Contractor : Contractor
PYRAMID E&C
HARDNESS TEST
PROCEDURE
Project : Erection of Crude Fired Heater
Submitted For:
Review/Approval
Information
Final
1
Main Client : Contractor : NDT Sub
Contractor : Contractor
PYRAMID E&C
CONTENTS
1. SCOPE
2. EQUIPMENT
3. REFERENCE DOCUMENTS
4. METHOD
5. HARDNESS REQUIREMENT AND ACCEPTANCE
6. RETEST
7. REPORT / DOCUMENTATION
2
Main Client : Contractor : NDT Sub
Contractor : Contractor
PYRAMID E&C
1 SCOPE
2 EQUIPMENT
2.2 Persons engaged in testing shall be familiar with the equipment operation and shall
have relevant experience in hardness testing with mentioned equipment.
3 REFERENCE DOCUMENTS
ASTM A-450 : Standard Specification for General Requirement for Carbon and
Low Alloy Steel Tubes.
4 METHOD
4.1 Instrument shall be verified on ASTM E10 standard calibrated test block having
known hardness. Traceability of the test block shall be maintained.
4.3 The surface to be examined shall be smooth, free from dirt, grease, oil & scale.
Surface shall be prepared by light grinding or solvent cleaning (if required). The
3
Main Client : Contractor : NDT Sub
Contractor : Contractor
PYRAMID E&C
4.5 The hardness check shall be performed at welds, heat affected zone (HAZ) and
adjacent base material to welds. Separation distance between reading shall be
specified as per ASTM E10 requirements
4.6 The appeared hardness value after testing shall be reported and same procedure is
to be followed repeatedly to take all required reading as per the extent mentioned
below. Brinell hardness testing machine verification shall be demonstrated
according to the ASTM E10 requirements
4.7 Indenter & calibration block certificate shall be verified by inspection authority prior
to proceeding for examination.
Hardness in base metals, weld and heat affected zone as per ASTM E10 shall not
exceed the following:
6 RETEST
Whenever any spot / seam fail to meet above requirement / ITP requirement, two
additional spots as required in 4.4 above shall be tested, further more if any spot
fail to meet requirements in additional test, the non-conformance report (NCR) after
consulting with client shall be raised against the non-conforming items and further
action shall be taken suitable heat treatment or weld removal etc… as per the
resolution of NCR.
7 REPORT / DOCUMENTATION
4
Main Client : Contractor : NDT Sub
Contractor : Contractor
PYRAMID E&C