MATARA-KATARAGAMA RAILWAY EXTENSION PROJECT (MATARA-BELIATTA SECTOR-PHASE-01)

Employer: Ministry of Transport.


Engineer: Central Engineering Consultancy Bureau.(CECB)
Contractor: China National Machinery Imp.& Exp.Corporation.
INSPECTION SHEET FOR CEMENT MASONRY BLOCK WALLS IN STATION BUILDING
Structure: DATE : Element ID:
Item to inspect Evaluation Remarks
SETTING OUT AND SURFACE PREPARATION
All the loose particles on on the slab in working area are removed and
ready for masonry work
 Yes /  N/A

Locations of the block walls are verified by engineer  Yes /  N/A

Suitable materials are available in site  Yes /  N/A

Cement masonry walls


Cement sand ratio for mortar are maintained  Yes /  N/A

Cement masonry blocks alignment in vertical and horizontal directions


 Yes /  N/A
are acceptable

The dimensions of walls are comply with design drawings  Yes /  N/A

Proper bonding patterns (English bond) are used  Yes /  N/A

Tie beams and lintels are located properly  Yes /  N/A

Stiffener columns are located properly  Yes /  N/A

Re bar chemical anchoring are done properly  Yes /  N/A

SAFETY AND ENVIRONMENT


Masonry blocks are stacked in safety manner  Yes /  N/A

Safety Measures(including lighting arrangement if needed only)  Yes /  N/A

Environmental Measures  Yes /  N/A

Remarks:

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


MATARA-KATARAGAMA RAILWAY EXTENSION PROJECT (MATARA-BELIATTA SECTOR-PHASE-01)
Employer: Ministry of Transport.
Engineer: Central Engineering Consultancy Bureau.(CECB)
Contractor: China National Machinery Imp.& Exp.Corporation.

INSPECTION SHEET FOR PRIOR TO PLACEMENT OF CONCRETE -IN SITU CONCRETE

Structure: DATE : Element ID:

Item to inspect Evaluation Remarks


BED PREPERATION

Chipping of slab and/or mortar layer is applied as bed and satisfied  Yes /  N/A

FORMWORK
Length of the formwork  Yes /  N/A
Width of the formwork  Yes /  N/A
Position of the formwork  Yes /  N/A

Stability and Rigidity (Properly fixed with supporters)  Yes /  N/A

Check cleanliness / free of dirt, debris & wash water  Yes /  N/A
Forms release agent applied  Yes /  N/A
Level marked  Yes /  N/A
Sealed against grout leaking  Yes /  N/A

REINFORCEMENT
Approve Material Used  Yes /  N/A
R/F Free from loose rust and mill scale, dirt, oil, grease and paint  Yes /  N/A
Placed in positioning according to the Drawings  Yes /  N/A
Correct bar sizes / spacing  Yes /  N/A
Correct lap length  Yes /  N/A
Properly fixed  Yes /  N/A
Layer of Bar separated by Spacer Bars (If Necessary)  Yes /  N/A
COVERING
Cover required  Yes /  N/A
Cover correct  Yes /  N/A
Properly fixed  Yes /  N/A

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


MATARA-KATARAGAMA RAILWAY EXTENSION PROJECT (MATARA-BELIATTA SECTOR-PHASE-01)
Employer: Ministry of Transport.

Engineer: Central Engineering Consultancy Bureau.(CECB)

Contractor: China National Machinery Imp.& Exp.Corporation.


INSPECTION SHEET FOR REINFORCEMENT SHEET NO:

Structure: DATE : Element ID:


Total
Bar Diameter No. of No. of Total Length
No. Length (mm) Shape Verification Remarks
Mark (mm) Members Bars (m)
of Bars

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


MATARA-KATARAGAMA RAILWAY EXTENSION PROJECT (MATARA-BELIATTA SECTOR-PHASE-01)
Employer: Ministry of Transport.
Engineer: Central Engineering Consultancy Bureau.(CECB)
Contractor: China National Machinery Imp.& Exp.Corporation.

INSPECTION SHEET FOR PLACEMENT OF CONCRETE - IN SITU

Structure: DATE : Element ID:

Item to inspect Evaluation Remarks


CONCRETE DELIVERY TO SITE
Acceptance of mix design  Yes /  N/A
Concrete Grade  Yes /  N/A
Delivery slip no’s  Yes /  N/A
Slump for Workability of concrete  Yes /  N/A
Temperature  Yes /  N/A
Test sample taken  Yes /  N/A
Test sample reference  Yes /  N/A

CONCRETE POURING

Concrete joint(s) properly wetted  Yes /  N/A

Starting time

Concrete placed and compacted in the formwork (Concert casting


 Yes /  N/A
sequence)

Horizontal concrete layer thickness not exceed required limits  Yes /  N/A

Concrete dropped high not exceed the required limits  Yes /  N/A

Using approved vibratos for compaction  Yes /  N/A

Continuous concreting, without any forming construction joints  Yes /  N/A

Finish time

Surface finishes  Yes /  N/A

SAFETY AND ENVIRONMENT


Safety Measures(including lighting arrangement if needed only)  Yes /  N/A
Environmental Measures  Yes /  N/A

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date


MATARA-KATARAGAMA RAILWAY EXTENSION PROJECT (MATARA-BELIATTA SECTOR-PHASE-01)
Employer: Ministry of Transport.
Engineer: Central Engineering Consultancy Bureau.(CECB)
Contractor: China National Machinery Imp.& Exp.Corporation.

INSPECTION AFTER IN SITU CONCRETE

Structure: DATE : Element ID:

Item to inspect Evaluation Remarks

CONCRETE CURING/ MASONRY WALLS CURING

Commence curing following initial set  Yes /  N/A

Curing carried out for required period of time  Yes /  N/A

Approved method of curing used  Yes /  N/A

FORMWORK STRIKING

Minimum time period from concrete pouring  Yes /  N/A

Check damaged to finished surfaces  Yes /  N/A

Check laitance & existence of cracks  Yes /  N/A

CONCRETE FINISH /MASONRY WALL FINISH


Check concrete finish  Yes /  N/A

Terminations of day work is satisfied  Yes /  N/A

verticality of wall and horizontal alignment  Yes /  N/A

No loose blocks or disturbed blocks or joints  Yes /  N/A

Properly green cut the required surfaces (if applicable)  Yes /  N/A

RECTIFICATION OF DEFECTIVE CONCRETE SURFACE

Repairing defective area by using construction grout as per the


 Yes /  N/A
manufacture’s recommendations

Rectifications of masonry wall (if necessary ) is satisfied  Yes /  N/A

Checked by Position Name Signature Date

Contractor :

Consultant Engineer

Accepted by contractor Reviewed by Engineer

Name, Signature & Date Name, Signature & Date