Service Letter
Dear Sirs,
We have improved the Piston design continuously to ensure the tightening condition
between Piston crown and skirt.
There are 5 kinds of different Piston design for H21/32(P) and 4 kinds of design for
H25/33(P).
So, please refer to attached Technical circular and to be kept the right instruction book at a
conspicuous place onboard so that the Pistons can be overhauled properly.
Faithfully yours,
2/1
TECHNICAL CIRCULAR
Page 1 of 6
TECHNICAL CIRCULAR Ref. No.: TEC2014/K2D0 - 001
[ BACKGROUND ]
Piston for HiMSEN engine has been improved continuously to ensure the tightening connection
between piston crown and skirt. This technical circular shows the design history of piston complete
for HiMSEN H21/32(P) and H25/33(P) to help customers’ easier understanding.
[ HISTORY OF MANUAL ]
1. H21/32(P)
Pressure
4 Stud A31100-2C M31100-2E 40 Nm 20 Nm - 60° 45 Nm
Washer
Pressure
A31100-3A M31100-3B 60 Nm 20 Nm - 60° 70 Nm
Washer
2 Stud
Nordlock
A31100-4B M31100-4C 60 Nm 40 Nm - 60° 100 Nm
Washer
Standard for
Nordlock new project
2 Bolt A31100-5A M31100-5A 30 / 60 Nm 25 Nm - 90° 100 Nm
Washer (Marine Genset
& Propulsion)
Page 2 of 6
ENGINE & MACHINERY DIVISION
Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: K2D0A@hhi.co.kr
TECHNICAL CIRCULAR Ref. No.: TEC2014/K2D0 - 001
2. H25/33(P)
Standard for
Thrust new project
4 Bolt C31100-1B M31100-1C 90 Nm 30 Nm - 60° 90 Nm
piece (Stationary &
Propulsion)
Pressure
C31100-2A M31100-2B 30 / 70 Nm 30 Nm - 60° 90 Nm
Washer
2 Stud
Nordlock 30/70Nm -
C31100-3A M31100-3B 30 / 70 Nm 150 Nm
Washer 60°
[ CONSIDERATION OF COMPATIBILITY ]
As the shapes of piston bowls of all piston types are same, there is nothing changed except for
slightly different piston mass in the engine-generator system. (Maximum deviation of mass is 3.9%
for H21/32 case with 4 Stud type and 2 Bolt type.)
Page 3 of 6
ENGINE & MACHINERY DIVISION
Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: K2D0A@hhi.co.kr
TECHNICAL CIRCULAR Ref. No.: TEC2014/K2D0 - 001
According to the analysis shown on Table.1 and Fig.2 for the effect of a piston weight unbalance on
the dynamic stability of the engine-generator system in terms of natural frequencies, engine
dynamic load and engine vibration, the variations were very small and could be neglected.
Page 4 of 6
ENGINE & MACHINERY DIVISION
Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: K2D0A@hhi.co.kr
TECHNICAL CIRCULAR Ref. No.: TEC2014/K2D0 - 001
Therefore, engine operation with combination of other types of piston completes will not cause any
problem and is allowed for 7H21/32.
Page 5 of 6
ENGINE & MACHINERY DIVISION
Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: K2D0A@hhi.co.kr
TECHNICAL CIRCULAR Ref. No.: TEC2014/K2D0 - 001
In case of other engine types such as 5H, 6H, 8H, 9H21/32 and all H25/33 are also acceptable to
use different types of piston completes in same engine according to this analysis result because it
was performed at 7H21/32 with 4 Stud and 2 Bolt piston types which is worst case of unbalance
condition on the dynamic stability, so it can cover other cases of mass deviation.
Attachment:
1. Manual sheets for H21/32
1) 1 Bolt : A31100-1B / M31100-1B
2) 4 Stud : A31100-2C / M31100-2E
3) 2 Stud (Pressure Washer) : A31100-3A / M31100-3B
4) 2 Stud (Nordlock Washer) : A31100-4B / M31100-4C
5) 2 Bolt : A31100-5A / M31100-5A
[The end]
Yours sincerely,
___________________________
Y. S. Ryoo / General Manager
HiMSEN Medium Bore D&D Dep’t
Page 6 of 6
ENGINE & MACHINERY DIVISION
Tel.: +82-52-202-7261, Fax: +82-52-202-7350, E-mail: K2D0A@hhi.co.kr
Page
H21/32 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
㋒›⼺ ⍊Ở᮪ᝂ ☆ᝓᅚ ᦥ ᬖ㈞ ᠿᗳ
A31100 1B
G
111 114
151
152
153
113
112
110
120
130
A32000
Part List
Weight
Item No. Description Q’ty / Cyl. Remarks / See Note
(kg)
114 Bolt 1
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 1B
G
# #
#
#
#
#
#
#
#
#
# Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#
#
71 எᝒ# 4# য┊# ㋒›⼺# ㋖# ⸊ᝓⓚ# ▚# ㊢ᔒ┊⍊ᜒ# 4. Dismantle circlips for piston pin by means of plier
Ṃ㋮⎂# ᬚ㌊㋲ၺ1# as shown in fig. 1.
㊢ᔒ┊⍊# =# # 91.240 Plier : 91.240
81 ㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⍦Ẳ# ㋒›⼺# ㋖ⓚ# ႖ᦿ㌻ 5. Take out the piston pin to the opposite side during
ⓒᗲ# ᳧⋚๎ၺ1# lifting the piston.
#
#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 1B
G
#
9 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ᬚ㌊㋲ၺ1# 6. Dismantle piston rings by means of plier.
㊢ᔒ┊⍊# =# # 91.250 Plier : 91.250
ቲ# ㋒›⼺# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㌊⌒# Be sure to use the plier for piston ring.
㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ⍦# ἦṗ┊# ṳ# ᾮ# ┞⁋ၞ Otherwise, piston rings may damage.
ၺ1#
: ⎆ἢ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ# ⾊▗ᣒⓚ# ㋒›⼺# ㋒›⼺# 7. Remove burned carbon deposits from piston and
# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ෭┊# ၼ⋚ piston ring grooves, and clean all the parts
๎ၺ1# # carefully.
; ㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖ 8. Inspect the piston for any abnormal marks
Ṃ㋲ၺ1# carefully.
< ㋒›⼺# ㋖# ἢၾᬖ# ᬖᜒ# ▦ਖ㋲ၺ1# 9. Inspect the piston pin and the small end bush.
+# # # # # M32130
# # # # # # # # # ⓮# “ἢၾᬖ# ᬖ⓮# ᬚ㌊2▦ਖ# ”# ᬖᬚ (See “Small end bush overhaul” in M32130 )
ⓚ# ⧎☆㋮₃⎺1,#
51 ᪒ぎ⓮# ฮṂṆ# ᦥ# ▧⪟᠊ⓚ# “ᡆᝂ⳪ቲ# ㄮ┊›ぎ# Jq# 2. Coat thread and contact surface of bolt with
soxv”ᗲ# ᦪᜎ# 㑚⍦# ㋒›⼺# ᪒ぎᜒ# 463# Qp⓮# ⼶⸂ᗲ# “Molycote-paste Gn plus”, and then tighten the bolt
⩊㋲ၺ1# with a torque of 130 Nm.
# # # # # # # # # # # # # # # ᪒ぎ⓮# ┊খ# :916# pp# ┊㋮┊᠊# ㋒›⼺# If only the length of bolt is less than
᪒ぎᜒ# ╂Ṃ㋶# ᾮ# ┞⁋ၞၺ1# 76.3 mm, reuse the piston bolt.
M8
Fig.2 Cross section of piston complete +㋒›⼺# ၾ᠊ᅚ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 1B
G
61 ᪒ぎᜒ# ၺ# ㈖੶# า# 㑚# 78# Qp⓮# ⼶⸂ᗲ# ၺ# ☆ 3. Loosen the bolt again, and tighten the bolt with a
┎ၺ1# torque of 45 Nm.
71 ⬪খ▗ⓒᗲ# 93㖡ᜒ# ც# ☆┎ၺ1# 4. Continue tighten the piston bolt by additional 60ȋ .
#
᪒ぎဪ# ㍮# ⼶⸂# 463# Qpᜒ# ▗㋮⎂# ც# Make sure that the bolt is not rotated
┊ṗ# ☆⎂❖❖# ⋠⋚⌒# ㋿ၞၺ1# # by application of test torque 130 Nm to tightening
# direction.
# # # # # # # # # # # # # # # ᪒ぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊/# Ṟᗲ⑊# ᪒ If the bolts can turn any more, replace
ぎᗲ# ૦⩊㋮₃⎺1# by new one.
71 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ㋒›⼺# # 4. Mount piston rings into its grooves by means of
㏞⍦# ☆ᝓ㋲ၺ# the plier.
㊢ᔒ┊⍊# =# # 91.250 Plier : 91.250
#
# # # # # # # # # # # # # # ㋒›⼺# ⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ⸂ᜒ# “Top” mark of piston rings should be
㏫┎㋲# 㑚/# ⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# assembled in upper side of groove.
# # # # # # # # # # # # # # গ# ㋒›⼺# ⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ The end gap of each piston ring should
ᅚᗳ# ᧆ⯮⸺₃⎺1# be arranged in 120ȋ in relation to each other.
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 1B
G
81 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ㋒›⼺# # 5. Mount piston rings into its grooves by means of the
㏞⍦# ☆ᝓ㋲ၺ# plier.
㊢ᔒ┊⍊# =# # 91.250 Plier : 91.250
#
91 எᝒ# 6# য┊# ㋒›⼺# ┊# ᠾᆮ⍞ဪ❖ᜒ# ㏫┎㋲ 6. Inspect the piston rings for wear carefully as
ၺ1# G09200 shown in fig. 3. G09200
# # # # # # # # # # # # # # ㋒›⼺# ┊# ᠾ# ▲㋲⯮ᜒ# ⪞㋮⎖ਆฮ# ㋒ If piston rings exceed the wear limit
›⼺# ⍦# ᯚ▫ṗ▗┎# 㓷❧┊# ┞ၺ᠊/# Ṟ# ᬖ㈞ⓒᗲ# ૦⩊㋮₃ and/or if the piston has any abnormal mark, then
⎺1# replace by new one.
:1 ㋒›⼺# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ# ┒⩊ᜒ# ⍪❚⍦# ╂㋲ 7. Mount the piston together with connecting rod
ၺ1# shaft into the engine.
+# # # # # M31000
# # # # # # # # # ⓮# “㋒›⼺# ⱺົ゛# ᗲቲᜒ# ⁺ᝆც# (See “Mounting of a piston and connecting rod into
ᔒ┊ພ⍦# ☆ᝓ# ”# ᬖᬚⓚ# ⧎☆㋮₃⎺1,# the cylinder liner” in M31000 )
G
G
Fig.3 The maximum vertical clearance of piston rings +㋒›⼺# ⓮# ⫲႖# ᾮ❗# ぞṞ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
㋒›⼺ ⍊Ở᮪ᝂ ☆ᝓᅚ ᦥ ᬖ㈞ ᝂ›ぎ
A31100 2C
G
152 117
153 116
114
112
115
120
130
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.07/HSYG
Page
H21/32 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 2E
G
# #
#
#
#
#
#
#
#
#
# Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#
#
71 எᝒ# 4# য┊# ㋒›⼺# ㋖# ⸊ᝓⓚ# ▚# ㊢ᔒ┊⍊ᜒ# 4. Dismantle circlips for piston pin by means of plier
Ṃ㋮⎂# ᬚ㌊㋲ၺ1# as shown in fig. 1.
㊢ᔒ┊⍊# =# # 91.240 Plier : 91.240
81 ㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⍦Ẳ# ㋒›⼺# ㋖ⓚ# ႖ᦿ㌻ 5. Take out the piston pin to the opposite side during
ⓒᗲ# ᳧⋚๎ၺ1# lifting the piston.
#
#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.07/HSYG
Page
H21/32 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 2E
G
#
9 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ᬚ㌊㋲ၺ1# 6. Dismantle piston rings by means of plier.
㊢ᔒ┊⍊# =# # 91.250 Plier : 91.250
ቲ# ㋒›⼺# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㌊⌒# Be sure to use the plier for piston ring.
㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ⍦# ἦṗ┊# ṳ# ᾮ# ┞⁋ၞ Otherwise, piston rings may damage.
ၺ1#
: ⎆ἢ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ# ⾊▗ᣒⓚ# ㋒›⼺# ㋒›⼺# 7. Remove burned carbon deposits from piston and
# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ෭┊# ၼ⋚ piston ring grooves, and clean all the parts
๎ၺ1# # carefully.
; ㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖ 8. Inspect the piston for any abnormal marks
Ṃ㋲ၺ1# carefully.
< ㋒›⼺# ㋖# ἢၾᬖ# ᬖᜒ# ▦ਖ㋲ၺ1# 9. Inspect the piston pin and the small end bush.
+# # # # # M32130
# # # # # # # # # ⓮# “ἢၾᬖ# ᬖ⓮# ᬚ㌊2▦ਖ# ”# ᬖᬚ (See “Small end bush overhaul” in M32130 )
ⓚ# ⧎☆㋮₃⎺1,#
51 ›⻆ቲ⓮# ฮṂṆ# ᦥ# ▧⪟᠊ⓚ# “ᡆᝂ⳪ぎ# ㄮ┊›ぎ# 2. Coat thread and contact surface of stud with
J0q# soxv# ru# J0q”ⓒᗲ# ᦪᜎ# 㑚⍦# ㋒›⼺# ›⻆ቲᜒ# “Molycote-paste G-n plus or G-n”, and then tighten
58# Qp⓮# ⼶⸂ᗲ# ႖গẶᦿ㌻ⓒᗲ# ⸂ᔒ⑊⍦# ☆ᝓ㋲ၺ1# the stud with a torque of 25 Nm to assemble to
# crown diagonally.
# # # # # # # # # # # # # # # ›⻆ቲ⓮# ┊খ# ;716# pp# ┊㋮┊᠊# ㋒›⼺# If only the length of stud is less than
›⻆ቲᜒ# ╂Ṃ㋶# ᾮ# ┞⁋ၞၺ1# 84.3 mm, reuse the piston stud.
M8
Fig.2 Cross section of piston complete +㋒›⼺# ၾ᠊ᅚ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.07/HSYG
Page
H21/32 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 2E
G
61 ›⻆ቲ⓮# ฮṂṆ⍦# ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᦪᜊ੶# ㋒ 3. Coat thread of studs with molycote-paste and
›⼺# ›ⱺぎᜒ# ⸂ᔒ⑊⍦# ☆ᝓ㋲ၺ1# ⏖Ṻ⓮# ⌧᠊⍦ᅚ# assemble piston skirt to crown. Before assembling
ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᅚㆂ㋮⎂# ☆ᝓ㋲ၺ1# washers, coat contact surface with molycote-paste.
71 ພぎᜒ# ႖গẶ# ᦿ㌻ⓒᗲ# 73# Qp⓮# ⼶⸂ᗲ# ☆┚# 㑚# 4. Tighten the nuts with a torque of 40 Nm, loosen
ၺ# ㈖੶# ›⻆ቲᜒ# 58# Qp⓮# ⼶⸂ᗲ# ၺ# ☆⎂Ẳ# the nuts again, and tighten the stud bolt with a
㏫┎㋲ၺ1# torque of 25 Nm for checking.
81 ພぎᜒ# 53Qp# গগ# ⩊㋲# 㑚# ⬪খ▗ⓒᗲ# 93㖡ᜒ# 5. Continue tighten the nuts with a torque of 20 Nm
ც# ☆┎ၺ1# each by each and turn the nuts additional 60ȋ .
ພぎဪ# ㍮# ⼶⸂# 78#Qpᜒ# ▗㋮⎂# ც# ┊ Make sure that the nut is not rotated
ṗ# ☆⎂❖❖# ⋠⋚⌒# ㋿ၞၺ1# # by application of test torque 45 Nm to tightening
# direction.
# # # # # # # # # # # # # # # ພぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊/# Ṟᗲ⑊# › If the nuts can turn any more, replace
⻆ቲ⏖# ພぎᗲ# ૦⩊㋮₃⎺1# by new ones(stud & nut).
# # # # # # # # # # # # # # ㋒›⼺# ⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ⸂ᜒ# “Top” mark of piston rings should be
㏫┎㋲# 㑚/# ⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# assembled in upper side of groove.
# # # # # # # # # # # # # # গ# ㋒›⼺# ⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ The end gap of each piston ring should
ᅚᗳ# ᧆ⯮⸺₃⎺1# be arranged in 120ȋ in relation to each other.
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.07/HSYG
Page
H21/32 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 2E
G
81 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ㋒›⼺# # 4. Mount piston rings into its grooves by means of
㏞⍦# ☆ᝓ㋲ၺ# the plier.
㊢ᔒ┊⍊# =# # 91.250 Plier : 91.250
#
# # # # # # # # # # # # # # ㋒›⼺# ⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ⸂ᜒ# “Top” mark of piston rings should be
㏫┎㋲# 㑚/# ⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# assembled in upper side of groove.
# # # # # # # # # # # # # # গ# ㋒›⼺# ⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ The end gap of each piston ring should
ᅚᗳ# ᧆ⯮⸺₃⎺1# be arranged in 120ȋ in relation to each other.
#
91 எᝒ# 6# য┊# ㋒›⼺# ┊# ᠾᆮ⍞ဪ❖ᜒ# ㏫┎㋲ 6. Inspect the piston rings for wear carefully as
ၺ1# G09200 shown in fig. 3. G09200
# # # # # # # # # # # # # # ㋒›⼺# ┊# ᠾ# ▲㋲⯮ᜒ# ⪞㋮⎖ਆฮ# ㋒ If piston rings exceed the wear limit
›⼺# ⍦# ᯚ▫ṗ▗┎# 㓷❧┊# ┞ၺ᠊/# Ṟ# ᬖ㈞ⓒᗲ# ૦⩊㋮₃ and/or if the piston has any abnormal mark, then
⎺1# replace by new one.
:1 ㋒›⼺# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ# ┒⩊ᜒ# ⍪❚⍦# ╂㋲ 7. Mount the piston together with connecting rod
ၺ1# shaft into the engine.
+# # # # # M31000
# # # # # # # # # ⓮# “㋒›⼺# ⱺົ゛# ᗲቲᜒ# ⁺ᝆც# (See “Mounting of a piston and connecting rod into
ᔒ┊ພ⍦# ☆ᝓ# ”# ᬖᬚⓚ# ⧎☆㋮₃⎺1,# the cylinder liner” in M31000 )
G
G
Fig.3 The maximum vertical clearance of piston rings +㋒›⼺# ⓮# ⫲႖# ᾮ❗# ぞṞ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.07/HSYG
Page
H21/32 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
㋒›⼺ ⍊Ở᮪ᝂ ☆ᝓᅚ ᦥ ᬖ㈞ ᝂ›ぎ
A31100 3A
G
152
153
114
115
120
112
130
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 3B
G
# #
#
#
#
#
#
#
#
#
#
#
#
# Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#
#
71 எᝒ# 4# য┊# ㋒›⼺# ㋖# ⸊ᝓⓚ# ▚# ㊢ᔒ┊⍊ᜒ# 4. Dismantle circlips for piston pin by means of plier
Ṃ㋮⎂# ᬚ㌊㋲ၺ1# as shown in fig. 1.
㊢ᔒ┊⍊# =# # 91.240 Plier : 91.240
81 ㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⍦Ẳ# ㋒›⼺# ㋖ⓚ# ႖ᦿ㌻ 5. Take out the piston pin to the opposite side during
ⓒᗲ# ᳧⋚๎ၺ1# lifting the piston.
#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 08.08/PMUG
Page
H21/32 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 3B
G
91 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ᬚ㌊㋲ၺ1# 6. Dismantle piston rings by means of plier.
㊢ᔒ┊⍊# =# # 99.010 Plier : 91.250
ቲ# ㋒›⼺# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㌊⌒# Be sure to use the plier for piston ring.
㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ⍦# ἦṗ┊# ṳ# ᾮ# ┞⁋ၞ Otherwise, piston rings may damage.
ၺ1#
:1 ⎆ἢ# ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ# ⾊▗ᣒⓚ# ㋒›⼺# ㋒›⼺# 7. Remove burned carbon deposits from piston and
# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ෭┊# ၼ⋚๎ piston ring grooves, and clean all the parts
ၺ1# # carefully.
;1 ㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖṂ 8. Inspect the piston for any abnormal marks
㋲ၺ1# carefully.
<1 ㋒›⼺# ㋖# ἢၾᬖ# ᬖᜒ# ▦ਖ㋲ၺ1# 9. Inspect the piston pin and the small end bush.
+# # # # #M.32.130
# # # # # # # # # # ⓮# “ἢၾᬖ# ᬖ⓮# ᬚ㌊2▦ਖ# ”# ᬖ (See “Small end bush overhaul” in M32130 )
ᬚⓚ# ⧎☆㋮₃⎺1,#
51 ›⻆ቲ⓮# ฮṂṆ# ᦥ# ▧⪟᠊ⓚ# “ᡆᝂ⳪ぎ# ㄮ┊›ぎ# 2. Coat thread and contact surface of stud with
J0q# soxv# ru# J0q”ⓒᗲ# ᦪᜎ# 㑚⍦# ㋒›⼺# ›⻆ቲᜒ# “Molycote-paste G-n plus or G-n”, and then tighten
63# Qp⓮# ⼶⸂ᗲ# ႖গẶᦿ㌻ⓒᗲ# ⸂ᔒ⑊⍦# ☆ᝓ㋲ၺ1# the stud with a torque of 30 Nm to assemble to
# crown diagonally.
# # # # # # # # # # # # # # # ›⻆ቲ⓮# ┊খ# ;713# pp# ┊㋮┊᠊# ㋒›⼺# If only the length of stud is less than
›⻆ቲᜒ# ╂Ṃ㋶# ᾮ# ┞⁋ၞၺ1# 84.0 mm, reuse the piston stud.
Fig.2 Cross section of piston complete +㋒›⼺ ၾ᠊ᅚ, Fig.3 Caulking position +⳪⎺⹏# ⒚⯮,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 08.08/PMUG
Page
H21/32 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 3B
G
61 ›⻆ቲ⓮# ฮṂṆ⍦# ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᦪᜊ੶# ㋒ 3. Coat thread of studs with molycote-paste and
›⼺# ›ⱺぎᜒ# ⸂ᔒ⑊⍦# ☆ᝓ㋲ၺ1# ⏖Ṻ⓮# ⌧᠊⍦ᅚ# assemble piston skirt to crown. Before assembling
ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᅚㆂ㋮⎂# ☆ᝓ㋲ၺ1# washers, coat contact surface with molycote-paste.
71 ພぎᜒ# ႖গẶ# ᦿ㌻ⓒᗲ# 93# Qp⓮# ⼶⸂ᗲ# ☆┚# 㑚# 4. Tighten the nuts with a torque of 60 Nm, loosen
ၺ# ㈖੶# ›⻆ቲᜒ# 63# Qp⓮# ⼶⸂ᗲ# ၺ# ☆⎂Ẳ# the nuts again, and tighten the stud bolt with a
㏫┎㋲ၺ1# torque of 30 Nm for checking.
81 ພぎᜒ# 53Qp# গগ# ⩊㋲# 㑚# ⬪খ▗ⓒᗲ# 93㖡ᜒ# 5. Continue tighten the nuts with a torque of 20 Nm
ც# ☆┎ၺ1# each by each and turn the nuts additional 60ȋ .
# # # # # # # # # # # # # # # ພぎ⓮# ㍮# ⼶⸂# <3#Qpᜒ# ▗㋮⎂# ც# ┊ Make sure that the nut is not rotated
ṗ# ☆⎂❖❖# ⋠⋚⌒# ㋿ၞၺ1# # by application of test torque 70 Nm to tightening
# # # # # # # # # # # # # # # ພぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊/# Ṟᗲ⑊# › direction.
⻆ቲ⏖# ພぎᗲ# ૦⩊㋮₃⎺1# If the nuts can turn any more, replace
# by new ones(stud & nut).
91 எᝒ# 6⍦# ᔒ# ▫ⓚ# ┊㋮⎂# ພぎ᠊# ⍦# ⳪⎺⹏# 6. Caulk the nut by using a chisel as shown in fig. 3.
# # ┧⍛ⓚ# ⁺㋶# ਙ1#
⫲☛# ⳪⎺⹏㑚# ⍦ဪ# ㍮⼶⸂# ▦ਖⓚ# Do not turn the nut again with test
# ㋮❖ᝦ# ਙ1# torque after caulking.
# # # # # # # # # # # # # # ㋒›⼺# ⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ⸂ᜒ# “Top” mark of piston rings should be
㏫┎㋲# 㑚/# ⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# assembled in upper side of groove.
# # # # # # # # # # # # # # গ# ㋒›⼺# ⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ The end gap of each piston ring should
ᅚᗳ# ᧆ⯮⸺₃⎺1# be arranged in 120ȋ in relation to each other.
#
91 எᝒ# 6# য┊# ㋒›⼺# ┊# ᠾᆮ⍞ဪ❖ᜒ# ㏫┎㋲ 6. Inspect the piston rings for wear carefully as
ၺ1# G09200 shown in fig. 3. G09200
# # # # # # # # # # # # # # ㋒›⼺# ┊# ᠾ# ▲㋲⯮ᜒ# ⪞㋮⎖ਆฮ# ㋒ If piston rings exceed the wear limit
›⼺# ⍦# ᯚ▫ṗ▗┎# 㓷❧┊# ┞ၺ᠊/# Ṟ# ᬖ㈞ⓒᗲ# ૦⩊㋮₃ and/or if the piston has any abnormal mark, then
⎺1# replace by new one.
:1 ㋒›⼺# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ# ┒⩊ᜒ# ⍪❚⍦# ╂㋲ 7. Mount the piston together with connecting rod
ၺ1# shaft into the engine.
+# # # # # M31000
# # # # # # # # # ⓮# “㋒›⼺# ⱺົ゛# ᗲቲᜒ# ⁺ᝆც# (See “Mounting of a piston and connecting rod into
ᔒ┊ພ⍦# ☆ᝓ# ”# ᬖᬚⓚ# ⧎☆㋮₃⎺1,# the cylinder liner” in M31000 )
G
G
Fig.3 The maximum vertical clearance of piston rings +㋒›⼺# ⓮# ⫲႖# ᾮ❗# ぞṞ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 08.08/PMUG
Page
H21/32 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
㋒›⼺ ⍊Ở᮪ᝂ ☆ᝓᅚ ᦥ ᬖ㈞ ᝂ›ぎ
A31100 4B
G
152
153
114
115
120
112
130
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 12.03/YTYG
Page
H21/32 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4C
2. I-볼트를 피스톤 크라운에 설치하고, 크레인에 매달 2. Install I-bolt on the piston crown, and hook up onto
아 올린다. a crane.
3. 피스톤과 커넥팅 로드 샤프트를 작업대에서 들어올 3. Lift up the piston together with connecting rod
린 후, 커넥팅 로드 샤프트의 접합면을 목재 테이블 shaft from working stand, and slow down the joint
또는 유사한 종류 위에 조심스럽게 내려 놓는다. faces of connecting rod shaft on the wooden table
or the likes carefully.
Fig.1 Dismantling the circlips for piston pin (피스톤 핀 서클립의 분해)
4. 그림 1과 같이 피스톤 핀 써클립을 전용 플라이어를 4. Dismantle circlips for piston pin by means of plier
사용하여 분해한다. as shown in fig. 1.
플라이어 : 91.240 Plier : 91.240
5. 피스톤을 들고 있는 상태에서 피스톤 핀을 반대방향 5. Take out the piston pin to the opposite side during
으로 뽑아낸다. lifting the piston.
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 13.12/YTY
Page
H21/32 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4C
7. 연소 중 눌어 붙은 카본 퇴적물을 피스톤과 피스톤 7. Remove burned carbon deposits from piston and
링 홈에서 제거한 후, 모든 부품들을 깨끗이 닦아낸 piston ring grooves, and clean all the parts
다. carefully.
8. 피스톤에 비정상적인 흠집이 있는 지를 자세히 검사 8. Inspect the piston for any abnormal marks
한다. carefully.
9. 피스톤 핀과 소단부 부시를 점검한다. 9. Inspect the piston pin and the small end bush.
( M.32.130 의 “소단부 부시의 분해/점검 ” 부 (See “Small end bush overhaul” in M32130 )
분을 참조하십시오.)
2. 체결부위(피스톤 크라운의 탭홀, 스터드 볼트)를 깨 2. Clean up stud bolts and tap holes in piston crown.
끗하게 세척한다. (스터드의 풀림방지제 제외) (Except stud fastener)
3. 스터드를 크라운 탭홀에 면접촉할 때까지 체결한다. 3. Tighten the stud to put into the crown until the stud
end is touched with the bottom of the tap hole.
스터드의 길이가 84.0 mm 이하이면 피스톤 If only the length of stud is less than
스터드를 재사용할 수 있습니다. 84.0 mm, reuse the piston stud.
스터드 체결 후 잔여 길이(A)는 64.2 mm Remained length (A) of stud after as-
를 초과할 수 없습니다. sembly cannot exceed 64.2mm.
Fig.2 Cross section of piston complete (피스톤 단면도) Fig.3 Remained length of stud (스터드 잔여길이)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 13.12/YTY
Page
H21/32 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4C
4. 스터드의 나사산에 “몰리코트 페이스트 G-n plus or 4. Coat thread of studs with “Molycote-paste G-n plus
G-n”를 바르고 피스톤 스커트를 크라운에 조립한다. or G-n” and assemble piston skirt to crown. Before
와샤의 양면에도 몰리코트 페이스트를 도포하여 조 assembling washers, coat contact surface with
립한다. molycote-paste.
5. 너트를 대각선 방향으로 60 Nm의 토크로 조임 후 5. Tighten the nuts with a torque of 60 Nm, loosen
다시 풀고 스터드를 30 Nm의 토크로 다시 조여서 the nuts again, and tighten the stud bolt with a
확인한다. torque of 30 Nm for checking.
6. 너트를 40Nm 각각 체결한 후 추가적으로 60˚를 6. Continue tighten the nuts with a torque of 40 Nm
더 조인다. each by each and turn the nuts additional 60˚ .
너트는 시험 토크 100 Nm를 적용하여 더 Make sure that the nut is not rotated
이상 조여지지 않아야 합니다. by application of test torque 100 Nm to tightening
direction.
너트가 조금이라도 회전을 하면, 새로운 스 If the nuts can turn any more, replace
터드, 너트, 노드락 와셔로 교체하십시오. by new ones (stud, nut & nordlock washer).
사용한 노드락 와셔는 폐기 처분되어야 하 Used nordlock washers to be scraped,
며, 재조립 시 신규 노드락 와셔가 적용되어야 합니다. and new ones should be applied during re-
assemblies.
스터드의 풀림방지제가 손상되었다면 새로 If the stud fastener was damaged,
운 스터드로 교체하십시오. replace by new stud with new fastener.
side.
2. 피스톤 핀용 서클립을 전용 플라이어를 사용하여 장 2. Mount circlips for piston pin by means of plier.
착한다.
플라이어 : 91.240 Plier : 91.240
3. 피스톤과 커넥팅 로드 샤프트를 크레인을 사용하여 3. Lift up the piston together with connecting rod
들어 올린다. shaft by means of a crane.
4. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 4. Mount piston rings into its grooves by means of
홈에 조립한다 the plier.
플라이어 : 91.250 Plier : 91.250
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 13.12/YTY
Page
H21/32 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4C
5. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 5. Mount piston rings into its grooves by means of
홈에 조립한다 the plier.
플라이어 : 91.250 Plier : 91.250
6. 그림 4와 같이 피스톤 링이 마모되었는지를 확인한 6. Inspect the piston rings for wear carefully as
다. G09200 shown in fig. 4. G09200
피스톤 링이 마모 제한치를 초과하였거나 피 If piston rings exceed the wear limit
스톤 링에 비정상적인 흡집이 있다면, 새 부품으로 교체하십 and/or if the piston has any abnormal mark, then
시오. replace by new one.
7. 피스톤과 커넥팅 로드 샤프트 일체를 엔진에 탑재한 7. Mount the piston together with connecting rod
다. shaft into the engine.
( M31000 의 “피스톤과 커넥팅 로드를 실린더 (See “Mounting of a piston and connecting rod into
라이너에 조립 ” 부분을 참조하십시오.) the cylinder liner” in M31000 )
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 13.12/YTY
Page
H21/32 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
㋒›⼺ ⍊Ở᮪ᝂ ☆ᝓᅚ ᦥ ᬖ㈞ ᝂ›ぎ
A31100 5A
G
152
153
114
120
112
130
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 07.08/HSYG
Page
H21/32 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 5A
G
#############################################################################################################
㋒›⼺# ㋖# ᦥ# ⓮# ᬚ㌊# Dismantling a Piston Pin and Piston Rings
41 ㋒›⼺# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ⍪❚# ᮪ᗳ⍦Ẳ# ᬚ㌊ 1. Dismount the piston together with connecting rod
㋲ၺ1# shaft from the engine.
# # # # # # # # # # ⓮G “㋒›⼺# ⱺົ゛# ᗲቲ⓮# ᬚ㌊# ”G ᬖ
+# # # # # M31000 OSee “Dismounting of a piston and connecting rod ”
ᬚⓚ# ⧎☆㋮₃⎺1,# inG G G G G GM31000
G G PG G G G G G P
51 L0᪒ぎᜒ# ㋒›⼺# ⸂ᔒ⑊⍦# Ẻ⯮㋮੶/# ⸂ᖞ┎⍦# ႂ 2. Install I-bolt on the piston crown, and hook up onto
⋚# ⏂ᝆၺ1# a crane.
61 ㋒›⼺# ⱺົ゛# ᗲቲ# Ṻ㊚ぎᜒ# ┧⍛႖⍦Ẳ# ቺ⍊⏂ 3. Lift up the piston together with connecting rod
ᝆ# 㑚/# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ⓮# ▧㋿᠊ⓚ# ᠿ╂# ⻢┊᮪# shaft from working stand, and slow down the joint
Ꭶဪ# ⒶṂ㋲# ☛ᛮ# ⒚⍦# ☆₂›ᖓਢ# ๊ᖺ# ༩ဪၺ1# faces of connecting rod shaft on the wooden table
# or the likes carefully.
#
#
#
#
#
#
#
#
#
#
#
#
#
# Fig.1 Dismantling the circlips for piston pin +㋒›⼺# ㋖# Ẳ⸊ᝓ⓮# ᬚ㌊,#
#
71 எᝒ# 4# য┊# ㋒›⼺# ㋖# ⸊ᝓⓚ# ▚# ㊢ᔒ┊⍊ᜒ# 4. Dismantle circlips for piston pin by means of plier
Ṃ㋮⎂# ᬚ㌊㋲ၺ1# as shown in fig. 1.
㊢ᔒ┊⍊# =# # 91.240 Plier : 91.240
81 ㋒›⼺ⓚ# ቺ੶# ┞ဪ# ṗ⍦Ẳ# ㋒›⼺# ㋖ⓚ# ႖ᦿ㌻ 5. Take out the piston pin to the opposite side during
ⓒᗲ# ᳧⋚๎ၺ1# lifting the piston.
#
# #
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 08.11/PMUG
Page
H21/32 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 5A
G
91 ㋒›⼺# ⓚ# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㋮⎂# ᬚ㌊㋲ၺ1# 6. Dismantle piston rings by means of plier.
㊢ᔒ┊⍊# =# # 91.250 Plier : 91.250
ቲ# ㋒›⼺# ▚# ㊢ᔒ┊⍊ᜒ# Ṃ㌊⌒# Be sure to use the plier for piston ring.
㋿ၞၺ1# எᖝ❖# ⋠ⓒ᠊# ㋒›⼺# ⍦# ἦṗ┊# ṳ# ᾮ# ┞⁋ၞ Otherwise, piston rings may damage.
ၺ1#
:1 ⎆ἢ# ⚧# ྡྷ⍊# ᬯⓖ# Ⰺ# ⾊▗ᣒⓚ# ㋒›⼺# ㋒›⼺# 7. Remove burned carbon deposits from piston and
# ㏞⍦Ẳ# ▲ਆ㋲# 㑚/# ᠾቶ# ᬖ㈞ቺⓚ# ෭┊# ၼ⋚๎ piston ring grooves, and clean all the parts
ၺ1# # carefully.
;1 ㋒›⼺⍦# ᯚ▫ṗ▗┎# 㓶❧┊# ┞ဪ# ❖ᜒ# ┦Ỏ㔞# ਖṂ 8. Inspect the piston for any abnormal marks
㋲ၺ1# carefully.
<1 ㋒›⼺# ㋖# ἢၾᬖ# ᬖᜒ# ▦ਖ㋲ၺ1# 9. Inspect the piston pin and the small end bush.
+# # # # # M32130
# # # # # # # # # ⓮# “ἢၾᬖ# ᬖ⓮# ᬚ㌊2▦ਖ# ”# ᬖᬚ (See “Small end bush overhaul” in M32130 )
ⓚ# ⧎☆㋮₃⎺1,#
㋒›⼺# ᪒ぎ# ┎┻# ▦ਖ# ᦥ# ⩊# ᾲẲ# Tension inspection and tightening procedure
# of Piston Bolt
41 ┎┻# ▦ਖ# =# 433# Qp# ⼶⸂⍦Ẳ# ᪒ぎখ# ც# ┊ṗ# ☆⎂ 1. Tension inspection : Bolts should not turn any
❖❖# ⋠⋚⌒# ㋲ၺ1# more with a torque of 100 Nm.
51 ᝢ⌓# ᪒ぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊# ⋚ᔮ# ᾲẲ⍦# 2. If the bolts are turned any more, replace by new
ᔒ# Ṟᗲ⑊# ᪒ぎ⏖# ༎ቲᔓ# ⏖Ừᗲ# ૦⩊㋮⎂⌒# ㋲ၺ1# bolts and Nord-lock washers according to below
# tightening procedure of piston bolt.
61 எᝒ# 5⏖# য┊# ㋒›⼺# ᪒ぎᜒ# ⼶⸂# ›ゾພᗲ# ㈖⍊๎# 3. Loosen piston bolt by using a torque spanner and
㑚# ㋒›⼺⓮# ›ⱺぎᜒ# ᬚᝂ㋲ၺ1# dismount piston skirt as shown in fig. 2.
皦畲 枪砮嘎 : 91.810 (昦痣斲檗) Torque spanner : 91.810 (Optional)
Fig.2 Cross section of piston complete +㋒›⼺ ၾ᠊ᅚ, Fig.3 Angle marking & Bolt tightening procedure
+গᅚ# ㇲ# ᦥ# ᪒ぎ# ⩊# ᾲẲ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 08.11/PMUG
Page
H21/32 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
㋒›⼺ ⍊Ở᮪ᝂ ▫ᯚ▦ਖ ▞⦾
M31100 5A
G
71 ㋒›⼺# ›ⱺぎᜒ# ⸂ᔒ⑊⍦# ☆ᝓ# 㑚# ༎ቲᔓ# ⏖Ṻᜒ# 4. After assembling piston skirt to crown, put Nord
›ⱺぎ⍦# ☆ᝓ㋲ၺ1# ᪒ぎ⓮# ฮṂṆ# ᪒ぎ៎ᝂ# ┦ᝂ lock washers into skirt. Coat thread of bolt and
᠊⍦# ᡆᝂ⳪ぎ# ㄮ┊›ぎᜒ# ᦪᜎ# 㑚# ⸂ᔒ⑊⍦# ☆ᝓ contact surface of bolt head with “Molycote-paste
㋲ၺ1# G-n plus or G-n”
81 ᪒ぎᜒ# எᝒ# 6⓮# ᾲẲ⍦# ᔒ# 4vw# =# 63# Qp/# 5qg# =# # 5. Tighten the bolts with a torque of 1st : 30 Nm, 2nd :
93#Qp⓮# ⼶⸂ᗲ# ☆┚# 㑚# ၺ# ㈒ၺ1# 60 Nm as shown in fig. 3., loosen the bolts again.
91 ᪒ぎᜒ# எᝒ# 6⓮# ᾲẲ⍦# ᔒ# 58Qp# গগ# ⩊㋲# 6. Tighten the bolts with a torque of 25 Nm each by
㑚# ⬪খ▗ⓒᗲ# <3㖡ᜒ# ც# ☆┎ၺ1# each as shown in fig. 3 and turn the bolts
# additional 90ȋ .
⫲☛# ⩊# গᅚဪ# <3㕟㕗5㕟ᨪ⒚# ๊⍦# ⒚ Final angle should be 90¶·2¶. Make
⯮# Ⲳ⌒# ㋿ၞၺ1# ᪒ぎဪ# ㍮# ⼶⸂# 433# Qpᜒ# ▗㋮⎂# sure that the bolt is not rotated by application of
ც# ┊ṗ# ☆⎂❖❖# ⋠⋚⌒# ㋿ၞၺ1# # test torque 100 Nm to tightening direction.
#
# # # # # # # # # # # # # # # ᪒ぎখ# ☆ஞ┊ᔒᅚ# 㐢▚ⓚ# ㋮᠊/# Ṟᗲ⑊# ᪒ If the bolts can turn any more, replace
ぎ⏖# ༎ቲᔓ# ⏖Ừᗲ# ૦⩊㋮₃⎺1# by new ones(bolt and nordlock washer).
Ṃ㋲# ༎ቲᔓ# ⏖Ừဪ# ㅦெ# ⨮ᬚᆮ⍊⌒# ㋮᠆/# ╂☆ᝓ# # ⁶ Used nordlock washers to be scraped, and new
୲# ༎ቲᔓ# ⏖Ừখ# ▗ᆮ⍊⌒# ㋿ၞၺ1# ones should be applied during re-assemblies.
# # # # # # # # # # # # # # ㋒›⼺# ⓮# ㋲⡓# ᠊⍦# Ṟਾ❚# “wrs”# ⸂ᜒ# “Top” mark of piston rings should be
㏫┎㋲# 㑚/# ⸂খ# ㏞⓮# ⒚⡓ⓚ# ㌻㋮ᅚᗳ# ㌊⌒# ㋿ၞၺ1# assembled in upper side of groove.
# # # # # # # # # # # # # # গ# ㋒›⼺# ⓮# ෳၾ# ৃ┊# Ẳᗲ# 453㖡খ# ᆮ The end gap of each piston ring should
ᅚᗳ# ᧆ⯮⸺₃⎺1# be arranged in 120ȋ in relation to each other.
#
91 எᝒ# 6# য┊# ㋒›⼺# ┊# ᠾᆮ⍞ဪ❖ᜒ# ㏫┎㋲ 7. Inspect the piston rings for wear carefully as
ၺ1# G09200 shown in fig. 3. G09200
# # # # # # # # # # # # # # ㋒›⼺# ┊# ᠾ# ▲㋲⯮ᜒ# ⪞㋮⎖ਆฮ# ㋒ If piston rings exceed the wear limit
›⼺# ⍦# ᯚ▫ṗ▗┎# 㓷❧┊# ┞ၺ᠊/# Ṟ# ᬖ㈞ⓒᗲ# ૦⩊㋮₃ and/or if the piston has any abnormal mark, then
⎺1# replace by new one.
:1 ㋒›⼺# ⱺົ゛# ᗲቲ# Ṻ㊚ぎ# ┒⩊ᜒ# ⍪❚⍦# ╂㋲ 8. Mount the piston together with connecting rod
ၺ1# shaft into the engine.
+# # # # # M31000
# # # # # # # # # ⓮# “㋒›⼺# ⱺົ゛# ᗲቲᜒ# ⁺ᝆც# (See “Mounting of a piston and connecting rod into
ᔒ┊ພ⍦# ☆ᝓ# ”# ᬖᬚⓚ# ⧎☆㋮₃⎺1,# the cylinder liner” in M31000 )
G
G
Fig.3 The maximum vertical clearance of piston rings +㋒›⼺# ⓮# ⫲႖# ᾮ❗# ぞṞ,#
G
HYUNDAI HEAVY INDUSTRIES CO., LTD.G G G G G Engine & Machinery Division 08.11/PMUG
Page
H25/33 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
피스톤 어셈블리 조립도 및 부품 리스트
C31100 1B
111 110
151
152
153
112 116
113
120
114
130
C32000
Part List
Weight
Item No. Description Q’ty / Cyl. Remarks / See Note
(kg)
114 Bolt 4
116 O-ring 1
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 1C
Fig.1 Dismantling the circlips for piston pin (피스톤 핀 서클립의 분해)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 1C
7. 연소중 눌어 붙은 카본 퇴적물을 피스톤과 피스톤 7. Remove burned carbon deposits from piston and
링 홈에서 제거한 후, 모든 부품들을 깨끗이 닦아낸 piston ring grooves, and clean all the parts
다. carefully.
8. 피스톤에 비정상적인 흠집이 있는 지를 자세히 검사 8. Inspect the piston for any abnormal marks
한다. carefully.
9. 피스톤 핀과 소단부 부시를 점검한다. 9. Inspect the piston pin and the small end bush.
( M32130 의 “ 소단부 부시의 분해/점검 ” (See “Small end bush overhaul” in M32130 )
부분을 참조하십시오.)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 1C
3. 볼트를 다시 풀고 난 후 30 Nm의 토크로 다시 조인 3. Loosen the bolt again, and tighten the bolt with a
다. torque of 30 Nm.
4. 추가적으로 60˚를 더 조인다. 4. Continue tighten the piston bolt by additional 60˚ .
볼트는 시험 토크 90 Nm를 적용하여 더 이 Make sure that the bolt is not rotated
상 조여지지 않아야 합니다. by application of test torque 90 Nm to tightening
direction .
볼트가 조금이라도 회전을 하면, 새로운 볼 If the bolts can turn any more, replace
트로 교체하십시오. by new one.
side.
2. 피스톤 핀용 서클립을 전용 플라이어를 사용하여 장 2. Mount circlips for piston pin by means of plier.
착한다.
플라이어 : 91.240 Plier : 91.240
3. 피스톤과 커넥팅 로드 샤프트를 크레인을 사용하여 3. Lift up the piston together with connecting rod
들어 올린다. shaft by means of a crane.
4. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 4. Mount piston rings into its grooves by means of
홈에 조립한다. the plier.
플라이어 : 91.250 Plier : 91.250
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 1C
5. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 5. Mount piston rings into its grooves by means of
홈에 조립한다. the plier.
플라이어 : 91.250 Plier : 91.250
피스톤 링의 한쪽 면에 새겨진 “top” 마크 “Top” mark of piston rings should be
를 확인한 후, 마크가 홈의 위쪽을 향하도록 해야 합니다. assembled in upper side of groove.
각 피스톤 링의 끝단 갭이 서로 120˚가 되 The end gap of each piston ring should
도록 배치시키십시오. be arranged in 120˚ in relation to each other.
6. 그림 3과 같이 피스톤 링이 마모되었는지를 확인한 6. Inspect the piston rings for wear carefully as
다. G09200 shown in fig. 3. G09200
피스톤 링이 마모 제한치를 초과하였거나 피 If piston rings exceed the wear limit
스톤 링에 비정상적인 흡집이 있다면, 새 부품으로 교체하십 and/or if the piston has any abnormal mark, then
시오. replace by new one.
7. 피스톤과 커넥팅 로드 샤프트 일체를 엔진에 탑재한 7. Mount the piston together with connecting rod
다. shaft into the engine.
( M31000 의 “ 피스톤과 커넥팅 로드를 실린 (See “Mounting of a piston and connecting rod into
더 라이너에 조립 ” 부분을 참조하십시오.) the cylinder liner” in M31000 )
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
피스톤 어셈블리 조립도 및 부품 리스트
C31100 2A
152
153
114
115
120
112
130
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 2B
Fig.1 Dismantling the circlips for piston pin (피스톤 핀 서클립의 분해)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.06/CJC
Page
H25/33 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 2B
7. 연소중 눌어 붙은 카본 퇴적물을 피스톤과 피스톤 7. Remove burned carbon deposits from piston and
링 홈에서 제거한 후, 모든 부품들을 깨끗이 닦아낸 piston ring grooves, and clean all the parts
다. carefully.
8. 피스톤에 비정상적인 흠집이 있는 지를 자세히 검사 8. Inspect the piston for any abnormal marks
한다. carefully.
9. 피스톤 핀과 소단부 부시를 점검한다. 9. Inspect the piston pin and the small end bush.
( M32130 의 “ 소단부 부시의 분해/점검 ” (See “Small end bush overhaul” in M32130 )
부분을 참조하십시오.)
Fig.2 Cross section of piston complete (피스톤 단면도) Fig.3 Caulking position (코오킹 위치)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.06/CJC
Page
H25/33 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 2B
3. 스터드의 나사산에 몰리코트 페이스트를 바르고 피 3. Coat thread of studs with molycote-paste and
스톤 스커트를 크라운에 조립한다. 와샤의 양면에도 assemble piston skirt to crown. Before assembling
몰리코트 페이스트를 도포하여 조립한다. washers, coat contact surface with molycote-paste.
4. 너트를 대각선 방향으로 1차: 30 Nm, 2차: 70 Nm의 4. Tighten the nuts with a torque of 1st: 30 Nm, 2nd:
토크로 조임 후 다시 풀고 스터드를 40 Nm의 토크 70 Nm, loosen the nuts again, and tighten the stud
로 다시 조여서 확인한다. bolt with a torque of 40 Nm for checking.
5. 너트를 30Nm 각각 체결한 후 추가적으로 60˚를 3 5. Continue tighten the nuts with a torque of 30 Nm
단계로 더 조인다. each by each and turn the nuts additional 60˚ with
너트의 시험 토크 90 Nm를 적용하여 더 이 3 step.
상 조여지지 않아야 합니다. Make sure that the nut is not rotated
너트가 조금이라도 회전을 하면, 새로운 스 by application of test torque 90 Nm to tightening
터드와 너트로 교체하십시오. direction .
6. 그림 3에 따라 정을 이용하여 너트면에 코오킹 작업 If the nuts can turn any more, replace
을 실시할 것. by new ones(stud & nut).
최종 코오킹후 에는 시험토크 점검을 6. Caulk the nut by using a chisel as shown in fig. 3.
하지말 것. Do not turn the nut again with test
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.06/CJC
Page
H25/33 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 2B
5. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 5. Mount piston rings into its grooves by means of
홈에 조립한다. the plier.
플라이어 : 91.250 Plier : 91.250
피스톤 링의 한쪽 면에 새겨진 “top” 마크 “Top” mark of piston rings should be
를 확인한 후, 마크가 홈의 위쪽을 향하도록 해야 합니다. assembled in upper side of groove.
각 피스톤 링의 끝단 갭이 서로 120˚가 되 The end gap of each piston ring should
도록 배치시키십시오. be arranged in 120˚ in relation to each other.
6. 그림 3과 같이 피스톤 링이 마모되었는지를 확인한 6. Inspect the piston rings for wear carefully as
다. G09200 shown in fig. 3. G09200
피스톤 링이 마모 제한치를 초과하였거나 피 If piston rings exceed the wear limit
스톤 링에 비정상적인 흡집이 있다면, 새 부품으로 교체하십 and/or if the piston has any abnormal mark, then
시오. replace by new one.
7. 피스톤과 커넥팅 로드 샤프트 일체를 엔진에 탑재한 7. Mount the piston together with connecting rod
다. shaft into the engine.
( M31000 의 “ 피스톤과 커넥팅 로드를 실린 (See “Mounting of a piston and connecting rod into
더 라이너에 조립 ” 부분을 참조하십시오.) the cylinder liner” in M31000 )
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.06/CJC
Page
H25/33 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
피스톤 어셈블리 조립도 및 부품 리스트
C31100 3A
152
153
114
115
120
112
130
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/CJC
Page
H25/33 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 3B
Fig.1 Dismantling the circlips for piston pin (피스톤 핀 서클립의 분해)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 14.01/YTY
Page
H25/33 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 3B
7. 연소중 눌어 붙은 카본 퇴적물을 피스톤과 피스톤 7. Remove burned carbon deposits from piston and
링 홈에서 제거한 후, 모든 부품들을 깨끗이 닦아낸 piston ring grooves, and clean all the parts
다. carefully.
8. 피스톤에 비정상적인 흠집이 있는 지를 자세히 검사 8. Inspect the piston for any abnormal marks
한다. carefully.
9. 피스톤 핀과 소단부 부시를 점검한다. 9. Inspect the piston pin and the small end bush.
( M32130 의 “ 소단부 부시의 분해/점검 ” (See “Small end bush overhaul” in M32130 )
부분을 참조하십시오.)
2. 체결부위(피스톤 크라운의 탭홀, 스터드 볼트)를 깨 2. Clean up stud bolts and tap holes in piston crown.
끗하게 세척한다. (스터드의 풀림방지제 제외) (Except stud fastener)
3. 스터드를 크라운 탭홀에 면접촉할 때까지 체결한다. 3. Tighten the stud to put into the crown until the stud
end is touched with the bottom of the tap hole.
스터드의 길이가 86.0 mm 이하이면 피스톤 If only the length of stud is less than
스터드를 재사용할 수 있습니다. 86.0 mm, reuse the piston stud.
스터드 체결 후 잔여 길이(A)는 65.2 mm Remained length (A) of stud after as-
를 초과할 수 없습니다. sembly cannot exceed 65.2mm.
Fig.2 Cross section of piston complete (피스톤 단면도) Fig.3 Remained length of stud (스터드 잔여길이)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 14.01/YTY
Page
H25/33 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 3B
4. 스터드의 나사산에 “몰리코트 페이스트 G-n plus or 4. Coat thread of studs with “Molycote-paste G-n
G-n”를 바르고 피스톤 스커트를 크라운에 조립한다. plus or G-n” and assemble piston skirt to crown.
와샤의 양면에도 몰리코트 페이스트를 도포하여 조 Before assembling washers, coat contact surface
립한다. with molycote-paste.
5. 너트를 대각선 방향으로 1차: 30 Nm, 2차: 70 Nm의 5. Tighten the nuts with a torque of 1st: 30 Nm, 2nd:
토크로 조임 후 다시 풀고 스터드를 40 Nm의 토크 70 Nm loosen the nuts again, and tighten the stud
로 다시 조여서 확인한다. bolt with a torque of 40 Nm for checking.
6. 너트를 1차: 30 Nm, 2차: 70 Nm 각각 체결한 후 추 6. Continue tighten the nuts with a torque of 1st: 30
가적으로 60˚를 3단계로 더 조인다. Nm, 2nd: 70 Nm each by each and turn the nuts
7. additional 60˚ with 3 step.
너트의 시험 토크 150 Nm를 적용하여 더 Make sure that the nut is not rotated
이상 조여지지 않아야 합니다. by application of test torque 150 Nm to tightening
direction .
너트가 조금이라도 회전을 하면, 새로운 스 If the nuts can turn any more, replace
터드, 너트, 노드락 와셔로 교체하십시오. by new ones (stud, nut & nordlock washer).
사용한 노드락 와셔는 폐기 처분되어야 하 Used nordlock washers to be scraped,
며, 재조립 시 신규 노드락 와셔가 적용되어야 합니다. and new ones should be applied during re-
assemblies.
스터드의 풀림방지제가 손상되었다면 새로 If the stud fastener was damaged,
운 스터드로 교체하십시오. replace by new stud with new fastener.
side.
2. 피스톤 핀용 서클립을 전용 플라이어를 사용하여 장 2. Mount circlips for piston pin by means of plier.
착한다.
플라이어 : 91.240 Plier : 91.240
3. 피스톤과 커넥팅 로드 샤프트를 크레인을 사용하여 3. Lift up the piston together with connecting rod
들어 올린다. shaft by means of a crane.
4. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 4. Mount piston rings into its grooves by means of
홈에 조립한다. the plier.
플라이어 : 91.250 Plier : 91.250
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 14.01/YTY
Page
H25/33 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 3B
5. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 5. Mount piston rings into its grooves by means of
홈에 조립한다. the plier.
플라이어 : 91.250 Plier : 91.250
피스톤 링의 한쪽 면에 새겨진 “top” 마크 “Top” mark of piston rings should be
를 확인한 후, 마크가 홈의 위쪽을 향하도록 해야 합니다. assembled in upper side of groove.
각 피스톤 링의 끝단 갭이 서로 120˚가 되 The end gap of each piston ring should
도록 배치시키십시오. be arranged in 120˚ in relation to each other.
6. 그림 4와 같이 피스톤 링이 마모되었는지를 확인한 6. Inspect the piston rings for wear carefully as
다. G09200 shown in fig. 4. G09200
피스톤 링이 마모 제한치를 초과하였거나 피 If piston rings exceed the wear limit
스톤 링에 비정상적인 흡집이 있다면, 새 부품으로 교체하십 and/or if the piston has any abnormal mark, then
시오. replace by new one.
7. 피스톤과 커넥팅 로드 샤프트 일체를 엔진에 탑재한 7. Mount the piston together with connecting rod
다. shaft into the engine.
( M31000 의 “ 피스톤과 커넥팅 로드를 실린 (See “Mounting of a piston and connecting rod into
더 라이너에 조립 ” 부분을 참조하십시오.) the cylinder liner” in M31000 )
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 14.01/YTY
Page
H25/33 1/1
Section No. Rev.
Piston Assembly Assembly Drawing & Part List
피스톤 어셈블리 조립도 및 부품 리스트
C31100 4A
152
153
114
112 130
120
M32000
Part List
Weight
Item No. Description Q’ty/Cyl. Remarks / See Note
(kg)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 07.08/HSR
Page
H25/33 1/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4A
Fig.1 Dismantling the circlips for piston pin (피스톤 핀 서클립의 분해)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/CJC
Page
H25/33 2/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4A
7. 연소중 눌어 붙은 카본 퇴적물을 피스톤과 피스톤 7. Remove burned carbon deposits from piston and
링 홈에서 제거한 후, 모든 부품들을 깨끗이 닦아낸 piston ring grooves, and clean all the parts
다. carefully.
8. 피스톤에 비정상적인 흠집이 있는 지를 자세히 검사 8. Inspect the piston for any abnormal marks
한다. carefully.
9. 피스톤 핀과 소단부 부시를 점검한다. 9. Inspect the piston pin and the small end bush.
( M32130 의 “ 소단부 부시의 분해/점검 ” (See “Small end bush overhaul” in M32130 )
부분을 참조하십시오.)
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/CJC
Page
H25/33 3/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4A
4. 피스톤 스커트를 크라운에 조립 후 노드락 와샤를 4. After assembling piston skirt to crown, put Nord lock
스커트에 조립한다. 볼트의 나사산과 볼트머리 자리 washers into skirt. Coat thread of bolt and contact
면에 몰리코트 페이스트를 바른 후 크라운에 조립하 surface of bolt head with “Molycote-paste G-n plus or
다. G-n”
5. 볼트를 그림 3의 순서에 따라 1st: 30 Nm, 2nd : 60 5. Tighten the bolts with a torque of 1st : 30 Nm,
Nm의 토크로 조임 후 다시 푼다. 2nd : 60 Nm as shown in fig. 3., loosen the bolts
again.
6. 볼트를 그림 3의 순서에 따라 50Nm 각각 체결한 후 6. Tighten the bolts with a torque of 50 Nm each as
추가적으로 90˚를 더 조인다. shown in fig. 3 and turn the bolts additional 90˚ .
최종 체결 각도는 90°±2°범위 내에 위 Final angle should be 90°±2°. Make
치 시켜야 합니다. 볼트는 시험 토크 160 Nm를 적용하여 sure that the bolt is not rotated by application of
더 이상 조여지지 않아야 합니다. test torque 160 Nm to tightening direction.
볼트가 조금이라도 회전을 하면, 새로운 볼 If the bolts can turn any more, replace
트와 노드락 와셔로 교체하십시오. by new ones(bolt and nordlock washer).
사용한 노드락 와셔는 폐기 처분되어야 하며, 재조립 시 신 Used nordlock washers to be scraped, and new
규 노드락 와셔가 적용되어야 합니다. ones should be applied during re-assemblies.
side.
2. 피스톤 핀용 서클립을 전용 플라이어를 사용하여 장 2. Mount circlips for piston pin by means of plier.
착한다.
플라이어 : 91.240 Plier : 91.240
3. 피스톤과 커넥팅 로드 샤프트를 크레인을 사용하여 3. Lift up the piston together with connecting rod
들어 올린다. shaft by means of a crane.
4. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 4. Mount piston rings into its grooves by means of
홈에 조립한다. the plier.
플라이어 : 91.250 Plier : 91.250
피스톤 링의 한쪽 면에 새겨진 “top” 마크 “Top” mark of piston rings should be
를 확인한 후, 마크가 홈의 위쪽을 향하도록 해야 합니다. assembled in upper side of groove.
각 피스톤 링의 끝단 갭이 서로 120˚가 되 The end gap of each piston ring should
도록 배치시키십시오. be arranged in 120˚ in relation to each other.
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/CJC
Page
H25/33 4/4
Section No. Rev.
Piston Assembly Maintenance Procedure
피스톤 어셈블리 정비점검 절차
M31100 4A
5. 피스톤 링을 전용 플라이어를 사용하여 피스톤 링 5. Mount piston rings into its grooves by means of the
홈에 조립한다. plier.
플라이어 : 91.250 Plier : 91.250
피스톤 링의 한쪽 면에 새겨진 “top” 마크 “Top” mark of piston rings should be
를 확인한 후, 마크가 홈의 위쪽을 향하도록 해야 합니다. assembled in upper side of groove.
각 피스톤 링의 끝단 갭이 서로 120˚가 되 The end gap of each piston ring should
도록 배치시키십시오. be arranged in 120˚ in relation to each other.
6. 그림 3과 같이 피스톤 링이 마모되었는지를 확인한 6. Inspect the piston rings for wear carefully as
다.
G09200 shown in fig. 3. G09200
피스톤 링이 마모 제한치를 초과하였거나 피 If piston rings exceed the wear limit
스톤 링에 비정상적인 흡집이 있다면, 새 부품으로 교체하십 and/or if the piston has any abnormal mark, then
시오. replace by new one.
7. 피스톤과 커넥팅 로드 샤프트 일체를 엔진에 탑재한 7. Mount the piston together with connecting rod
다. shaft into the engine.
( M31000 의 “ 피스톤과 커넥팅 로드를 실린 (See “Mounting of a piston and connecting rod into
더 라이너에 조립 ” 부분을 참조하십시오.) the cylinder liner” in M31000 )
HYUNDAI HEAVY INDUSTRIES CO., LTD. Engine & Machinery Division 08.08/CJC