Documente Academic
Documente Profesional
Documente Cultură
• C
onduct baseline testing and collect operating data to • O
bserved slagging conditions significantly improved
establish conditions across the load range over pre-retrofit conditions
• P
erform unit inspection to gather missing data, verify
assumptions, and confirm existing unit conditions
• P
erform boiler thermal modeling, calibrated to acutal
operating data, to evaluate performance of various
design alternatives
• U
tilize BPS fabrication shop (BTA) with staged
component releases
• Include TECO in design evaluation and
fabrication activities