INTRODUCTION
TERMINOLOGY
PILE CLASSIFICATION
GENERAL DESCRIPTION OF WORK
WORKMANSHIP
PILE COMPRESSION LOAD TEST BY KENTLEDGE SYSTEM
EXECUTION OF CONSTRUCTION WORKS AT SITE
PICTURES
PILE CUT OFF, EXCAVATION AND CLEAN-UP
Content:
Location
Piling Work
Materials
Dewatering
Back Filling
Power and Water
Period of Completion
Workmanship:
Control of Piling Installation
Use of Drilling Mud
Cleaning of Borehole
Tremie Concreting
Defective Pile
Recording of Data
Pile Compression Load Test by
Kentledge System :
General
Frequency
Prerequisite
Method
KENTLEDGE
View of Tension Test Setup system
Preliminary Works
Piling Work
Steps of Piling
RIG(TRIPOD WITH WINCH)
CASING BAILER
DMC PIPES CHISEL
TREMIE PIPE REINFORCEMENTS
HYDROMETER
HOPPER
TOTAL STATION CONCRETE MIXING MECHINE
COVER BLOCK
Pile Cut Off, Excavation And
Clean-up:
BAILER CASING
CHISEL
Vertical Pile Load Test
(Initial & Routine) :
Definition
Process
PILE LOAD TEST
TEST PILE
LOAD vs SETTLEMENT GRAPH
Compression Test Of Concrete
(Cube Test) :
Aim
Equipments
Procedure
Precaution
Information
Results
Judgments
UNIVERSAL TESTING MACHINE
CONCRETE CUBES CUBE MOULDS
The Slump Test Of Concrete :
Aim
Equipments
Procedure
Precaution
Information
True Slump
Shear Slump
Collapse
SLUMP CONE
Results
Judgments
MEASUREMENT OF SLUMP SLUMP CLASSIFICATION
Fineness Modulus of Coarse
Aggregate :
Aim
Equipments
Procedure
Precaution
Information
Results Sieve
Judgments
Requirements Of Drilling Mud
(Bentonite):
Properties
Functions
Requirements
BENTONITE
Conclusion:
Bored Cast in situ piling is favourable than other piling processes.
Because there is no waste of time and materials so it is economical and
can be cast into exact length. It can bear heavier load and transfer it to
the ground soil. Also the transportation cost is not high.