DESCRIPTION OF WORK/ACTIVITY
: Leak Test Tubing Umbilical KRA South
LOCATION : KRA Platform
DATE ISSUED : 5 July 2013 EXISTIN
1 2 3 4 5 6 7 8 9 10 11
G 12 13 14
PERSONS AT RISK RISK POTENTIAL CONTRO
LIKELIH RISK L HIGH RESPONSI
NATURE OF HAZARD OR HAZARD
NO DESCRIPTION OF TASK OOD OF POTENTI EXISTING CONTROL METHODS METHOD REVISED MEDIUM BLE
PROBLEM EMP CON VIS SEVERIT
OCCURA AL S RISK OR LOW PERSON
Y
NCE VALUE ACCEPTA
BLE
YES/NO
Lack of skill, misunderstanding, low
Conduct Safety Meeting, Identify
controlling and wrong handling tools
Preparation Of Man Power, Potentials Of Hazard And Preparation GP - PROD -
1 Tools And Materials
can cause to personnel injury, - 3 2 2 4 Of JSA, PTW, Isolation Certificate And YES 2 LOW
accident/Incident and falling down to MECH - E / I
Direct / Self Safety Supervision
the sea.