In the calculation, three stages of rice farming are considered: Vegetative, Mid-Season and
Late-Season Stage. Figure 1 shows the diagram of the stages of growth of rice including the crop
coefficient per stages.
Basically, to determine the irrigation water requirement, we have to follow the following
steps:
1. The total land area of 2 hectares is divided into 64 paddies. The results are based on
the area of a paddy which is 312.5 m2.
2. The irrigation interval is set to be the days before the paddies will be irrigated again
for the water reached already the limit of 15 mm below the surface.
3. There is no effective rainfall due to limited data to calculate this variable.
4. AWD water usage (AWU) is calculate using this formula:
6. Percent efficiency is set to be the water use efficiency. This is where AWD method is
comparted with the existing method of continuous irrigation. The efficiency is
calculated using this formula:
Vegetative Stage
Duration 15 days 30 days
Water Level 100 mm 35 mm
Irrigation Interval 11 days 4 days
Times of Irrigation 1 times 8 times
Water Requirement
ETo 3.69 mm/day 3.69 mm/day
Kc 1.05 1.05
ET = ETo x Kc 3.8745 mm/day 3.8745 mm/day
SAT 200 mm 0 mm
PERC 5 mm/day 5 mm/day
P 0 0
Pe 0 mm/month 0 mm/month
IN 308.8745 mm/day 43.8745 mm/day
0.3089 m/day 0.0439 m/day
Water Usage
Total Land Area 20000 m2 20000 m2
Number of Blocks 64 64
Area per Block 312.5 m2 312.5 m2
Volume of Water 96.52 m3 13.71 m3
Mid-Season Stage
Duration 15 days 45 days
Water Level 35 mm 35 mm
Irrigation Interval 4 days 4 days
Times of Irrigation 4 times 12 times
Water Requirement
ETo 3.69 mm/day 3.69 mm/day
Kc 1.2 1.2
ET = ETo x Kc 4.428 mm/day 4.428 mm/day
SAT 0 mm 0 mm
PERC 5 mm/day 5 mm/day
P 45 45
Pe 17 mm/month 17 mm/month
IN 27.428 mm/day 27.428 mm/day
0.0274 m/day 0.0274 m/day
Water Usage
Total Land Area 20000 m2 20000 m2
Number of Blocks 64 64
Area per Block 312.5 m2 312.5 m2
Volume of Water 8.57 m3 8.57 m3
Water Requirement
ETo 3.69 mm/day
Kc 0.95
ET = ETo x Kc 3.5055 mm/day
SAT 0 mm
PERC 5 mm/day
P 45
Pe 17 mm/month
IN 91.5055 mm/day
0.0915 m/day
Water Usage
Total Land Area 20000 m2
Number of Blocks 64
Area per Block 312.5 m2
Volume of Water 28.60 m3