Sunteți pe pagina 1din 5

Princess Noura Bint Abdulrahman University for Women Project Joint venture

Riyadh, Kingdom of Saudi Arabia El Seif/CCC


part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

BRACKET 400-2
Building / area: Potable Tank rev: POTABLE TANK Sheet:
issued for: APPROVAL 0 pipe support 0 4 3

Princess Noura Bint Abdulrahman University for Women Project Joint venture
Riyadh, Kingdom of Saudi Arabia El Seif/CCC
part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

1.0 THE INPUT DATA


The wieght of fluid……….………………………………………………… 10 kN/m3
The weight of pipe 400 mm dia……….………………………………….. 95.5 kg/m
Adopted steel grade……………..… ASTM A36 yield stren..Py= 245 N/mm2
The strength of the weld (Fexx=60% of Py)…….…………….…..Pyw= 147 N/mm2
The distance between two supports horizontaly….……………L= 1.5 m
The pipe center line offset from the ceiling……….…………………… 1 m
The compressive strength of concrete after 28 days……….…...... fc'= 35 MPa
The density of the steel...……….………………………….………...γs= 7860 kg/m3
The earthquake zone, as per consultant instruction………....…..zone 0
The pipe diameter………………………………………………………..D= 400 mm
The height of the structure (roof elevation)……………………………… 8 m
The bracket elevation (the highest)………………………………………. 3 m
Adopted bolts are steel grade… 8.8 GR, diameter………. 20 mm

2. LOADS ANALYSES
2.1 Dead load
The wieght of the pipe………………………………………………. 143.25 kg
The weight of the fluid……………………………………………….. 125.6 kg
The weight of the clamp...………………………………………….. 30 kg
total= 298.85 kg
Total weight without water including stiffeners, bolts, nuts……… 190.575 kg
total dead load G=…………….. 1.90575 kN
Total weight including water weight (for seismic force required)… 316.175 kg
total dead load Gs=…………… 3.16175 kN

2.2 Seismic load


Seismic force as per UBC 1997 vol 2, section 1632-lateral seismic force for non structural

3.2.1 coefficients
Component amplification factor, Ap
Ap=…….. 1 as per table 16-O, for category 3B

Component response modification factor, Rp


Rp=…….. 3 as per table 16-O, for category 3B

Seismic importance factor, Ip


Ip=……… 1 as per table 16-K, for category 3

Seismic coefficient, Ca
Ca=…….. 0.19 as per table 16-Q, assuming soft soil (Se), and alternative for zone 1,

3.2.2 TOTAL SEISMIC LATERAL FORCE


Fp=(((Ap*Ca*Ip)/Rp)*(1+3(Hx/Hr))) * Gs=….………………………… 0.4255189 kN
Total force... E= 0.4255189 kN

2.3 Live load


Assumed pressure variation……………….……………………………p= 0.1 bar
Dynamic force created by water surge: Fw=A*P=…………….…...Fw= 1.256 kN
Building / area: Potable Tank rev: POTABLE TANK Sheet:
issued for: APPROVAL 0 pipe support 0 4 4

Princess Noura Bint Abdulrahman University for Women Project Joint venture
Riyadh, Kingdom of Saudi Arabia El Seif/CCC
part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

5. THE LOAD DISTRIBUTION ON THE CLAMP/STEEL BRACKET LOCATION


Forces are:
dead load:
vertical force…………….3.16175 kN
bending moment……… 0 kNm
live load:
vertical force……………. 1.256 kN
bending moment……… 0.2512 kNm
seismic load horizontal
horizontal force…………. 0.425519 kN
bending moment……… 0.085104 kNm

6. THE CHECK OF THE STEEL BRACKET


Is calculated in softwear STAAD PRO 2006 and input/output files are shown on following
pages.
The deisgn criteria AISC ASD included, and the bracket is checked on the torsion stress.
Building / area: Potable tabk rev: POTABLE TANK Sheet:
issued for: APPROVAL 0 the pipe support 0 4 5

Princess Noura Bint Abdulrahman University for Women Project Joint venture
Riyadh, Kingdom of Saudi Arabia El Seif/CCC
part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

7.0 THE CHECK OF THE ANCHORING SYSTEM

The adopted is post drilled HILTI anchored system using galvanized HILTI bolts prior to
water's environment.
Due to water's environment the designed anchored system is not using grouting, the plate
will be directly tighten to the concrete wall. All other steel items, susch as beam, clamp and
connection bolts will be hot deep galvanized.

The calculations are based on maximum reaction forces assuming all types of loads:
dead load:
live load,
seismic load horizontal perpendicular,
seismic load horizontal longitudinal

Fx= 0.625 kN Mx= 0.116 kNm


Fy= 1.853 kN My= 0 kNm
Fz= 0.27 kN Mz= 0.119 kNm

Assuming safety factor of ……. 2

Fx= 1.25 kN Mx= 0.232 kNm


Fy= 3.706 kN My= 0 kNm
Fz= 0.54 kN Mz= 0.238 kNm
Building / area: Potable tabk rev: POTABLE TANK Sheet:
issued for: APPROVAL 0 the pipe support 0 7 0