Responsbile
编 Construction works and technical Duration
工作内容及技术要求 Deadline person
号 requirements 时间
负责人
Road concrete work front of the
Administration building
From the front door to the water
办公室前路面水泥浇筑—从大门
pump near the Administration
1 到办公室水泵部分 30th Nov 7 Adana
building
地坪 25CM 不需要垫层
Technical Requirements: Thickness 25
cm , no low cement concrete