REPUBLIC OF THE PHILIPPINES c);l" 01" ~
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE SECRETARY
MANILA

tfEB 0 7 2006

DEPARTMENT ORDER) SUBJECT GUIDELINES IN THE CONSTRUCTION OF

No.
08 )
)
ENGINEER'S BUILDING/S AND FACILITIES
FOR THE IMPLEMENTATION OF LOCAL AND
FOREIGN-ASSISTED PROJECTS
Series of 2006 _~_~ )
ffpY"'~·
In order to ensure that the construction of Engineer's Buildings and Recreational
Facilities will be on government properties, in consonance with the provision of the New
Government Accounting System (NGAS), the following guidelines are hereby prescribed.

1. SELECTION OF SITE FOR THE PROJECT OFFICE BUILDING/S AND FACILITIES

1.1 The DPWH project implementing office (10), in coordination with DPWH
Regional/DistrictiSub-district office, shall identify the location site intended for the
construction of building/s and facilities, such as the combined field office,
laboratory, living quarter buildings and other facilities.

1.2 In the selection of construction site of the Engineer's Building/s and Recreational
Facilities, first priority shall be on DPWH property lots, second is public school lots,
third is public health lots, fourth is LGU lots, and then other government property
lots. The proximity, access road and cost of development of the proposed site
should be properly evaluated.

2. MEMORANDUM OF AGREEMENT

2.1 The construction of building/s and recreational facilities on property other than
DPWH-owned should be covered by a Memorandum of Agreement (MOA) to be
approved by DPWH Secretary or the Undersecretary for Administration. (Annex A)

2.2 The MOA shall provide a provision to allow the DPWH use of their property free of
charge until the completion of the project and shall be turned over without cost
effective after completion or acceptance of the project from the Contractor.

3. TRANSFER/TURN-OVER OF BUILDINGS AND FACILITIES

3.1 The Implementing Office shall facilitate the transfer/turn-over of buildings and
facilities of the Engineer as provided in the MOA. The transfer/turn-over shall be
supported by applicable document and shall be a requirement to support the
issuance of project Completion Certificate of the contractor.

This order shall take effect immediately and shall amend/revoke previous orders and
issuances inconsistent herewith.

111111111
WI N 6800048
AccGMOTNUc ca E.F.RFD 8.2006
/ ")'.
:kkbu" :"

JCJLN:KBRJ LD :ENCCJCKP

HKLT :II JCK ;U PFCOC MNCOCKPO7

Pefp JbjloWkarj lc :dobbjbkq jWab Wkabub_rqba fk qebmiW_bWkaaWqbebobfkYbilt jbkqflkba Wka


Ybqtbbk7

Peb BbmWoqjbkq lc MrYif_ Tlohp Wka FfdetWvp, W dlsbjjbkq Wdbk_v lc qeb NbmrYif_ lc qeb
Mefifmmfkbp,
obmobpbkqba
Yv qeb (FbWalc qebGjlibjbkqfkW Lccf_b)

Wka

Peb (BblCa/FbWiqe/IER) lc qeb NbmrYif_lc qeb Mefifmmfkbp,obmobpbkqba


ebobfk Yv qeb
( FbWalc BblCa/FbWiqe/IER) .

TGPKCOOCPF

TebobWp,qebBbmWoqjbkqlc MrYif_Tlohp WkaFfdetWvp fpabpfolrp ql _lkpqor_q (u) Yrfiafkd/p fkpfabqeb


_ljmlrka lc qeb iBblCa/FbWiqe/IER) , ql Yb rpba WpqebfoebWanrWoqbop
tefib _lkpqor_qfkdqeb VV .
( KWjb lc qebMolfb_q)

TebobWp,qeb mbojfppflk lc qeb (BblCa/FbWiqe/IER) Wka fp abbjba kb_bppWovWka


fkafpmbkpWYib
ql qebmolgb_q8

KLT, PFCNCDLNC, qebWYlsb-jbkqflkba mWoqfbp


ebobYvWdobbql al Wkambocloj qebcliiltfkd7

Pl jWhb WsWfiWYibql qeb (GjlibjbkqfkW Lccf_b) clo fqprpb Wmloqflk lc iWkaltkba Yv qeb
(BblCa/FbWiqe/IER) , il_WqbaWqqeb 8Wka

Pl Yb WYibql molsfabprmmloqql qebdlsbjjbkq'p molgb_q


fk _lkpqor_qfkd (;ofbc Bbp_oflqflk lc qebMolgb_q).

ALKBGPGLKO RKBCN PFC :ENCCJCKP

:. MCNOLKKCI

1. Peb mboplkkbi lc qeb (GjlibjbkqfkW Lccf_b) , BMTF peWiiklq mlpb WkvmolYibj fk pb_rofqvklo
fjmbab qeb. (BblCa/FbWiqe/IER) lmboWqflkp.

2. Peb. (BblCa/FbWiqe/IER) pqWcc


peWiiifhbtfpb klq fkqbocbob
klo efkaboqebBMTF molgb_q.

;. ALKOPNRAPGLKLD D:AGIGPGCO
1. Peb. (BblCa/FbWiqe/IER) qeolrde fqpobmobpbkqWqfsb,
qeb peWiimbojfq Wka
Wiilt qebBMTF ql bob_qV (u) Yrfiafkd fkpfabqeb_ljmlrka lc pWfa. (BblCa/FbWiqe/IER) clo
lccf_b,/GWYloWqlov/ifsfkd
nrWoqbop/ob_obWqflkWi
cW_fifqfbp.

2. Peb rpb lc qeb iWkaYv qeb BMTF peWiiYb cobblc _eWodbprYgb_qql qeb_lkafqflkp ebobfkpl molsfaba,Wp
cliiltp7

3. Peb abpfdk lc qebV (u) Yrfiafkd jrpq Yb fk W__loaWk_btfqe qebmolsfpflkp lc qeb_lkqoW_qWkaqebmiWkpWka


pmb_fcf_Wqflkp WmmolsbaYv BMTF. Peb Wrqelofqfbp lc qeb. (BblCa/FbWiqe/IER) _WkobklsWqb
qeb Yrfiafkdp ql jbbq qebfoobnrfobjbkqp Wcibo_ljmibqflk lc molgb_qWkaqeb Yrfiafkd eWsbYbbk eWkabalsbo. ,
Attachment to D.0.#08 5.2006
p.2/2

4. A perimeter fence shall be constructed by DPWH to separate the . (DeoEd/Health/LGU)


compound from the area to be utilized by DPWH.

5. The DPWH may construct an access road separate from that used by the. (DeoEd/Health/LGU)

C. ITEMS FOR CONSTRUCTION

1. Upon the termination of the road project, the _ (x) building/recreational facilities shall be turned over to the
(DeoEd/Health/LGU) without cost.

2. The turn-over of such buildings and recreational facilities shall be effective after acceptance of the project from
the Contractor and upon the approval of the Secretary of Public Works and Highways or his duly authorized
representative.

IN WITNESS WHEREOF, the parties hereto have hereunto affixed their signatures on this
_____ dayof 2006 at • Philippines.

DPWH (DeoEd/Health/LGU)
Head Implementing Office Head of Office

SIGNED IN THE PRESENCE OF :

Regional Director/District Engineer, DPWH

APPROVED this __ th day of .•2006 • Manila, Philippines

Secretary/Undersecretary for Administration