Can somebody enlighten me on the functions of production version and some tips
on its configuration?
Production Versions are used to describe the production process to be used for planned /
production order.
You can use the production versions based on:
Why is it required?
Suppose you have 2/3 production lines and 2/3 alternative BOMs to produce one FG.
How system will come to know which BOM and Routing to be used. This is done thru
Prod.Version.
After entering the reqd. routing no. and BOM alternative , carry a check.
Does this mean that I have to activate all the BOM’s if in case I have 3 alternative
BOM’s? if yes, then, will it these 3 BOM’s be exploded in MRP? I’m just worried
‘coz I might bloat our inventory if there are three active BOM’s.
----------------------------------------------------------
You can change the Production Versions in MRP 4 screen in MM02. Click on the version then
click details. Here you can set validity dates for the version or you can also set lot sizes.
Based on the quantity of the order, a certain version will be picked. Or, the version will be
picked if it falls in the date range.
1) Validity date of the Production version as maintained in MRP4 view Production version
details (material master), and
2) Lot size maintained in MRP1 view i.e. FX (Fixed) or EX etc
3) Lot size maintained in MRP4 view Production version details(Material Master)
----------------------------------------------------------
Maybe you change the Production Versions in MRP 4 interface from MM02.
- Choice and Click on Prodversion.
- May be You have more than one Production version.
- Then You click detail,
- And then where are BOM do you want to choice
And the others may be you can use in MD02, If you have more than one of Production
version. when did You choice? May be number one and etc
----------------------------------------------------------
But my problem is the follow:
I've 5 different production version all with same valitity date and all with the same lot size.
The numbers of different production version are 0001, 0002, 0003, 0004, 0005. When I
release the order the choice of production version is automatic and the system always
choses the production version 0001.
How I can define that the sistem choses production version 0004?
----------------------------------------------------------
When there is five different versions available in the system, why do you want to select only
version 0004. On what basis the system has to select this. If it has to select 0004 always
then why do you want to keep the other versions validity. You can change the validity
period of others. Otherwise you can go into Quota arrangement and give the version 0004.
----------------------------------------------------------
I've 5 different production version because I can realize the same product on 5 different
work center (same product but different work center). But when I release the order I want
the system choses automatically as default production version
0004 used for work center number 4. After, if I want, I can change production version, so I
can change work center in wich realize the product. I don't know where I can define quota
arrangement for production version.
----------------------------------------------------------
In customisation order type dependent parameters TZ OPL8, you have selection of
production version. Change that to manual selection. While creating order, all versions will
pop up for selection.
All the best
----------------------------------------------------------
As mentioned, you can control this for manual selection. Or otherwise you can do the
control thru Quota arrangement settings. This you can do from MEQ1 transaction. If you set
the required version for 100 percent, then automatically this version will be selected.
===============
see that if I've different production version for a product the system chose as
default (when I release a production order) always the version which has the
smallest number. Is it the only way?
If not, where I can define how the system chose the default production version?
You can change the Production Versions in MRP 4 screen in MM02. Click on the version then
click details. Here you can set validity dates for the version or you can also set lot sizes.
Based on the quantity of the order, a certain version will be picked. Or, the version will be
picked if it falls in the date range.
However, the Production version number which gets selected depends on following factors:
1) Validity date of the Production version as maintained in MRP4 view Production version
details (material master), and
2) Lot size maintained in MRP1 view i.e. FX (Fixed) or EX etc
3) Lot size maintained in MRP4 view Production version details(Material Master)
Maybe you change the Production Versions in MRP 4 interface from MM02.
- Choice and Click on Prodversion.
- May be You have more than one Production version.
- Then You click detail,
- And then where are BOM do you want to choice
And the others may be you can use in MD02, If you have more than one of Production
version. when did You choice? May be number one and etc
----------------------------------------------------------
----------------------------------------------------------
When there is five different versions available in the system, why do you want to select only
version 0004. On what basis the system has to select this. If it has to select 0004 always
then why do you want to keep the other versions validity. You can change the validity
period of others. Otherwise you can go into Quota arrangement and give the version 0004.
----------------------------------------------------------
I've 5 different production version because I can realize the same product on 5 different
work center (same product but different work center). But when I release the order I want
the system choses automatically as default production version
0004 used for work center number 4. After, if I want, I can change production version, so I
can change work center in wich realize the product. I don't know where I can define quota
arrangement for production version.
----------------------------------------------------------
In customisation order type dependent parameters TZ OPL8, you have selection of
production version. Change that to manual selection. While creating order, all versions will
pop up for selection.
All the best
----------------------------------------------------------
As mentioned, you can control this for manual selection. Or otherwise you can do the
control thru Quota arrangement settings. This you can do from MEQ1 transaction. If you set
the required version for 100 percent, then automatically this version will be selected.
Comments
If the validity dates and lot sizes are the same for all your 5 PVs I would set your 4th PV-
BOM&Routing- in the PV0001 as the system shall take the first one as default
Through OPL8 one can set it ( automatic/manual) for production orders,how does one
choose the production version / alternate BOM manually during sub-contracting PO's.