HOUSE CONNECTIONS

LOCATION TOTAL EMPTY LOTS OCCUPIED


Laban 3 1150 - to be checked

Formwork cost
No. of House Total board required
Pipe Dia (mm) shutter area (m2) depth (m) nos of board (pcs) Total Cost (sar)
connection (pcs)
200.00 997.01 1.21 0.28 2.38 20.94 3,560.50
250.00 48.13 1.46 0.33 1.97 1.22 207.76
250.00 12.03 1.46 0.33 1.97 0.31 51.94
300.00 55.01 1.76 0.38 1.63 1.68 286.14
400.00 37.82 2.33 0.48 1.24 1.53 259.78

House Connection Laban

Short Pcs
Pipe Dia (mm) Y-TEE (sar/pcs) Percentages (%) trench width (m) Total Concrete (sar/HC) Bitumen (SAR/HC)
(sar/pcs)
200.00 255.00 48.00 0.87 0.70 75.10 19.59
250.00 350.00 80.00 0.04 0.75 4.59 1.08
250.00 450.00 112.00 0.01 0.75 1.15 0.27
300.00 513.00 210.00 0.05 0.85 6.86 1.45
400.00 798.00 348.00 0.03 0.95 6.68 1.23

Total HC (nos)
Total pipes Length (lm)
Total VCP Material Cost
/House Connection

Total Concrete Cost /House


Connection

Total Bitumen Cost /House


Connection

Total Formwork /House


Connection

Total House Connection Cost pe


Formwork (SAR/HC) Total VCP (SAR/HC) Length (m)

3.10 345.92 29,000.00


0.18 24.69 1,400.00
0.05 8.22 350.00
0.25 54.67 1,600.00
0.23 60.57 1,100.00
33450.0000
1,150.00
33,450.00

SAR / Nos SAR SAR / LM


494.08 568196.26 16.99

94.38 108534.80 3.24

23.63 27179.15 0.81

3.80 4366.12 0.13

otal House Connection Cost per Lm (SAR/lm)


21.17