Sunteți pe pagina 1din 23

MADHUCON - SHARDA - SHRI SATY

Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project lengt
Contract.
RFI Summary
Financial Year 2017:2018

BOQ
RFI No. Department Description of work
Reference

1 2 3 4
1 HWY Clearing and Grubbing

2 HWY FDD testing for OGL Bed

3 HWY FDD testing for Embankment 1st Layer

4 HWY FDD testing for Embankment 2nd Layer

5 HWY FDD testing for Embankment 3rd Layer

6 HWY FDD testing for Embankment 4th Layer

7 HWY FDD testing and Level Checking for Embankment Top

8 HWY FDD testing for Subgrade 1st Layer


MADHUCON - SHARDA - SHRI SATY
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project lengt
Contract.
RFI Summary
Financial Year 2017:2018

BOQ
RFI No. Department Description of work
Reference

9 HWY FDD testing for Subgrade 2nd Layer

10 HWY FDD testing and level checking for Subgrade Top Layer

11 HWY Clearing and Grubbing

12 HWY FDD testing for OGL Bed

13 HWY FDD testing for Embankment 1st Layer

14 HWY FDD testing for Embankment 2nd Layer

15 HWY FDD testing for Embankment 3rd Layer

16 HWY FDD testing and Level Checking for Embankment Top


RI SATYA SAIBABA JOINT VENTURE
ect length 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction (EPC)

Time for
Side Type Chainage. Submission Date Inspection date Remarks
Inspection

5 6 From To 8 9 10 11
RHS MCW 67+000 67+110 10.00 AM

RHS MCW 67+000 67+110 2.00 PM

RHS MCW 67+000 67+110 11.00 AM

RHS MCW 67+000 67+110

RHS MCW 67+000 67+110

RHS MCW 67+000 67+110

RHS MCW 67+000 67+110

RHS MCW 67+000 67+110


RI SATYA SAIBABA JOINT VENTURE
ect length 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and Construction (EPC)

Time for
Side Type Chainage. Submission Date Inspection date Remarks
Inspection

RHS MCW 67+000 67+110

RHS MCW 67+000 67+110

RHS MCW 67+110 67+160

RHS MCW 67+110 67+160

RHS MCW 67+110 67+160

RHS MCW 67+110 67+160

RHS MCW 67+110 67+160

RHS MCW 67+110 67+160


MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and
Construction (EPC) Contract.
RFI Summary
Financial Year 2017:2018

BOQ Submission Inspection Time for


RFI No. Department Description of work Side Type Chainage. Remarks No Length Width depth Quantity
Reference Date date Inspection

1 2 3 4 5 6 From To 8 9 10 11
1 HWY OGL Sampling for embankment Suitability LHS MCW 77+500 77+980 5-Jul-17 6-Jul-17 11:00 AM 480 10
2 HWY Excavation of unsutable soil LHS MCW 77+500 77+980 13-Jul-17 14-Jul-17 11:00 AM 480 10
3 HWY FDD testing for OGL Bed LHS MCW 77+500 77+980 17-Jul-17 18-Jul-17 3:00 PM 480 10 0.15 720.00
4 HWY FDD testing for Embankment 1st Layer LHS MCW 77+500 77+590 19-Jul-17 20-Jul-17 11:00 AM 90 10 900.00
5 HWY FDD testing for Embankment 2nd Layer LHS MCW 77+500 77+590 20-Jul-17 21-Jul-17 11:00 AM 90 10
6 HWY FDD testing for Embankment 1st Layer LHS MCW 77+590 77+650 21-Jul-17 22-Jul-17 3:00 PM 60 10 0.2 120.00
7 HWY FDD testing and Level Checking for Embankment Top LHS MCW 77+500 77+650 24-Jul-17 25-Jul-17 3:00 PM 150 10 0.15 225.00
8 HWY FDD testing for Subgrade 1st Layer LHS MCW 77+500 77+650 26-Jul-17 28-Jul-17 4:30 PM 150 10 0.15 225.00
9 HWY FDD testing for Subgrade 2nd Layer LHS MCW 77+500 77+650 28-Jul-17 29-Jul-17 3:00 PM 150 5.06
10 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 77+500 77+650 31-Jul-17 1-Aug-17 3:00 PM 150 5.06
11 HWY FDD testing for Embankment 1st Layer LHS MCW 77+650 77+980 21-Jul-17 22-Jul-17 3:00 PM 330 4.66 0.2 307.56
12 HWY FDD testing and Level Checking for Embankment Top LHS MCW 77+650 77+980 24-Jul-17 25-Jul-17 3:00 PM 330 5.06 0.15 250.47
13 HWY FDD testing for Subgrade 1st Layer LHS MCW 77+650 77+980 25-Jul-17 26-Jul-17 4:30 PM 330 8.45 2788.50
14 HWY FDD testing for Subgrade 2nd Layer LHS MCW 77+650 77+980 28-Jul-17 29-Jul-17 11:00 AM 330 8.45
15 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 77+650 77+980 1-Aug-17 2-Aug-17 11:00 AM 330 8.45 0.2 557.70
16 HWY OGL Sampling for embankment Suitability LHS MCW 77+980 78+570 13-Jul-17 14-Jul-17 11:00 AM 590
17 HWY Excavation of unsutable soil LHS MCW 77+980 78+570 590
18 HWY FDD testing for OGL Bed LHS MCW 77+980 78+570 590
19 HWY FDD testing for Embankment 1st Layer LHS MCW 77+980 78+270 290
20 HWY FDD testing and Level Checking for Embankment Top LHS MCW 77+980 78+270 290
21 HWY FDD testing for Subgrade 1st Layer LHS MCW 77+980 78+270 290
22 HWY FDD testing for Subgrade 2nd Layer LHS MCW 77+980 78+270 290
23 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 77+980 78+270 290
24 HWY FDD testing and Level Checking for Embankment Top LHS MCW 78+270 78+570 300
25 HWY FDD testing for Subgrade 1st Layer LHS MCW 78+270 78+570 300
26 HWY FDD testing for Subgrade 2nd Layer LHS MCW 78+270 78+570 300
27 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 78+270 78+570 300
28 HWY FDD testing for Embankment 1st Layer LHS MCW 78+430 78+570 140
29 HWY FDD testing for Embankment 2nd Layer LHS MCW 78+430 78+570 140
30 HWY FDD testing for Embankment 3rd layer LHS MCW 78+430 78+570 140
31 HWY FDD testing and Level Checking for Embankment Top LHS MCW 78+430 78+570 140
32 HWY OGL Sampling for embankment Suitability LHS MCW 78+570 79+010 17-Jul-17 18-Jul-17 3:00 PM 440 78570 79010.00
33 HWY Excavation of unsutable soil LHS MCW 78+570 79+010 440
34 HWY FDD testing for OGL Bed LHS MCW 78+570 79+010 440
35 HWY FDD testing for Embankment 1st Layer LHS MCW 78+570 78+710 140
36 HWY FDD testing for Embankment 2nd Layer LHS MCW 78+570 78+710 140
37 HWY FDD testing for Embankment 1st Layer LHS MCW 78+780 78+840 60
38 HWY FDD testing and Level Checking for Embankment Top LHS MCW 78+570 78+840 270
39 HWY FDD testing for Subgrade 1st Layer LHS MCW 78+570 78+840 270
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and
Construction (EPC) Contract.
RFI Summary
Financial Year 2017:2018

BOQ Submission Inspection Time for


RFI No. Department Description of work Side Type Chainage. Remarks No Length Width depth Quantity
Reference Date date Inspection

40 HWY FDD testing for Subgrade 2nd Layer LHS MCW 78+570 78+840 270
41 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 78+570 78+840 270
42 HWY FDD testing for Embankment 1st Layer LHS MCW 78+840 79+010 170
43 HWY FDD testing for Embankment 2nd Layer LHS MCW 78+840 79+010 170
44 HWY OGL Sampling for embankment Suitability LHS MCW 79+010 79+340 330
45 HWY Excavation of unsutable soil LHS MCW 79+010 79+340 330
46 HWY FDD testing for OGL Bed LHS MCW 79+010 79+340 330
47 HWY FDD testing for Embankment 1st Layer LHS MCW 79+010 79+100 90
48 HWY FDD testing for Embankment 2nd Layer LHS MCW 79+010 79+100 90
49 HWY FDD testing for Embankment 3rd Layer LHS MCW 79+010 79+100 90
50 HWY FDD testing for Embankment 4th Layer LHS MCW 79+010 79+100 90
51 HWY FDD testing and Level Checking for Embankment Top LHS MCW 78+840 79+100 260
52 HWY FDD testing for Subgrade 1st Layer LHS MCW 78+840 79+100 260
53 HWY FDD testing for Subgrade 2nd Layer LHS MCW 78+840 79+100 260
54 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 78+840 79+100 260
55 HWY FDD testing for Embankment 1st Layer LHS MCW 79+100 79+250 150
56 HWY FDD testing for Embankment 1st Layer LHS MCW 79+250 79+280 30

57 HWY FDD testing for Embankment 2nd Layer LHS MCW 79+250 79+280 30

58 HWY FDD testing for Embankment 3rd Layer LHS MCW 79+250 79+280 30
59 HWY FDD testing for Embankment 4th Layer LHS MCW 79+250 79+280 30
60 HWY FDD testing for Embankment 5th Layer LHS MCW 79+250 79+280 30
61 HWY FDD testing for Embankment 1st Layer LHS MCW 79+330 79+340 10
62 HWY FDD testing for Embankment 2nd Layer LHS MCW 79+330 79+340 10
63 HWY FDD testing for Embankment 3rd Layer LHS MCW 79+330 79+340 10
64 HWY FDD testing for Embankment 4th Layer LHS MCW 79+330 79+340 10
65 HWY FDD testing for Embankment 5th Layer LHS MCW 79+330 79+340 10
66 HWY FDD testing for Embankment 6th Layer LHS MCW 79+330 79+340 10
67 HWY FDD testing and Level Checking for Embankment Top LHS MCW 79+100 79+340 240
68 HWY FDD testing for Subgrade 1st Layer LHS MCW 79+100 79+340 240
69 HWY FDD testing for Subgrade 2nd Layer LHS MCW 79+100 79+340 240
70 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 79+100 79+340 240
71 HWY OGL Sampling for embankment Suitability LHS MCW 79+340 79+850 510
72 HWY Excavation of unsutable soil LHS MCW 79+340 79+850 510
73 HWY FDD testing for OGL Bed LHS MCW 79+340 79+850 510
74 HWY FDD testing for Embankment 1st Layer LHS MCW 79+340 79+580 240
75 HWY FDD testing and Level Checking for Embankment Top LHS MCW 79+340 79+580 240
76 HWY FDD testing for Subgrade 1st Layer LHS MCW 79+340 79+580 240
77 HWY FDD testing for Subgrade 2nd Layer LHS MCW 79+340 79+580 240
78 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 79+340 79+580 240
79 HWY FDD testing for Embankment 1st Layer LHS MCW 79+580 79+850 270
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58.549 Kms in the state of Maharashtra through an Engineering, Procurement and
Construction (EPC) Contract.
RFI Summary
Financial Year 2017:2018

BOQ Submission Inspection Time for


RFI No. Department Description of work Side Type Chainage. Remarks No Length Width depth Quantity
Reference Date date Inspection

80 HWY FDD testing for Embankment 2nd Layer LHS MCW 79+580 79+850 270
81 HWY FDD testing for Embankment 3rd Layer LHS MCW 79+580 79+850 270
82 HWY FDD testing and Level Checking for Embankment Top LHS MCW 79+580 79+850 270
83 HWY FDD testing for Subgrade 1st Layer LHS MCW 79+580 79+850 270
84 HWY FDD testing for Subgrade 2nd Layer LHS MCW 79+580 79+850 270
85 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 79+580 79+850 270
86 HWY OGL Sampling for embankment Suitability LHS MCW 79+850 80+470 620
87 HWY Excavation of unsutable soil LHS MCW 79+850 80+470 620
88 HWY FDD testing for OGL Bed LHS MCW 79+850 80+470 620
89 HWY FDD testing for Embankment 1st Layer LHS MCW 79+850 80+100 250
90 HWY FDD testing for Embankment 2nd Layer LHS MCW 79+850 80+100 250
91 HWY FDD testing for Embankment 3rd Layer LHS MCW 79+850 80+100 250
92 HWY FDD testing and Level Checking for Embankment Top LHS MCW 79+850 80+100 250
93 HWY FDD testing for Subgrade 1st Layer LHS MCW 79+850 80+100 250
94 HWY FDD testing for Subgrade 2nd Layer LHS MCW 79+850 80+100 250
95 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 79+850 80+100 250
96 HWY FDD testing for Embankment 1st Layer LHS MCW 80+100 80+200 100
97 HWY FDD testing for Embankment 2nd Layer LHS MCW 80+100 80+200 100
98 HWY FDD testing for Embankment 3rd Layer LHS MCW 80+100 80+200 100
99 HWY FDD testing for Embankment 4th Layer LHS MCW 80+100 80+200 100
100 HWY FDD testing for Embankment 5th Layer LHS MCW 80+100 80+200 100
101 HWY FDD testing for Embankment 6th Layer LHS MCW 80+100 80+200 100
102 HWY FDD testing for Embankment 7th Layer LHS MCW 80+100 80+200 100
103 HWY FDD testing for Embankment 8th Layer LHS MCW 80+100 80+200 100
104 HWY FDD testing and Level Checking for Embankment Top LHS MCW 80+100 80+200 100
105 HWY FDD testing for Subgrade 1st Layer LHS MCW 80+100 80+200 100
106 HWY FDD testing for Subgrade 2nd Layer LHS MCW 80+100 80+200 100
107 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 80+100 80+200 100
108 HWY FDD testing for Embankment 1st Layer LHS MCW 80+200 80+470 270
109 HWY FDD testing for Embankment 2nd Layer LHS MCW 80+200 80+470 270
110 HWY FDD testing for Embankment 3rd Layer LHS MCW 80+200 80+470 270
111 HWY FDD testing for Embankment 4th Layer LHS MCW 80+200 80+470 270
112 HWY FDD testing and Level Checking for Embankment Top LHS MCW 80+200 80+470 270
113 HWY FDD testing for Subgrade 1st Layer LHS MCW 80+200 80+470 270
114 HWY FDD testing for Subgrade 2nd Layer LHS MCW 80+200 80+470 270
115 HWY FDD testing and level checking for Subgrade Top Layer LHS MCW 80+200 80+470 270
MADHUCON - SHARDA - SHRI SATY
Project Name: Up-gradation of Section 55+937 Km to 114+486 Km of NH-752E
Maharashtra through an Engineering, Procurement and Construction (EPC) Con
RFI Summary
Financial Year

BOQ
RFI No. Department
Reference
1 HWY
2 HWY
3 HWY
4 HWY
5 HWY
6 HWY
11 HWY
12 HWY
13 HWY
14 HWY
7 HWY
8 HWY
9 HWY
10 HWY
15 HWY
16 HWY
17 HWY
18 HWY
19 HWY
20 HWY
21 HWY
22 HWY
38 HWY
39 HWY
40 HWY
41 HWY
23 HWY
24 HWY
25 HWY
26 HWY
27 HWY
28 HWY
29 HWY
30 HWY
42 HWY
43 HWY
44 HWY
45 HWY
46 HWY
47 HWY
48 HWY
31 HWY
32 HWY
33 HWY
34 HWY
35 HWY
36 HWY
37 HWY
49 HWY
50 HWY
51 HWY
52 HWY
59 HWY
60 HWY
61 HWY
62 HWY
53 HWY
54 HWY
55 HWY
56 HWY
57 HWY
58 HWY
63 HWY
64 HWY
65 HWY
66 HWY
67 HWY
68 HWY
69 HWY
70 HWY
71 HWY
72 HWY
73 HWY
74 HWY
75 HWY
76 HWY
77 HWY
78 HWY
79 HWY
80 HWY
81 HWY
84 HWY
85 HWY
86 HWY
87 HWY
82 HWY
83 HWY
88 HWY
89 HWY
90 HWY
91 HWY
92 HWY
93 HWY
94 HWY
98 HWY
99 HWY
100 HWY
101 HWY
95 HWY
96 HWY
97 HWY
102 HWY
103 HWY
104 HWY
105 HWY
MADHUCON - SHARDA - SHRI SATYA SAIBABA JOINT VENTURE
Section 55+937 Km to 114+486 Km of NH-752E from Shirur to Kharda (Project length 58
ering, Procurement and Construction (EPC) Contract.

2017:2018

77500 to 80470 RHS side

Description of work

OGL Sampling for embankment Suitability


Excavation of unsutable soil
FDD testing for OGL Bed
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
OGL Sampling for embankment Suitability
Excavation of unsutable soil
FDD testing for OGL Bed
FDD testing for Embankment 1st Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing for Embankment 4th Layer
FDD testing for Embankment 5th Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
OGL Sampling for embankment Suitability
Excavation of unsutable soil
FDD testing for OGL Bed
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing for Embankment 4th Layer
FDD testing for Embankment 5th Layer
FDD testing for Embankment 6th Layer
FDD testing for Embankment 7th Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing for Embankment 4th Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing for Embankment 4th Layer
FDD testing for Embankment 5th Layer
FDD testing for Embankment 6th Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
OGL Sampling for embankment Suitability
Excavation of unsutable soil
FDD testing for OGL Bed
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
OGL Sampling for embankment Suitability
Excavation of unsutable soil
FDD testing for OGL Bed
FDD testing for Embankment 1st Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
OGL Sampling for embankment Suitability
Excavation of unsutable soil
FDD testing for OGL Bed
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
FDD testing for Embankment 1st Layer
FDD testing for Embankment 2nd Layer
FDD testing for Embankment 3rd Layer
FDD testing and Level Checking for Embankment Top
FDD testing for Subgrade 1st Layer
FDD testing for Subgrade 2nd Layer
FDD testing and level checking for Subgrade Top Layer
OINT VENTURE
da (Project length 58.549 Kms in the state of

Side Type Chainage. Length Width

RHS MCW 77+500 78+070 570


RHS MCW 77+500 78+070 570
RHS MCW 77+500 78+070 570
RHS MCW 77+500 77+730 230
RHS MCW 77+500 77+730 230
RHS MCW 77+500 77+730 230
RHS MCW 77+500 77+730 230
RHS MCW 77+500 77+730 230
RHS MCW 77+500 77+730 230
RHS MCW 77+500 77+730 230
RHS MCW 77+730 77+900 170
RHS MCW 77+730 77+900 170
RHS MCW 77+900 78+070 170
RHS MCW 77+900 78+070 170
RHS MCW 77+730 78+070 340
RHS MCW 77+730 78+070 340
RHS MCW 77+730 78+070 340
RHS MCW 77+730 78+070 340
RHS MCW 78+070 78+570 500
RHS MCW 78+070 78+570 500
RHS MCW 78+070 78+570 500
RHS MCW 78+070 78+260 190
RHS MCW 78+070 78+260 190
RHS MCW 78+070 78+260 190
RHS MCW 78+070 78+260 190
RHS MCW 78+070 78+260 190
RHS MCW 78+260 78+410 150
RHS MCW 78+260 78+410 150
RHS MCW 78+260 78+410 150
RHS MCW 78+410 78+490 80
RHS MCW 78+410 78+490 80
RHS MCW 78+410 78+490 80
RHS MCW 78+410 78+490 80
RHS MCW 78+410 78+490 80
RHS MCW 78+260 78+490 230
RHS MCW 78+260 78+490 230
RHS MCW 78+260 78+490 230
RHS MCW 78+260 78+490 230
RHS MCW 78+570 78+930 360
RHS MCW 78+570 78+930 360
RHS MCW 78+570 78+930 360
RHS MCW 78+490 78+570 80
RHS MCW 78+490 78+570 80
RHS MCW 78+490 78+570 80
RHS MCW 78+490 78+570 80
RHS MCW 78+490 78+570 80
RHS MCW 78+490 78+570 80
RHS MCW 78+490 78+570 80
RHS MCW 78+570 78+700 130
RHS MCW 78+570 78+700 130
RHS MCW 78+570 78+700 130
RHS MCW 78+570 78+700 130
RHS MCW 78+490 78+770 280
RHS MCW 78+490 78+770 280
RHS MCW 78+490 78+770 280
RHS MCW 78+490 78+770 280
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+770 78+930 160
RHS MCW 78+930 79+500 570
RHS MCW 78+930 79+500 570
RHS MCW 78+930 79+500 570
RHS MCW 78+930 79+330 400
RHS MCW 78+930 79+330 400
RHS MCW 78+930 79+330 400
RHS MCW 78+930 79+330 400
RHS MCW 79+330 79+500 170
RHS MCW 79+330 79+500 170
RHS MCW 79+330 79+500 170
RHS MCW 79+330 79+500 170
RHS MCW 79+500 79+950 450
RHS MCW 79+500 79+950 450
RHS MCW 79+500 79+950 450
RHS MCW 79+650 79+710 60
RHS MCW 79+500 79+850 350
RHS MCW 79+500 79+850 350
RHS MCW 79+500 79+850 350
RHS MCW 79+500 79+850 350
RHS MCW 79+850 79+950 100
RHS MCW 79+850 79+950 100
RHS MCW 79+850 79+950 100
RHS MCW 79+850 79+950 100
RHS MCW 79+850 79+950 100
RHS MCW 79+850 79+950 100
RHS MCW 79+950 80+470 520
RHS MCW 79+950 80+470 520
RHS MCW 79+950 80+470 520
RHS MCW 79+950 80+220 270
RHS MCW 79+950 80+220 270
RHS MCW 79+950 80+220 270
RHS MCW 79+950 80+220 270
RHS MCW 80+220 80+300 80
RHS MCW 80+220 80+300 80
RHS MCW 80+220 80+300 80
RHS MCW 80+220 80+470 250
RHS MCW 80+220 80+470 250
RHS MCW 80+220 80+470 250
RHS MCW 80+220 80+470 250
depth Quantity