General notes from examining the structural conditions, of the building, the metal ceiling and clad-
implementing the building code regula- ding, and can take the necessary precau-
This assembly handbook refers to all LOOP ® tions and observing the information given tions for correct, safe static mounting.
special ceilings manufactured by durlum. in the building permit prior to starting as-
sembly. They have priority, but could not If parts from different manufacturers are
durlum is a leading German manufacturer be included here. used to assemble the ceiling, the relevant
of metal ceilings and cladding elements, mounting company must provide the cer-
mainly made of galvanised sheet steel, It is advisable always to draw up assembly tificates required by EN  13964:2007 and
aluminium and expanded metal. diagrams/drawings, to establish the loca- must obtain suitable certificates of con-
tion where assembly is to begin and to es- formity itself.
tablish the required suspension points for
the relevant ceiling system prior to starting Liability for proper selection of the products
assembly. and system conformity can only be as-
sumed for the systems delivered by durlum.
CERTIFICATE
The Certification Body
of TÜV SÜD Management Service GmbH Structural preconditions To prevent the parts from becoming dirty,
certifies that
gloves must be worn during assembly.
Metal ceilings may usually be installed as If the ceiling products are supplied with
durlum GmbH
soon as the building is swept clean, but a protective foil, they must be protected
An der Wiese 5 at least when all wet work in the interior against UV irradiation [sunlight], also, the
79650 Schopfheim
Germany has been completed and the building has foil must be removed no later than 4 weeks
has established and applies a
Quality and Environmental Management System been closed. after delivery of the goods, the storage
for the following scope of application:

Planning, development, manufacturing and sales of


temperature must not exceed 30° as hard-
metal ceilings, functional ceilings, luminaires,
lighting and daylight systems. Prior to starting assembly, the suspension ening of the adhesive to the panels is then
Performance of audits (Report-No. 70014435)
has furnished proof that the requirements under:
points must be checked for their usabil- unavoidable and prevents the foil from be-
ISO 9001:2008 ity, and load introduction into the building ing stripped.
ISO 14001:2004
ISO 50001:2011 must be guaranteed.
are fulfilled. The certificate is valid from 2014-07-27 until 2017-05-29.

Storage
Certificate Registration No. 12 100/104/340 25601 TMS
When using wall mounting points, such as
brackets or wall anchors, the load-carrying
Product Compliance Management
Munich, 2014-06-17 capacity of the wall in question must be durlum metal ceilings are usually delivered
checked. on pallets. It is advisable to leave the metal
panels on the pallets as long as possible. If
If ceiling elements rest on brackets, pos- the pallets have to be opened, the durlum
The relevant products are described in the sible wall movements must be taken into metal panel should always be positioned
marketing and sales documents. They are account. on the long side, it can then be placed
both acoustically effective, and can also carefully against the wall, do not store flat.
be used as design elements only. Only dowels for which a general building
supervisory approval is available may be Storage must be carried out such that
Specifically, these products are: used, and their minimum extraction force damage is excluded.
• Acoustic ceilings must be greater than 100 kg. The dowels
• Chilled ceilings must be mounted as specified by the rele- The assembly of the ceiling panels must
• Character products vant dowel manufacturer. We recommend not start until all dust-producing work has
performing regular tensile stress tests, to been completed [swept clean].
All durlum systems are systems of modular verify that dowels have been set correctly.
design. This applies not only to the sub- durlum products are certified according
structure but also the ceiling parts that are durlum metal ceilings are dimensioned to ISO  9001 for development, production,
suspended, locked into place or placed such that they carry their own weight of sales and also for service. Nonetheless, it
on the substructure. the system construction plus a surface is recommended as a matter of principle
load amounting to 40 N/m². Higher loads to inspect the delivered metal ceilings im-
durlum metal ceilings comply with stand- must be taken into account or suspended mediately and to report complaints imme-
ard EN  13964:2007 and are CE certified. separately in the construction, and the diately [as a rule immediately after delivery
durlum lighting complies with EN 60598-1. measures must be adapted to the situa- or within 3 days]. Visible damages are to
For special systems marketed by us and for tion at hand. Usually, built-in components be recorded on the consignment note.
which no general approvals are available, and loads must be suspended separately. Standards and regulations
there are suitable static certificates avail-
able, and suitable designs compliant with For ceiling systems that do not allow any The relevant regulations applicable at the
EN 13964 have been constructed. If neces- tolerance compensation within a module, installation site must be determined by
sary, individual approvals are required. suitable material expansions must be tak- the assembly company in question. The
en into account. ceilings marketed by durlum comply with
EN 13964. This standard also regulates the
Guidelines Building expansion joints and tolerances classification of fire protection. The durlum
customary in building construction must luminaires comply with EN 60598-1.
These installation instructions have been be taken into account accordingly.
structured in accordance with the require-
ment of EN  13964:2007 and describe a durlum metal ceilings are, as a matter of Standards and regulations
proper assembly. principle, to be assembled by professional
dry construction companies who are ca- The relevant regulations applicable at the
The description does not exempt the user pable of assessing the overall conditions installation site must be determined by

2 © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors excepted. All rights reserved. | Issued: 04.08.2014
General Information

the assembly company in question. The 7. Shorten intended fastening elements,


ceilings marketed by durlum comply with such as the M12 threaded rod to the
EN 13964. This standard also regulates the intended length or order the correct
classification of fire protection. The durlum length and mount it on the raw ceiling.
luminaire comply with EN 60598-1.
8. As a rule, arrangement of the panels
should be from the centre of the room
Application to compensate and halve the toler-
ances of the room/panels. The precise
The application of durlum metal ceilings is arrangement must always be done on
restricted, unless agreed upon otherwise, the basis of the ceiling lighting layout
to interiors, so that, pursuant to EN  13964, plan.
class of use 1, corrosion protection class A,
has been defined here as standard. 9. As a rule, durlum metal ceilings are
provided with cross grids [primary pro-
Should it become necessary to adjust the file].
metal ceiling panels to the building by cut-
ting them, we recommend protecting the 10. Use the layout plan to determine in
cutting edges from corrosion by means which direction the cross reinforce-
of paint in order to maintain the corrosion ment profiles are laid, either in parallel
protection class A. to the façade [usually] or vertically to
the façade. The cross-supporting pro-
The use of durlum lighting is restricted to files should be mounted via a wall an-
interiors. The lighting complies with protec- chor or anchor span to prevent shifting
tion type IP 20, protection class 1 in accord- in axial direction.
ance with EN 60598-1.
The respective primary profiles are
mounted at a right angle to the sec-
Quality standard ondary profiles. To this end, the sys-
tem-specific connecting elements are
For material properties, dimensions, toler- used, see system descriptions.
ances, colour deviations, the TAIM Direc-
tives [Technical Association of Industrial The position of the primary profiles
Metal Ceiling Manufacturers] applies. is established in the reflected ceiling
plan.

Mounting sequence 11. Always ensure that the joins are


aligned.
1. Prepare a ceiling-lighting layout plan
or use that provided by the architect. 12. If the panels are placed on a perime-
ter trim, we recommend our F-bracket
2. Check the ceiling-lighting layout plan as bracket or as stepped F-bracket.
with conditions on site. The bracket secures the panel and
protects it against lifting. The ceiling
3. Prepare a bill of materials, including a panel is cut with electric sheet shears
suitable work plan and retrieval/order [i.e. Treco shears] and adapted to the
of the materials required. prevailing room dimensions.

4. Determine the required suspension When calculating the minimum sup-


points in accordance with the classes port area [10 mm], the dimensions of
of use of EN  13964. The correspond- possible wall movement should be tak-
ing suspension distances for the dif- en into account.
ferent systems can be taken from the
detailed descriptions of the individual 13. Attachments or other loads are to be
ceiling systems. mounted separately. For logical rea-
sons these parts are integrated during
5. Establish which generally approved the mounting process.
dowel is suitable. Check the raw ceiling
and the walls. Mark the dowel mounting 14. After completion and preliminary ac-
holes and drill them. Mount the dowels ceptance of the ceiling, the joint line
as specified by the dowel manufacturer should be readjusted. Soiled ceiling
and carry out extraction tests using the panels should be cleaned to give a
device recommended by the dowel perfect result for assembly.
manufacturer, if necessary.

6. Follow the same procedure when


mounting the perimeter trim, mounting
interval approx. 400-625  mm, check
transmission of force into wall.

© durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors excepted. All rights reserved. | Issued: 04.08.2014 3
LOOP ® TYPE 2 Mounting instructions

1
Plattenlänge | Panel length | Longueur de la plaque: 1004,25
Modullänge | Module length | Longueur du module: 966

U 1040 C41-LOOP

U 1043 A
U 1041
Plattenbreite | Panel width | Largeur de la plaque: 1124,23
Modulbreite | Module width | Largeur du module: 1115,44

LOOP ® -Element
Ø 60
80,5
139,43

L-shaped primary carrier with connector and adapter for C-profile

C41-LOOP

C41-LVB
LOOP-Adapter

LOOP ® -Element
2

C-profile with adapter for mounting ceiling element

4 © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors excepted. All rights reserved. | Issued: 04.08.2014
Mounting instructions LOOP ® TYPE 2

Abbreviations distance is less, depending on additional Mounting of secondary profile [C41-LOOP]


loads, the type of wall and special require- 18. Outline the defined axial grid for the
AH: Distance of the suspension hangers in ments. secondary profiles on the L-shaped pri-
axial direction of the primary profile mary carriers.
AP: Distance of the primary profiles 1. Level and outline the given ceiling 19. Cut C-profile C41-LOOP to the required
AS: Distance of the secondary profiles height. length.
2. Outline the upper edge of the perim- 20. Align C-profile and mount to the L-
eter trim. shaped primary carriers U  1040 with
Distance of the suspensions, etc. 3. Mark the drill hole. screw, nut and washer using the
4. Drill a hole for the dowel. U 1043 A adapter for L-shaped primary
The following recommendation for the dis- 5. Secure the perimeter trim with a dowel. carriers.
tances of the primary profiles and the sus- 6. Cleanly mitre cut the edges of the pe- 21. Centre connector C41-LVB above the
pension points refers only to the standard rimeter trim profiles. join of the C-profiles C41-LOOP and se-
ceilings in the indoor applications without cure with drilling screws. Required con-
additional loads. Mounting of primary profile [U 1040] nections should be positioned offset.
7. Outline the axis grid for the primary 22. Thread LOOP adapters to C-profiles.
Distance of the primary profiles AP and secondary profiles.
according to EN 13964: 8. Define the suspension points.
• Class 1: <1 000 mm 8.1. The suspension hangers of the Mounting of ceiling panels
• Class 2: <1 200 mm primary profile should be mount-
ed as close as possible to the 1. Wear clean cotton gloves.
Distance of the secondary profiles AS crossing point of the primary and 2. Remove protective foil from ceiling
according to EN 13964: secondary profiles. The maxi- panels, if applicable.
Depending on the index perforation of the mum distance between the sus- 3. Secure LOOP ® element to LOOP adapt-
LOOP ® element pension hanger and the second- ers with countersunk screws.
ary profile is 200 mm. 4. Check joint for flatness and uniform
Distance of the AH suspensions points: 8.2. Module adapters [cross connec- width and align the elements by slid-
The distance of the suspension points AH tors] may not be mounted at the ing. The joins of the LOOP ® ceiling are
is determined by the corresponding panel joint of the primary profiles. aligned horizontally by pushing or pull-
length. The L-shaped primary carrier serves 8.3. Keep at least 400 mm distance to ing the adjacent element.
mainly for the cross bracing. the joint of the primary profiles. 5. Adapt the elements in the border re-
8.4. The maximum distance of a sus- gion to the building using a jigsaw or
The maximum force applied to the suspen- pension point from the wall is flex, deburr, and protect against corro-
sion point may be 200 N. The correspond- 500 mm. sion. At least 3 or 4 suspension points
ing suspension parts and dowels must be 9. Drill a hole for the dowel. per element are necessary. The projec-
considered. 10. Mount the upper part of vernier scale tion section must not exceed 300 mm.
U 1300 or threaded rod M6 with dowel Otherwise, you need to drill and coun-
If it is not possible to specify in advance according to manufacturer’s instruc- tersink.
where the secondary profiles will run, se- tions. 6. Mount and align the fitting elements
lect the following distances of the suspen- 11. Cut the L-shaped primary carrier as described in section 4.
sion points AH: U 1040 to the required length.
• Class 1: <1 000 mm 12. Fasten the lower part of vernier scale
• Class 2: <1 200 mm U  1370 at the suspension points with Mounting of luminaires
self-securing screw connection M6.
Load-carrying capacity of the suspen- 13. Place L-shaped primary carrier U  1040 1. Remove both springs of PUNTEO ® -J80
sion points [tensile loads]: horizontally, vertically and aligned for LED downlights.
• Maximum load per Nonius suspension: the given ceiling height.
200 N 14. Fasten the lower part of vernier scale
• Maximum load per M6 threaded rod: U  1370 on the upper parts of vernier
500 N scale with two safety pins of vernier
• Other loads must be verified statically. scale U 1372. When using the threaded
rod suspension, the threaded rod is
Class of use according to EN 13964: guided through the horizontal shank
Class of use A according to table 7 of the L-shaped primary carrier and rig-
idly fastened with the self-securing M6
screw connection. Drawing no. M-Pun J080-013-Z001

Please note 15. U  1041 connector of the L-shaped pri- 2. A connecting adapter is necessary
mary carrier is connected to the joint when fitting PUNTEO® -J80 LED down-
• Use only officially approved dowels. of the L-shaped primary carrier using a lights, which is glued to the back of the
• The fastening base must be suitable in self-securing M6 screw connection. Ar- element. Attention: luminaires cannot
terms of statics. It must be able to reli- range the longitudinal connections of be mounted in the area of the second-
Adapter
ably absorb the forces introduced into the profiles in an offset manner. ary profiles.
the building. 16. When adjusting the height, observe the 3. Mount ballast/driver in ceiling cavity,
permissible height tolerances accord- possibly on U 1040.
Assembly sub-construction ing to EN 13964, readjust if necessary. 4. Perform electrical connection of the
17. The primary profiles must be connect- driver. Attention: only by certified elec-
Assembly wall connection ed to the wall at one point at least with trician!
The general distance for mounting the pe- the wall bracket U  1042 to preclude 5. Remove the paper on the adhesive tape
rimeter trim is max. 500 mm. This general any shift in the axial direction. of the LOOP® adapters PUN J080-013-Z001.

© durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors excepted. All rights reserved. | Issued: 04.08.2014 5
LOOP ® TYPE 2 Mounting instructions

Then position and mount the adapter 3. Put ceiling panel down and store pro-
on the back of the LOOP ® element. tected against damage.
Press the adapter down firmly.

Adapter

Drawing no. M-Pun J080-013-Z001

6. Insert PUNTEO® -J80 laterally into the


adapter and position it centrally over
the hole. Then fasten the LED downlight
Adapter

with the knurled screws without tools.


7. Connect the ballast units/drivers via
plugs. If a system is not fitted with a
plug, wiring should be carried out by a
certified electrician.

Rändel-
schraube

Rändel-
schraube

Drawing no. M-Pun J080-013-Z001

8. Prior to acceptance, align the ele-


ments precisely, in as far as they have
been moved by other systems.

Disassembly of ceiling panels

1. Wear clean cotton gloves.


2. Loosen countersunk screws and se-
cure LOOP ® elements by hand. Lower
element downwards.

6 © durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors excepted. All rights reserved. | Issued: 04.08.2014
Mounting instructions LOOP ® TYPE 2

© durlum GmbH | www.durlum.com | Subject to changes of dimensions and design. Errors excepted. All rights reserved. | Issued: 04.08.2014 7
CEILING LIGHTING AMBIENCE
PLAFOND LUMIERE AMBIANCE

durlum GmbH | An der Wiese 5 | D-79650 Schopfheim

T +49  (0)  76  22 | 39  05-0
F +49  (0)  76  22 | 39  05-42
E info@durlum.com
I www.durlum.com

S-ar putea să vă placă și