SITE TEST REPORT

Contractor’s Name: AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV KHUDARIYAH Substation Page 1 of 5

DIGITAL POWER METER CONTRACT NO.: 4400003554/00


Make: Equip. No.: (MOHE(MOHE)
Dwg. Ref.:

GENERAL DATA AND INFORMATION.

Panel No: Class

Make Scale

Serial No: VT Ratio

Model CT Ratio
No:

For Mechanical Check/Visual Inspection and Electrical Tests Use C.L. of W.I.105

Current Measurement:

Injected Expected
Meter Readings in Amps Errors
Secondary Primary
current (A) current (A) R Y B R Y B

Limits: -0.2 to + 0.2%

Tested by Witnessed by
Name:
Signature:
CSD ID:
Date:
SITE TEST REPORT

Contractor’s Name: AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV KHUDARIYAH Substation Page 2 of 5

DIGITAL POWER METER CONTRACT NO.: 4400003554/00


Make: Equip. No.: (MOHE(MOHE)
Dwg. Ref.:

Voltage Measurement: .
Injected
Expected Meter Readings in kV Errors
Secondary
Voltage (kV)
Voltage (V) R-N Y-N B-N R-N Y-N B-N

R-Y Y-B B-R R-Y Y-B B-R

Limits: -0.2 to + 0.2%

Frequency Measurement:
Injected
Meter Read OUT in Hz %Error
Voltage in Volts Frequency(Hz)

Limits: ± 0.15 %

Tested by Witnessed by
Name:
Signature:
CSD ID:
Date:
SITE TEST REPORT

Contractor’s Name: AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV KHUDARIYAH Substation Page 3 of 5

DIGITAL POWER METER CONTRACT NO.: 4400003554/00


Make: Equip. No.: (MOHE(MOHE)
Dwg. Ref.:

Active Power Measurement:


Calculated Calculated
Injected Injected Injected Observed Meter
Meter %
Secondary secondary current angle meter reading Reading Remark
Reading Error
voltage (v) current (A) (Lag) in Deg (MW) fixed (MW)
(MW)
66.4 0.25 -30 25%scale=
66.4 0.50 -30 50%scale=
66.4 0.75 -90 75%scale=
66.4 1.00 -90 100%scale=
66.4 0.25 -210 25%scale=
66.4 0.50 -210 50%scale=
66.4 0.75 -270 75%scale=
66.4 1.00 -270 100%scale=
Limits: ± 0.2 %

Reactive Power Measurement:


Injected Calculated Measured
Injected Injected Observed meter
current Meter Meter %
Secondary secondary reading (MVAR) Remarks
angle (Lag) Reading Reading Error
voltage (v) current (A) fixed
in Deg (MVAR) (MVAR)

66.4 0.25 -30 25%scale=


66.4 0.50 -30 50%scale=
66.4 0.75 -90 75%scale=
66.4 1.00 -90 100%scale=
66.4 0.25 -210 25%scale=
66.4 0.50 -210 50%scale=
66.4 0.75 -270 75%scale=
66.4 1.00 -270 100%scale=
Limits: ± 0.5 %

Tested by Witnessed by
Name:
Signature:
CSD ID:
Date:
SITE TEST REPORT

Contractor’s Name: AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV KHUDARIYAH Substation Page 4 of 5

DIGITAL POWER METER CONTRACT NO.: 4400003554/00


Make: Equip. No.: (MOHE(MOHE)
Dwg. Ref.:

Apparent Power Measurement:


Injected Calculated Measured
Injected Injected Observed meter
current Meter Meter %
Secondary secondary reading (MVA) Remarks
angle (Lag) Reading Reading Error
voltage (v) current (A) fixed
in Deg (MVA) (MVA)

66.4 0.25 -30 25%scale=


66.4 0.50 -30 50%scale=
66.4 0.75 -90 75%scale=
66.4 1.00 -90 100%scale=
66.4 0.25 -210 25%scale=
66.4 0.50 -210 50%scale=
66.4 0.75 -270 75%scale=
66.4 1.00 -270 100%scale=
Limits: ± 0.2 %
Important note: Meter with center zero scale, the full-scale reading is equal
to sum of upper and lower limit irrespective of sign
Results: % Error = (Observed meter reading-Calculated meter reading)/
Full scale Reading x 100
MW = Zero

-90

-MVAR +MW

(MW = Max) -180 0 (360) (MW = Max)

Tested by Witnessed by
Name:
Signature:
CSD ID:
Date:
SITE TEST REPORT

Contractor’s Name: AL OSAIS CONTRACTING CO

Name of substation: Construction of New 115/13.8 kV KHUDARIYAH Substation Page 5 of 5

DIGITAL POWER METER CONTRACT NO.: 4400003554/00


Make: Equip. No.: (MOHE(MOHE)
Dwg. Ref.:

4. Test Equipment Used:

Item Description Make Equipment Sl. No Calibration Calibration


No Date Due Date

Tested by Witnessed by