Sunteți pe pagina 1din 21

A B C

2
MALL
3

PARTICULARS OF ITEMS NO.


ITEM
4

5
NO
6 SUBSTRUCTURE
7

8 1SITE CLEARANCE AND


9 SETTING OUT
10

11 2EARTH WORK IN
12 EXCAVATION IN FOUNDATION
( 230MM)
13

14 Shuttering for faces of


concrete foundations 6
Centring and shuttering for
15
columns (Square or
rectangular or polygonal in
plain) 6
Centring and shuttering for
sides and soffits of beam
16

1
A B C

Centring and shuttering for


17
sides and soffits of beam
2
Centring and shuttering for
18
flat surfaces such as
suspended floors, roofs
2
19

20 3LEAN CONCRETE IN FOUNDATION


21 230 MM
22

23 IST CLASS BRICK WORK IN


4 FOUNDATION
24 AND PLINTH (230 MM)
25

26 1 ST FOOTING
27 2 ND FOOTING
28 3 RD FOOTING
29 4 TH FOOTING
30 PLINTH WALL ABOVE
FOOTING
31

32

33
A B C

PARTICULARS OF ITEMS NO.


ITEM
34

35
NO
36
TOTAL BRICK WORK
37

38 LINTEL OVER DOORS 2


39 DOOR OPENING 2
40 WINDOW OPENING 2
41 LINTEL OVER WINDOWS 2
42

43

44 7 (b)PARAPET
45 TOTAL BRICK WO
46

47 8R.C.C. WORK
48 COLUMNS 6
49 BEAMS 6
50 SLAB 1
51 LINTEL (230 MM) 4
52

53

54 9SKIRTING
55 INNER PERIMETER 1
56 DOORS 2
57
A B C

58

59 10FLOORING
60 TOTAL CARPET AREA
61 FINE SAND
62 BRICK BALAST
63 PCC
64

Vetrified tile flooring 15mm


65 to 20mm thick over 12.5mm
thick base of Cement mortar
1:3 laid and jointed with
white cement slurry with
pigment to match the shade
of tile including rubbing &
Polishing.
66

67

68 11PLASTERING
69 CENTRE LINE OF OUTER WALL=
70 CENTRE LINE OF INNER WALL=
71 REDUCE WINDOW OPENINGS 2
72 REDUCE DOOR OPENINGS 2
73
A B C

74

75 12WHITE WASHING
76
A B C

PARTICULARS OF ITEMS NO.


ITEM
77

78
NO
79

Preparation of concrete or
plastered surfaces for painting
or oil-bound distemper
80 including sand papering the
surface applying one coat of
linseed oil and filling with
approved quality filler,
consisting of white lead,
linseed-oil varnish and chalk
mitti including finishing the
surface to the required finish
complete.

Distempering with Acrylic


81
washable oil bound distemper
(of approved manufacture)
two coats over one priming
coat to give an even shade.
82

83 14TERRACE
A B C

Terracing consiting of tiles


22.86x11.43x3.83cm laid over
84 25 mm mud plaster 7.5 cm
mud filling on another laver of
25mm mud plaster including
two coats of bitumen laid hot
at 1.65
Top Kg/sqm
khurra 0.6mtop of RCC
x 0.6m for
slab water
rain including grouting
pipe in with
25mm thick
85 cementconcrete
cement sand mortar
1:2:41:4 and
over
top surface
50mm thickto be leftconcrete
cement clean
after wire brushing etc.
1:8:16.
1
Cement concrete 1:2:4 gola
10cm x 10cm concave
quadrant along junction of
86
roofs with parapet wall
finished smooth, where
specially specified.

87

88

89
D E F

2
MALL- ESTIMATE
3

4 LENGTH BREATH HEIGHT OR


5 (IN M) (IN M) DEPTH (IN M)
6

8 11.5 10.13
9

10

11 11.5 10.13 0.9


12

13

14
0.45 0.23 0.76

15

0.45 0.23 5

16

20 0.45 1
D E F

17

20 0.23 0

18

20 0.23
19

20

21 1.8 0.15 1.3


22 TOTAL
23

24

25

26 20 1 0.15
27 20 0.8 0.15
28 20 0.6 0.15
29 20 0.4 0.15
30
20 0.23 0.45
31

32 TOTAL
33
D E F

34 LENGTH BREATH HEIGHT OR


35 (IN M) (IN M) DEPTH (IN M)
36 43.26 0.23 4.5
37

38 3.9 0.23 0.15


39 3.6 0.23 2.4
40 4 0.23 2.4
41 4.3 0.23 0.15
42 TOTAL
43

44 43.26 0.23 0.9


45TOTAL BRICK WORK

46

47

48 0.45 0.23 5
49 20.9 0.45 0.23
50 11.5 10.13 0.115
51 7.9 0.23 0.15
52 TOTAL
53

54

55 43.26
56 1
57 TOTAL
D E F

58

59

60

61

62

63

64 TOTAL

65

66

67

68

69 41.66 5
70 1 4.85
71 4 2.4
72 3 2.4
73 TOTAL
D E F

74

75

76
D E F

77 LENGTH BREATH HEIGHT OR


78 (IN M) (IN M) DEPTH (IN M)
79

80

81

82

83
D E F

84

11.3 9.7

85

EACH

86

87

88 TOTAL COST OF THE PR


89
G H I J

4 QUANTITY UNITS RATES COST


5

8 116.495 SQ.M. 28.17 3281.66


9

10

11 104.8455 CU.M. 103.4 10841


12

13

14
0.47196 SQ.M. 117.27 55.3467

15

3.105 SQ.M. 179.27 556.633

16

9 SQ.M. 139.8 1258.2


G H I J

17

45.6 SQ.M. 139.8 6374.88

18

4.6 SQ.M. 151.12 695.152


19

20

21 0.351 CU.M.
22 0.351 CU.M. 1438.55 504.931
23

24

25

26 3 CU.M.
27 2.4 CU.M.
28 1.8 CU.M.
29 1.2 CU.M.
30
2.07 CU.M.
31

32 10.47 SQM 146.28 1531.55


33
G H I J

34 QUANTITY UNITS RATES COST


35

36 44.7741 CU.M.
37

38 0.2691 CU.M.
39 3.9744 CU.M.
40 4.416 CU.M.
41 0.2967 CU.M.
42 -1.0074 CU.M.
43

44 8.95482
45 7.94742 CU.M. 2536.95 20162
46

47

48 3.105 CU.M.
49 12.9789 CU.M.
50 13.396925 CU.M.
51 1.0902 CU.M.
52 30.571025 CU.M. 3689.49 112791
53

54

55 43.26 M
56 2 M
57 41.26 M 83.2 3432.83
G H I J

58

59

60 79.5 SQM
61 79.5 SQM
62 79.5 SQM
63 79.5 SQM
64 318 SQM 197.32 62748

65

79.5 SQM 1252.84 99601


66

67

68

69 208.3 SQM
70 4.85 SQM
71 19.2 SQM
72 14.4 SQM
73 179.55 SQM 71.74 12881
G H I J

74

75 179.55 SQM 5.41 971.366


76
G H I J

77 QUANTITY UNITS RATES COST


78

79

80

179.55 SQM 25.02 4492.34

81

179.55 SQM 35.6 6391.98


82

83
G H I J

84

109.61 SQM 358.26 39269

85

86

18.8 M 176.1 3310.68


87

TOTAL88COST OF THE PROJECT 391151


89

S-ar putea să vă placă și