Sunteți pe pagina 1din 6

Daily Construction Report(DCR)

DCR # : 230 DCR Date : Thursday, February 02, 2012 Recording Date : 3-Feb-12

To Supervision Consultant :
Temp
15
From Contractor :

Weather Wind Humidity


Bright Overca
Clear Rain Dust Still Moder High Dry Moder Humid
Sun st

MACHINERY USED
Augering Bar bending Bar cutting Elect. Wood Concrete Dewatering
Bull Dozer Compressor Mobile Crane Tower Crane
Machine Machine Machine Saw Pump pump

Size
No. On Site 3 2 1 2 1 2
Hrs

Hydraulic
Dump Truck 6-Wheel Dumpers Excavator Bob cat Generator Grader Half Lorry Hoist
Placing Boom

Size
No. On Site 2 2
Hrs

Transit Water Pump


Plate Roller Welding
Jack hammer Total Station Tractor Trailer Concrete Vibrator with Water
Compactor Compactor Machine
Mixer Tank
Size
No. On Site 2 1 1 1 4
Hrs 8 8

Wheel Loader JCB

Size
No. On Site
Hrs

INDIRECT MAN POWER (Indicate P for part time)


Project Project Senior Project Srtuctural
Admin Staff Architect Scheduler Site Eng. Total
Manager Engineer Engineer Coordinator Eng.

No. On Site 1 1 2 1 1 4 10

Plumb/FF Quantity
Elect. Eng. HVAC Eng. QA/QC Eng. Secretery Draftsman Safety officer Safety Helper Total
Eng. Surveyor
No. On Site 2 1 1 1 1 1 2 1 2 12
Grand Total – Indirect Manpower 22

KEO(A/E) Projacs(CM) Owner


DISTRIBUTION

NASA Construction Gen. Trad. and


Cont. Co. W.L.L 1 of 6
Daily Construction Report(DCR)
DIRECT MAN POWER (P for part time)
Elect. Plumb/FF HVAC Machine
Civil Foreman Land surveyor Store Keeper Guards Driver Total
Foreman Foreman Foreman Operator
No. On Site 4 2 2 2 1 1 2 1 4 19

Carpenter Steel Fixer Welder Water Proofer


Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 30 10 20 10 2 2 74

Mason Joiner Electrician Plumber


Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 4 2 3 3 7 4 23

Fire System HVAC Pipe Fitter Marble


Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 4 2 7 3 8 4 28

Ceramic Stones Aluminium Painter


Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 20 8 28

Pre-cast False Ceiling Glazing Plasterer


Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 11 14 25

Tiler Labour Site office Maint. IT Labors


Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 8 12 20

Concrete casting
Total
Skld. Help. Skld. Help. Skld. Help. Skld. Help.
No on site 2 2 4
Grand Total - Direct Man Power 221

MATERIAL DELIVERED TO THE SITE


Sr. No: Description Quantity Unit Origin/Manufacturer

SITE SAFETY
We have inspected the works, working area, procedures and practices and have found the following items are
satisfactory with regard to safety precautions

Electrical(Temp Light, Temp. Power, Generators, etc.)


Temporary works (scaffolding, shoring, hoists,
rubbish chutes, etc.)
Access (Ladder tied-off, walk ways clear, etc.)
Equipment (excavator, tower & mobile cranes,
loaders lifts, etc.)
PPE (All personnel provided with personal protective equipment compliant to safety standards and codes.
and informed of emergency management procedures)
Warnings at hazard areas (pits, holes, tripping
hazards, stair
Provisions for first aid stocked landing, floor and roof edges, etc.)

NASA Construction Gen. Trad. and


Cont. Co. W.L.L 2 of 6
Daily Construction Report(DCR)
DCR # 230 DCR Date: Thursday, February 02, 2012
DAILY ACTIVITIES

% of
Start Finish
Location Task activity CCS ID completio Remarks
Date Date
n
Zone 04 Zone 03 Zone 02 Zone 01
Basement-02(-7.00)

B2F-F170 22-Dec-11 29-Jan-12 75%


B2F-210 26-Nov-11 14-Jan-12 34%
Finishes
Zone 04 Zone 03 Zone 02 Zone 01
Basement-01(-3.50)

Finishes

NASA Construction Gen. Trad. and


Cont. Co. W.L.L 3 of 6
Daily Construction Report(DCR)
DCR # 230 DCR Date: Thursday, February 02, 2012
DAILY ACTIVITIES
% of
Start Finish
Location Task activity CCS ID completio Remarks
Date Date
n
Zone 04 Zone 03 Zone 02 Zone 01
Ground floor (0.00)

Finishes
Zone 04 Zone 03 Zone 02 Zone 01
First floor (+3.50)

Finishes

NASA Construction Gen. Trad. and


Cont. Co. W.L.L 4 of 6
Daily Construction Report(DCR)
DCR # 230 DCR Date: Thursday, February 02, 2012
DAILY ACTIVITIES
% of
Start Finish
Location Task activity CCS ID completio Remarks
Date Date
n
Zone 04 Zone 03 Zone 02 Zone 01
Second floor (+7.00)

Finishes
Zone 04 Zone 03 Zone 02 Zone 01
Third floor (+10.50)

Finishes

NASA Construction Gen. Trad. and


Cont. Co. W.L.L 5 of 6
Daily Construction Report(DCR)
DCR # 230 DCR Date: Thursday, February 02, 2012
DAILY ACTIVITIES
% of
Start Finish
Location Task activity CCS ID completio Remarks
Date Date
n
Zone 04 Zone 03 Zone 02 Zone 01
Fourth floor (+14.00)

Finishes

Zone 01

Zone 02
Roof floor (+17.50)

Zone 03

Zone 04
Finishes

Remarks

KEO(A/E) Site Engineer's Signature :

NASA Construction Gen. Trad. and


Cont. Co. W.L.L 6 of 6

S-ar putea să vă placă și