe slab per metre run of wall
Heel slab
Bending Moment calculations for Heel Slab per metre run of wall
Curtaiment of bars
Ast2 3805 mm²
Diameter of steel 20 mm
Area of 20mm diameter bars 314 mm²
No. of 20mm diameter bars 12.11l No.
Provided no. of bars 13 No.
Bearing strensm of soil for horizontal loading = 0.7 * SBC for vertical loading
140 kN/m²
Let the height of key be "y"
140000 * y = 59062
Therefore y = 0.42 m
So, provide a key of 650 mm
Reinforcement details
S.no Item Diameter Spacing Remarks
1 Stem
Main bars 20 mm 250 mm 1,2
Distribution bars 20 mm 300 mm 3,4
2 Toe slab
Main bars 20 mm 240 mm 6,8
Distribution bars 20 mm 240 mm 7,9
3 Heel slab
Main bars 20 mm 240 mm 10,12
Distribution bars 20 mm 240 mm 11,13
Figure shows below strain diagram, strain at any distance x1 below neutral axis is given by
fc/Ec
x = 173.62mm
d-x = 366.38mm
d = 540mm D =600mm
Dia of bar = 20 mm
D-x =426.38mm
b = 1000 fs/Es
Strain Diagram
Crack width value is = 0.315 < 0.2 mm as per IS 456:2000 clause 43.1 - Redesign
2
a_𝑐𝑟=√((�_𝑐^2 )+(�_𝑐^2 ) )
−(�_𝑅/2)
Tc = 60 mm
Diameter of Rebar(DR) = 20 mm
= (√((60^2)+(60^2)))-(20/2)
acr = 74.853 mm
E1 = E*(d-x)
E = 7.41E-06
d = 540 mm
x = 173.62 mm
= 0.000007*366.38
E1 = 0.002715 mm²
𝐸_𝑚=𝐸_1−(((𝑏(�−𝑥)(𝑎−𝑥)))/
((3∗𝐸_�∗𝐴_�𝑡∗(𝑑−𝑥)) ))
E1 = 0.002715 mm²
b = 1000 mm
D = 600 mm
a = 600 mm
x = 173.62 mm
Es = 200000 N/mm²
Ast = 1320 mm²
d = 540 mm
= 0.0027-((1000*(600-173.62)*(600-173.62))
/(3*200000*1320*(540-173.62)))
Em = 0.0020885872
Crack width(Wcr)
𝑊_�𝑟=((3∗𝑎_𝑐𝑟∗𝐸_𝑚)/ 〖 (1+
( ((2∗(𝑎_𝑐𝑟−�_𝑚𝑖𝑛 )))/((�−𝑥) ))) 〗 )
Em = 0.0020885872
acr = 74.853 mm
Cover (Cmin) = 50 mm
D = 600 mm
x = 173.62 mm
= (3*74.85*0.0021)/(1+((2*(74.85-50))/426.38))
Crack width(Wcr) = 0.42 mm < 0.2 mm Redesign
Crack width value is = 0.42 < 0.2 mm as per IS 456:2000 clause 43.1 - Redesign
3
5.2.8. Check for crack width as per IS 456-2000
5.2.8.1. Chech for crack width for base of retainning wall
Input
Diameter of Rebar(DR) = 20 mm
Grade of concrete (fck ) = M 25
BM at sevice load(Ms) = 146786.24 Nm
= 1.4679E+08 N-mm
1.5 x BM = 2.2018E+08 N-mm Since limit state craiteria
cover (Cmin) = 50 mm
Width(b) = 1000 mm
Depth(D) = 600 mm
Area of Steel (Ast) = 2042 mm²
Elastic modulus of steel(Es) = 200000 N/mm²
Total cover (Tc) = 60 mm
Effective depth (d)
= D-Total cover(Tc) = 540 mm
Figure shows below strain diagram, strain at any distance x1 below neutral axis is given by
fc/Ec
x = 223.36mm
d-x = 316.64mm
d = 540mm D =600mm
Dia of bar = 20 mm
D-x =376.64mm
b = 1000 fs/Es
Strain Diagram
Crack width value is = 0.06 < 0.2 mm as per IS 456:2000 clause 43.1 - Hence ok
2
a_𝑐𝑟=√((�_𝑐^2 )+(�_𝑐^2 ) )
−(�_𝑅/2)
Tc = 60 mm
Diameter of Rebar(DR) = 20 mm
= (√((60^2)+(60^2)))-(20/2)
acr = 74.853 mm
E1 = E*(d-x)
E = 2.52E-06
d = 540 mm
x = 223.36 mm
= 0.000003*316.64
E1 = 0.000798 mm²
𝐸_𝑚=𝐸_1−(((𝑏(�−𝑥)(𝑎−𝑥)))/
((3∗𝐸_�∗𝐴_�𝑡∗(𝑑−𝑥)) ))
E1 = 0.000798 mm²
b = 1000 mm
D = 600 mm
a = 600 mm
x = 223.36 mm
Es = 200000 N/mm²
Ast = 2042 mm²
d = 540 mm
= 0.0008-((1000*(600-223.36)*(600-223.36))
/(3*200000*2042.33*(540-223.36)))
Em = 0.0004322285
Crack width(Wcr)
𝑊_�𝑟=((3∗𝑎_𝑐𝑟∗𝐸_𝑚)/ 〖 (1+
( ((2∗(𝑎_𝑐𝑟−�_𝑚𝑖𝑛 )))/((�−𝑥) ))) 〗 )
Em = 0.0004322285
acr = 74.853 mm
Cover (Cmin) = 50 mm
D = 600 mm
x = 223.36 mm
= (3*74.85*0.0004)/(1+((2*(74.85-50))/376.64))
Crack width(Wcr) = 0.09 mm < 0.2 mm Hence ok
Crack width value is = 0.09 < 0.2 mm as per IS 456:2000 clause 43.1 - Hence ok
3
Wst
300 Sα .
Ws1
h
5000
5000 hagl Ws2
1666.67 Wsb
600
600 Df 1300 0 300 2020
0
Wc2 Hb 600
Wb
3920
b a
Summery
S.no Item Value
I Properties of soil -1 (Back fill material)
1 Density of Soil (ϒ1) 18000 N/m³
2 Density of wet soil(W1) 0 N/m³
3 Angle of repose( φ1) 30°
4 Angle of repose in fully wet( φw1) 0°
5 Cohesion (c1) 0
II Properties of soil -2 (soil in front of the heel and under the base slab)
6 Safe bearing capacity, SBC 200000 N/m²
7 Density of Soil (ϒ2) 18000 N/m³
8 Density of wet soil(W2) 0 N/m³
9 Angle of repose( φ2) 30°
10 Angle of repose in fully wet( φw2) 0°
11 Cohesion (c2) 0
12 Friction coefficient (μ) 0.65
III Properties of concrete
13 Density of Concrete (ρcon) 25000 N/m³
14 Effective cover 50 mm
15 Grade of concrete M 25
IV Properties of steel
16 Grade of Steel Fe 500
17 Permissible compressive stress in concrete in bend 8.5 N/mm²
18 Tensile stress in steel (σst) 275 N/mm²
19 Modular ratio (m) = 280 /(3.σcbc) 10.98
V Direct loads
20 Live load 0
21 Surcharge angle, α 26.34°
VI Retain wall Dimentions
21 Height of retain wall(above GL) 5000 mm
22 Depth of foundation 600 mm
23 Foundation depth 0 mm
24 Inclined length at earthfill side 300 mm
25 Inclined length at opposite side of earthfill 0 mm
26 Stem
1 Top width 300 mm
2 Bottom width 600 mm
3 Height 5000 mm
27 Toe slab
1 Length 1300 mm
2 Thickness 600 mm
28 Heel slab
1 Length 2020 mm
2 Thickness 600 mm
29 Shear key
1 Height 650 mm
2 Thickness 300 mm
Check list
SBC<Pmax, hence un-safe against
1 Condition 1 219497.33 <=200000 subsidence
Pmin<0, hence tension will be their in the
2 Condition 2 -61155.5 >0 base and the structure is un-safe
3 Condition 3 1.73 >=2 FS overturning =Un-Safe
4 Condition 4 0.91 >=1.55 FS Sliding =Un-Safe
5 Condition 5 1.158 <=0.653 Re-design
6 Condition 6 406400 >0 Shear key is to be provided
Reinforcement details
S.no Item Diameter Spacing Remarks
1 Stem
Main bars 20 mm 150 mm 1,2
Distribution bars 20 mm 480 mm 3,4
2 Toe slab
Main bars 20 mm 240 mm 6,8
Distribution bars 20 mm 240 mm 7,9
3 Heel slab
Main bars 20 mm 180 mm 10,12
Distribution bars 20 mm 240 mm 11,13
4 Shear kay
Main bars both ways 16 mm 300 mm
5 Curtailement of bars
No. of cuetaied bars 3 No.
Height from top 3.8 m
IS 14458 (part 1) : 1997
80 784800
60 588600
40 392400
40 392400
30 294300
30 294300
30 294300
25 245250
15 147150
30 294300
20 196200
15 147150
40 392400
20 196200
5 49050
30 294300
15 147150
5 49050
esimic condition
VALUES OF DESIGN CONSTANTS
Grade of concrete M 25 M 15 M 20 M 25 M 30 M 35
Modular Ratio 10.98 18.67 13.33 10.98 9.33 8.11
scbc N/mm 2 8.5 5 7 8.5 10 11.5
m scbc 93.33 93.33 93.33 93.33 93.33 93.33
Fe 250 l 140
kc 0.4 0.4 0.4 0.4 0.4 0.4
(a) sst =
140 jc 0.867 0.867 0.867 0.867 0.867 0.867
N/mm2 Rc 1.474 0.867 1.214 1.474 1.734 1.994
(Fe 250)
Pc (%) 1.214 0.714 1 1.214 1.429 1.643
Fe 250 h 190
kc 0.329 0.329 0.329 0.329 0.329 0.329
jc 0.89 0.89 0.89 0.89 0.89 0.89
(b) sst =
190
Rc 1.244 0.732 1.025 1.244 1.464 1.684
N/mm2
Pc (%) 0.736 0.433 0.606 0.736 0.866 0.997
Fe 415 230
kc 0.289 0.289 0.289 0.289 0.289 0.289
(c ) sst = jc 0.904 0.904 0.904 0.904 0.904 0.904
230
N/mm2 Rc 1.11 0.653 0.914 1.11 1.306 1.502
(Fe 415)
Pc (%) 0.534 0.314 0.44 0.534 0.628 0.722
Fe 500 275
kc 0.253 0.253 0.253 0.253 0.253 0.253
(d) sst =
275 jc 0.916 0.916 0.916 0.916 0.914 0.916
N/mm2 Rc 0.985 0.579 0.811 0.985 1.159 1.332
(Fe 500) Pc (%) 0.391 0.23 0.322 0.391 0.46 0.53
0.329
Development Length in tension
0.89
0.816 M 30 1 35 1.6 36
M 35 1.1 32 1.76 33
0.253 M 40 1.2 29 1.92 30
0.916 M 45 1.3 27 2.08 28
1.506 M 50 1.4 25 2.24 26
0.599
4 Fe 500 275
1 Fe 250/140 140
2 Fe 250/190 190
3 Fe 415 230
4 Fe 500 275
Ws1
h
5000
5000 hagl Ws2
1666.67 Wsb
600
600 Df 1300 0 300 2020
0
Wc2 Hb 600
Wb
3920
b a