0 evaluări0% au considerat acest document util (0 voturi)
15 vizualizări1 pagină
This document discusses a feasibility study for expanding the existing sewage treatment plant in Muharraq, Bahrain. It provides details on the project number, tender number, and that it relates to the financial proposal from January 2018. It also discusses a tender for consultancy services for post-contract engineering on the expansion of the Tubli STP, including the project number, tender number, and that it is the design report from January 2018.
This document discusses a feasibility study for expanding the existing sewage treatment plant in Muharraq, Bahrain. It provides details on the project number, tender number, and that it relates to the financial proposal from January 2018. It also discusses a tender for consultancy services for post-contract engineering on the expansion of the Tubli STP, including the project number, tender number, and that it is the design report from January 2018.
This document discusses a feasibility study for expanding the existing sewage treatment plant in Muharraq, Bahrain. It provides details on the project number, tender number, and that it relates to the financial proposal from January 2018. It also discusses a tender for consultancy services for post-contract engineering on the expansion of the Tubli STP, including the project number, tender number, and that it is the design report from January 2018.