No Area Sub area Team Member Related to


1 RMHS BED Manoj TSK
2 RMHS Mech GA Manoj TSK
3 RMHS Misc Manoj TSK
4 RMHS Misc Manoj TSK
5 RMHS Schedule RAJA TSK
6 RMHS T.O.P RAJA TSK
7 RMHS Mech GA RAJA TSK
8 RMHS Mech GA RAJA TSK
9 RMHS Mech GA RAJA TSK
10 RMHS Report RAJA TSK
11 RMHS Report Debabrata TSK
12 RMHS Review Debabrata TSK
13 RMHS TS Debabrata TSK
14 RMHS TS Vikash Kumar TSK
15 RMHS TS Vikash Kumar TSK
16 RMHS TS Vikash Kumar TSK
17 RMHS SR Yogesh TSK
18 RMHS GA Drawings Yogesh TSK
19 RMHS TOP Yogesh TSK
20 RMHS GA Drawings Yogesh TSK
21 RMHS Datasheet Yogesh TSK
22 RMHS Technical Specs Yogesh TSK
23 RMHS MDL Sameer TSK
24 RMHS MDL Sameer TSK
25 RMHS MDL Sameer TSK
Technical
26 RMHS Shashikant/Sahendra TSK
Specification
Technical
27 RMHS DJ TSK
specification
28 RMHS Technical offer DJ TSK
Technical
29 RMHS Shashikant TSK
specification
Technical
30 RMHS Shashikant/Sahendra TSK
specification
31 RMHS Drawing Review DJ/Shashikant/Sahendra
32 RMHS Technical Offer DJ TSK
Technical
33 Shashikant/Sahendra
RMHS specification TSK
34 RMHS Layout Saumen TSJ

35 RMHS Calculation Saumen TSJ


36 RMHS Saumen TSJ
Layout
37 RMHS Drawing Supriya Khondbond
38 RMHS Drawing Supriya Joda MHS-RLS
39 RMHS Layout Supriya Joda LG ben
40 RMHS TS RV TSK
41 RMHS Misc RV Others

42 RMHS Misc RV KIM

43 RMHS Pellet Plant Kundan TSJ-Pellet

44 RMHS Pellet Plant Kundan TSJ-Pellet


45 RMHS Pellet Plant Kundan TSJ-Pellet
Weekly Plan - RMHS Phase-2 Engg
Period: 20th Nov to 24th Nov 2017
Activities
BED preparation for Coke circuit
Review of Mech. GA drg of CK-9,10,19 & 25
Assignment for Civil & Structural - Trestle Location POC-3,PPC-1, RF-1A & RF-1B
Finalisation of trestle position of CC-2A,3A, CO-27 & 28
Updation of RMHS Engineering Schedule - PRIMAVERA
Preparation of Revised T.O.P Documents for BF#2, PP & CP-2
Preparation of Techn Paramenter Sheet & Load Data for Mech GA (SC-17) & Review for finalization
Preparation of Techn Paramenter Sheet & Load Data for Mech GA (CK-56B) & Review for finalization
Review & Preparation of observations on GA drawings submitted by TRF
Preparation of weekly MIS - VP(E&P) for IL-2 Communication meeting.
Updation of Conveyor Summary & Component Shedules
Review of TRF Deliverables
Discussion with vendors regarding preparation of GA drgs
Offer evaluation of Weigh Feeder of Transweigh and Saratorious mechatronics
Technical discussion with Schenk regarding weigh feeder
Technical discussion with Transweigh regarding weigh feeder
Finalisation of SR for order placement for 3rd Rod mill.
Preparation Mech GA and datasheet for SLC-1 Conveyor
Sign off of TOP with COBP-2 at TSJ Kick off with Acre
Marking of trestles for CC-8 conveyor to sent to structural & layout team
Providing Inputs& Preparation of shutdown plan for Phase-2 activities with Project team
Preparation of Technical Specs for Low Alumina bricks for Bunkers
LSC -3 conveyor GA drawing checking
LSc-14&15 GA drawing checking
Future wagon tippler lay out Option-6

TS of Sampler

Technical Specification of CJS

Technical Offer evaluation of Weigh feeder

TS for Lighting of RMHS O&F circuit & SMS

TS for 6.6 kV HV MCC Extension

Review of MCC and PCC load list based on latest PFD


Technical Offer evaluation of ZSS

TS for 6.6 kV HV PCC Extension


Preparation of Basic mechanical drawings with load data for estimation of civil & structural BOQ for Battery connectivity projec

Conveyor Power & Tension calculation for SP1 & SP2 connectivity project
Preparation of Basic mechanical drawings with load data for estimation of civil & structural BOQ for SP1 & SP2 connectivity pro
Crushing & washing plant : Comment on GA & Load data drg for Transfer House & Conveyors as per submission
Comment on submitted drawings by vendor
Checking of Technical offer from vendor
Technical evaluation of Metal Detector , Internal & external scraper
Study,review and checking of MHS mechanical drawing of KIM.

Noumundi project layout study and profile study.

Checking of design capacitied for the pellet conveyor HL01GL62, HL01GL63, HL01GL64, HL01GL65 as per requirement for 7MTP
plant capacities
Rationalization of pulley shaft dia for pellet conveyor as per assigment#1 augumentation requirement
Preparation of pulley schedule as per revised standard for pellet plant conveyor augmentation assignment#1
Start Date Finish Date
11/24/2017 11/24/2017
11/20/2017 11/22/2017
11/21/2017 11/23/2017
11/22/2017 11/24/2017
11/20/2017 11/20/2017
11/20/2017 11/20/2017
11/20/2017 11/21/2017
11/22/2017 11/23/2017
11/20/2017 11/23/2017
11/24/2017 11/24/2017
11/21/2017 11/23/2017
11/20/2017 11/22/2017
11/22/2017 11/24/2017
11/20/2017 11/21/2017
11/23/2017 11/24/2017
11/22/2017 11/22/2017
10/31/2017 11/21/2017
11/21/2017 11/23/2017
11/23/2017 11/24/2017
11/20/2017 11/22/2017
11/15/2017 11/23/2017
11/15/2017 11/22/2017
11/20/2017 11/21/2017
11/22/2017 11/23/2017
11/24/2017 11/24/2017

11/20/2017 11/24/2017

11/20/2017 11/24/2017

11/20/2017 11/24/2017

11/20/2017 11/24/2017

11/20/2017 11/24/2017

11/20/2017 11/24/2017
11/20/2017 11/24/2017

11/20/2017 11/24/2017

11/20/2017 11/21/2017

11/22/2017 11/23/2017
11/22/2017 11/23/2017
11/20/2017 11/24/2017
11/20/2017 11/24/2017
11/20/2017 11/24/2017
Started 23 November 2017
Started on going

20 November 2017 24 November 2017

11/20/2017 11/21/2017

11/23/2017 11/23/2017
11/23/2017 11/24/2017
S.No Area Sub area Team Member Related to
1 RMHS BED Manoj TSK
2 RMHS Discussion Manoj TSK
3 RMHS Mech GA Manoj TSK
4 RMHS TS Manoj TSK
5 RMHS Mech GA RAJA TSK
9 RMHS Report Debabrata TSK
10 RMHS Review Debabrata TSK
11 RMHS TS Debabrata TSK
12 RMHS TS Vikash Kumar TSK
13 RMHS TS Vikash Kumar TSK
14 RMHS TS Vikash Kumar TSK
15 RMHS SR Yogesh TSK

16 RMHS Yogesh TSK


GA Drawings
17 RMHS Calculation Yogesh TSK
18 RMHS GA Drawings Yogesh TSK
19 RMHS GA Drawings Yogesh TSK
20 RMHS GA Drawings Yogesh TSK
21 RMHS Technical offer Yogesh TSK

22 RMHS Yogesh TSK


Technical Specs
23 RMHS MDL Sameer TSK
24 RMHS MDL Sameer TSK
25 RMHS MDL Sameer TSK
Technical
26 RMHS Shashikant/Sahendra TSK
Specification
Technical
27 RMHS DJ TSK
specification
28 RMHS Technical offer DJ TSK

29 RMHS Technical Shashikant TSK


specification
Technical
30 RMHS Shashikant/Sahendra TSK
specification
31 RMHS Layout Saumen TSJ
32 RMHS TS Saumen TSJ
33 RMHS Calculation Saumen TSJ
34 RMHS Calculation Saumen TSJ

35 RMHS Drawing Supriya Khondbond

36 RMHS Drawing Supriya Joda MHS-RLS

37 RMHS Layout Supriya Joda & Noamundi

38 RMHS TS RV TSK

39 RMHS Misc RV Others


40 RMHS Misc RV KIM
41 RMHS Misc RV Knowledge sharing
42 RMHS Pellet Plant Kundan TSJ-Pellet
43 RMHS Pellet Plant Kundan TSJ-Pellet
44 RMHS Pellet Plant Kundan Knowledge sharing
Weekly Plan - RMHS Phase-2 Engg
Period: 13th Nov to 17th Nov 2017
Activities
BED preparation for Lime circuit
Evaluation of offer of TKII for hammer mill and vibrating screens
Assignment for Civil & Structural - Trestle Location POC-2, CC-1A, CC-4A, CO-29, CO-32
Release of TS for RFQ for Belt Changing Device
Leave
Updation of Conveyor Summary & Component Shedules
Review of TRF Deliverables
Consolidating the Motor List for Electrical Input
TS preparation of autosampler
Offer evaluation of Weigh Feeder
Checking of FLS comment on Stacker reclaimer
Finalisation of SR for order placement for 3rd Rod mill.

Providing Inputs for Mech GA and datasheet for CC-8 Conveyor


Power calculation for SP conveyor E9006 for 898 TPH capacity
Providing Inputs for Mech GA and datasheet for SLC-1 Conveyor
Providing Inputs for Mech GA and datasheet for SLC-6 , SRC-1 Conveyor
Review of GA of CC-8 conveyor
Scrutiny of NHI china technical offer R2

Preparation of Technical Specs for Low Alumina bricks for Bunkers


Future wagon tippler lay out Option-4
Future wagon tippler lay out Option-5
Future wagon tippler lay out Option-6

Preparation of TS for LCP

Preparation of TS for PLC Augmentation of FRM #3

Technical Offer evaluation of Weigh feeder

TS for Lighting of RMHS O&F circuit & SMS

TS for 6.6 kV HV MCC Extension

Preparation of final conveyor profile drawings as per site survey for Battery connectivity project
Reply of DEC resolution on our comments for SP1&SP2 connectivity project
Conveyor calculation for Battery for connectivity project
Load data calculation for civil assignment drg. for Battery for connectivity project

Crushing & washing plant : Comment on GA & Load data drg for Transfer House & Conveyors as per submission

Comment on submitted drawings by vendor

Conveyor profile feasibilty study for LG beneficiation

Technical evaluation of Metal Detector , Internal & external scraper

Study,review and checking of C&W plant with water utility system of KIM
Discussion, role responsibility , calculation and way forward for Noumundi projects.
Calculation regarding Bucket elevator, conveyor augumentation calculation at kolkata office
Component list preparation for pellet plant augumentation assignment part-2
Review, finalization and release of component list for TSJ pellet plant assignment no-2
Knowledge sharing bulket elevetor, conveyor component selection Layout
Start Date Finish Date Compliance
11/17/2017 11/17/2017 Completed
11/16/2017 11/17/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/15/2017 WIP
11/13/2017 11/17/2017
11/13/2017 11/15/2017 Completed
11/15/2017 11/16/2017 WIP
11/17/2017 11/17/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/17/2017 WIP
10/31/2017 11/16/2017 In Progress
11/17/2017
11/13/2017 Completed
11/14/2017 11/16/2017 Completed
11/13/2017 11/17/2017 Completed
11/13/2017 11/17/2017 In Progress
11/14/2017 11/15/2017 Completed
11/14/2017 11/14/2017 Completed

11/15/2017 11/16/2017 In Progress


11/13/2017 11/14/2017 Completed
11/15/2017 11/16/2017 Completed
11/16/2017 11/17/2017 wip
11/13/2017 11/17/2017 Completed

11/13/2017 11/17/2017 Completed

11/13/2017 11/17/2017 WIP

11/13/2017 11/17/2017 WIP

11/13/2017 11/17/2017 WIP

11/13/2017 11/14/2017 completed


11/15/2017 11/15/2017 completed
11/16/2017 11/16/2017 completed
11/17/2017 11/17/2017 completed

11/13/2017 11/17/2017 Completed

11/13/2017 11/17/2017 Completed

11/13/2017 11/17/2017 Completed

Started 11/14/2017 WIP

Started On going
11/15/2017 11/17/2017 Completed
11/15/2017 11/17/2017 Completed
11/13/2017 11/14/2017 Completed
11/15/2017 11/17/2017 Completed
11/15/2017 11/17/2017 Completed
Remarks

Will be completed by 20/11/17

R1-24-11-2017

R1-22-11-17
Final Commercial offer awaited from party.
Datasheet sent to Debabrata for further
evaluation

Vendor inputs recived. Completion date:


22/11/2017

Review in progress

Review in progress

2 out of 4 vendors completed

Progressively as per submission sequence and will


be continued to upcoming weeks.
Progressively as per submission sequence and will
be continued to upcoming weeks.

Discussion with Thermo Fisher held on 7th


Revised offer submitted by vendor.
Depends on Drg Availability
S.No Area Sub area Team Member Related to
1 RMHS BED Manoj TSK
2 RMHS Discussion Manoj TSK
3 RMHS Mech GA Manoj TSK

4 RMHS TS Manoj TSK

5 RMHS Mech GA RAJA TSK


6 RMHS Schedule RAJA TSK
7 RMHS Mech GA RAJA TSK
8 RMHS Report RAJA TSK
9 RMHS General Debabrata TSK
10 RMHS Mech GA Debabrata TSK
11 RMHS General Debabrata TSK
12 RMHS Calculation Debabrata TSK
13 RMHS TS Vikash Kumar TSK
14 RMHS Basic engineering Vikash Kumar TSK
15 RMHS Basic engineering Vikash Kumar TSK
16 RMHS Basic engineering Vikash Kumar TSK
17 RMHS TS Vikash Kumar TSK
18 RMHS SR Yogesh TSK
19 RMHS GA Drawings Yogesh TSK
20 RMHS Calculation Yogesh TSK
21 RMHS BOQ Yogesh TSK
22 RMHS MDL Sameer TSK
23 RMHS MDL Sameer TSK
24 RMHS MDL Sameer TSK
25 RMHS Technical Specification DJ TSK
26 RMHS Technical offer Shashikant/DJ/Sahendra TSK
27 RMHS Technical Specification Shashikant TSK

28 RMHS Sahendra TSK


Technical specification
29 RMHS Layout Saumen TSJ
30 RMHS Layout Saumen TSJ
31 RMHS Training Saumen TSJ
32 RMHS Meeting Saumen TSJ
33 RMHS Drawing Supriya Joda MHS-RLS
34 RMHS Layout Supriya Joda & Noamundi
35 RMHS Training Supriya Training
36 RMHS Meeting Supriya TSK
37 RMHS TS RV TSK
38 RMHS TS RV TSK
39 RMHS Misc RV Others

40 RMHS Pellet Plant Kundan Kumar TSJ-Pellet


41 RMHS Training Kundan Kumar TSJ
Weekly Plan - RMHS Phase-2 Engg
Period: 6th Nov to 10th Nov 201
Activities
BED preparation for Limestone
Discussion with TKII regarding Hammer Mill & Screens
Assignment for Civil & Structural - Trestle Location SLC-1C, RF-1B & POC-2

Release of TS for RFQ for Belt Changing Device

Send requied inputs to TRF for preparation of Mech GA drgs


Updation of RMHS Engineering Schedule - PRIMAVERA
Preparation of Mech GA of CK-27
Preparation of weekly MIS - VP(E&P) for IL-2 Communication meeting.
Leave
Review of TRF Deliverables
Updation of Conveyor Summary & Component Shedules
Consolidating the Motor List for Electrical Input
Completion of TS of autosampler
Revision of note on capacity augmentation of reclaiming ore and flux circuit
Motor rating calculation and drive component selection of BF-2 and pellet feeding conveyors( 8 nos)
CO-30,FX-1 OF-1 GA drawing preparation
Offer evaluation of Weigh Feeder
Finalisation of SR for order placement for 3rd Rod mill.
Providing Inputs for Mech GA and datasheet of 5 Conveyors Slag & Coal
Power calculation for SC-01& SC-02 for 1370 TPH capacity
Detaling of BOQ for Rod mill including Rod chager to sent to project
Questionaries to the vendors regarding SPOUT & SECTOR GATE
Questionaries to the vendors regarding IDLER
Release of TS for RFQ for Hoists
TS for Battery charger & DCDB
Technical offer evaluation of Weighfeeder
TS for power distribution board 415 V

TS for 415 V PCC

Review of final data from site survey for Coke battery connectivity project
Preparation of layout drawings Coke battery connectivity project
FLET leadership training
Visit to JSR for meeting with construction & erection team for Coke battery connectivity project
Comment on GA & Load data drg for Belt Feeder, Gear Box, Input coupling & Rod Gate
Conveyor profile feasibilty study for LG beneficiation
Training at TMDC - Effective Leadership Program
Meeting with Metso for Hybrid wagon tippler
Preparation of Control Philoshiphy of Coal Circuit
Technical evaluation of Travelling tripper and Metal Detector
Study,review and checking of C&W plant with water utility system of KIM
Pellet Plant Upgradation : Preparation of list of component modifications for RSC HA01GL22, RSC HA01GL22, and Shuttle c
JH01GL02
Training - Felt Leadership @ TSJ
Start Date Finish Date Compliance
11/6/2017 11/7/2017 Completed
11/7/2017 11/7/2017 Rescheduled
11/8/2017 11/10/2017 Completed

11/9/2017 11/10/2017 WIP

11/6/2017 11/6/2017 Completed


11/7/2017 11/8/2017 Completed
11/9/2017 11/10/2017 Completed
11/10/2017 11/10/2017 Completed
11/6/2017 11/8/2017 Completed
11/9/2017 11/10/2017 Completed
11/10/2017 11/10/2017 Completed
11/10/2017 11/10/2017 Yet to be finalised
11/6/2017 11/10/2017 Inprogress
11/6/2017 11/6/2017 Completed
11/7/2017 11/8/2017 Completed
11/9/2017 11/10/2017 Inprogress
11/6/2017 11/10/2017 Inprogress
10/31/2017 11/8/2017 In progress
11/3/2017 11/9/2017 In progress
11/9/2017 11/10/2017 Completed
11/8/2017 11/10/2017 Completed
11/6/2017 11/7/2017 WIP
11/7/2017 11/8/2017 WIP
11/8/2017 11/9/2017 WIP
11/6/2017 11/10/2017 HOLD
11/6/2017 11/10/2017 WIP
11/6/2017 11/10/2017 Hold

11/6/2017 11/10/2017
WIP
11/6/2017 11/6/2017 Completed
11/7/2017 11/7/2017 Completed
11/8/2017 11/9/2017 Completed
11/10/2017 11/10/2017 Completed
11/6/2017 11/10/2017 Complied
11/6/2017 11/10/2017 Complied
11/8/2017 11/8/2017 Complied
11/9/2017 11/9/2017 Complied
In Progress 11/7/2017 WIP
Started 11/7/2017 WIP
Started WIP

06.11.2017 07.11.2017 Completed


08.11.2017 10.11.2017 Completed
Remarks

Vendor not available


Completed for SLC-1C,CC-2A,PPC-3,PPC-4
Will be completed by 15/11/17,Worked on different options for modification of JH-18
and KJ-4.

Few conveyor details awaited in O&F

Approved

Completed by evening
First round discussion completed with Schenk
Commercial terms are yet to be agreed upon by both parties
SLC-1C,CC-27 Trestle marking Inputs provided Completed: CK-9/10,CC-5

Lighting load calculation for SMS area


Technical discussion with vendor is in progress
Preparation of E&I TS for LCP
Draft copy made and also discussion with vendor done for site visit for complete input
for TS

Discussion with electrical team in progress


Discussion with Vendors in progress
Depends on Drg Availability
S.No Area Sub area Team Member
1 RMHS MDL RAJA

2 RMHS Schedule RAJA

3 RMHS Misc RAJA


4 RMHS Mech GA RAJA
5 RMHS Review RAJA
6 RMHS Mech GA Debabrata
7 RMHS Mech GA Debabrata
8 RMHS General Debabrata
1 RMHS TS Vikash Kumar
2 RMHS TS Vikash Kumar
3 RMHS GA drwaing Vikash Kumar
4 RMHS Technical Study Vikash Kumar
12 RMHS BED Manoj
13 RMHS Discussion Manoj
14 RMHS Mech GA Manoj
15 RMHS TS Manoj
16 RMHS TS RV
17 RMHS TS RV
18 RMHS Misc RV
19 RMHS Misc RV
20 RMHS Misc RV
21 RMHS Misc RV
22 RMHS Vendor discussion Yogesh

23 RMHS SR Yogesh

24 RMHS SR Yogesh
25 RMHS Technical Study Yogesh

26 RMHS MDL Sameer

27 RMHS MDL Sameer


28 RMHS MDL Sameer
29 RMHS MDL Sameer

30 RMHS MDL Sameer

31 RMHS Technical Offer Shashikant/DJ


32 RMHS Technical Offer Shashikant/DJ
33 RMHS TS Shashi/DJ
34 RMHS TS Shashi/DJ
35 RMHS Leave sahendra
36 RMHS TEFR Saumen

37 RMHS PFD Saumen

38 RMHS TS Saumen

39 RMHS Drawing Supriya

40 RMHS Layout Supriya

7 RMHS TSJ-Pellet plant Kundan Kumar


Weekly Plan - RMHS Phase-2 Engg
Period: 30th Oct to 3rd Nov 2017
Related to
TSK

TSK

TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
Others
Others
Others
TSK

TSK

TSK
TSK

TSK

TSK
TSK
TSK

TSK

TSK
TSK
TSK
TSK
TSK
TSJ

TSJ

TSJ
Khondbond - Crushing & washing
plant
Joda & Noamundi

TSJ
Weekly Plan - RMHS Phase-2 Engg
Period: 30th Oct to 3rd Nov 2017
Activities
Updating MDL & Dashboard

Updating Integrated Schedule of RMHS with RMHS Phasing Priorities & preparation of revised BOQ

Follow-up for revised drawings of FOB(Replacement of Wiremesh with steel plate)


Preparation of Inputs required for TRF for Mech GA Preparation
Preparation of weekly MIS - VP(E&P) for IL-2 Communication meeting.
Required inputs to TRF for starting JH-6
Discussion with TRF at TSJ regarding Mechn GA of CO-21/22
Leave (LTC)
Evaluation of Offer of M/s NHI for Stacker Reclaimer
Offer evaluation and preparation of comparision sheet for Weigh Feeder
Preparation of First Cut GA of Conveyor RF-1B
Study on occupancy reduction of ore & flux reclaiming circit and report preparation
BED preparation for Slag circuit
Discussion with Mcnally sayaji regarding hammer mill and screen
Assignment for Civil & Structural - Trestle Location CO-28, CC-3A
Release of RFQ for Belt Changing Device
Preparation of Control Philoshiphy of Coal Circuit
Technical Recommondation of Semi Portal scraper
Overall Checking of coal Ckt with all respect
Study,review and checking of C&W plant with water utility system of KIM
Study on Noamundi and joda LG Beneficiation plant
Study on Slime beneficiation unit.
Discussion with Mcnally Sayaji for Final scope sign up for 3rd Rod mill

Preparation of SR for order placement for 3rd Rod mill

Finalisation of SR for order placement for Barrel reclaimer


Study of Revised material balace for Sinter circuit & occupancy study

All existing elevators new sheeting work decission to be taken by discussing with respective
departments

Questionaries to the vendors regarding SPOUT & SECTOR GATE


Questionaries to the vendors regarding IDLER
Release of TS for RFQ for Hoists

Hybrid wagon trippler lay out finalization by the help of layout department

Technical offer evaluation for Bin weighing system(SCHENCK,IPA)


Technical offer evaluation for Hooter(Kheraj)
SPECIFICATION FOR 415 V MCC
SPECIFICATION FOR DRY TYPE TRANSFORMER
Leave
Review of TEFR for Battery-7 rebuilding project

14 MTPA coke citcuit block flow diagram

TS review for conveyor system & vibrating feeder for SP1 & SP2 connectivity

Comment on GA & Load data drg for Transfer House & Conveyors as per submission

Conveyor profile feasibilty study for LG beneficiation

Review of Drive component list for Pellet conveyor augumentation work


Conveyor Include:- HL01GL63, HL01GL64, HL01GL65,
HA01GL11HA01GL12,HA01GL23,JU0GL12,JU01GL13
Start Date Finish Date Compliance Remarks
10/30/2017 10/30/2017 Completed

10/31/2017 10/31/2017 Completed

11/2/2017 11/3/2017 Completed


10/30/2017 11/3/2017 Completed
11/3/2017 11/3/2017 Completed
10/30/2017 10/30/2017 Completed
10/31/2017 11/1/2017 Completed
11/2/2017 11/3/2017 Completed
10/30/2017 11/1/2017 Completed
11/1/2017 11/2/2017 Inprogress Will be completed by 10-nov
10/30/2017 11/3/2017 Not started Not in my scope
11/1/2017 11/3/2017 Completed
10/25/2017 10/27/2017 Completed
10/30/2017 10/30/2017 Completed
10/30/2017 11/3/2017 Completed
11/3/2017 11/3/2017 WIP Worked on Trestle Locations
In Progress 11/2/2017 In Progress Under discussion for process
In Progress 11/3/2017 Not completed Only two vendor quoted yet
Started 10/31/2017 In Progress R1-15.11.17
Started 10/31/2017 In Progress Depends on Drg Availability
Started 10/31/2017 Completed
Started 10/31/2017 Completed
10/30/2017 10/31/2017 Completed
Commerrcial terms are yet to be agreed upon
10/31/2017 11/1/2017 Not Completed by both parties
10/30/2017 11/3/2017 Completed
10/31/2017 11/3/2017 Completed
new sheeting TGS Design team assigned to release shheting
10/30/2017 11/1/2017 arrangement drawing of elevator
reequired
11/1/2017 11/2/2017 WIP
11/2/2017 11/3/2017 WIP
11/2/2017 11/3/2017 WIP
Lay Out completed and given to layout
11/2/2017 11/3/2017 WIP department
10/30/2017 11/3/2017 completed
10/30/2017 11/3/2017 completed
10/30/2017 11/3/2017 completed
10/30/2017 11/3/2017 completed
10/25/2017 11/3/2017
Postpond due to involvement in review of Coke
circuit connectivity project layout as per civil
10/30/2017 10/31/2017 Postponed observation and concept note revision, conv.
Calculation.

Post pond due to JSR visit for coke circuit


11/1/2017 11/2/2017 Postponed connectivity and drg slag WLS survey drg.
review & site visit.
11/3/2017 11/3/2017 Completed DEC reply on our comments resolved.
Will be continued progressively as per
10/30/2017 11/3/2017 Completed submission
10/30/2017 11/3/2017 WIP

02.11.2017 03.11.2017 In Progress will be completed by EOD 03.11.2017


S.No Area Sub area Team Member
1 RMHS MDL RAJA

2 RMHS Calculations RAJA

3 RMHS Misc RAJA


4 RMHS Mech GA RAJA
5 RMHS Review RAJA

6 RMHS Material Balance Debabrata

7 RMHS Calculations Debabrata


8 RMHS Calculations Debabrata
9 RMHS Conveyor Vikash kumar
10 RMHS Stockyard equipment Vikash kumar

11 RMHS Calculations Vikash kumar

12 RMHS TS Manoj
13 RMHS Misc Manoj
14 RMHS Misc Manoj
15 RMHS Misc Manoj
16 RMHS TS RV
17 RMHS TS RV
18 RMHS Misc RV
19 RMHS Misc RV
20 RMHS Misc RV
21 RMHS Misc RV

22 RMHS Misc Yogesh

23 RMHS Technical Recommendation Yogesh


24 RMHS Technical Recommendation Yogesh
25 RMHS MDL Sameer
26 RMHS MDL Sameer
27 RMHS MDL Sameer
28 RMHS MDL Sameer
29 RMHS TS DJ
30 RMHS Technical Offer Sahendra/shashikant/DJ
31 RMHS Technical Offer Sahendra/shashikant/DJ

32 RMHS TS Shashi

33 RMHS TS shashi/sahendra
34 RMHS Leave sahendra
35 RMHS Technical discussion Shashikant/DJ
36 RMHS TS Saumen
37 RMHS Layout Saumen
38 RMHS TS Saumen

39 RMHS PFD Saumen

40 RMHS Drawing Supriya


41 RMHS TS Supriya
42 RMHS Visit Supriya

43 RMHS Layout Supriya

44 RMHS Leave Kundan


Weekly Plan - RMHS Phase-2 Engg
Period: 23rd Oct to 27th Oct 2017
Related to
TSK

TSK

TSK
TSK
TSK

TSK

TSK
TSK
TSK
TSK

TSK

TSK
TSK
TSK
TSK
TSK
TSK
TSK
RM
RM
RM

TSL

TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK
TSK

TSK

TSK
TSK
TSK
TSJ
TSJ
TSJ

TSJ

Khondbond - Crushing & washing plant


TSJ - LD Slag processing plant
NTPC Nabinagar Plant

Noamundi

TSJ
Weekly Plan - RMHS Phase-2 Engg
Period: 23rd Oct to 27th Oct 2017
Activities
Updating MDL & Dashboard

Resolution of problems in RMHS System which araised out of revised Material Balance

Arranging for revised drawings of FOB (Replacement of Wiremesh with steel plate)
Discussion with TRF and sharing inputs for starting preparation of GA drawings
Preparation of weekly PPT for GM review.

Resolution of problems in RMHS System which araised out of revised Material Balance

Basic Engineering Calculations for Conveyors CC-1A, CC-2A, CC-3A, CC-4A


Discussion with TRF and sharing inputs for starting preparation of GA drawings
GA drawing preparation of CO-21 & 22
Technical discussion with Thyssenkrupp regarding stacker cum reclaimer

Resolution of high occupancy problems in O&F Circuit which araised out of revised Material Balance

Release of RFQ for belt changing device


BED preparation for Sinter circuit
Discussion with Mcnally sayaji regarding hammer mill and screen
Discussion with TRF and sharing inputs for starting preparation of GA drawings
Preparation of Control Philoshiphy of Coal Circuit
Technical Recommondation of Semi Portal scraper
Overall Checking of coal Ckt with all respect
Study and checking of C&W plant with water utility system of KIM
Study on Noamundi and joda LG Beneficiation plant
Study on Slime beneficiation unit.

Discussion with Mcnally Sayaji for Final scope sign up for 3rd Rod mill

Discussion with Thyssenkrupp for Final scope sign up for 2nd Barrell reclaimer
Discussion with Tenova Tekraf for Final scope sign up for 2nd Barrell reclaimer
Questionaries to the vendors regarding conveyor belt
Questionaries to the vendors regarding IDLER
Finalization of Layout for Hybrid Tippler & Conveyor Connectivity
Release of TS for RFQ for Hoists
SPECIFICATION FOR SWITCHES ( CJS)
BOQ FINALIZATION & SIGN OFF ON TS, GS & SCOPE MATRIX OF MSEL OFFER OF RM
OFFER EVALUATION OF BAG FILTER DE SYSTEM OF PC ENGG

SPECIFICATION FOR 415 V MCC

SPECIFICATION FOR DRY TYPE TRANSFORMER


Leave
Technical discussion on Rebar cutting and bendin plant
TS review of Hammer mill crusher for Battery-7 rebuilding
LD slag transportation & wagon loading survey requirement
TS review for conveyor system & vibrating feeder for SP1 & SP2 connectivity

14 MTPA coke citcuit block flow diagram

Comment on GA & Load data drg for Transfer House - 11


Technical specification & schedule for Drive pulley of conv C-108
Visit to NTPC Nabinagar for investigating conveyor erection

Conveyor profile feasibilty study for Noamundi LG beneficiation

On Leave
Start Date Finish Date Compliance
10/23/2017 10/23/2017 Completed

10/23/2017 10/27/2017 WIP

10/24/2017 10/25/2017 WIP


10/23/2017 10/24/2017 Completed
10/27/2017 10/27/2017 Completed
Assignment given to Mr. Vikash & Mr.
10/23/2017 10/27/2017 Yogesh
10/26/2017 10/27/2017 Completed
10/23/2017 10/24/2017 Completed
10/23/2017 10/27/2017
10/25/2017 10/25/2017

10/23/2017 10/27/2017 Completed

10/26/2017 10/27/2017 WIP


10/25/2017 10/27/2017 Completed
10/26/2017 10/26/2017 Postponed to 30-10-2017
10/23/2017 10/24/2017 Completed
10/9/2017 10/27/2017 In Progress
In Progress 10/27/2017 In Progress
Started 10/31/2017 In Progress
Started In Progress
Started In Progress
Started In Progress

10/26/2017 10/26/2017 Not Completed

10/25/2017 10/25/2017 Completed


10/24/2017 10/24/2017 Completed
10/23/2017 10/25/2017 completed
10/23/2017 10/25/2017 WIP
10/26/2017 10/27/2017 Completed
10/26/2017 10/27/2017 WIP
10/23/2027 10/27/2017 Completed
10/23/2027 10/27/2017 Vendor visit has been postponed
10/23/2027 10/27/2017 Completed

10/23/2027 10/27/2017 WIP

10/23/2027 10/27/2017 WIP


10/25/2017 11/3/2017
10/26/2017 10/26/2017 Completed
10/23/2019 10/24/2019 Completed
10/25/2019 10/25/2019 Completed
Revised document is pending from DEC.
10/26/2019 10/26/2019 Will complete on next week.

10/27/2019 10/27/2019 WIP

10/23/2017 10/24/2017 Complied


10/25/2017 10/26/2017 Complied
10/27/2017 10/29/2017 Complied

10/26/2017 10/27/2017 Not started

10/23/2017 10/27/2019
Remarks

Required data given to Mr. Vikash & Mr. Yogesh


to carryout the job.
Revised date 4-11-2017

Worked on BOQ for TGS

Unplanned leave
Offer still yet to receive
In Progress
Depends on Drg Availability
Unplanned leave
Unplanned leave
Mcnally defered date of visit for finl sign off to
30/10/2017

Hoist travel length not finalized

Discussion with vendor is going on and shall be


completed in next week
75% Completed
It will be progressive work & will be continued to
upcoming weeks.

Revised PFD & revised drg of process bldg yet to


be received from Mineral processing engg team.
S.No Area Sub area Team Member Related to

1 RMHS MDL RAJA TSK

2 RMHS Calculations RAJA TSK


3 RMHS Misc RAJA TSK

4 RMHS Mech GA RAJA TSK

5 RMHS Review RAJA TSK

6 RMHS Material Balance Debabrata TSK

7 RMHS Calculations Debabrata TSK

8 RMHS Pellet plant Supriya TSJ


MHS part of Crushing
9 RMHS &Washing plant of KIM Supriya Khondbond
expansion
10 RMHS Leave Supriya
11 RMHS Conveyor Vikash kumar TSK

12 RMHS Stockyard equipment Vikash kumar TSK

13 RMHS Leave Vikash kumar

14 RMHS TS Manoj TSK

15 RMHS Misc Manoj TSK

16 RMHS Misc Manoj TSK

17 RMHS Misc Manoj TSK


RMHS Misc Manoj TSK
18 RMHS TS RV TSK
19 RMHS TS RV TSK

20 RMHS TS RV TSK

21 RMHS Misc RV TSK


22 RMHS Misc RV TSK
23 RMHS Calculation KUNDAN TSJ
Conveyor component
24 RMHS KUNDAN TSJ
finalization
25 RMHS Calculation KUNDAN TSJ
26 RMHS Calculation KUNDAN TSJ
27 RMHS Leave Yogesh
28 RMHS Technical Recommendation Yogesh TSK
29 RMHS CN Sahendra/shashikant/DJ TSK
30 RMHS TS Sahendra TSK
31 RMHS TS Sahendra/shashikant/DJ TSK
32 RMHS TS DJ TSK
33 RMHS Technical Offer Sahendra/shashikant/DJ TSK
34 RMHS Leave Shashikant
35 RMHS MDL Sameer TSK
36 RMHS MDL Sameer TSK

37 RMHS MDL Sameer TSK

38 RMHS MDL Sameer TSK

39 RMHS MDL Sameer TSK

40 RMHS DE System ANKUR TSK


41 RMHS TS Saumen TSJ
42 RMHS TS Saumen TSJ
43 RMHS TS Saumen TSJ
45 RMHS MDL Saumen TSJ
Weekly Plan - RMHS Phase-2 Engg
Period: 16th Oct to 20th Oct 2017
Activities

Updating MDL & Dashboard


(Considering increase in Technical Specifications of Electrical team because of splitting in to small packages).

Occupancy analysis of RMHS System for revised Material Balance.


Fouling Issue resolving for FOB Extension.

Review of BF#2 GA drawing (Conveyors CFC-2 & CFC-3).

Preparation of weekly PPT for GM review.

Resolution of problems in RMHS System which shall araise out of revised Material Balance

Basic Engineering Calculations for Conveyors CC-1A, CC-2A, CC-3A, CC-4A, CC-5A

Checking of conveyor calculation for Assignment-2

Checking engineering deliverables of MHS part

Festival Holiday
GA drawing preparation of CO-30,FX-1 and OF-1

Comments on NHI offer

Leave

Preparation of RFQ for belt changing device

BED preparation for Pellet circuit

Discussion with Mcnally sayaji regarding hammer mill and screen

Checking of circuit occupancy as per new material balance


revision of flow diagram of Coal,Coke,Limestone and Lime ckt
Technical Evaluation of Metal Detector
Preparation of Control Philoshiphy of Coal Circuit

Technical evaluation of Semi Portal scraper

Overall Checking of coal Ckt with all respect


Study and checking of C&W plant with water utility system of KIM
Conveyor augmention calculation of pellet conveyor # TSJ, Shuttle conveyor HA 01 GL 22
Finalization of conveyor componnet of pellet conveyor # TSJ for following conveyor ,
OC-3, HA 01 GL 22 , JH 01 GL 02, LT DRIVE OF HA 01 GL22, LT DRIVE OF JH 01 GL 02
LT drive calculation of reversible shuttle conveyor # TSJ, HA 01 GL22
LT drive calculation of reversible shuttle conveyor # TSJ, JH 01 GL 01
On leave
Preparation of revised Technical recommndation of Fuel rod mill to send to Procurement
E&I Concept Note
TS for Vibration Monitoring System
SCR offer evaluation (make-NHI China)
TS for Belt Rupture Switch
Drawing review of magnetic separator (Make-EMI)
Leave
Report generation of Site visit of Metal Karma regarding covered shed
Technical evaluation of Offers given my METSO for conveyor belt

Technical evaluation of Offers for FIX TRIPPER

Track hopper conveyor connectivity route finalization

Technical evaluation of Offers given by KALI BMH for FIX TRIPPER

Modification in concept note of DE system of coke and return fines


TS review of conveyor system for Battery-7 rebuilding
TS review for Vibrating screen, vibrating feeder for Battery-7 rebuilding
TS review for magnetic seperator, rack & pinion gate, sector gate etc. for Battery-7 rebuilding
Mid year review & H2 plan
Start Date Finish Date Compliance Remarks

10/16/2017 10/16/2017 Completed

10/16/2017 10/17/2017 Completed


10/16/2017 10/18/2017 Completed
Drawing yet to be received for
10/18/2017 10/18/2017 WIP review
10/20/2017 10/20/2017 Completed

10/16/2017 10/17/2017 WIP On emergency leave


(R1-27-10-17)
WIP
10/17/2017 10/20/2017 On emergency leave
(R1-27-10-17)
10/16/2017 10/17/2017 Completed

No assignment came from project


10/18/2017 10/18/2017 No job in this week. for this week.

10/19/2017 10/20/2017 Completed


10/16/2017 10/18/2017 Completed
WIP
10/16/2017 10/18/2017 (Mechanical part completed)
10/20/2017 10/20/2017
WIP
10/16/2017 10/19/2017 (R1-27-10-17)
10/18/2017 10/20/2017 Completed First cut prepared
Vendor will be available on 26-10-
10/19/2017 10/19/2017 Not started 17
10/18/2017 10/18/2017 Completed
10/18/2017 10/18/2017 Completed
In progress 10/18/2017 Completed
In progress 10/20/2017 WIP
Metso -Regreted,
In Progress 10/18/2017 WIP FLS will provide on 24th.
In Progress 10/20/2017 WIP
Started 10/24/2017 WIP
10/16/2017 10/17/2017 Completed

10/16/2017 10/20/2017 In Progress Will be completed by today

10/12/2017 10/13/2017 Completed


10/18/2017 10/18/2017 In Progress Will be completed by today
10/16/2017 10/23/2017
10/18/2017 10/18/2017 Completed
10/13/2017 10/20/2017 completed
10/13/2017 10/20/2017 completed
10/13/2017 10/20/2017 completed
10/13/2017 10/20/2017 Completed
10/13/2017 10/20/2017 completed
10/13/2017 10/20/2017
10/18/2017 10/20/2017 Under progress
10/16/2017 10/17/2017 completed

Regreted by the vendors because


10/17/2017 10/18/2017 they denied to supply only fix
tripper.
Track hopper replaced with hybrid
WIP
10/16/2017 10/20/2017 wagon tippler.Layout preparation
(R1-27-10-17) under progress

10/19/2017 10/20/2017 Party not submitted the ofer after


somany time of followup
In progress 10/20/2017 Completed
10/16/2019 10/17/2019 Completed
10/17/2019 10/17/2019 Completed
10/18/2019 10/18/2019 Completed
10/20/2019 10/20/2019 Completed
S.No Area Sub area Team Member

1 RMHS Calculation KUNDAN

2 RMHS Conveyor component finalization KUNDAN

3 RMHS Calculation KUNDAN

4 RMHS Survey Work Supriya

5 RMHS Pellet plant Supriya

6 RMHS 14 MTPA expansion Supriya

7 RMHS Misc Debabrata

8 RMHS TS Debabrata

9 RMHS TS Debabrata

10 RMHS Misc Debabrata

11 RMHS Leave Debabrata

12 RMHS Technical Specs Yogesh

13 RMHS TS Datasheet Yogesh


14 RMHS Vendor discussion Yogesh

15 RMHS MDL RAJA

16 RMHS Misc RAJA

17 RMHS TS RAJA

18 RMHS BF#2 RAJA

19 RMHS Misc RAJA

20 RMHS TS RV

21 RMHS TS RV

22 RMHS TS RV

23 RMHS Misc RV

24 RMHS TS RV

25 RMHS-KIM KIM RV

26 RMHS Misc Manoj

27 RMHS Misc Manoj


28 RMHS Misc Manoj

29 RMHS Misc Vikash Kumar

30 RMHS Calculation Vikash Kumar

31 RMHS Misc Vikash Kumar

32 RMHS conveyor Vikash Kumar

33 RMHS TS Sahendra

34 RMHS TS Shashikant

35 RMHS TS DJ

36 RMHS Technical Offer Sahendra/shashikant/DJ

37 RMHS DE System ANKUR

38 Saumen

39 Misc Misc Manoj

40 RMHS TS Datasheet Yogesh

41 RMHS BOQ Sahendra/shashikant


42 RMHS CN Sahendra/shashikant/DJ
Weekly Plan - RMHS Phase-2 Engg
Period: 9th Oct to 13th Oct 2017
Related to Activities Start Date

Conveyor augmention calculation of pellet conveyor # TSJ,


TSJ 10/10/2017
Shuttle conveyor JH 01 GL 02

Finalization of conveyor componnet of pellet conveyor # TSJ


for conveyors OC-1, OC-2, ORC-1, OC-4, HA01GL63,
TSJ 10/9/2017
HA01GL64, HA01GL65, HA01GL11, HA01GL12, HA01GL23,
JUO1GL12, JU01GL13

Conveyor augmention calculation of pellet conveyor # TSJ,


TSJ 10/12/2017
yard conveyor OC-3 and SCR-1

Preparation of SR for survey work of conveyor route for


TSJ 10/9/2017
SP1/2, Battery 10/11 and Dry slag & granshot transportation

TSJ Checking of conveyor calculation for Assignment-2 10/10/2017

Preparation block flow diagram of RMY & RMBB conveyor


TSJ 10/12/2017
connectivity

TSK Re-Standardization of Pulley to Reduce types 10/9/2017

TSK Re-Standardization of Belts to Reduce types 10/13/2017

TSK Meeting with Ringfeeder Vendor 10/12/2017

TSK Discussion related to Conveyor drawing cheking at Kolkata 10/12/2017

TSK Leave for Health cheak-up 10/11/2017

TSK Final TS of Rod& RP Gates to sent to prcurement for RFQ. 10/9/2017

Preparation of detail datasheet for Fuel belt feeder to sent to


TSK 10/10/2017
TGS
Preparation datasheet of HS coupling to sent to Voith turbo
TSK 10/11/2017
for enquiry.

Updating MDL & Dashboard


TSK (Considering increase in Technical Specifications of Electrical 10/9/2017
team because of splitting in to small packages)

Preparation of Draftsman engangement plan for next 3


TSK 10/10/2017
months

TSK Standardization of Pulleys to reduce no of types 10/10/2017

TSK Review of BF#2 GA drawing (Conveyors CFC-2 & CFC-3) 10/12/2017

TSK Preparation of weekly PPT for GM review 10/13/2017

TSK Technical Evaluation of Metal Detector 10/9/2017

TSK Preparation of Control Philoshiphy of Coal Circuit 10/9/2017

TSK Technical Evaluation of Semi Portal scraper In Progress

TSK Overall Checking of coal Ckt with all respect Started

TSK TS preparation of suspended magnet Started

KIM Study on C&W and water utility system of KIM

TSK BED preparation for Return fines circuit 10/9/2017

TSK Meeting with Ringfeeder Vendor 10/12/2017


Discussion with Kolkata utility team regarding TR for modular
TSK 10/12/2017
bag filter

TSK Sending commented offer to metso for technical discussion 10/12/2017

Report on different options explored for interchangeability


TSK 10/9/2017
of WT-1 and 2 .

conveyor connectivity checking of CC-1A from CO-9


TSK 10/9/2017
conveyor

TSK GA drawing preparation of CO-30,FX-1 and OF-1 10/10/2017

Technical specification for Isolator panel for Lighting


TSK 10/9/2017
transformer and electrical hoist

TSK Technical specification for SLDB 10/9/2017

TSK Technical specification for ZSS 10/9/2017

TSK Technical Offer evaluation for E&I part of SCR(Metso) 10/9/2017

Modification in concept note of DE system of coke and


TSK 10/9/2017
return fines

LTC leave 10/9/2017

TSK Attended seminar on smart simplicity at JSR 10/10/2017

TSK Technical evaluation of cemtec revised offer 10/10/2017

TSK E&I BOQ preparation for cost estimation of COBP 10/9/2017


TSK E&I Concept Note
Finish Date Compliance Remarks

10/11/2017 Completed

10/12/2017 Completed

10/13/2017 WIP Will be completed by today evening

10/9/2017 Completed Technical offer recd on 12/10/17. Preparation of SR completed on 13/10/17

10/11/2017 WIP Review of calculation under progress. Calculation tool has been updated fo

10/13/2017 Not started This job will start after finalisation of SP-5 location.

10/10/2017 Completed

10/13/2017 Completed

10/12/2017 Completed

10/12/2017 Completed

10/11/2017 info

10/10/2017 Completed

10/11/2017 Completed
10/12/2017 Completed

10/9/2017 Completed

10/10/2017 Completed

10/11/2017 Completed

10/12/2017 Not started Drawing not received yet

10/13/2017 Completed

10/13/2017 Under Progress

10/20/2017 Under Progress

10/11/2017 Completed Comments send to NHI & Tenova Tekraf , Still Offer yet to receive

10/10/2017 In Progress

10/18/2017 In Progress

In Progress New job

10/11/2017 First cut prepared

10/12/2017 Completed
10/12/2017 Completed

10/12/2017 Completed By evening will send to metso

10/11/2017 Completed

10/10/2017 Completed

10/13/2017 Inprogress Will be completed by 18-oct.worked on layout and profile of CC-1A ,CC-2A,3

10/13/2017 Completed

10/13/2017 Completed

10/13/2017 Completed

10/13/2017 Completed

10/13/2017 In progress

10/13/2017

10/10/2017 Completed

10/13/2017 Completed

10/13/2017 WIP Sahendra & Shashikant were on CB


10/13/2017 Review Under Progress
on of SR completed on 13/10/17.

ation tool has been updated for including flat belt conv calculation. Review of calculation will be continued to next week.
ll Offer yet to receive
ut and profile of CC-1A ,CC-2A,3A and 4A conveyor.
d to next week.
S.No Area Sub area Team Member

1 RMHS Calculation KUNDAN

2 RMHS Conveyor Saumen

3 RMHS TS Saumen

4 RMHS Misc Saumen

5 RMHS Misc Debabrata

6 RMHS TS Debabrata

7 RMHS Stockyard equipment Vikash Kumar

8 RMHS Stockyard equipment Vikash Kumar

9 RMHS Technical Evaluation Yogesh

10 RMHS TS Datasheet Yogesh

11 RMHS Vendor discussion Yogesh

12 RMHS Technical Recommendation Yogesh

13 RMHS Pulley RAJA

14 RMHS TS RAJA

15 RMHS TS RAJA

16 RMHS Misc RAJA

17 RMHS TS RV

18 RMHS TS RV

19 RMHS TS RV

20 RMHS TS RV

21 RMHS Misc RV
22 RMHS MDL Sameer

23 RMHS MDL Sameer

24 RMHS MDL Sameer

25 RMHS TS Manoj

26 RMHS TS Manoj

27 RMHS Misc Vikash Kumar

28 RMHS Calculation Vikash Kumar

29 RMHS BOQ Sahendra/shashikant

30 RMHS Tech Offer Sahendra/shashikant/DJ

31 RMHS TS Sahendra

32 RMHS TS Shashikant

33 RMHS BED DJ

34 RMHS TS DJ

35 RMHS TS Shashikant
36 RMHS TSJ 14MTPA Expansion Supriya

37 RMHS Training Supriya

Dry Slag Wagon Loading


38 RMHS Supriya
System
Weekly Plan - RMHS Phase-2 Engg
Period: 3rd Oct to 6th Oct 2017
Related to Activities Start Date

Conveyor augmentation calculation of pellet plant conveyor


TSJ (TSJ # pellet plant) HA 01 GL 23, 10/3/2017
JU O1 GL 12, JU 01 GL 13, HN 01 GL 51

TSJ Conveyor Profiles checking for SP1 & SP2 connectivity 10/3/2017

TSJ TS review for equipment package for SP1 & SP2 connectivity 10/4/2017

SR preparation for site survey work (Battery 10/11 & Battery


TSJ 10/5/2017
5/6/7 connectivity)

TSK Standardization of Pulley types & Summary preparation 10/3/2017

TSK Release of TS of Pulley for RFQ 10/6/2017

TSK Sending commented offer to Elecon for technical discussion 10/4/2017

TSK Comment on Metso offer of stacker reclaimer 10/3/2017

TSJ Revision of datasheets for Gates. 10/3/2017

TSK Preparation of technical datasheet for cemtec rod mill offer 10/3/2017

TSK Preparation of revised datasheet of HS coupling 10/4/2017

Preparation of draft Technical recommndation of Fuel rod


TSK 10/3/2017
mill to send to approval

TSK Standardization of Pulley types & Summary 10/4/2017

TSK Release of TS of Wagon Tippler for RFQ 10/4/2017

TSK Release of TS of Pulley for RFQ 10/4/2017

TSK Preparation of weekly PPT for GM review 10/6/2017

TSK Technical Evaluation of Travelling tripper 10/3/2017

TSK Technical Evaluation of External scraper 10/3/2017

TSK Technical Evaluation of Internal scraper 10/3/2017

TSK Technical Evaluation of Semi Portal scraper 10/3/2017

TSK Overall Checking of coal Ckt with all respect Started


TSK Technical evaluation of Offers for conveyor belt 10/3/2017

TSK Technical evaluation of Offers for Idlers 10/3/2017

TSK Release of TS for RFQ for fixed tripper 10/3/2017

TSK Release of TS for RFQ of skirt board 10/4/2017

TSK BED preparation for Fuel Ciruit and Return fines circuit In progress

TSK Assignment drawing of JH-2C and JH-2D 10/3/2017

TSK Trajectory calculation of CO-17 A ,17B ,CO-29,32 and POC-1 10/3/2017

TSK E&I BOQ preparation for cost estimation of COBP 10/3/2017

TSK Technical offer evaluation of stacker from ELECON 10/3/2017

Technical specification for Isolator panel for Lighting


TSK 10/3/2017
transformer and electrical hoist

TSK Technical specification for SLDB 10/3/2017

TSK BED for E&I of RMHS 10/3/2017

TSK Technical specification for Hooter 10/3/2017

TSK Technical specification of Fixed Tripper for E&I PART 10/3/2017


TSJ SP-5 location comparison 10/3/2017
Effective decision making (Learning program DM_PL3)
Training 10/5/2017
organised by TMDC

Preparation of Equipment list & conveyor configuration for


TSJ 10/6/2017
Dry slag Wagon Loading System.
Finish Date Compliance Remarks

10/6/2017 Completed

10/4/2017 completed

10/6/2017 completed

10/6/2017 WIP Will be completed by 10-10-17

10/5/2017 Completed

Re-standardization in progress for


10/6/2017 WIP reducing no. of types

10/4/2017 Completed
From mechanical side its completed
10/3/2017 Completed ,electrical comments to be
incorporated
CO-27 conveyor GA drawing
10/4/2017 Inprogress underprogress will be completed by 7-
oct
10/5/2017 Completed

10/5/2017 Completed

10/6/2017 In Progress Cemtec will send revised offer by


10/10/2017
Chief Engg advised to reduce the no of
10/5/2017 Completed types.
TS Prepared. Review by Layout
10/4/2017 team in progress.
WIP. (Reducing No of types in
10/6/2017 progress)

10/6/2017 Completed

10/6/2017 Completed

10/6/2017 Completed

10/6/2017 Completed

10/6/2017 In Progress Offer yet to receive

10/10/2017 In Progress
10/6/2017 Completed 3 More offers awaited

10/6/2017 Completed 1 more offer awaited

10/6/2017 Completed

10/6/2017 Completed

First cut completed for fuel


10/6/2017 ckt.
CO-27 conveyor GA drawing
10/6/2017 WIP underprogress will be completed by 7-
oct

10/4/2017 Completed

10/6/2017 WIP

10/6/2017 Completed

10/6/2017 50% Completed

10/6/2017 50% Completed


As per CN,E&I is
10/6/2017 WIP completed,Mechanical and Utility BED
Inputs required
10/6/2017 Completed Review Under Progress

10/6/2017 Completed
10/4/2017 Completed

10/5/2017 Completed

Major eqpt list prepared. Conveyor


configuration will be prepared during
10/6/2017 WIP 1st week of November after
completion of survey work (survey
work to be completed by Oct-16)
S.No Area Sub area Team Member Related to

1 RMHS TS Sahendra TSK

2 RMHS DRWG Sahendra/shashi TSK

3 RMHS TS Shashikant TSK

4 RMHS BED DJ TSK

5 RMHS Tech Offer DJ TSK

6 RMHS Report DJ TSK

7 RMHS Tech Offer Shashikant TSK

8 RMHS Calculation KUNDAN TSJ

9 RMHS Misc Debabrata TSK

10 RMHS TS Debabrata TSK

11 RMHS TS Debabrata TSK

12 RMHS TS Debabrata TSK

13 RMHS Stockyard equipment Vikash Kumar TSK

14 RMHS Stockyard equipment Vikash Kumar TSK

15 DE SYSTEM Stockyard equipment ANKUR TSK

16 DE SYSTEM DE System ANKUR TSK

17 RMHS Conveyor Saumen TSJ

18 RMHS Leave Saumen

19 RMHS Leave Supriya

20 RMHS Leave Supriya

21 RMHS Technical Evaluation Yogesh TSJ

22 RMHS TS Datasheet Yogesh TSK

23 RMHS Vendor discussion Yogesh TSK

24 RMHS Technical Recommendation Yogesh TSK

25 RMHS TS RAJA TSK


26 RMHS Calculation RAJA TSK

27 RMHS TS RAJA TSK

28 TS RAJA TSK

29 RMHS Misc RAJA TSK

30 RMHS PID RV TSK

31 RMHS TS RV TSK

32 RMHS Misc RV TSK

33 RMHS Misc RV TSK

34 Utility MDL Himanshu TSK

35 RMHS MDL Sameer TSK

36 RMHS MDL Sameer TSK

37 RMHS MDL Sameer TSK

38 RMHS TS Manoj TSK

39 RMHS TS Manoj TSK

40 RMHS Misc Manoj TSK

41 RMHS Stockyard equipment Vikash Kumar TSK

42 RMHS Calculation Vikash Kumar TSK

43 RMHS Leave Vikash Kumar TSK


Weekly Plan - RMHS Phase-2 Engg
Period: 25th Sept to 29th Sept 2017
Activities Start Date

TS of lighting transformer 9/25/2017

Technical offer evaluation of stacker from TKIL 9/25/2017

TS of PJB,Tap off JB 9/25/2017

BED for E&I of RMHS 9/25/2017

Technical offer evaluation of Stacker from L&T 9/25/2017

Report preparation for Energy Chain System 9/25/2017

Offer evaluation of Modular type bag filter fan 9/25/2017


Conveyor augmentation calculation of pellet plant conveyor (TSJ # pellet 9/25/2017
plant). OC-03, ORC-01,HA 01 GL 63,HA 01 GL 64, HA 01 GL 65.
Detail calculation of Pulley & preparation of data sheet for O & F,Sinter Return 9/25/2017
fines,Coke,Slag Circuits
Release of TS of Pulley 9/27/2017

Review of TS of Skirt Board 9/28/2017

Checking of TS of Rod gate and Rack and Pinion gate 9/29/2017


Preparation of report on drag chain alternative of PCRD in travelling 9/25/2017
equipment
Sending commented offer to Thyssenkrupp for technical discussion 9/26/2017

Modification in PFD of coke circuit DE system, concept note & BED 9/25/2017

Study : Bag filter design review 9/25/2017

Preparation of input for 14 MTPA expansion for MHS 9/25/2017

Puja Holiday 9/27/2017

Leave 9/25/2017

Puja Holidays 9/27/2017

Technical evaluation of Offers for Cemtec& Mcnally Rod Mill. 9/26/2017

Preparation of complete equpt list for Fuel ckt 9/28/2017

Technical discussion with M/s Cemtec for Rod mill 9/25/2017


Preparation of Final Technical recommndation of 2nd Barrel Reclaimer to be 9/21/2017
sent to procurement department.
Preparation of Summary of Pulley types 9/25/2017
Detail calculation of Pulley & preparation of data sheet for Coal & Pellet 9/27/2017
Circuits
Release of TS of Pulley for RFQ 9/28/2017

Release of TS of Wagon Tippler for RFQ 9/27/2017

Preparation of weekly PPT for GM review 9/29/2017

Technical evaluation of Offers for Metal Detector 9/25/2017

Release of TS for RFQ for Bin Vibrator 9/25/2017

Overall Checking of coal Ckt with all respect Started

Preparation of Operation Philosophy of ORE & FLUX Circuit. Started

Revision of CN of RMHS water system. In Pogress

Technical evaluation of Offers for conveyor belt 9/25/2017

Technical evaluation of Offers for Idlers 9/27/2017

Release of TS for RFQ for fixed tripper In progress

Release of TS for RFQ of skirt board 9/27/2017

BED preparation for Fuel Ciruit and Return fines circuit 9/25/2017

Preparation of schedule of Openings for Rod and Rack & pinion gates 9/26/2017

Comment on Metso offer of stacker reclaimer 9/28/2017

Trajectory calculation of CO-27,28 and CO-17 C 9/26/2017

Leave 9/29/2017
Finish Date Compliance Remarks

9/29/2017 completed

9/29/2017 completed

9/29/2017 completed

9/29/2017 WIP 50% completed

9/29/2017 completed

9/29/2017 completed

9/29/2017 completed

9/29/2017 Completed

9/26/2017 WIP (Shaft dia completed, Standardization in Progress)

9/28/2017 WIP Detail Pulley calculation in Progress

9/28/2017 Completed

9/29/2017 Completed

9/25/2017 Completed

9/27/2017 Completed

9/29/2017 Completed

9/29/2017 Completed

9/26/2017 WIP 50% completed

9/29/2017

9/26/2017

9/29/2017

9/29/2017 Completed

9/29/2017 Completed

9/26/2017 Completed

9/25/2017 Completed

9/26/2017 WIP (60% Completed) Hold Down Pulley & Deflector Pulley Calculation delayed.
9/28/2017 Completed

9/29/2017 WIP Preparation of data sheet is in Progress.

9/29/2017 WIP Under review.

9/29/2017 Completed

9/27/2017 Complete

9/27/2017 Complete

10/10/2017 In Progress

9/29/2017 Complete

9/29/2017 WIP 50% Completed

9/26/2017 WIP Some more offers awaited

9/28/2017 WIP 60% completed

9/28/2017 WIP Electrical comments awaited

9/29/2017 WIP TS submitted for review

9/29/2017 WIP 50% Completed

10/27/2017 Completed

9/28/2017 WIP (75% completed)

9/26/2017 Completed

9/29/2017
Weekly Plan
Perio
S.No Area Sub area Team Member Related to
1 RMHS TR Shashikant/DJ/Sahendra TSK

2 RMHS TS Sahendra TSK

3 RMHS DRWG Sahendra/shashi TSK

4 RMHS TS Shashikant TSK

5 RMHS TS Shashikant TSK

6 RMHS Tech Offer Shashikant/DJ/Sahendra TSK

7 RMHS BED DJ TSK

8 RMHS Tech Offer DJ TSK

9 RMHS Calculation KUNDAN TSJ

10 RMHS Misc Debabrata TSK

11 RMHS Misc Debabrata TSK

12 RMHS Misc Debabrata TSK

13 RMHS TS Debabrata TSK

14 RMHS TS Debabrata TSK

15 RMHS Basic engineering Vikash Kumar TSK

16 RMHS Stockyard equipment Vikash Kumar TSK

DE
17 DE System ANKUR TSK
SYSTEM

18 RMHS SP1 & SP2 connectivity Saumen TSJ

Batt-10/11 & Batt-5/6/7


19 RMHS Saumen TSJ
connectivity
Batt-10/11 & Batt-5/6/7
20 RMHS Saumen TSJ
connectivity
Batt-10/11 & Batt-5/6/7
21 RMHS Saumen TSJ
connectivity
Batt-10/11 & Batt-5/6/7
22 RMHS Saumen TSJ
connectivity

23 RMHS TSJ Supriya TSJ

24 RMHS Supriya

25 RMHS TSJ Supriya Pellet plant

26 RMHS TS Datasheet Yogesh TSK

27 RMHS Layout Yogesh TSJ


28 RMHS Technical Evaluation Yogesh TSK

29 RMHS Vendor discussion Yogesh TSK

30 RMHS Technical Evaluation Yogesh TSK

31 RMHS Calculation RAJA TSK

32 RMHS Calculation RAJA TSK

33 RMHS GA RAJA TSK

34 Presentation RAJA TSK

35 RMHS PID RV TSK

36 RMHS TS RV TSK

37 RMHS Misc RV TSK

38 RMHS Misc RV TSK

39 Utility MDL Himanshu TSK


40 Utility MDL Himanshu TSK

41 RMHS MDL Sameer TSK

42 RMHS MDL Sameer TSK

43 RMHS MDL Sameer TSK


44 RMHS MDL Manoj TSK
45 RMHS MDL Manoj TSK
46 RMHS Stockyard equipment Vikash Kumar TSK

47 RMHS MDL Manoj TSK

DE
48 DE System ANKUR TSK
SYSTEM

49 RMHS Plant Visit DJ TSK


Weekly Plan - RMHS Phase-2 Engg
Period: 18th Sept to 22nd Sept 2017
Activities Start Date Finish Date
Technical offer evaluation of Barrel Reclaimer from 9/18/2017 9/22/2017
TENOVA
TS of lighting transformer 9/18/2017 9/22/2017

Technical offer evaluation of stacker from TKIL 9/18/2017 9/22/2017

TS of PJB,Tap off JB 9/18/2017 9/22/2017


Procurement specification for erection of electrics 9/18/2017 9/22/2017
and cable supply for FRM

Technical offer evaluation of Stacker from Flsmidth 9/18/2017 9/22/2017

BED for E&I of RMHS 9/18/2017 9/22/2017

Technical offer evaluation of Stacker from L&T 9/18/2017 9/22/2017

Conveyor augmentation calculation of pellet plant


conveyor (TSJ # pellet plant).OC-04, OC-01, OC-02, 9/18/2017 9/22/2017
OC-03, ORC-01.

Trajectory preparation for Preliminary chute design 9/18/2017 9/19/2017

Pulley Shaft dia calculation for Coke, Sinter, Return 9/19/2017 9/21/2017
fines, Slag circuit as per revised parameter.

Head / Tail Pulley frame design for Priority 1 9/18/2017 9/20/2017


conveyrs.
Checking of TS for Bin Vibrator 9/21/2017 9/22/2017

Checking of TS for Gates 9/22/2017 9/22/2017

Preparation of Floor plan of JH-21 junction house of 9/20/2017 9/22/2017


O & F circuit

Checking and comments on Elecon technical 9/20/2017 9/20/2017


offer

Modification in PFD of coke circuit DE system, 9/18/2017 9/22/2017


concept note & BED

Review of technical specification for conveyor & 9/18/2017 9/19/2017


related equipment

Site visit at TSJ 9/20/2017 9/20/2017


New Circuit Layout 9/21/2017 9/22/2017

Flow Diagram 9/21/2017 9/22/2017

Conveyor profile 9/21/2017 9/22/2017

Preparation of input for MHS flow diagram of TSJ 14 9/18/2017 9/20/2017


MTPA expansion
Festival leave 9/19/2017 9/19/2017
Preparation of pulley schdule for pellet plant 9/21/2017 9/22/2017
upgradation Project.

Technical Specs preparation for Diverter Gates. 9/19/2017 9/21/2017

preparation of Conveyor layout dwgs for TSJ 9/19/2017 9/20/2017


Technical presentation of Voith turbo 9/20/2017 9/20/2017
Site discussion with M/s SMB for D&E for stockyard 9/21/2017 9/22/2017
equipments
Study& Preparation of comparision parameters sheet 9/21/2017 9/25/2017
for Tenova & TKIL Barrel reclaimer offer
Revised calculation of Pulley Shaft dia because of
change in design basis of angular deflection limits - 9/18/2017 9/22/2017
Coal Circuit

Revised calculation of Pulley Shaft dia because of


change in design basis of angular deflection limits - 9/18/2017 9/22/2017
Pellet Circuit
Review of BF#2 deliverables. Revised conveyor GA 9/18/2017 9/22/2017
drawings 2 nos
Preparation of weekly update PPT for GM 9/18/2017 9/22/2017
Preparation of Operation Philosophy of ORE & FLUX Started 9/20/2017
Circuit.
Preparation of Comparision sheet for External 9/18/2017 9/20/2017
scraper
Overall Checking of coal Ckt with all respect Started on going
Preparation of Comparision sheet for Semi Portal Started on going
scraper
Revision of CN of Fire water system. In Pogress 9/14/2017
Revision of CN of RMHS water system. In Pogress 9/14/2017

RFQ of Manual Hoist 9/18/2017 9/22/2017

RFQ of Electrical Hoist 9/18/2017 9/22/2017

RFQ for fixed tripper 9/18/2017 9/22/2017


Preparation of Schedule of Skirt Board 9/18/2017 9/19/2017
BED preparation for Fuel Ciruit 9/20/2017 9/22/2017
Visit to Sagar dighi power plat for IGUS make drag 9/18/2017 9/19/2017
chain(Replacement of PCRD)

Evaluation of concept note of De-dusting system 9/21/2017 9/22/2017

Review of revised offers from Donaldson and PCE 9/21/2017 9/22/2017

Plant visit to West Bengal Thermal power plant at 9/18/2017 9/19/2017


Sagardighi
Compliance Remarks
Completed

WIP
Enganged in other work for cable route
survey of Fire detection building &
WIP drawing generation for the same and
preparation of TR for Barrel reclaimer
WIP Leave
Completed

Completed

WIP ON CB

WIP
ON CB

OC-3 and ORC-01 in


progress.Others completed

Completed

Completed

Completed

Completed

Gate opening calculation in


WIP progress,Completion date-29/09/17

Preparation of Junction house 2E in


Not started progress

Completed from mechanical Electrical comments awaited


site

WIP
4 out of 7 PFDs prepared
Prepared survey requirement drawings
Deffered due to other for B-10/11 & B-5/6/7 connectivity
assignment as per superior project and SP-1 & SP-2 connectivity
advice project

Completed
Layout prepared based on site
visit

Completed

Completed

WIP

Completed

Chute opening will be completed


WIP.(Gate opening awaited) during detail engg.
Completed
Completed

Completed

Completed

Completed

Completed

Completed

Completed

WIP Under elect. Review

Completed

WIP
Offer yet to be received from
WIP Schade,FLS & METSO

WIP

Final weight of pulley awaited due to


WIP modification of shaft dia.

Final weight of pulley awaited due to


WIP modification of shaft dia.
WIP Electrical comments awaited
WIP RFQ release date 28/09/17
WIP
Completed Report will be submitted by 27/09/17

Comments will be sent to utility team


Completed on 25/09/17

Completed

completed
Weekly Plan Compliance - RMHS Pha
Period: 11th Sept to 15t
S.No Area Sub area Team Member Related to
1 RMHS TS Datasheet Yogesh TSK
2 RMHS TS Datasheet Yogesh TSK
Technical
3 RMHS Yogesh TSK
Evaluation
Vendor
4 RMHS Yogesh TSK
discussion
Technical
5 RMHS Yogesh TSK
Evaluation

6 RMHS PID RV TSK

7 RMHS TS RV TSK
8 RMHS Misc RV TSK
9 RMHS Misc RV TSK

10 RMHS Misc RV TSK

11 RMHS Misc RV TSK

12 RMHS Manoj Sahoo TSK


13 RMHS Raja TSK
DE
14 DE System ANKUR TSK
SYSTEM
DE
15 DE System ANKUR TSK
SYSTEM
Dry slag
16 RMHS TSJ Supriya loading

17 RMHS TSJ Supriya Pellet plant

18 RMHS Misc Debabrata TSK

19 RMHS Misc Debabrata TSK

20 RMHS Misc Debabrata TSK

21 RMHS TS Debabrata TSK

22 RMHS TS Debabrata TSK


23 RMHS TS Debabrata TSK

Basic
24 RMHS engineering Vikash Kumar TSK
Stockyard
25 RMHS equipment Vikash Kumar TSK

Stockyard
26 RMHS equipment Vikash Kumar TSK

27 RMHS Presentation Vikash Kumar TSK

28 Utility MDL Himanshu TSK

29 Utility MDL Himanshu TSK

Shashikant/DJ/Sa
30 RMHS TR TSK
hendra
31 RMHS TS Sahendra TSK

32 RMHS DRWG Sahendra/DJ TSK

33 RMHS TS Shashikant TSK

34 RMHS TS Shashikant TSK

Shashikant/DJ/Sa
35 RMHS Tech Offer TSK
hendra
36 RMHS BED DJ TSK

37 RMHS GA Soumen TSJ

38 RMHS Calculation Soumen TSJ

39 RMHS MDL Sameer TSK

40 RMHS MDL Sameer TSK

41 RMHS MDL Sameer TSK


Weekly Plan Compliance - RMHS Phase-2 Engg
Period: 11th Sept to 15th Sept 2017
Activities Start Date Finish Date
Technical Specs preparation for Rod gates& RPG's. 11 September 2017 14 September 2017
Datasheet preparation for Sector & Prism gates. 14 September 2017 15 September 2017

Site discussion on technical offer with TKIL for Barrel reclaimer 13 September 2017 14 September 2017

Site discussion with M/s SMB for D&E for stockyard 11 September 2017 12 September 2017
equipments
Study& Preparation of technical parameters sheet for Tenova 15 September 2017 19 September 2017
Takraf Barrel reclaimer offer

Preparation of Operation Philosophy of ORE & FLUX Circuit. Started 15 September 2017

Comparision sheet for Travelling Tripper 11 September 2017 14 September 2017


Overall Checking of coal Ckt with all respect Started on going
Comparision sheet for Internal scraper Started
Technical Discussion with Thyssen Krupp for Travelling tripper 13 September 2017 13 September 2017
& Semi portal scraper
Attended presentation on scrapers and other sealing 13 September 2017 13 September 2017
component by M/s Tega.
On leave (LTC)
On leave (LTC)

Study of documents related to LF DE system 11 September 2017 15 September 2017

Modification in PFD of coke circuit DE system 11 September 2017 15 September 2017

RMHS Concept note for Dry slag loading 11 September 2017 13 September 2017

Preparation of sketch for pellet plant upgradation Project. 14 September 2017 15 September 2017

Trajectory calculation for chutes of return fines circuit 11 September 2017 15 September 2017

Checking of GA of CK-45 11 September 2017 15 September 2017

Pulley Shaft dia calculation with revised DBR 11 September 2017 15 September 2017

Pulley frame design and Chute profile design checking 11 September 2017 15 September 2017

Checking of TS for Bin Vibrator 11 September 2017 15 September 2017


Checking of TS for Fixed tripper 11 September 2017 15 September 2017

Preparation of Floor plan of PJ-2 ,JH-6 junction house of O & F 9/11/2017 9/13/2017
circuit
Checking and comments on TKII technical offer 9/11/2017 9/15/2017

Checking and comments on Elecon technical offer 9/11/2017 9/15/2017

Coordination and attending presention on clean, safe,


and uninterrupted conveying system, spillage 9/13/2017 9/13/2017
control,skirt sealing ,internal and exernal scrapper by
tega indstries

Revision of CN of Fire water system. In Pogress 14 September 2017

Revision of CN of RMHS water system. In Pogress 14 September 2017

Technical offer evaluation of FRM-3 from TENOVA 11 September 2017 15 September 2017

TS of lighting transformer 11 September 2017 15 September 2017


Scketch drawing for cable routing between fire fighting bldg & 11 September 2017 15 September 2017
MSDs bldg
TS of PJB,Tap off JB 11 September 2017 15 September 2017
Procurement specification for erection of electrics and cable 11 September 2017 15 September 2017
supply for FRM

Technical offer evaluation of Stacker from Flsmidth 11 September 2017 15 September 2017

BED for E&I of RMHS 11 September 2017 15 September 2017


Preparation of Mech GA for Transfer House 1 & 2, CC-08A
11 September 2017 13 September 2017
(HMC)
Preparation of Conv Calculation, Load List for upgradation of 14 September 2017 15 September 2017
Coke Conveyors KC-1, KC-3

RFQ of Manual Hoist 13 September 2017 14 September 2017

RFQ of Electrical Hoist 13 September 2017 14 September 2017

RFQ for fixed tripper 15 September 2017 16 September 2017


Compliance Remarks
Completed
In progress

Completed

Not completed

In progress

Under Progress

Completed
Under Progress
Completed

Completed

Completed

Complete

WIP

Concept layout prepared &


circulated for review.

Draft completed

Calculation Completed,
Projectile to be drawn in Acad
by Draftsman.
Completed
Completed for Ore and Flux
Circuit
Design Philosophy discussed
at Kolkata. To be prepared
along with GA.
Not received for checking
Completed

Completed
Completed

Will be
completed
Inprogress completed by
20-sep

completed

Sent to Kolkata
team for
Completed comments/approv
al

Completion Date:
WIP 22/09/2017

WIP

WIP

Completed

WIP Leave ( shahsi)

WIP Leave ( shahsi)

WIP Leave ( shahsi)

WIP

Complete

Complete

Pulley calculation
WIP under process.

Pulley calculation
WIP under process.

WIP
S.No Area Sub area Team Member Related to
1 RMHS TS Datasheet Yogesh TSK
2 RMHS TS Datasheet Yogesh TSK
3 RMHS TS Yogesh TSK
Technical
4 RMHS Yogesh TSK
Evaluation
Technical
5 RMHS Yogesh TSK
Evaluation
6 RMHS PID RV TSK
7 RMHS TS RV TSK
8 RMHS Misc RV TSK
9 RMHS Misc RV TSK
10 RMHS TS Manoj TSK
11 RMHS BED Manoj TSK
12 RMHS TS Manoj TSK

13 RMHS Misc Manoj TSK

14 RMHS MDL Sameer TSK

15 RMHS MDL Sameer TSK


16 RMHS MDL Sameer TSK
DE
17 DE System ANKUR TSK
SYSTEM
18 RMHS TSJ Supriya Coke Circuit

19 RMHS TSJ Supriya Pellet plant

20 RMHS TSJ Supriya Pellet plant


Dry Slag
21 RMHS TSJ Supriya loading
22 RMHS Misc Debabrata TSK
23 RMHS Misc Debabrata TSK
24 RMHS Misc Debabrata TSK
25 RMHS TS Debabrata TSK

26 RMHS TS Debabrata TSK

27 RMHS TS Debabrata TSK

Detail
28 RMHS Vikash Kumar TSK
engineering

29 RMHS Technical specs Vikash Kumar TSK


Stockyard
30 RMHS equipment Vikash Kumar TSK

31 RMHS Soumen
32 RMHS Raja Sirigineni
33 Utility Himanshu TSK
34 Utility Himanshu TSK
35 RMHS TR Sahendra TSK
36 RMHS TS Sahendra TSK

37 RMHS TS Sahendra TSK

38 RMHS TR Shashikant TSK

39 RMHS TS Shashikant TSK

40 RMHS Cable routeShashikant/DJ/Sahendra TSK


42 RMHS TS DJ TSK
Weekly Plan - RMHS Phase-2 Engg
Period: 4th Sept to 8th Sept 2017
Activities Start Date
Datasheet preparation for Rod gates& RPG's. 04 September 2017
Datasheet preparation for Flap gates. 04 September 2017
Site discussion on technical offer with TKIL for Barrel reclaimer 07 September 2017
Comments and queries on technical data sheet for Mcnally sayaji rod mill 05 September 2017
revised offer (Including electrical)

Evaluation of technical data sheet for NHI china Barrel offer 04 September 2017

Preparation of Operation Philosophy of ORE & FLUX Circuit. Started


Comparision sheet for Internal scraper 04 September 2017
Overall Checking of coal Ckt with all respect 04 September 2017
Study and report preparation on Dust and environmental issues Started
Study and report preparation on Dust and environmental issues 04 September 2017
Preparation of Basic Engineering Document of Fuel circuit 04 September 2017
Preparation of schedule for skirt board 04 September 2017

Preparation of shutdown category list for Phase-2 expansion of RMHS 05 September 2017

RFQ of Manual Hoist 04 September 2017

RFQ of Electrical Hoist 04 September 2017


Preparation of TS for fixed tripper 04 September 2017

Study of documents related to LF DE system 04 September 2017

Review HMC circuit GA & assignment drgs 04 September 2017


Rationalization of conveyor components and release final
recommendations. 04 September 2017

Preparation of sketch for pellet plant upgradation Project. 07 September 2017

Site visit & review proposed conveyor route & new wagon loading station 07 September 2017

Trajectory calculation for chutes of return fines circuit 04 September 2017


Coasting time calculation for Ore & flux Circuit 04 September 2017
Manual Hoist and Electrical hoist Capacity Finalisation 04 September 2017
Checking of Final TS for RCTBF 04 September 2017

Checking of TS for Bin Vibrator 04 September 2017

Checking of TS for Fixed tripper 04 September 2017

Preparation of Floor plan of PJ-1 junction house of O & F circuit 04 September 2017

Revision In TS of Auto sampler and send to procurement for RFQ 04 September 2017
Checking and comments on FLS technical offer 04 September 2017

On Leave
On Leave
Revision of CN of Fire water system. 04 September 2017
Revision of CN of RMHS water system. 04 September 2017
Technical offer evaluation of FRM-3. 04 September 2017
TS of E&I of wagon tippler 04 September 2017

04 September 2017
Cable route servey for connecting fire fighting building with MSDS BF
TS of Bin Vibrator 04 September 2017
Procurement specification for erection of electrics and cable supply for 04 September 2017
FRM
cable route servey for fuel ckt 04 September 2017
Incorporation of comments of P&ID 04 September 2017
Phase-2 Engg
Sept to 8th Sept 2017
Finish Date Compliance
07 September 2017 Completed
07 September 2017 Completed
08 September 2017 Not Completed

06 September 2017 Completed

07 September 2017 Completed

08 September 2017 under Progress


07 September 2017 Prepared
on going
08 September 2017 Prepared
07 September 2017 Completed
07 September 2017 Not started
07 September 2017 WIP

07 September 2017 Completed

08 September 2017 UNDER PROGRESS

08 September 2017 UNDER PROGRESS


08 September 2017 100%

08 September 2017 WIP

08 September 2017 WIP

06 September 2017 Completed

08 September 2017 Deferred

07 September 2017 Completed

08 September 2017 WIP


08 September 2017 Completed
08 September 2017 Completed
08 September 2017 Completed

08 September 2017 Not received for checking

08 September 2017 Not received for checking

08 September 2017 Completed

08 September 2017 Inprogress


08 September 2017 Completed

08 September 2017 WIP


08 September 2017 WIP
08 September 2017 completed
08 September 2017 TS made and under review

08 September 2017 Completed

08 September 2017 Completed

08 September 2017 WIP

08 September 2017 Completed


08 September 2017
Remarks

TKIL revised visit date 13/09/2017 R1

Sent to vendor

05/09/2017 R1

DUE TO RECALCULATION OF PULLEY SHAFT SOME CHANGE REQUIRE.

Reviewed by Saumen

Awaiting confirmation from customer for selected conveyor components

Coke oven operation team suggested about prisecter sampler ,trying to get data
from vendor.
Target completion 14/9/17
Target completion 16/9/17

nder review

BOQ completed and individual Specs in progress


Weekly Plan - RMHS Phase-2 Eng
Period: 21st Aug to 25th A
S.No Area Sub area Team Member Related to
1 RMHS TS Manoj MDL
2 RMHS TS Manoj MDL
3 RMHS TS Manoj MDL
4 RMHS TS Vikash Kumar MDL
5 RMHS TS Vikash Kumar MDL

6 RMHS PID RV MDL

7 RMHS TS RV MDL

8 RMHS TS RV MDL
DE
9 DE System ANKUR TSK
SYSTEM
10 RMHS Pellet Plant KUNDAN TSJ

11 RMHS Pellet Plant KUNDAN TSJ

12 RMHS Pellet Plant KUNDAN TSJ

13 RMHS Pellet Plant KUNDAN TSJ

14 RMHS Pellet Plant KUNDAN TSJ

15 RMHS TSJ SAUMEN HMC & G-BF


16 RMHS TSJ SAUMEN HMC & G-BF

17 RMHS Common Supriya Common

18 RMHS TSJ Supriya Pellet plant

19 RMHS MDL Raja TSK


20 RMHS MDL Raja TSK

21 RMHS MDL Raja TSK

22 RMHS MDL Debabrata TSK

23 RMHS TS Debabrata MDL

24 RMHS TS Debabrata Misc


25 RMHS MDL Sameer TSK
26 RMHS MDL Sameer TSK
27 RMHS MDL Sameer TSK
28 RMHS TR Sahendra TSK
29 RMHS TS Sahendra TSK

30 RMHS TR Shashikant TSK

31 RMHS TS Shashikant TSK

32 RMHS TS Shashikant TSK

33 RMHS Cable routeShashikant/DJ/Sahendra TSK

34 RMHS TS Shashikant TSK

35 RMHS Technical discussion


Shashikant/DJ/Sahendra TSK

36 RMHS TS DJ TSK

37 RMHS TS DJ TSK

38 U&W CN Himanshu TSK


39 U&W TN Himanshu TSK
Weekly Plan - RMHS Phase-2 Engg
Period: 21st Aug to 25th Aug 2017
Activities Start Date Finish Date
Preparation of Annexure and Schedule for VGTU WIP 23 August 2017
Preparation of Annexure and Schedule for HGTU WIP 24 August 2017
Preparation of schedule for belt changing device WIP 25 August 2017
Completion of TS of belt sampler 21 August 2017 25 August 2017
Completion of TS of Retractable belt feeder 21 August 2017 25 August 2017

Preparation of Operation Philosophy of ORE & FLUX Circuit. 22 August 2017 25 August 2017

Preparation of Operation Philosophy of Fuel Circuit. Started. 23 August 2017

Preparation of TS of Bin Vibrator. 21 August 2017 25 August 2017


Incorporation of coke and return fines DE systems in concept note of RMHS 21 August 2017 25 August 2017
DE system
calculation of augmentation capacity of conveyor OC-04 21 August 2017 25 August 2017
Drive component finalization including pulley dia and shaft dia calculation 21 August 2017 25 August 2017
of OC-04 conveyor for augmented capacity
Calculation of augmented capacity of conveyor HA 01 GL 22 21 August 2017 25 August 2017
Drive component finalization including pulley dia and shaft di calculation of 21 August 2017 25 August 2017
HA 01 GL 22 conveyor.

TS preparation of drive component of pellet plant augmented conveyor 21 August 2017 25 August 2017

Conveyor Calculation 21 August 2017 21 August 2017


Designing of HMC circuit layout & GA drawings 22 August 2017 25 August 2017
Visit to MMD's manufacturing unit at Sricity, Chennai for new vendor due 21 August 2017 23 August 2017
diligence for twin shaft sizer & apron feeder

Preparation of sketch for pellet plant upgradation Project. 24 August 2017 25 August 2017

Coasting time calculation for Coal Circuit Conveyors 21 August 2017 23 August 2017
Coasting time calculation for Pellet Circuit Conveyors 24 August 2017 25 August 2017

Wagon Tippler TS to be made ready for RFQ 21 August 2017 25 August 2017

Checking of TS & Annexure of Idlers 21 August 2017 22 August 2017


Coasting time calculation for Sinter, Ore & Flux, Return Fines, Coke, Slag, 21 August 2017 25 August 2017
Lime, Limestone.
Checking of TS & Annexure of HS & LS Couplings 24 August 2017 25 August 2017
RFQ of Pulley 21 August 2017 25 August 2017
RFQ of Idler. 21 August 2017 25 August 2017
RFQ of Conveyor Belt. 21 August 2017 25 August 2017
Technical offer evaluation of FRM-3. 21 August 2017 25 August 2017
21 August 2017 25 August 2017
TS of E&I of wagon tippler
21 August 2017 25 August 2017
Technical offer evaluation of Barrel reclaimer
21 August 2017 25 August 2017
TS of E&I of RTCBF
21 August 2017 25 August 2017
TS of E&I of auto sampler
21 August 2017 25 August 2017
cable route servey for fuel ckt
TS of cable supply for Fuel circuit 21 August 2017 25 August 2017

21 August 2017 25 August 2017


Technical discussion of FRM with MBL
21 August 2017 25 August 2017
System configuration for CHP-RMHS
21 August 2017 25 August 2017
Incorporation of comments of P&ID
Revision of CN of Fire water system. Started. 23 August 2017
Feasibility of installing MVWS system in WT tunnel conveyors. Started. 26 August 2017
Compliance Remarks
Completed
Completed
WIP
Completed
Completed
Not started Non availability of
other members

In Progress Under Discussion with


Process and Electrical

Completed

Completed

Completed

Completed

Completed

Completed

Completed

WIP On medical leave


WIP On medical leave
Completed

Customer feedback on
Deferred available conv
component is awaited

Completed
Completed
Electrical comments
WIP awaited
Completed

Completed

Completed
WIP Checking in progress
Completed
Completed
Completed
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Completed
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Engaged in JSR for
WIP estimation of BOQ
Completed
Completed
Weekly Plan Compliance - RMHS
Period: 14th Aug to
S.No Area Sub area Team Member Related to

1 RMHS MDL Raja TSK

2 RMHS MDL Raja TSK

3 RMHS MDL Raja TSK


4 RMHS MDL Raja TSK
5 U&W CN Himanshu TSK
6 U&W TN Himanshu TSK
Interchangea
7 RMHS RMHS Vikash Kumar bility of WT-1
&2

8 RMHS RMHS Vikash Kumar TS


9 RMHS TS Manoj MDL

10 RMHS TS Manoj MDL

11 RMHS TS Manoj MDL

12 RMHS TS Manoj MDL


13 RMHS TS Manoj Misc
14 RMHS TR Sahendra TSK
Control
15 RMHS Sahendra TSK
Philosophy
16 RMHS TS Shashikant TSK
17 RMHS TS Shashikant TSK
18 RMHS TS DJ TSK
19 RMHS TS DJ TSK
20 RMHS TSJ SAUMEN Battery-7

21 RMHS TSJ SAUMEN HMC & G-BF

SP1 & SP2


22 RMHS TSJ SAUMEN connectivity

23 RMHS TSJ kundan Pellet plant


24 RMHS TSJ kundan Pellet plant
25 RMHS TSJ kundan Pellet plant
26 RMHS TSJ kundan Pellet plant
27 RMHS TSJ kundan Pellet plant
28 RMHS TSJ kundan Pellet plant
29 RMHS TSJ kundan Pellet plant
30 RMHS Others Yogesh Others
31 RMHS Others RV Others
32 RMHS Others Sameer Others
33 U&W Others Ankur Others
34 RMHS TS Vikash Kumar TS

Magnetic
35 RMHS separator Vikash Kumar MDL

36 RMHS TSJ kundan Pellet plant


37 RMHS TSJ kundan Pellet plant
38 RMHS TSJ kundan Pellet plant
39 RMHS TSJ kundan Pellet plant
40 RMHS TSJ kundan Pellet plant
41 RMHS TSJ kundan Pellet plant
42 RMHS TSJ kundan Pellet plant
43 RMHS TSJ kundan Pellet plant

44 RMHS MDL Debabrata TSK

45 RMHS TS Debabrata MDL

46 RMHS TS Debabrata Misc

47 RMHS CN Supriya TSJ

48 RMHS TSJ Supriya Pellet plant


Weekly Plan Compliance - RMHS Phase-2 Engg
Period: 14th Aug to 18th Aug 2017
Activities Start Date Finish Date

Preparation of assignment for extension of JH-18. (Load Data details) 14 August 2017 21 August 2017

Finalization of TS of Wagon Tippler with Transfer Platform for RFQ.


(Electrical comments to be incorporated, Layout assignment to be WIP 18 August 2017
prepared).

WEBINAR on Rokcy-DEM software - Arrange & participate 17 August 2017 17 August 2017
Finalization of Belt Schedule - Lengths of HGTU to be updated 18 August 2017 18 August 2017
Revision of CN of Fire water system. Started. 18 August 2017
Feasibility of installing MVWS system in WT tunnel conveyors. Started. 18 August 2017

Assignment drawing preparation for interchangeability of WT-1 & 2 14 August 2017 18 August 2017

Completion of TS of belt sampler 14 August 2017 18 August 2017


Preparation of Pulley Schedule 14 August 2017 17 August 2017

Preparation of Annexure and Schedule for VGTU WIP 18 August 2017

Preparation of Annexure and Schedule for HGTU WIP 23 August 2017

Preparation of schedule for belt changing device WIP 23 August 2017


Preparation of TS for sector gate 17 August 2017 18 August 2017
Technical offer evaluation of FRM-3. 14 August 2017 18 August 2017

Control philosophy finalization of Fuel circuit(FRM-3). 14 August 2017 18 August 2017

TS of E&I erection & commisioning for fuel circuit. 14 August 2017 18 August 2017
TS of cable supply for Fuel circuit 14 August 2017 18 August 2017
TS of PLC Augmentation for Fuel ircuit. 14 August 2017 18 August 2017
TS of bin weighing system for Fuel circuit 14 August 2017 18 August 2017
Leave 14 August 2017 14 August 2017

HMC circuit connectivity with G-BF_layout, flow dagram & sectional drg. 16 August 2017 17 August 2017

SP1 & SP2 connectivity_ WBS, TEFR, Scope final document submission to 18 August 2017 18 August 2017
project

TS preparation of drive component of pellet conveyor 14 August 2017 18 August 2017


Revised GA drawing preparation of conveyor PC-02 14 August 2017 18 August 2017
Revised GA drawing preparation of conveyor PC-03 14 August 2017 18 August 2017
Revised GA drawing preparation of conveyor HA 01 GL 01 14 August 2017 18 August 2017
Revised GA drawing preparation of conveyor HA 01 GL 15 14 August 2017 18 August 2017
Revised GA drawing preparation of conveyor JH 01 GL 11 14 August 2017 18 August 2017
Revised GA drawing preparation of conveyor JH 02 GL 11 14 August 2017 18 August 2017
On Leave 14 August 2017 28 August 2017
On Leave 14 August 2017 18 August 2017
On Leave 14 August 2017 18 August 2017
On Leave 14 August 2017 18 August 2017
Completion of TS of belt sampler 14 August 2017 18 August 2017

Checking of revise drawing submitted by party for magnetic separator and 14 August 2017 14 August 2017
comments on drawing along with electrical team
Pulley shaft calculation for conveyor PC-02 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor PC-03 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor 511-512 BC 210 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor HA 01 GL 01 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor HA 01 GL 15 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor JH 01 GL 11 14 August 2017 18 August 2017
Pulley shaft calculation for conveyor JH 02 GL 11 14 August 2017 18 August 2017
Drive componenet finalization for 9 Nos. of conveyor 14 August 2017 18 August 2017

Preparation of assignment for extension of JH-18. (Load Data details) 16 August 2017 17 August 2017

Checking of Pulley TS & Data sheet. 16 August 2017 18 August 2017

Checking of Spout, Sector TS & Data sheet. 16 August 2017 18 August 2017

Preparation of sketch for pellet plant upgradation Project. 18 August 2017 18 August 2017
Review of conveyor calculation and component selectionfor Pellet plant 14 August 2017 17 August 2017
upgradation project.
Compliance Remarks

Completed

Layout prepared.
Waiting for electrical
comments.

Completed
Completed
WIP
WIP

Completed

Completed
Completed
Travel length updating
WIP balance
Travel length updating
WIP balance
WIP
Completed
2/9 completed

completed
completed
wip
Completed
Completed

WIP

Completed

Reschedule
Reschedule
Reschedule
Reschedule
Reschedule
Reschedule
Reschedule

Inprogress

Completed

Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed

Completed

WIP (Yet to be
finalized by Manoj)
WIP (Yet to be
finalized by Manoj)
WIP

Completed
Weekly Plan Compliance - RMHS Phase-
Period: 7th Aug to 11th Au
S.No Area Sub area Team Member Related to
1 RMHS TR Sahendra TSK
2 RMHS TS Sahendra MDL
Control
3 RMHS Sahendra TSK
Philosophy

4 RMHS TS Shashikant TSK

5 RMHS TS DJ TSK

Technical
6 RMHS Yogesh TSK
Datsheet
Technical
7 RMHS Yogesh TSK
Evaluation

8 RMHS TS Yogesh TSK

9 RMHS TS Yogesh TSK

Technical
10 RMHS Yogesh TSK
Evaluation
11 RMHS TS Debabrata MDL
12 RMHS TS Debabrata MDL
13 Debabrata MDL
14 RMHS TS Debabrata MDL

15 RMHS TS Debabrata MDL

16 RMHS PID RV MDL

17 RMHS TS RV MDL

18 RMHS TS RV MDL

19 RMHS General Kundan TSJ

20 RMHS General Kundan TSJ

21 RMHS General Kundan TSJ

22 RMHS General Kundan TSJ

23 RMHS TS Manoj MDL

24 RMHS TS Manoj MDL


25 RMHS TS Manoj MDL

26 RMHS TS Manoj MDL

27 RMHS TS Manoj Misc


28 RMHS TSJ SAUMEN Battery-7

29 RMHS TSJ SAUMEN HMC & G-BF

SP1 & SP2


30 RMHS TSJ SAUMEN connectivity

31 RMHS TSJ SAUMEN HMC & G-BF

32 U&W TN Himanshu TSK

33 RMHS TS Vikash MDL

34 RMHS Phase-1 Vikash Phase-1

35 RMHS TS Vikash MDL

36 RMHS CN Supriya TSJ

Pellet plant
37 RMHS TSJ Supriya upgradation

38 RMHS MDL Raja TSK

39 RMHS MDL Raja TSK

40 RMHS MDL Raja TSK

41 RMHS MDL Raja TSK

42 RMHS MDL Raja TSK

43 RMHS Others Sameer TSK


44 U&W Others Ankur TSK
Weekly Plan Compliance - RMHS Phase-2 Engg
Period: 7th Aug to 11th Aug 2017
Activities Start Date Finish Date Compliance
Technical offer evaluation of FRM-3. 07 August 2017 11 August 2017 WIP
TS of Metal Detector. 07 August 2017 11 August 2017 completed
Control philosophy finalization of Fuel 07 August 2017 11 August 2017 WIP
circuit(FRM-3).

TS of E&I erection & commisioning for fuel circuit. 07 August 2017 11 August 2017 WIP

TS of PLC Augmentation for Fuel Circuit. 07 August 2017 11 August 2017 WIP

Preparation of technical data sheet of FBF-3. 07 August 2017 09 August 2017 Completed

Preparation of technical data sheet for Rod mill 07 August 2017 11 August 2017 Completed
(Cemtec) .
Annexture and Preparation of Datasheet for HS 08 August 2017 11 August 2017 Completed
couplings.
Annexture and Preparation of Datasheet for LS 08 August 2017 11 August 2017 Completed
couplings.
Preparation of draft technical data sheet for 07 August 2017 11 August 2017 In progress
Mcnally sayaji rod mill.
TS & Data sheet checking of Idlers. 09 August 2017 10 August 2017 Not Started.
TS & Data sheet checking of Pulley. 10 August 2017 11 August 2017 Not Started.
Load data generation for SC-17,CK-45,RF-1A. 07 August 2017 10 August 2017 WIP
TS & Data sheet checking of gearbox 08 August 2017 10 August 2017 Completed.

TS & Data sheet checking of LS and HS coupling 08 August 2017 11 August 2017 Completed.

Preparation of Operation Philosophy of ORE & 07 August 2017 11 August 2017 WIP
FLUX Circuit.
Preparation of Operation Philosophy of Fuel Started. 08 August 2017 WIP
Circuit.
Preparation of TS of Bin Vibrator. 08 August 2017 11 August 2017 WIP
Calculation for augmentation of capacity of pellet 07 August 2017 10 August 2017 Completed
conveyor HA01GL15.
Calculation for augmentation of capacity of pellet 07 August 2017 10 August 2017 Completed
conveyor HA01GL01.
Calculation for augmentation of capacity of pellet 09 August 2017 11 August 2017 Completed
conveyor 511BC210,512BC210.
Calculation for augmentation of capacity of pellet 09 August 2017 11 August 2017 Completed
conveyor KP01AP05,PC-02,PC-03.
Preparation of Annexure and Schedule for Screw 07 August 2017 08 August 2017 Completed
Take up

Preparation of Annexure and Schedule for VGTU 08 August 2017 09 August 2017 WIP
Preparation of Annexure and Schedule for HGTU 09 August 2017 11 August 2017 WIP

Preparation of schedule for belt changing device 10 August 2017 WIP

Preparation of schedule of Bins and Bunkers 10 August 2017 10 August 2017 Completed
Screen house design discussion with civil 07 August 2017 07 August 2017 Completed
HMC circuit connectivity with G-BF _ layout 07 August 2017 08 August 2017 Completed
preparation w.r.t survey drg.

SP1 & SP2 connectivity_ WBS, TEFR, Scope final 09 August 2017 Revised document
09 August 2017
document submission to project awating from DEC

CB to TSJ for HMC circuit connectivity with G-BF 10 August 2017 11 August 2017 Completed

Feasibility of installing MVWS system in WT Started. 11 August 2017 WIP


tunnel conveyors.
Completion of TS of belt sampler 07 August 2017 10 August 2017 WIP

Modification in discharge chute of OC-1 07 August 2017 10 August 2017 Completed

Completion of TS of bearing and plummer 07 August 2017 10 August 2017 Completed


block.
Preparation of concept notes for OHP wrt 14 07 August 2017 09 August 2017 Completed
MTPA.
Review conv calculation for Pellet plant 10 August 2017 11 August 2017 WIP.
upgradation project.
Preparation of Belt schedule for Coal and Pellet 07 August 2017 08 August 2017 Completed
circuit.
Load data calculation for pellet conveyors PPC-1 & 08 August 2017 09 August 2017 Completed
PPC-2 .
Preparation of Civil & structural drawing for 09 August 2017 11 August 2017 WIP
extension of KJ-4 and JH-18.
Prepared Visit Report for BELTCON-19 08 August 2017 08 August 2017 Completed

Prepared first cut TS for Future Wagon Tipplers 09 August 2017 10 August 2017 Completed

On leave. 07 August 2017 11 August 2017 On Leave


On leave. 07 August 2017 11 August 2017 On Leave
Remarks
1/9 completed

will be completed by
18/8/17
will be completed by
16/8/17
will be completed by
18/8/17

8/23/2017

Data sheet not received.


Data sheet not received.

On Leave.

On Leave.

On Leave.
Sent for review and
approval

JH-18 will be completed by


21 Aug 2017
Weekly Compliance - RMHS Phase-2
Period:31st July to 04th A
S.No Area Sub area Team Member Related to
1 RMHS TS Yogesh MDL

2 RMHS TS Yogesh TSK

3 RMHS TS Yogesh TSK

4 RMHS TS Yogesh TSK

Technical
5 RMHS Yogesh TSK
Evaluation

6 RMHS General Kundan TSJ

7 RMHS General Kundan TSJ

8 RMHS General Kundan TSJ

9 RMHS General Kundan TSJ

10 RMHS General Kundan TSJ

11 RMHS Others Debabrata MDL


12 RMHS TS Debabrata MDL
13 RMHS Calculation Debabrata MDL
14 RMHS Others Debabrata Others
15 RMHS TS Debabrata MDL

16 RMHS Others RAJA Others

17 RMHS TR Manoj Phase-1

18 RMHS TS Manoj MDL


19 RMHS PFD Manoj MDL

20 RMHS Others Manoj Phase-1

21 RMHS TS Manoj MDL

22 RMHS TS Manoj MDL

23 RMHS TS RV MDL
24 RMHS TS RV MDL
25 RMHS TS RV MDL
Control
26 RMHS RV Others
Philosophy
27 RMHS TS SAMEER MDL
28 RMHS TS SAMEER MDL
29 RMHS TS SAMEER MDL
30 RMHS TS SAMEER MDL
31 RMHS TS SAMEER MDL
32 RMHS TS SAMEER MDL
33 RMHS TS SAMEER MDL
34 RMHS TS SAMEER MDL
35 RMHS PID Sahendra MDL
36 RMHS PID Sahendra MDL
37 RMHS TS Sahendra MDL
38 RMHS TS SAHENDRA MDL
39 RMHS TS Shashikant MDL
40 RMHS TS Shashikant MDL

41 RMHS CN Shashikant MDL

42 RMHS System DJ MDL

43 RMHS PID DJ MDL

44 RMHS TS DJ MDL

45 RMHS General DJ MDL


46 RMHS TS Vikash Kumar MDL

47 RMHS TS Vikash Kumar MDL

48 RMHS TS Vikash Kumar MDL

49 RMHS TSJ SAUMEN Battery-7

50 RMHS TSJ SAUMEN G-BF


51 RMHS TSJ SAUMEN TSJ
52 DE SYSTEM DE System ANKUR TSK
53 DE SYSTEM DE System ANKUR TSK

54 DE SYSTEM DE System ANKUR TSK

55 RMHS CN Supriya TSJ


56 RMHS CN Supriya
57 U&W CN Himanshu TSK
58 U&W CN Himanshu TSK
59 U&W TN Himanshu TSK
Weekly Compliance - RMHS Phase-2 Engg
Period:31st July to 04th Aug 2017
Activities Start Date Finish Date
Final Technical Specification to be sent to procurement for 31 July 2017 02 August 2017
Reversible shuttle conveyor.
Final Technical specfication for Rod gate & RPG for 3rd Rod mill 01 August 2017 03 August 2017
project .
Correction work for TS of HS couplings. 02 August 2017 04 August 2017
Technical Discussion with Thyssenkrupp for 2nd Barrel 03 August 2017 03 August 2017
Reclaimer.

Preparation of technical data sheet for Rod mill (Cemtec). 31 July 2017 04 August 2017

Mass balance finalization of pellet plant as per 7 MTPA and 8 31 July 2017 04 August 2017
MTPA.

Finalization of list of equipment to be upgraded in 7 MTPA and 31 July 2017 04 August 2017
8 MTPA pellet plant upgradation- detail report preparation.

Mass balance of different unit of TSJ plant existing and future 31 July 2017 04 August 2017
requirement in 14 MTPA TSJ plant- balance work of last week.

Calculation for augmentation of capacity of pellet conveyor 03 August 2017 04 August 2017
JH01GL11
Calculation for augmentation of capacity of pellet conveyor 03 August 2017 04 August 2017
JH02GL11
On Leave. 31 July 2017 02 August 2017
TS & Data sheet checking of Idlers. 02 August 2017 02 August 2017
TS & Data sheet checking of Metal Detector. 03 August 2017 03 August 2017
Interview for 2 Draftsman. 03 August 2017 03 August 2017
TS & Data sheet checking of Pulley. 04 August 2017 04 August 2017

On CB. 31 July 2017 04 August 2017

Preparation of technical recommendation of modular type bag 31 July 2017 02 August 2017
filter with kolkata environment engg. Group
Processing of PFD of DE-system of lime storage building. 01 August 2017 02 August 2017
Processing of PFD of DE-system of Sinter Circuit. 01 August 2017 02 August 2017

Solution of LDE-4 duct jamming issue at LC-16 and 17 with 01 August 2017 02 August 2017
Kolkata team.

Completion of Technical Specification of belt changing device. 02 August 2017 04 August 2017

Preparation of Annexure and Schedule for TS of Brakes. 03 August 2017 03 August 2017

Preparation of Operation Philosophy of Fuel Circuit. 31 July 2017 04 August 2017


RFQ FOR METAL DETECTOR. 31 July 2017 03 August 2017
RFQ FOR EXTERNAL SCRAPPER. 31 July 2017 03 August 2017

Preparation of Operation Philosophy of ORE & FLUX Circuit. 03 August 2017 09 August 2017

RFQ FOR PULLEYS. 31 July 2017 31 July 2017


RFQ FOR IDLERS. 31 July 2017 31 July 2017
RFQ FOR FOUNDATION BOLTS. 01 August 2017 01 August 2017
RFQ FOR MANUAL HOISTS. 01 August 2017 01 August 2017
RFQ FOR BULK LOADING SPROUT. 02 August 2017 02 August 2017
RFQ FOR SECTOR GATE. 03 August 2017 03 August 2017
RFQ FOR CONVEYORS BELT. 03 August 2017 03 August 2017
RFQ FOR ELECTRIC HOISTS. 04 August 2017 04 August 2017
P& ID FOR COKE HANDLING CIRCUIT. 31 July 2017 04 August 2017
P& ID FOR COKING COAL HANDLING SYSTEM. 31 July 2017 04 August 2017
SPECIFICATION FOR LEVEL INDICATORS. 31 July 2017 04 August 2017
TS of E&I part for FRM#3. 31 July 2017 04 August 2017
TS of Reversible shuttle conveyor. 31 July 2017 04 August 2017
TS of Conveyor Brake. ( E & I part ). 31 July 2017 04 August 2017
CONCEPT NOTE FOR ELECTRICAL, INSTRUMENTATION & 31 July 2017 04 August 2017
AUTOMATION SYSTEM.
SYSTEM CONFIGURATION DRAWING FOR SLAG HANDLING 31 July 2017 04 August 2017
SYSTEM FOR BF-2.
P& ID FOR LIMESTONE HANDLING SYSTEM FOR LCP. 31 July 2017 04 August 2017

TS for Load cell based bin weighing system. 31 July 2017 04 August 2017

Study of Automation system for Fuel handling system. 31 July 2017 04 August 2017
Completion of TS of belt feeder. 31 July 2017 01 August 2017

Completion of TS of belt sampler. 01 August 2017 04 August 2017

Completion of TS of magnetic separator. 01 August 2017 04 August 2017

Battery - 7 rebuilding - coke circuit refurbishment requirement 31 July 2017 31 July 2017
finalization.
HMC circuit connectivity with G-BF. 01 August 2017 01 August 2017
CB at TSJ. 02 August 2017 04 August 2017
Calculation of Gas volume for coke circuit. 31 July 2017 04 August 2017
Preparation of SLD of DE system for coke circuit. 31 July 2017 04 August 2017
Preparation of Isomertric drawing of pressure loss calculation 31 July 2017 04 August 2017
for sinter DE.
Preparation of concept notes for OHP wrt 14 MTPA. 31 July 2017 02 August 2017
Preparation of Pre Concept Note for TSJ Expansion. 03 August 2017 04 August 2017
Revision of CN of RMHS water system. 01 August 2017 04 August 2017
Revision of CN of Fire water system. 01 August 2017 04 August 2017
Feasibility of installing MVWS system in WT tunnel conveyors. 01 August 2017 11 August 2017
Compliance Remarks
COMPLETED

COMPLETED

COMPLETED
Comments sent for Pre Bid
WIP queries .

WIP

Completed

Completed

Rescheduled

WIP 07 August 2017

WIP 07 August 2017

WIP 10-Aug
Completed
Completed
WIP 10-Aug
Prepared visit report and
Completed submitted to Chief-RMHS
for review.
Discussion with vendors
WIP completed.
Completed
Completed

Additional drawing being


WIP studied for calculation of
pressure drop

WIP Write up completed

WIP Write up completed


Process finalization under
WIP discussion.
Completed
Completed

WIP

On Leave
On Leave
On Leave
On Leave
On Leave
On Leave
On Leave
On Leave
Completed
Completed
Completed
Completed
Completed
Completed

Completed

Completed

Completed
TS Prepared.Review Under
Completed Progress.
Completed
Sent for Review.

WIP

Sent for Review.

Completed

Completed
Postponed
Completed
Completed

WIP

WIP
WIP
WIP
WIP
WIP
Weekly Compliance - RMHS Phase-2 E
Period: 24th July to 28th J
S.No Area Sub area Team Member Related to
1 U&W DE System ANKUR TSK

2 U&W DE System ANKUR TSK

3 RMHS TS Yogesh MDL

4 RMHS TS Yogesh TSK

5 RMHS TS Yogesh TSK

6 RMHS TS Yogesh TSK

7 RMHS TS Yogesh TSK

8 RMHS TS SAMEER MDL


9 RMHS TS SAMEER MDL
10 RMHS TS SAMEER MDL
11 RMHS TS SAMEER MDL
12 RMHS TS SAMEER MDL
13 RMHS TS SAMEER MDL
14 RMHS TS SAMEER MDL
15 RMHS TS SAMEER MDL

16 RMHS CN Supriya TSJ

17 RMHS CN Supriya TSJ

18 U&W CN Himanshu TSK


19 U&W CN Himanshu TSK

20 U&W TN Himanshu TSK

21 RMHS TS RV MDL

22 RMHS TS RV MDL
23 RMHS TS RV MDL
24 RMHS TS RV MDL

25 RMHS PID RV MDL

26 RMHS TS Manoj MDL


27 RMHS TS Manoj MDL

28 RMHS TS Manoj MDL

29 RMHS TS Manoj MDL

30 RMHS TS Manoj MDL

31 RMHS TS Manoj MDL

32 RMHS TS Manoj MDL

33 RMHS General Kundan TSJ

34 RMHS General Kundan TSJ

35 RMHS P&ID DJ MDL

SYSTEM
36 RMHS CONFIGURATION DJ MDL

SYSTEM
37 RMHS CONFIGURATION DJ MDL

SYSTEM
38 RMHS CONFIGURATION DJ MDL

39 RMHS SPECS DJ MDL

40 RMHS TS SAHENDRA MDL


41 RMHS SPECS SAHENDRA MDL

42 RMHS HT FEEDER CAL SAHENDRA MDL

43 RMHS TS SAHENDRA MDL

44 RMHS CN SHASHIKANT MDL

45 RMHS TS SHASHIKANT MDL


46 RMHS HT FEEDER CAL SHASHIKANT MDL

47 RMHS ELE PART SHASHIKANT MDL

48 RMHS TSJ SAUMEN CN

49 RMHS TSJ SAUMEN Others

50 RMHS TSJ SAUMEN TSJ

51 RMHS TSK RAJA Others

52 RMHS TSK RAJA MDL

53 RMHS TSK RAJA MDL

54 RMHS TSK RAJA Others

55 RMHS TSK RAJA MDL

56 RMHS TSK RAJA Others

57 RMHS TSK RAJA MDL

58 RMHS TSK VIKASH MDL

59 RMHS TSK VIKASH CN

60 RMHS TSK VIKASH MDL

61 RMHS Calculation Debabrata MDL

62 RMHS Others Debabrata MDL

63 RMHS Calculation Debabrata MDL

64 RMHS TSK VIKASH MDL


65 RMHS TSK VIKASH MDL
66 RMHS TSK VIKASH MDL

67 RMHS CN Supriya TSJ

68 RMHS CN Supriya TSJ


69 RMHS Site visit Supriya Noamundi
Weekly Compliance - RMHS Phase-2 Engg
Period: 24th July to 28th July 2017
Activities Start Date Finish Date Compliance
Calculation of Gas volume for coke circuit 24 July 2017 28 July 2017 WIP

Preparation of SLD of DE system for coke 24 July 2017 28 July 2017 Completed.
circuit.
Final Technical Specification to be sent to
procurement for Reversible shuttle 24 July 2017 25 July 2017 In Progress
conveyor

Finalisation of scope of work for rod mill


,Rod gate & RPG Technical specfication for 25 July 2017 28 July 2017 In Progress
3rd rod mill project preparatory work

Capacity augmentation of A1001 final note Started 26 July 2017 Completed


for BED.
Correction work in TS of Couplings Started 27 July 2017 Completed
Comments sent for Technical queries for
Barrel Reclaimer by Thyssen and Metso. 26 July 2017 27 July 2017 Completed

RFQ FOR PULLEYS. 24 July 2017 24 July 2017 WIP


RFQ FOR IDLERS. 24 July 2017 24 July 2017 WIP
RFQ FOR FOUNDATION BOLTS. 25 July 2017 25 July 2017 WIP
RFQ FOR MANUAL HOISTS. 25 July 2017 25 July 2017 WIP
RFQ FOR BULK LOADING SPOUT. 27 July 2017 27 July 2017 WIP
RFQ FOR SECTOR GATE. 27 July 2017 27 July 2017 WIP
RFQ FOR CONVEYORS BELT. 28 July 2017 28 July 2017 WIP
RFQ FOR ELECTRIC HOISTS. 28 July 2017 28 July 2017 WIP
Development of Concept Note for Iron 24 July 2017 26 July 2017 Completed
Storage in TSJ.
Preparation of Pre Concept Note for TSJ 27 July 2017 28 July 2017 Not complied
Expansion .
Revision of CN of RMHS water system 24 July 2017 25 July 2017 WIP
Revision of CN of Fire water system 26 July 2017 27 July 2017 WIP
Feasibility of installing MVWS system in WT 28 July 2017 28 July 2017 WIP
tunnel conveyors
Preparation of Operation Philosophy of 24 July 2017 27 July 2017 WIP
Fuel Circuit.
RFQ FOR EXTERNAL SCRAPPER 24 July 2017 27 July 2017 WIP
RFQ FOR INTERNAL SCRAPPER 24 July 2017 28 July 2017 completed
RFQ FOR METAL DETECTOR 24 July 2017 28 July 2017 WIP
REVIEW OF PID OF CKT-LIME, LIMESTONE,
PELLET, COKE, FUEL AND RETURN FINES 25 July 2017 26 July 2017 Completed
CKT.
Checking and preparation of complete 24 July 2017 25 July 2017 Completed
Technical specification list
Preparation of Annexure and schedule of 25 July 2017 26 July 2017 Format Completed
screw take up
Preparation of Annexure and schedule of 26 July 2017 27 July 2017 Format Completed
vertical gravity take up

Preparation of technical recommendation


of modular type bag filter with kolkata 27 July 2017 28 July 2017 Not started
environment engg. Group

Preparation of Annexure and schedule of 28 July 2017 28 July 2017 Format Completed
Horizontal gravity take up

Incorporation of comments in technical 27 July 2017 27 July 2017 In progress


specification of belt changing device

Preparation of equipment list of limestone 28 July 2017 28 July 2017 Completed


and coal circuit

Block flow diagram preliminarily


(material ) as per 14 MTPA project- for 24 July 2017 28 July 2017 Completed.
pellet ckt, incoming material ckt up to raw
material yard. -JSR

Pellet conveyor occupancy report 24 July 2017 28 July 2017 Completed.


preparation.- JSR
P&ID for Pellet handling system 24 July 2017 28 July 2017 Completed.

System configuration drawing for sinter 24 July 2017 28 July 2017 Completed.
handling system

System configuration drawing for fuel 24 July 2017 28 July 2017 Completed.
crushing and screening handling system

System configuration drawing for pellet 24 July 2017 28 July 2017 Completed.
handling system

Specification for switches (pcs, zss, bcs, brs, 24 July 2017 28 July 2017 Completed.
cjs)
TS of Magnetic Separator 24 July 2017 28 July 2017 Completed.
Specification for level indicators 24 July 2017 28 July 2017 WIP
HT motor feeder finalisation for coal ckt at 24 July 2017 28 July 2017 Completed.
RM#10

TS of E&I part for FRM#3 24 July 2017 28 July 2017 WIP

Concept note for Electrical 24 July 2017 28 July 2017 WIP


,Instrumentation and Automation sytem-

TS of Belt Feeder( E&I part, supply & 24 July 2017 28 July 2017 Completed.
Erecrtion & Commissioning )
HT motor feeder finalisation for coal ckt at 24 July 2017 28 July 2017 Completed.
RM#10

Study and preparation of complete E&I 24 July 2017 28 July 2017 Completed.
report for A1001 BMR HT conveyor

Concept note for Coke circuit connectivity 24 July 2017 25 July 2017 Completed.
with HMC circuit & G - BF.
Battery - 7 rebuilding - refurbishment list 26 July 2017 27 July 2017 Coal circuit completed.
finalization.
Complete from MHS
SP - 1, SP - 2 connectivity - review of TEFR. 28 July 2017 28 July 2017 side, C&S comments
pending.
Review of conveyor drawings of BF#2 - 24 July 2017 24 July 2017 Completed.
Preparation of Equipment List for Coke 25 July 2017 25 July 2017 Completed.
Circuit.
Preparation of Equipment List for Pellet 26 July 2017 26 July 2017 Completed.
Circuit.
Self development - Study of Projectile 27 July 2017 27 July 2017 Completed.
Motion & Trajectory
Preparation of Equipment List for Slag & 27 July 2017 27 July 2017 Completed.
Returns fines.
Preparation of Weekly Review report for 28 July 2017 28 July 2017 Completed.
GM(D&E)
Preparation of Equipment List for Fuel, 28 July 2017 28 July 2017 Completed.
Sinter & Lime.

Completion of TS of magnetic separator 24 July 2017 25 July 2017 Completed.

Note on capacity augmantation of OC-1 24 July 2017 26 July 2017 Completed.


conveyor

Completion of TS of Belt sampler 27 July 2017 28 July 2017 Not started

Pulley, Conveyor belt. Gearbox & coupling 24 July 2017 26 July 2017 Completed.
standardization at Kolkata.
Leave 27 July 2017 27 July 2017
Load data Calculation for 1 No Conveyor ( 4 28 July 2017 28 July 2017 Completed.
No of Pulleys)
Ore & Flux circuit P & ID checking. 24 July 2017 24 July 2017 Completed.
Coal circuit P & ID checking. 25 July 2017 25 July 2017 Completed.
Slag circuit P & ID checking. 26 July 2017 26 July 2017 Completed.
Development of Concept Note for Iron 24 July 2017 26 July 2017 Complied
Storage in TSJ.
Preparation of Pre Concept Note for TSJ 27 July 2017 28 July 2017 Not complied
Expansion
Site visit for freewheeling issue of downhill 26 July 2017 27 July 2017 Completed.
conv C-1
Remarks
Review in Progress.

Review in Progress.

Electrical team yet to submit TS

Scope finalised

Data Sheet to be prepared.


Data Sheet to be prepared.
Data Sheet to be prepared.
Data Sheet to be prepared.
Data Sheet to be prepared.
Data Sheet to be prepared.
Data Sheet to be prepared.
Data Sheet to be prepared.

Due to urgent site visit

CIRCUIT STUDY IN PROGRESS

DATA SHEET UNDER REVIEW

DATA SHEET UNDER REVIEW


Planned for next week due to non
availability of Vendor

Send to O&M to review.

Specification checked for scope


completeness.
Sent to O&M for review.

Observation sent to BF Team.

Topic changed to Resolving forces.

Sent to electrical team for in


corporation of electrical part.

Reschuled ( Belt Feeder TS in


Progress.)

Due to urgent site visit


Weekly Plan Compl
Perio
S.No Area Sub area Team Member Related to
1 RMHS General Saumen Others
2 RMHS KPO PH-II Saumen MDL

3 RMHS TSJ Saumen Others

4 RMHS TS Supriya TSJ


5 RMHS TS Supriya TSK

6 RMHS Meeting Supriya TSJ

Technical
7 RMHS Manoj Others
Recommendation

8 RMHS Technical specification Manoj MDL

9 RMHS Technical specification Manoj MDL

10 RMHS Technical specification Manoj MDL

11 RMHS Technical specification Manoj MDL

12 RMHS Technical specification Manoj MDL

13 RMHS Calculation Raja MDL


14 RMHS Calculation Raja MDL

15 RMHS Calculation MDL


Raja
16 RMHS Mech GA Raja MDL
17 RMHS Others Raja Others
18 RMHS Others Raja Others

19 RMHS Technical specs Vikash Kumar MDL

20 RMHS Technical specs Vikash Kumar MDL


21 RMHS BF conveyor Vikash Kumar Others

22 RMHS Stacker reclaimer Vikash Kumar MDL

23 RMHS Calculation Debabrata MDL

RMH Vertical Storage


24 RV MDL
S Sheds
RMH Vertical Storage
25 RV MDL
S Sheds
RMH
26 Covered Shed RV MDL
S
27 U&W CN Himanshu TSK
28 U&W CN Himanshu TSK
29 U&W TN Himanshu TSK
30 RMHS CN DJ MDL

31 RMHS P&ID DJ MDL

32 RMHS P&ID DJ MDL

33 RMHS P&ID DJ MDL

34 RMHS P&ID DJ MDL

35 RMHS P&ID DJ MDL

36 RMHS ELE LOAD CALCULATION SAHENDRA MDL


37 RMHS ELE LOAD CALCULATION SAHENDRA MDL
38 RMHS SPECS SAHENDRA MDL
39 RMHS TS SAHENDRA MDL

40 RMHS TS SAHENDRA MDL

41 RMHS TS SAHENDRA MDL

42 RMHS TS SAHENDRA MDL

43 RMHS CN SHASHIKANT MDL

44 RMHS ELE PART SHASHIKANT MDL

45 RMHS ELE PART SHASHIKANT MDL


46 RMHS TECH OFFER SHASHIKANT MDL

47 RMHS TS SHASHIKANT MDL


48 RMHS TS SHASHIKANT MDL

49 RMHS DE System ANKUR TSK

50 RMHS DE System ANKUR TSK

51 RMHS TS Yogesh MDL

52 RMHS TS Yogesh TSK

53 RMHS Flow diagram Yogesh TSJ

54 RMHS TS Yogesh TSK


55 RMHS ECR Kundan TSK
56 RMHS General Kundan TSJ
57 RMHS Kundan TSJ

58 RMHS TS SAMEER MDL


59 RMHS TS SAMEER MDL

60 RMHS TS SAMEER MDL

61 RMHS TS SAMEER MDL


62 RMHS TS SAMEER MDL
63 RMHS TS SAMEER MDL
64 RMHS TS SAMEER MDL
Weekly Plan Compliance - RMHS Phase-2 Engg
Period: 17th July to 21st July 2017
Activities Start Date Finish Date
Leave 17 July 2017 17 July 2017
Drive component selection 18 July 2017 18 July 2017
CB at TSJ for meeting on 14 MTPA and site survey co-ordination and 19 July 2017 21 July 2017
HMC to G BF coke ckt connectivity & other TSJ project
Understanding & basic work out on TSJ expansion. 17 July 2017 17 July 2017
Finalisation of TS for paddle feeder 18 July 2017 18 July 2017
Travel to TSJ for meeting for:-
a) TSJ expansion 19 July 2017 21 July 2017
b) With strategic project procurement on conveyor

Preparation of draft technical recommendation of modular type bag 17 July 2017 18 July 2017
filter to be submitted to Environment engg. Group

Preparation of Basic engg. Document of conveyor system 17 July 2017 28 July 2017

Preparation and incorporation of comments in specification of belt 18 July 2017 20 July 2017
changing device

Incorporation of comments in technical specification of tie rod and 19 July 2017 19 July 2017
fasteners

Incorporation of comments in technical specification of brakes. 21 July 2017 21 July 2017

Incorporation of comments in technical specification of locking device 20 July 2017 20 July 2017
for pulley.

Selection of Gear Box, HS & LS Couplings for Coal Circuit 17 July 2017 18 July 2017
Selection of Gear Box, HS & LS Couplings for Pellet Circuit 19 July 2017 19 July 2017

Standardization of Pulley Shafts (Reduce No of types of Pulleys) 19 July 2017 20 July 2017

Finalization of Basic GA drawing for Conveyor CK-27 20 July 2017 20 July 2017
Technical Class for AET regarding Material Handling 21 July 2017 21 July 2017
Preparation of Weekly reports, Weekly plan etc 21 July 2017 21 July 2017

Annexure preparation for TS of gearbox 18 July 2017 18 July 2017

Annexure preparation for TS of weighfeeder and belt scale 19 July 2017 21 July 2017
Study about OC-1 conveyor ,calculation checking and necessary
recommendation for its augmentation. 17 July 2017 21 July 2017

Technical discussion with SANDVIK for phase-2 stacker reclaimer 21 July 2017 21 July 2017

Selection of HS & LS Couplings - Ore & Flux and Limestone Circuits 17 July 2017 21 July 2017

RFQ FOR SEMI PORTAL SCRAPPER. Started 19 July 2017

RFQ FOR TRAVELLING TRIPPER IN VERTICAL STORAGE CUM Started 20 July 2017
RECLAIMING YARD.
MEETING WITH M/S METAL KARMA FOR COVERED SHED. 18 July 2017 18 July 2017
Revision of CN of RMHS water system 10 July 2017 21 July 2017
Revision of CN of Fire water system 10 July 2017 19 July 2017
Feasibility of installing MVWS system in WT tunnel conveyors 17 July 2017 24 July 2017

Concept note for Electrical ,Instrumentation and Automation sytem- 17 July 2017 21 July 2017

P& ID for Ore & Flux handling circuit 17 July 2017 21 July 2017

P& ID for Lime Stone handling system for LCP 17 July 2017 21 July 2017

P& ID for Fuel handling system 17 July 2017 21 July 2017

P&ID for return fines handling system 17 July 2017 21 July 2017

P&ID for lime handling system 17 July 2017 21 July 2017

Calculating load detail of RM#10 17 July 2017 21 July 2017


Calculating load detail of RM#9 17 July 2017 21 July 2017
TS of Level Indicator 17 July 2017 21 July 2017
TS of Paddle Feeder 17 July 2017 21 July 2017

P& ID for Coke handling system 17 July 2017 21 July 2017

P& ID for Coking Coal hadling system 17 July 2017 21 July 2017

TS of electrical part of Belt Scale 17 July 2017 21 July 2017

Concept note for Electrical ,Instrumentation and Automation sytem 17 July 2017 21 July 2017

Study and preparation of BMR circuit (One no HT conv augmentation) 17 July 2017 21 July 2017

Study and preparation of E&I Report of Fuel circuit 17 July 2017 21 July 2017
Review and comment on Technical offer of Stacker Reclaimer-SANDVIK 17 July 2017 21 July 2017

TS of electrical part of Weigh Feeder 17 July 2017 21 July 2017


TS of electrical part of Sector Gate 17 July 2017 21 July 2017
Preparation of list of informations required for calculation of gas 17 July 2017 21 July 2017
volume for coke circuit.

Calculation of Gas volume for coke circuit 17 July 2017 21 July 2017

Correction of Technical Specification work for BR & Reversible shuttle 17 July 2017 19 July 2017
conv

Rod Mill Technical specfication preparatory work 18 July 2017 21 July 2017

Understanding the RMHS concept note wrt RMHS scope.


Understanding I-BF stockhouse incl upstream and downstream 19 July 2017 21 July 2017
conveying system circuit wrt new J-BF.
Understanding RM storage and RMBB#1-3 configuration.
Capacity augmentation of A1001 final note for BED. Started 26 July 2017
ECR preparation for 3rd rod mill 17 July 2017 17 July 2017
TSJ plant visit 19 July 2017 21 July 2017
Pellet plant material requirement finalization and block diagram 17 July 2017 18 July 2017
preparation
Study on belt sampler of conveyor BC-109 of Coke plant. 17 July 2017 17 July 2017
ECR process for conveyor roof sheeting of RMHS. 17 July 2017 17 July 2017
Attend meeting at Kolkatta, for Technical discussion regarding cover 18 July 2017 18 July 2017
shed.
ANNEXURE PREPARATIONFOR TRAVELLING TRIPPERS 19 July 2017 19 July 2017
ANNEXURE PREPARATION FOR FIXED TRIPPERS. 20 July 2017 20 July 2017
ANNEXURE PREPARATION FOR BULK LOADING SPROUT 21 July 2017 21 July 2017
ANNEXURE PREPARATION FOR FOUNDATION BOLTS 21 July 2017 21 July 2017
Compliance Remarks
Completed
Completed

Completed

Completed
WIP Review under progress.

Completed

Completed

In Progress

In Progress

Completed

completed

Completed

Completed
Completed

Completed

Completed
Completed
Completed
Technical data sheet for gearbox not
available ,final review will be
WIP completed 24th july

Completed
WIP

Comments awaited from electrical


Not Started. team ,after that commented Letter
will be sent to sandvik for further
discussion
Completed

Completed

Completed

Completed
WIP Revision to be in corporated.
WIP Revision to be in corporated.
WIP Revision to be in corporated.
Completed

Joint doscussion with Mechanical


Completed team to be done.
Joint doscussion with Mechanical
Completed team to be done.
Joint doscussion with Mechanical
Completed team to be done.
Joint doscussion with Mechanical
Completed team to be done.
Joint doscussion with Mechanical
Completed team to be done.
Completed
Completed
WIP
Completed
Joint doscussion with Mechanical
Completed team to be done.
Joint doscussion with Mechanical
Completed team to be done.
Completed

WIP

Completed

Completed
Completed

Completed
Completed

Completed

Calculation completed. Review under


WIP Progress.

Completed
BR TS (D&E) sent to procurement

Note on Total Scope for Rod mill


Completed completed.Engineering activities
finalised.

Not Completed

In Progress
Completed
Completed

Rescheduled

Completed
Completed

Completed

Completed
Completed
Completed
Completed
S.No Area Sub area Team Member Related to

26 RMHS Flow diagram Yogesh TSJ

27 RMHS TS Yogesh TSK


28 RMHS TS Yogesh MDL
29 RMHS Vertical Storage Sheds RV MDL

30 RMHS Vertical Storage Sheds RV MDL

40 RMHS TS SAMEER MDL


42 RMHS TS SAMEER MDL
43 RMHS TS SAMEER MDL
44 RMHS TS SAMEER MDL
55 RMHS KPO PH-II Debabrata TSK
58 RMHS SYSTEM CONFIGURATION DJ MDL
59 RMHS SYSTEM CONFIGURATION DJ MDL
60 RMHS SYSTEM CONFIGURATION DJ MDL

63 RMHS ELE LOAD CALCULATION SAHENDRA MDL

64 RMHS ELE LOAD CALCULATION SAHENDRA MDL

65 RMHS SPECS SAHENDRA MDL

66 RMHS ELE LAYOUT SAHENDRA MDL

67 RMHS TS SAHENDRA MDL


75 RMHS TS SHASHIKANT MDL
76 RMHS TS SHASHIKANT MDL

78 RMHS DE KPO PH-II ANKUR TSK

79 RMHS DE KPO PH-II ANKUR TSK


Weekly Plan - RMHS Phase-2 Engg
Period: 10th July to 14th July 2017
Activities Start Date
Understanding of basic flow diagram and layout of Coal& Ore circuit 9.7MTPA 13 July 2017
TSJ
Capacity augmentation of A1001 final note for BED. Started
Submission of 3 no of TS after commets 12 July 2017
RFQ FOR SEMI PORTAL SCRAPPER Started

RFQ FOR TRAVELLING TRIPPER IN VERTICAL STORAGE CUM RECLAIMING YARD Started

ANNEXURE PREPARATION FOR FOUNDATION BOLTS 11 July 2017


ANNEXURE PREPARATIONFOR TRAVELLING TRIPPERS 12 July 2017
ANNEXURE PREPARATION FOR FIXED TRIPPERS. 12 July 2017
ANNEXURE PREPARATION FOR BULK LOADING SPROUT 13 July 2017
Gear Box selection for lime, lime stone & ore&flux. 14 July 2017
P&ID OF RETURN FINES HANDLING SYSTEM 10 July 2017
P&ID OF LIME HANDLING SYSTEM 10 July 2017
P&ID OF FUEL HANDLING SYSTEM 10 July 2017

CALCULTING LOAD DETAILS OF RM#10 10 July 2017

CALCULTING LOAD DETAILS OF RM#9 10 July 2017

SPECIFICATION FOR LEVEL INDICATORS 10 July 2017


PROPOSED ELECTRICAL EQUIPMENT LAYOUT OF RM-10, PH-II INSTALLATION 10 July 2017
AREA
TS OF PADDLE FEEDER 10 July 2017
TS OF ELECTRICAL PART OF WEIGH FEEDER 10 July 2017
TS OF ELECTRICAL PART OF SECTOR GATE 10 July 2017

Preparation of list of informations required for calculation of gas volume for coke 12 July 2017
circuit.

Calculation of Gas volume for coke circuit 14 July 2017


Finish Date Compliance Remarks

14 July 2017 WIP

14 July 2017 WIP Capacity calculation completed


14 July 2017 WIP
11-Jul-17 WIP Electrical Part under review

11-Jul-17 WIP Electrical Part under review

11 July 2017 WIP


12 July 2017 WIP
12 July 2017 WIP
13 July 2017 WIP
14 July 2017 WIP Will be completed by this week.
14 July 2017 WIP
14 July 2017 WIP
14 July 2017 WIP
Today site visit done and based on the
14 July 2017 WIP guidelines it will be completed by
19/7/17

Today site visit done and based on the


14 July 2017 WIP guidelines it will be completed by
19/7/17
14 July 2017 WIP Revised : 19-07-2017

14 July 2017 WIP

14 July 2017 WIP Revised : 18-07-2017


14 July 2017 WIP Revised : 18-07-2017
14 July 2017 WIP Revised : 18-07-2017
Details of KVF, KVS and KSB opennings
13 July 2017 WIP are not available as equipments are yet
to be finalized
14 July 2017 WIP
Weekly Plan - RMHS Phas
Compliance ( Period: 3rd

S.No Area Sub area Team Member Related to

1 RMHS TS Yogesh MDL

2 RMHS TS Yogesh MDL


3 RMHS TS Yogesh TSK
4 RMHS PFD Yogesh MDL

5 RMHS Flow diagram Yogesh TSJ

6 RMHS Pain area Yogesh TSK


7 RMHS KPO PH-II Kundan TSK
8 RMHS KPO PH-II Kundan TSK

9 RMHS CN Kundan TSJ

10 RMHS TS Supriya Track Hopper


11 RMHS Layout Supriya Track Hopper

12 RMHS Layout Supriya NoamundI

13 RMHS TS Manoj MDL

14 RMHS TS Manoj MDL

15 RMHS TS Manoj MDL

16 RMHS TS Manoj MDL

17 RMHS TS Manoj MDL

18 RMHS TS Manoj MDL

19 RMHS TS Manoj MDL

20 RMHS Technical specs Vikash Kumar MDL


21 RMHS Technical specs Vikash Kumar MDL

22 RMHS Technical specs Vikash Kumar MDL

23 RMHS Technical specs Vikash Kumar MDL

24 RMHS Stacker reclaimer Vikash Kumar TSK

Vertical Storage
25 RMHS RV MDL
Sheds
Vertical Storage
26 RMHS RV MDL
Sheds
Vertical Storage
27 RMHS RV TSK
Sheds
Vertical Storage
28 RMHS RV TSK
Sheds

29 RMHS Barrel Reclaimer RV TSK

30 RMHS Battery-7 rebuilding Saumen TSJ

31 RMHS Battery-7 rebuilding Saumen TSJ

32 RMHS KPO PH-II Saumen TSK


33 RMHS TS SAMEER MDL
34 RMHS TS SAMEER MDL
35 RMHS TS SAMEER MDL
36 RMHS TS SAMEER MDL
37 RMHS TS SAMEER MDL
38 RMHS TS SAMEER MDL
39 RMHS TS SAMEER MDL
40 RMHS TS SAMEER MDL
41 RMHS TS SAMEER MDL
42 RMHS TS SAMEER MDL
43 RMHS TS SAMEER TSK
44 RMHS MDL Raja MDL

45 RMHS Calculation Raja MDL

46 RMHS Calculation Raja Others

47 RMHS Calculation Raja MDL


48 RMHS Common Raja Common

49 RMHS GA Raja Common

50 RMHS KPO PH-II Debabrata TSK

51 TSK
RMHS KPO PH-II Debabrata
SYSTEM
52 RMHS CONFIGURATION DJ MDL

53 RMHS SYSTEM
CONFIGURATION DJ MDL

54 RMHS SYSTEM
CONFIGURATION DJ MDL

55 RMHS SYSTEM
CONFIGURATION DJ MDL

56 RMHS SYSTEM
CONFIGURATION DJ MDL

57 RMHS SPECS SHASHIKANT MDL

58 RMHS SPECS SHASHIKANT MDL

59 RMHS SPECS SAHENDRA MDL


60 RMHS TS SHASHIKANT MDL
61 RMHS TECH COMMENTS SAHENDRA MDL
62 RMHS TS SAHENDRA MDL
Weekly Plan - RMHS Phase-2 Engg
Compliance ( Period: 3rd July to 7th July 2017)

Activities Start Date Finish Date

Fine tuning of Technical Specification work for RSC,Flap 03 July 2017 03 July 2017
,RPG,ROD gates
SP conveyor calculation for augmentation A1001. 04 July 2017 07 July 2017
Barrel Reclaimer mechanical specfication 03 July 2017 16 July 2017
Review of Process Flow diagrams O&F track hopper. 05 July 2017 05 July 2017
Study of basic flow diagram and layout of Coal& Ore circuit 06 July 2017 06 July 2017
9.7MTPA TSJ
BMS-2 bearing failure analysis and solution 03 July 2017 07 July 2017
Fuel circuit Conveyor capacity Calculation 03 July 2017 07 July 2017
Esentiality study report finalization for 3rd Rod Mill. 03 July 2017 07 July 2017

Pellet plant circuit study as per requirement of 14MTPA plant 03 July 2017 07 July 2017

Preparation of TS for paddle feeder 03 July 2017 05 July 2017


Checking and finalising the drg 06 July 2017 06 July 2017
Review revised layout, section drg & technical data sheet for 05 July 2017 06 July 2017
MHS part
Fine tuning and preparation of annexure for TS of Rope 05 July 2017 05 July 2017
sheaves
Fine tuning and preparation of annexure for TS of Screw take 06 July 2017 06 July 2017
ups

Fine tuning and preparation of annexure for TS of Skirt Board 06 July 2017 06 July 2017

Fine tuning and preparation of annexure for TS of take up 07 July 2017 07 July 2017
components

Fine tuning and preparation of annexure for TS of Take up 07 July 2017 07 July 2017
trolley

Technical discussion with kolkata utility team regarding 05 July 2017 05 July 2017
requirements from Utility for RMHS in phase-2

Approval of RMHS concept notes by Ajit Kothari Sir 07 July 2017 07 July 2017

Annexure preparation for TS of weigh feeder 7/3/2017 7/3/2017


Annexure preparation for TS of gearbox 7/4/2017 7/4/2017

Annexure preparation for TS of bearing and plummerblock 7/5/2017 7/5/2017

Annexure preparation for TS of magnetic separator 7/6/2017 7/6/2017

Technical discussion with TRF for stacker reclaimer 7/6/2017 7/7/2017

PREPARATION OF ANNEXURE FOR SEMI PORTAL SCRAPPER Started 4-Jul-17

PREPARATION OF ANNEXURE FOR TRAVELLING TRIPPER IN


VERTICAL STORAGE CUM RECLAIMING YARD Started 4-Jul-17

RFQ FOR SEMI PORTAL SCRAPPER Started 5-Jul-17

RFQ FOR TRAVELLING TRIPPER IN VERTICAL STORAGE CUM


RECLAIMING YARD Started 5-Jul-17

PREPARATION OF SPECIFICATION SHEET FOR BARREL


RECLAIMER Started 15-Jul-17

Review of feasibility report & scheme drawings 3-Jul-17 4-Jul-17

Meeting with MND & project for finalisation of scheme 5-Jul-17 5-Jul-17
Conv. Claculation 6-Jul-17 7-Jul-17
ANNEXURE PREPARATION FOR PULLEYS 03 July 2017 03 July 2017
ANNEXURE PREPARATION FOR IDLERS 03 July 2017 03 July 2017
ANNEXURE PREPARATION FOR FOUNDATION BOLTS 04 July 2017 04 July 2017
ANNEXURE PREPARATION FOR MANUAL HOISTS 04 July 2017 04 July 2017
ANNEXURE PREPARATIONFOR TRAVELLING TRIPPERS 05 July 2017 05 July 2017
ANNEXURE PREPARATION FOR FIXED TRIPPERS 05 July 2017 05 July 2017
ANNEXURE PREPARATION FOR BULK LOADING SPROUT 05 July 2017 05 July 2017
ANNEXURE PREPARATION FOR SECTOR GATE 06 July 2017 06 July 2017
ANNEXURE PREPARATION FOR CONVEYORS BELT 06 July 2017 06 July 2017
ANNEXURE PREPARATION FOR ELECTRIC HOISTS 07 July 2017 07 July 2017
GA PREPARATION FOR TRACK HOPPER. 07 July 2017 07 July 2017
Finalization of MDL 03 July 2017 03 July 2017
Final cut calculation (Power, Tension, Belt, Pulley & Curvature) 03 July 2017 03 July 2017
-for Coal Circuit.

Report on Phase -1 design mismatch regarding BW & TPH. 04 July 2017 04 July 2017

Conveyor Power & Tension Calculation - 2 Nos (Coal Circuit 05 July 2017 05 July 2017
PPC-1,2,3&4)
Standardization of Conveyor belt & pulley dia. 06 July 2017 06 July 2017
Finalization of first cut generic checklist for checking Mech GA 07 July 2017 07 July 2017
drawings.
Power, radious, belt selection for 15 nos of conveyors. 03 July 2017 04 July 2017
Gear box, HS, LS coupling, Motor selection for CK45, CK27, 06 July 2017 07 July 2017
A1001.
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
COKE HANDLING SYSTEM
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
LIME & LIME STONE HANDLING SYSTEM
CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
SINTER HANDLING SYSTEM

CONCEPTUAL PLC SYSTEM CONFIGURATION DIAGRAM FOR 03 July 2017 07 July 2017
FUEL CRUSHING AND SCREENING HANDLING SYSTEM

SYSTEM CONFIGURATION DRAWING FOR ORE & FLUX 03 July 2017 07 July 2017
HANDLING SYSTEM
SPECIFICATION FOR MOTOR 03 July 2017 07 July 2017
SPECIFICATION FOR SWITCHES (PCS, ZSS, BCS, BRS, CJS 03 July 2017 07 July 2017
,proximity switch)
SPECIFICATION FOR LOAD CELLS 03 July 2017 07 July 2017
TS preparation of weigh feeder 03 July 2017 07 July 2017
Technical comments on offer of Stacker Reclaimer . 03 July 2017 07 July 2017
TS preparation of Belt scale 03 July 2017 07 July 2017
Compliance Remarks

Completed

Completed
In Progress
In Progress Comments sent

In Progress

Completed
Completed
Completed

In Progress

Completed Draft issued for review


Completed

Completed

WIP

WIP

Completed

In progress

WIP

Completed

Completed

1. TS of belt scale and geared motor


completed.
Inprogress
2.Revise TS of gearbox ,magnetic
separator,Belt scale completed
Inprogress

Inprogress

Inprogress

on 10 july technical discussion has


Not started been finalized with TRF

Completed

Completed

Under Progress Under Electrical Checking

Under Progress Under Electrical Checking

Under Progress

Completed

Completed

Completed
WIP
WIP
WIP
WIP
WIP
WIP
WIP
WIP
WIP
WIP
Completed
WIP

Completed

Completed

Completed
Completed

WIP

Completed
completed

completed

completed

completed

completed

rescheduled

rescheduled

rescheduled
wip
completed
rescheduled