Demand Side Management Unit

Energy Management Development


& Service Quality Division
Energy Commission

ENERGY EFFICIENCY
REGULATIONS (ELECTRICAL)
1
Presentation Outline
1. Introduction

2. Acts &
Regulations

3. Efficient Management
of Electrical Energy
Regulations (EMEER)
2008

4. Minimum Energy
Performance
Standards (MEPS)
Energy Commission Act 2001
To promote efficiency, economy and safety in the
generation, production, transmission, distribution
supply and use of electricity

To promote the use of renewable energy and the


conservation of non-renewable energy
Electricity Supply Act 1990
Section 23A – Minister to determine standards, etc.
“The Minister may, from time to time, prescribe the standards specifications,
practices and measures to be adopted and any other matters in respect of the
efficient use of electricity.”

Section 23B – Installation to meet requirements.


“No person shall use or operate any installation unless the installation meets
such requirements as may be prescribed in respect of efficient use of
electricity.”

Section 23C – Equipment to meet requirements


“No person shall manufacture, import, sell or offer for sale or lease any
equipment unless the equipment meets such requirements as may be
prescribed in respect of efficient use of electricity.”
Efficient Management Of Electrical Energy
Regulations (EMEER) 2008
Gazetted on 15th December 2008

Applied to big energy users (equal or exceeding 3 Million kWh


over any period not exceeding 6 consecutives months)

Notification by Energy Commission

To appoint a Registered Electrical Energy Manager and to submit


written confirmation of the appointment

To submit Electrical Energy Management Objectives and Policy.

To submit Electrical Energy Management accounts and documents

5
Registered Electrical Energy Manager (REEM)

The registration is needed for the


purpose of the Regulations.

“No person shall engage in, be


employed or hold himself out as
a REEM for the purposes of
these Regulations unless the
person has been registered by
the Commission”
6
Registration Process Electrical Energy Manager
(REEM)

23 years and above.


i. Professional Engineer (6 months
experience in EE)
ii. Degree in Science, Engineering,
Architecture or equivalent (12
months experience in EE)
iii. Cert of Competency with ST such
as Electrical Service Engg or Comp
Electrical Engg (9 months experience
in EE)
7
Registration Process Electrical Energy Manager
(REEM)

Interview Session with ST.


Must demonstrates knowledge of the
requirement of the Act and
regulations.
Must demonstrates knowledge in EE
(management, technology etc)

8
647 Registered Electrical Energy Managers.

Recognized Energy
Manager Program by
Asean Energy
Management Scheme
(AEMAS) and
Malaysian Association
of Energy Service
Companies (MAESCO)

9
Functions And Duties Of REEM

Audit and analyse


Advise in developing
and implementing
measures
Monitor the
implementation of the
measures

Supervise the keeping of records


and verify its accuracy; and

Ensure the timely submission


of information and reports.
10
REGULATION 22: GENERAL PENALTY

Any person who commits an offence


under the Regulations shall, on
conviction, be liable to a fine not
exceeding five thousand ringgit or to
imprisonment for a term not exceeding
one year or both.

11
EMEER 2008 Summary
2500

2000 1867 1936


1942
1384 1490
1500
1423
1000 717 830
1040
481
500 279 647
119 497
165 217 306
0 22 133
2009 2010 2011 2012 2013 2014 2015 (as of
Mei)

Total no of REEM accumulative

12
TOTAL CONSUMPTION ELECTRICITY OF INSTALLATIONS SUBJECTED TO
EMEER 2008

TOTAL CONSUMPTION ELECTRICITY OF INSTALLATIONS SUBJECTED


TO EMEER 2008
1936 installations
23,076,907,112 kWh 1942 installations
22,831,240,987 kWh
23,500,000,000
1423 installations
23,000,000,000 22,118,095,411 kWh

22,500,000,000 1867 installations


21,237,230,004 kWh
k 22,000,000,000
W
h 21,500,000,000

21,000,000,000

20,500,000,000

20,000,000,000
2012 2013 2014 2015
YEAR
Energy Consumption for Industry Sector (2014)
(*Based on the Number of Installation that Submitted a Complete Report for Year 2014)

kWh
2,000 1,874
Millions

1,800
1,519
1,600
1,400
1,200
1,000
720
800 652
600 330
202 385
400 282
156 214
124
200
-
Sector
Energy Consumption for Commercial Sector (2014)
(*Based on the Number of Installation that Submitted a Complete Report for Year 2014)

kWh 789
800
Millions

700

600

500

400
252
300

200 96
71
34
100

0
HOTEL SHOPPING OFFICE HOSPITAL UNIVERSITY Sector
3 Installations COMPLEX 8 Installations 3 Installations 10 Installations
44 Installations
ESM IMPLEMENTED IN 2014

BREAKDOWN OF ENERGY CONSERVATION ACTIVITY


IMPLEMENTED IN 2014

53
20
40 13%
17 10% 5%
LIGHTING
4% 103 MOTOR
25%
48 AIRCOND/ CHILLER/AHU
12%
INVERTER/VSD/VFD
COMPRESSOR
88 PUMP
19 21% PROCESS
5% 21 AWARENESS
5%
OTHERS

NOTE: AS OF JUNE 2014


EXAMPLE OF ESM IMPLEMENTED
• REPLACE T8 FLUORESCENT • CHANGE TO HIGH • RESET AIR CONDITIONER • INSTALL VSD FOR MOTORS
TUBES WTH T5 EFFICIENCY MOTOR TEMPERATURE TO 24 DEG • INSTALL INVERTER FOR
FLUORESCENT LIGHTS / • CONTROLLING 'ON' AND C PUMPS
LED LIGHTS 'OFF' TIMING FOR • AIR CONDITIONING
• TIMER CONTROL AND SPECIFIC MOTOR REPLACEMENT TO MORE
SETTING FOR LIGHTING EFFICIENT TYPE
AIRCOND/CHILLER INVERTER /VSD
LIGHTING MOTOR
/AHU /VFD

• LEAKAGE IMPROVEMENT • MAINTENANCE PUMP • CONDUCTED ENERGY • USING TRANSPARENT


• CHANGING TO HIGH SYSTEM SAVING AWARENESS ROOFING TO UTILIZE
EFFICIENT COMPRESSOR • CHANGING TO HIGH BREIFING TO ALL STAFF SUNLIGHT IN
EFFICIENT PUMP • ENERGY SAVING PRODUCTION AREA
AWARENESS LABELLING • INSTALL ECONOMIZER
FOR LIGHT SWITCHES FOR BOILER
AWARENESS
COMPRESSOR PUMP OTHERS
PROGRAM

• STOPPING PLANT
EQUIPMENT BASED ON
OPERATION
REQUIREMENT
• CONTROL PROCESS FLOW

PROCESS
ESTIMATED kWh SAVING FOR ESM IMPLEMENTED IN 2014
BREAKDOWN kWh SAVING PER ACTIVITY IMPLEMENTED IN
2014
13,170,815.83

17,846,299.99 12,053,928.95
4,379,854.14 LIGHTING

1,380,826.80 MOTOR
AIRCOND/ CHILLER/AHU
INVERTER/VSD/VFD
16,024,571.24 COMPRESSOR
PUMP
PROCESS
36,094,972.40
AWARENESS
OTHERS
31,220,531.37

NOTE: AS OF JUNE 2014


Minimum Energy Performance
Standards (MEPS)

Gazzetted by the Minister of Energy, Green


Technology and Water Malaysia on the 3rd
May 2013 In the amendments of the
Electricity Regulations 1994 .

Enforcement of standards, criteria and


labelling for 5 Domestic Electrical Products
(Air Conditioner, Refrigerator, Television,
Domestic Fan and Lamps).
101A. (1) For the purpose of efficient
use of electricity, prior to an application
for a Certificate of Approval under
regulation 97, any person who
manufactures, imports, sells or offers for
sale or lease any equipment under that
regulation, shall ensure that such
equipment meets the energy
performance testing standards, the
minimum energy performance standards
and the efficiency ratings as set out in
the Fourth Schedule.

101A(3) Any equipment that


meets all the requirements of
efficient use of electricityunder
subregulation (1) shall be affixed
withan efficiency rating label in such
form and manner as may be
determined by the Commission.
Energy Efficiency Label
MEPS APPLIANCES 2014
APPLIANCES 2 STAR 3 STAR 4 STAR 5 STAR TOTAL
Refrigerator 21 30 23 85 159
Television 2 4 4 281 291
Air Conditioning 51 64 47 211 373
Fan 28 13 49 135 225
Lamp 17 17
TOTAL 1065

400

350

300

250
2014
200
5 STAR

150
4 STAR

100
3 STAR
50
2 STAR
0

Refrigerator Television Air Fan Lamp


Conditioning
MEPS APPLIANCES 2015
APPLIANCES 2 STAR 3 STAR 4 STAR 5 STAR TOTAL
Refrigerator 5 13 12 81 111
Television 0 9 2 244 255
Air Conditioning 60 75 43 170 348
Fan 19 21 53 172 265
Lamp 236 236
TOTAL 1215

400

350

300

250
2015
5 STAR
200
4 STAR
150

100
3 STAR
50
2 STAR
0

Refrigerator Television Air Fan Lamp


Conditioning
Policies and Guidelines
ENERGY PERFORMANCE CONTRACTING (EPC)

Approve by the Cabinet in


January 2013 for implementation
in government buildings.
To overcome the capital
costs/financing barriers in
implementing cost-effective
energy efficiency measures.
25
EPC implementation?
To engage the service
of an ESCO;

To perform energy audit


to evaluate the ESM
and level of savings;

ESCO offer to implement


and finance the project.
CRITERIAS FOR REGISTRATION ESCO
The list of requirements and criteria:
i. Business registered with either the Registrar of
Business or the Registrar of Companies,
ii. Employ, on a full time basis, a Registered
Electrical Energy,
iii. Access to monitoring and testing equipment and
instruments, and
iv. the applicant has satisfactorily furnished all the
information as stipulated in the Application Form.
No of ESCOs registered
45
41
40

35

30

25

20 Registered ESCOs

15 Total no of ESCOs
is 54 as of May
10 9 2015.

5 4

0
2013 2014 2015
Example:
Electricity Bil,
RM

RM 100,000 baseline
Payment to Savings to
ESCO (RM Owner (RM
20,000) 20,000)
RM 80,000

Electricity Bil
Amount Reduction in Reduction in
Electricity Bil Electricity Bil

Timeline
0 5 year (Years)
Before During After
implementation implementation implementation
of EPC of EPC of EPC 29
Summary:
NO UPFRONT COST to the Owner

ESCO will finance and implement the Energy Saving Measures.

Saving achieved without compromising user’s comfort

ESCO install & maintain the E.E equipment involved

ESCO payment based on actual savings achieved in electricity bill

All equipments installed become the property of the Owner after the
contract period ended
Way Forward For Energy Efficiency In Malaysia

 Introduction of National EE Action Plan with SMART electricity


consumption savings target of 6.0% compared to business-as-usual at the
end of 10 years
 Establish effective and sustainable funding mechanism for EE projects
 Minimize costs and price distortions in energy supply
 Strengthen capacity of industry players in EE
 Intensify enforcement of EE legislation
 Strengthen and streamline policy as well as legal and institutional
framework

 Foster EE culture among industry stakeholders and the public


THANK YOU
Energy Commission Malaysia
(Suruhanjaya Tenaga)
Demand Side Management
Energy Management & Industry Development
No12, Jalan Tun Hussein, Precinct 2
62100, Putrajaya
Malaysia

Tel: 03-8870 8657


Fax: 03-8888 8648
Email: kumareshan@st.gov.my
Website address : www.st.gov.my